CN103225348A - Concrete member fixing method and special fastener for same - Google Patents
Concrete member fixing method and special fastener for same Download PDFInfo
- Publication number
- CN103225348A CN103225348A CN2013101914570A CN201310191457A CN103225348A CN 103225348 A CN103225348 A CN 103225348A CN 2013101914570 A CN2013101914570 A CN 2013101914570A CN 201310191457 A CN201310191457 A CN 201310191457A CN 103225348 A CN103225348 A CN 103225348A
- Authority
- CN
- China
- Prior art keywords
- concrete component
- concrete
- securing member
- installing hole
- fixing means
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a concrete member fixing method. According to the method, at least one mounting hole meshed with a fastener is formed in each concrete member; the mounting holes penetrate through two side faces of the concrete members; the positions of the mounting holes of the adjacent concrete members correspond to each other; and at least one fastener respectively and sequentially penetrate through the mounting holes, so that the adjacent concrete members are fixed so as to form a concrete component. The concrete component is fixed by utilizing fixation between the fastener and the concrete member, so that the fixation among the concrete members is tight, and the structural integrity and the safety are enhanced. The invention also provides a special fastener for the concrete member fixing method. The fastener is a rod-shaped fastener. By adoption of the structure, the fastener is simple in structure and easy to process.
Description
Technical field
The present invention relates to a kind of fixing means of concrete component; The invention still further relates to a kind of special fastener of fixing means of concrete component.
Background technology
The mould that agrees with expection concrete component profile is at first made in the method processing that concrete component adopts mould to build more, is equipped with an amount of reinforcing bar in the mould, is steel concrete, and is main by having adhesion stress between the two, compatible deformation behind the load-bearing.Because concrete component has utilized reinforcing bar and concrete performance characteristics rational in infrastructurely, it is higher to form intensity, the structure that rigidity is bigger, its durability and fireproof performance are good, and normability is good, and Mechanical Builds is flexible, and globality, ductility are good, reduce own wt, be applicable to characteristics such as earthquake resistant structure, thereby in building structure and other civil engineerings, be used widely.
At present, normally connect between the concrete component, make good penetrability between the concrete component, but when being to use binding material to connect concrete component, usually the intensity of Lian Jieing is difficult to reach the standard of construction, and restricted to construction environment by binding material.
Summary of the invention
It is more fastening that technical problem to be solved by this invention provides a kind of connection, simple to operate, and construction environment is required the fixing means of low concrete component; Technical problem to be solved by this invention is the special fastener that a kind of fixing means of concrete component also is provided.
For solving the problems of the technologies described above, the invention provides a kind of special fastener of fixing means of concrete component, described securing member is shaft-like securing member.
After adopting such structure, fastener constructions is simple, and is easy to processing.
Below for more convenient understanding technology contents of the present invention, abbreviate the special fastener of the fixing means of concrete component as this securing member.
This securing member is a fastening bolt, and the fastening bolt two ends have screw thread respectively, two clamp nuts respectively with fastening bolt two ends threaded engagement; After adopting such structure, fastening bolt is fixing more firm by the two ends clamp nut, and for convenience detach.
The center line of the shaft-like securing member of this securing member is a circular arc line; After adopting such structure, improve the tensile strength of shaft-like securing member, and can the application-specific operation environment.
For solving the problems of the technologies described above, the present invention also provides a kind of fixing means of concrete component, may further comprise the steps:
A) after concrete component is built, be processed with the installing hole that at least one agrees with securing member in each concrete component, installing hole runs through two sides of concrete component;
B) some concrete component butt joints, the installing hole of concrete component is corresponding on the position, forms an installation passage that is enough to securing member is passed through, and at least one securing member passes described installation passage respectively successively, make concrete component fix, form concrete segment.
After adopting such method, securing member passes some concrete components, utilizes the toughness of the material of securing member own to connect concrete component, make between the concrete component fixing more tight, reinforcement globality and safety.
