CN103219674B - A kind of optical cable and the laying method of cable - Google Patents

A kind of optical cable and the laying method of cable Download PDF

Info

Publication number
CN103219674B
CN103219674B CN201310165312.3A CN201310165312A CN103219674B CN 103219674 B CN103219674 B CN 103219674B CN 201310165312 A CN201310165312 A CN 201310165312A CN 103219674 B CN103219674 B CN 103219674B
Authority
CN
China
Prior art keywords
cable
laying
draught line
adhesive tape
traction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310165312.3A
Other languages
Chinese (zh)
Other versions
CN103219674A (en
Inventor
杨永峰
李红超
董钦
王瑞刚
刘金好
王如刚
马政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INNER MONGOLIA ELECTRONIC TECHNOLOGY Co.,Ltd.
Xingtai Construction Group Co., Ltd
Original Assignee
INNER MONGOLIA XINGTAI ELECTRONIC TECHNOLOGY LLC
INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INNER MONGOLIA XINGTAI ELECTRONIC TECHNOLOGY LLC, INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd filed Critical INNER MONGOLIA XINGTAI ELECTRONIC TECHNOLOGY LLC
Priority to CN201310165312.3A priority Critical patent/CN103219674B/en
Publication of CN103219674A publication Critical patent/CN103219674A/en
Application granted granted Critical
Publication of CN103219674B publication Critical patent/CN103219674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Light Guides In General And Applications Therefor (AREA)

Abstract

The present invention relates to the laying method of a kind of optical cable and cable, including step: laying of horizontal distribution and laying of vertical main line, specifically include laying of horizontal distribution: 1) draught line is penetrated spool;2) traction horizontal cable.Laying of vertical main line: 1), the laying of big pair count cable;Laying of optical cable.The present invention has the advantages such as economic benefit is prominent, practical, applied widely.