Below for more convenient understanding technology contents of the present invention, abbreviate the fixing means of concrete component as this method.
The securing member two ends are in the concrete segment outside respectively in the step b) of this method, and the securing member two ends are fixedly connected with banking stop, and the banking stop area is greater than the area of installing hole opening part.
After adopting such method, the banking stop area is greater than the area of installing hole opening part, and banking stop can not enter in the installing hole, when making concrete segment fixedly, banking stop is in the outside of concrete segment, utilizes securing member to cooperate with its two ends banking stop respectively, and the fixing concrete assembly is more firm.
The center line of the installing hole of this method is a circular arc line; After adopting such method, can shorten the length of securing member, more flexible when making the connection concrete component, reduce difficulty of construction.
Be embedded with spiral bar and U type muscle in the concrete component of this method, the installing hole in the step a) is in the spiral bar, and U type muscle is spiral bar fixedly.
After adopting such method, pre-buried spiral bar can play the effect of about beam core inner concrete in the concrete component, when installing hole need bear bigger pressure, to improve the bearing capacity of installing hole, improve the fragility of concrete component, U type muscle plays the fixedly effect of spiral bar.
Description of drawings
Fig. 1 is the front view of this fastener embodiment.
Fig. 2 is the part drawing of this method embodiment U type muscle.
Fig. 3 is a) sectional view of the first concrete component front view in the step of this method embodiment.
Fig. 4 is a) sectional view of step the second concrete component front view of this method embodiment.
Fig. 5 is the sectional view of this method embodiment user mode figure.
The specific embodiment
As shown in Figure 1, the special fastener of the fixing means of concrete component comprises zinc-base the fall fastening bolt 5 and the clamp nut 6 of chromate coating preservative treatment;
Fastening bolt 5 is a double threaded screw, and the center line of fastening bolt 5 is a circular arc line, and its radius of central line is 0.465m;
Two clamp nuts 6 respectively with fastening bolt 5 two ends threaded engagement.
When the first concrete component 1a builds shown in Fig. 2 to 4, in the casting die with concrete spouting to the first concrete component 1a, the end face of casting die has first projection, be fixed with the first installing hole sleeve pipe 2a in the casting die, spiral bar 8 and U type muscle 9, the diameter of the first installing hole sleeve pipe 2a is greater than the diameter of fastening bolt 5, the center line radian of the first installing hole sleeve pipe 2a agrees with the center line radian of fastening bolt 5, the first installing hole sleeve pipe 2a, one end stretches out outside the sidewall of casting die, the other end stretches out the first projection outside of the first concrete component 1a, spiral bar 8 is socketed in outside the first installing hole sleeve pipe 2a, and by the fixing spiral bar 8 of U type muscle 9, after the first concrete component 1a moulding, the corresponding position of first projection forms the first notch 3a, and 1/2nd of the length of fastening bolt 5 is in length in the first concrete component 1a greater than the first installing hole sleeve pipe 2a.
In like manner build the second concrete component 1b, when the second concrete component 1b builds, in the casting die with concrete spouting to the second concrete component 1b, the end face of casting die has second projection, be fixed with the second installing hole sleeve pipe 2b in the casting die, spiral bar 8 and U type muscle 9, the diameter of the second installing hole sleeve pipe 2b equals the diameter of the first installing hole sleeve pipe 2a, the center line radian of the second installing hole sleeve pipe 2b agrees with the center line radian of fastening bolt 5, the second installing hole sleeve pipe 2b, one end stretches out outside the sidewall of casting die, the other end stretches out the second projection outside of casting die, spiral bar 8 is socketed in outside the second installing hole sleeve pipe 2b, and by the fixing spiral bar 8 of U type muscle 9, after the second concrete component 1b moulding, the corresponding position of second projection forms the second notch 3b, 1/2nd of the length of fastening bolt 5 is in length in the second concrete component 1b greater than the second installing hole sleeve pipe 2b, and the second concrete component 1b is identical with the structure of the first concrete component 1a.