Description

A kind of optical cable and the laying method of cable
Technical field
The present invention relates to construction and decoration field, especially, relate to building field optical cable, the laying of cable.
Background technology
As the Administration office building of modernization, while having spaciousness, Comfort housing space, also should be the information facility system that clerical workforce provides perfect, information-based application system, in order to build efficient, convenient, environmental protection, healthy architectural environment.At the information network that scale in building is the hugest, the separate and incompatible wiring system of tradition cannot meet use demand, and there is structuring, modular comprehensive wiring system is arisen at the historic moment.
The invention provides the laying method of a kind of optical cable and cable,
Its cable lays general provisions:
Cable lays must be complete in constructions such as its spool routeing, crane span structures, and can carry out after acceptance(check).Cable to the spool mouth of pipe, the section of crane span structure and may be caused injury region to carry out protective treatment before laying in cabling processes by cable;It is then determined that cable is laid to each end again in the position that cable disc, line case are placed.
Including step: laying of horizontal distribution and laying of vertical main line.
Specifically include:
Laying of horizontal distribution:
1, draught line is penetrated spool.The steel wire that draught line selects rigidity, toughness is moderate, and during construction, traction the end of a thread pliers is curved rounded diamond shape, short diagonal length L is not more than 2/3 (see the accompanying drawing 1) of spool internal diameter D.When draught line the end of a thread arrives spool turning or is obstructed, stir in rear end around action, make traction the end of a thread be rotationally advancing in managing online, draught line can be allowed to pass through turning.
2, traction horizontal cable.When laying in spool, if cable is directly banded together by unit cable with draught line electrical adhesive tape;If multi-cable draws together, the most first the termination of cable neat electrical adhesive tape are bundled into a branch of, binding distance about 50mm~100mm, then catches at cable binding with draught line, more smooth to draught line and bunch of cables is banded together with electrical adhesive tape;Last at the uniform velocity dragline lead terminal, by cable laying in pipe.When laying in horizontal crane span structure, first multi-cable head neat electrical adhesive tape are bundled into a branch of, then tie up once every 0.5m~1m, tie up 3~4 times, tie up length 2m~3m;Then at every 3m~5m of crane span structure straightway and at turning, threeway, distribution workmen wears power transmission cable in crane span structure.
Laying of vertical main line:
1, the laying of big pair count cable, is used the form of construction work of " downward lowering ", big pair count cable dish is both positioned over telecommunication closet or the equipment room of higher level, is laid downwards by vertical crane span structure.In laid processes, first by supporter, cable disk is erected, then drawn downwards by fixed pulley and lay (see figure accompanying drawing 2).So lay, it is ensured that cable does not produce knob in laid processes and rolls up the phenomenon looped, and effectively prevents cable from being dragged, rubs, scrapes, grinds equivalent damage, thus improves cable laying quality, reduces hidden danger.
2, the laying of optical cable, the same form of construction work using " downward lowering ", due to the particularity of the material of optical cable own, so its bending radius, pull strength etc. all have to comply with the regulation of corresponding product, when laying, answer SC, careful.When institute's laying optical cable needs to bear relatively large traction, carry out drawing (the yellow silk thread in cable outer sheath) by aramid fiber yarn, concrete grammar is as follows: first peelled off by the oversheath ring cutting of optical cable termination about 0.5m, then optical fiber is separated with aramid fiber yarn, fiber section excision is removed, with electrical adhesive tape, root parcel is wound up after aramid fiber yarn part is twisted, then aramid fiber yarn is fastened with pull rope.Drawn by aramid fiber yarn, can reach product nominal maximum tension, the loss caused in distraction procedure can be avoided, thus improve the laying quality of optical cable.
Other business
1, the mark of cable.Cable lays paper of should labelling at 200mm~300mm of cable two ends in the past, is then wrapped by label paper with adhesive tape.The printed coding of label paper should uniform format, ink marks clear, it is possible to reflect that the information such as the purposes of this cable, position and numbering, such as " A-F5-TP-37 " represent No. 37 voice link of Building A five floor.
2, the maximum drawbar pull of cable.Cable is in distraction procedure, and pull strength should be less than cable and allows the 80% of tension force, when pull strength exceedes permission tension force, it is likely to result in irreversible damage, causing transmission performance to decline, when cable producer does not provide the ultimate value of cable pull strength, ordinary circumstance is as follows:
Single 4 core inside cables, maximum drawbar pull is 450N;
Single 6 core inside cables, maximum drawbar pull is 560N;
Single 12 core inside cables, maximum drawbar pull is 675N;
Single 4 pairs of UTP cables, maximum drawbar pull is 100N;
N root 4 is to UTP cable, and maximum drawbar pull is n × 50+50N.
Additionally, many 4 pairs of UTP cables, maximum drawbar pull not can exceed that 400N.
3, the minimum bending radius of cable.Cable is in laid processes, the bending radius of cable affects the quality of wiring equally, when cable bend radius is less than ultimate value, it may appear that the fibre core fracture of optical cable, the hidden danger such as the electric property reduction of cable, the ultimate value according to each cable bend radius of existing national regulation is as follows:
2 cores or 4 core optical cables, bending radius is more than 25mm;
Other core number and backbone optical cables, minimum bending radius is 10 times of cable outer diameter;
4 pairs of UTP cables, minimum bending radius is 4 times of the outside diameter of cable;