As shown in Figure 5, specifically explain the fixing means of implementing concrete component, may further comprise the steps below in conjunction with above-mentioned securing member:
A) after the second concrete component 1b and the first concrete component 1a moulding, the first installing hole sleeve pipe 2a is deviate from from the first concrete component 1a, form the first installing hole 4a, the second installing hole sleeve pipe 2b is deviate from from the second concrete component 1b, form the second installing hole 4b.
B) with the second concrete component 1b and the first concrete component 1a placed adjacent, corresponding on the second installing hole 4b position of the first installing hole 4a of the first concrete component 1a and the second concrete component 1b, the first installing hole 4a and the second installing hole 4b form one section installation passage (not shown) that seamlessly transits, it is the circular arc that agrees with fastening bolt 5 center lines that channel centerline is installed, fastening bolt 5 passes the first concrete component 1a and the second concrete component 1b respectively successively, the two ends of fastening bolt 5 are stretched out the second notch 3b outside of the second concrete component 1b and the first notch 3a outside of the first concrete component 1a respectively, again the first banking stop 7a and the second banking stop 7b are enclosed within fastening bolt 5 two ends respectively, and by clamp nut 6 lockings, make the second concrete component 1b closely be connected, constitute concrete segment with the first concrete component 1a.
The modularization simple to operate, that can be used for concrete component of this method is assembled, and the intensity that connects is greater than the connected mode between the concrete component that uses at present.
The first installing hole 4a and the second installing hole 4b can also directly process the first installing hole 4a and the second installing hole 4b with conventional meanses such as borings in the first concrete component 1a and the second concrete component 1b except processing with the first installing hole sleeve pipe 2a and the second installing hole sleeve pipe 2b demoulding.
Above-mentioned spiral bar of using 8 and U type muscle 9 all are the commercially available prod.
Above-described only is conventional embodiment of the present invention; should be understood that; for the person of ordinary skill of the art; under the prerequisite that does not break away from the principle of the invention; can also make some modification and improvement; these also should be considered as belonging to protection scope of the present invention; such as; the concrete component number that comprises in one group of concrete segment, fastening bolt be shaped as column or the like; and the present invention can the utilization scope be not limited to connect between two concrete components, and plural concrete component also can connect by said method.
Claims (7)
1. the special fastener of the fixing means of a concrete component, it is characterized in that: described securing member is shaft-like securing member.
2. the special fastener of the fixing means of concrete component according to claim 1, it is characterized in that: described shaft-like securing member is a fastening bolt, and the fastening bolt two ends have screw thread respectively, two clamp nuts respectively with fastening bolt two ends threaded engagement.
3. the special fastener of the fixing means of concrete component according to claim 1 and 2, it is characterized in that: the center line of described shaft-like securing member is a circular arc line.
4. the fixing means of concrete component may further comprise the steps:
A) after the concrete component moulding, be processed with the installing hole that at least one agrees with securing member in each concrete component, installing hole runs through two sides of concrete component;
B) some concrete component butt joints, the installing hole of concrete component is corresponding on the position, forms an installation passage that is enough to securing member is passed through, and at least one securing member passes described installation passage respectively successively, make concrete component fix, form concrete segment.
5. the fixing means of concrete component according to claim 4, it is characterized in that: the securing member two ends are in the concrete segment outside respectively in the described step b), the securing member two ends are fixedly connected with banking stop, and the banking stop area is greater than the area of installing hole opening part.
6. according to the fixing means of claim 4 or 5 described concrete components, it is characterized in that: the center line of described installing hole is a circular arc line.