4 pairs of FTP cables, minimum bending radius is 8 times of the outside diameter of cable;
Big logarithm main cable, minimum bending radius is 10 times of the outside diameter of cable.
Additionally, when cable uses crane span structure to lay, in it, the bending radius of this cable is more than 300mm.
4, cable is reserved.Cable laid after in working area, telecommunication closet and equipment room leave surplus, to adapt to terminating, to detect and change.When requiring without design, ordinary circumstance is as follows:
Cable is reserved as 0.05m in working area;
Cable is reserved as 2m at telecommunication closet;
Cable is reserved as 3.5m at equipment room;
Reel stays, and length in reserve is 4.5m.
Additionally, cable also should do at crane span structure turning, the place of registering one's residence, building deformation joint etc. suitable reserved.
5, cable tie up fixing.Cable is distinguished the type of line, purposes etc. crane span structure planted agent and is carried out tying up fixing.Tie up fixing requirement as follows:
Every 2m~3m of cable horizontal segment carries out one-step bundling to be fixed;
Every 1m~1.5m of cable vertical section carries out one-step bundling to be fixed;
Cable turnover crane span structure position, turning carry out tying up fixing.
In addition tying up of cable selects professional nylon cable tie, and ties up unsuitable tension, not make cable deformation be as the criterion.
The laying method of optical, electrical cable of the present invention uses unified Wiring technique and interface standard, selects the wire rod of same type, makes the basis wiring of each intellectualizing system in building be mutually redundant, allows the extending capacity reformation of each system become more flexible and convenient.
Economic benefit highlights: uses the method, relatively conventional construction method can reduce spool amount about 12.1% according to statistics, reduces wire rod amount about 9.5%, reduces labour cost about 10.4%.
Practical: the method combines the construction experience of enterprise's long term accumulation according to current specifications and standard, system flow is clear, easy and simple to handle, and workmen can be made quickly to grasp.
Applied widely: this engineering method is not only applicable to Administration office building, and to most office, business, the comprehensive wiring of cultural building, has universal directive significance.
The method is applicable to Administration office building and has the Generic Cabling System of Construct of office building of similar demands.
Accompanying drawing explanation
Accompanying drawing 1 shows a kind of traction the end of a thread schematic diagram.
Accompanying drawing 2 shows that a kind of main line " downward lowering " formula lays schematic diagram.
Cable disc 1, fixed pulley 2, steel wire traction line 3, support base 4, link up with 5.
Detailed description of the invention
Example 1:
Laying of horizontal distribution:
1) draught line is penetrated spool: the steel wire that draught line selects rigidity, toughness is moderate, and during construction, traction the end of a thread pliers is curved rounded diamond shape, short diagonal length L is not more than the 2/3 of spool internal diameter D, when draught line the end of a thread arrives spool turning or is obstructed, stir in rear end around action, make traction the end of a thread be rotationally advancing in managing online, allow draught line pass through turning;
2) traction horizontal cable: when laying in spool, if multi-cable is drawn together, first the termination of cable neat electrical adhesive tape are bundled into a branch of, binding distance about 75mm, then catch at cable binding with draught line, then with electrical adhesive tape, the most smooth to draught line and bunch of cables is banded together;Last at the uniform velocity dragline lead terminal, by cable laying in pipe;
Laying of vertical main line:
1), the laying of big pair count cable, use the form of construction work of " downward lowering ", both big pair count cable dish be positioned over telecommunication closet or the equipment room of higher level, laid downwards by vertical crane span structure.In laid processes, first by supporter, cable disk is erected, then drawn downwards by fixed pulley and lay;
2), the laying of optical cable, the same form of construction work using " downward lowering ", when institute's laying optical cable needs to bear relatively large traction, drawn by aramid fiber yarn, concrete grammar is as follows: is first peelled off by the oversheath ring cutting of optical cable termination about 0.5m, is then separated with aramid fiber yarn by optical fiber, and fiber section excision is removed, with electrical adhesive tape, root parcel is wound up after aramid fiber yarn part is twisted, then aramid fiber yarn is fastened with pull rope.
Embodiment 2
Laying of horizontal distribution:
1) draught line penetrating spool: the steel wire that draught line selects rigidity, toughness is moderate, and during construction, traction the end of a thread pliers is curved rounded diamond shape, short diagonal length L is not more than the 2/3 of spool internal diameter D;
2) traction horizontal cable: lay in horizontal crane span structure, is first bundled into a branch of by multi-cable head neat electrical adhesive tape, then ties up once every 0.5m, tie up 4 times, tie up length 3m;Then at the every 3m of crane span structure straightway and at turning, threeway, distribution workmen wears power transmission cable in crane span structure;
Laying of vertical main line
1), the laying of big pair count cable, use the form of construction work of " downward lowering ", both big pair count cable dish be positioned over telecommunication closet or the equipment room of higher level, laid downwards by vertical crane span structure.In laid processes, first by supporter, cable disk is erected, then drawn downwards by fixed pulley and lay;
2), the laying of optical cable, the same form of construction work using " downward lowering ", institute's laying optical cable bears relatively large traction, drawn by aramid fiber yarn, concrete grammar is as follows: is first peelled off by the oversheath ring cutting of optical cable termination about 0.5m, is then separated with aramid fiber yarn by optical fiber, and fiber section excision is removed, with electrical adhesive tape, root parcel is wound up after aramid fiber yarn part is twisted, then aramid fiber yarn is fastened with pull rope.