7. the fixing means of concrete component according to claim 6, it is characterized in that: be embedded with spiral bar and U type muscle in the described concrete component, the installing hole in the step a) is in the spiral bar, and U type muscle is spiral bar fixedly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101914570A CN103225348A (en) | 2013-05-22 | 2013-05-22 | Concrete member fixing method and special fastener for same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101914570A CN103225348A (en) | 2013-05-22 | 2013-05-22 | Concrete member fixing method and special fastener for same |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103225348A true CN103225348A (en) | 2013-07-31 |
Family
ID=48835970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101914570A Pending CN103225348A (en) | 2013-05-22 | 2013-05-22 | Concrete member fixing method and special fastener for same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103225348A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930284A (en) * | 2018-06-05 | 2018-12-04 | 南京吉欧地下空间科技有限公司 | Assembled retaining wall structure and backfilling method |
CN113914146A (en) * | 2021-10-29 | 2022-01-11 | 同济大学 | Assembly type hollow pile plate structure roadbed joint structure |
CN113914147A (en) * | 2021-10-29 | 2022-01-11 | 同济大学 | Convex-shaped assembled pile plate structure roadbed joint structure |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201495454U (en) * | 2009-09-01 | 2010-06-02 | 中铁二院工程集团有限责任公司 | High-speed railway plate type ballastless track longitudinal connecting structure |
-
2013
- 2013-05-22 CN CN2013101914570A patent/CN103225348A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201495454U (en) * | 2009-09-01 | 2010-06-02 | 中铁二院工程集团有限责任公司 | High-speed railway plate type ballastless track longitudinal connecting structure |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930284A (en) * | 2018-06-05 | 2018-12-04 | 南京吉欧地下空间科技有限公司 | Assembled retaining wall structure and backfilling method |
CN108930284B (en) * | 2018-06-05 | 2023-09-12 | 南京吉欧地下空间科技有限公司 | Assembled retaining wall structure and backfilling method |
CN113914146A (en) * | 2021-10-29 | 2022-01-11 | 同济大学 | Assembly type hollow pile plate structure roadbed joint structure |
CN113914147A (en) * | 2021-10-29 | 2022-01-11 | 同济大学 | Convex-shaped assembled pile plate structure roadbed joint structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2013201397B2 (en) | Wooden member assembly | |
CN102051964A (en) | Composite sleeve type steel bar connecting device | |
CN103225348A (en) | Concrete member fixing method and special fastener for same | |
CN103912288A (en) | High-bearing-capacity segment joint structure | |
CN103469967B (en) | Steel bar connecting sleeve of fabricated constructional member of reinforced concrete member | |
CN104032837A (en) | Design and construction for connection node between steel tube-reinforced concrete composite column and reinforced concrete beam | |
JP5671096B2 (en) | Junction structure | |
CN102366971A (en) | Stretching system for concrete tubular pile | |
JP4377927B2 (en) | Joint structure of wooden building components | |
US10961711B2 (en) | Reinforcement system and a method of reinforcing a structure with a tendon | |
CN105257664A (en) | Anti-loose fastener | |
CN205421915U (en) | A instrument formula ties for well small cross section concrete column template | |
US20120255243A1 (en) | Seismic coupler | |
CN203796280U (en) | Segment joint structure high in bearing capacity | |
CN102672821A (en) | Tensioning tool for simultaneously manufacturing prestressed concrete pipe piles | |
KR101360360B1 (en) | Form assembly easily installed distance maintenance implement | |
CN203403522U (en) | Special fastener used in fastening method of concrete components | |
JP2012046925A (en) | Joint structure of concrete member and joint method thereof | |
JP4221461B2 (en) | Steel pipe column structure | |
CN205591545U (en) | Instrument is consolidated to log template | |
JP2009299267A (en) | Structure and method for joining precast concrete structural members together | |
JP2020190103A (en) | Precast concrete member joining method | |
CN112392202A (en) | Mechanical connection structure and connection method for prestressed reinforcement and non-prestressed reinforcement | |
JP2006090015A (en) | Construction method for curved section of tunnel | |
JP4381567B2 (en) | Joint structure of concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130731 |