Claims (1)

1. optical cable and a laying method for cable, including step: laying of horizontal distribution and laying of vertical main line, it is characterised in that:
Laying of horizontal distribution:
1) draught line is penetrated spool: the steel wire that draught line selects rigidity, toughness is moderate, and during construction, traction the end of a thread pliers is curved rounded diamond shape, short diagonal length L is not more than the 2/3 of spool internal diameter D, when draught line the end of a thread arrives spool turning or is obstructed, stir in rear end around action, make traction the end of a thread be rotationally advancing in managing online, draught line can be allowed to pass through turning;
2) traction horizontal cable: when laying in spool, if cable is directly banded together by unit cable with draught line electrical adhesive tape;If multi-cable draws together, the most first the termination of cable neat electrical adhesive tape are bundled into a branch of, binding distance 50mm~100mm, then catch at cable binding with draught line, more smooth to draught line and bunch of cables banded together with electrical adhesive tape;Last at the uniform velocity dragline lead terminal, by cable laying in pipe, when laying in horizontal crane span structure, is first bundled into a branch of by multi-cable head neat electrical adhesive tape, then ties up once every 0.5m~1m, tie up 3~4 times, tie up length 2m~3m;Then at every 3m~5m of crane span structure straightway and at turning, threeway, distribution workmen wears power transmission cable in crane span structure;
Laying of vertical main line:
1), the laying of big pair count cable, use the form of construction work of " downward lowering ", both big pair count cable dish had been positioned over telecommunication closet or the equipment room of higher level, laid downwards by vertical crane span structure, in laid processes, first by supporter, cable disk is erected, then drawn downwards by fixed pulley and lay;
2), the laying of optical cable, the same form of construction work using " downward lowering ", when institute's laying optical cable needs to bear relatively large traction, drawn by aramid fiber yarn, concrete grammar is as follows: is first peelled off by the oversheath ring cutting of optical cable termination about 0.5m, is then separated with aramid fiber yarn by optical fiber, and fiber section excision is removed, with electrical adhesive tape, root parcel is wound up after aramid fiber yarn part is twisted, then aramid fiber yarn is fastened with pull rope.
CN201310165312.3A 2013-05-08 2013-05-08 A kind of optical cable and the laying method of cable Active CN103219674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310165312.3A CN103219674B (en) 2013-05-08 2013-05-08 A kind of optical cable and the laying method of cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310165312.3A CN103219674B (en) 2013-05-08 2013-05-08 A kind of optical cable and the laying method of cable

Publications (2)

Publication Number Publication Date
CN103219674A CN103219674A (en) 2013-07-24
CN103219674B true CN103219674B (en) 2016-08-03

Family

ID=48817261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310165312.3A Active CN103219674B (en) 2013-05-08 2013-05-08 A kind of optical cable and the laying method of cable

Country Status (1)

Country Link
CN (1) CN103219674B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104517550A (en) * 2013-09-30 2015-04-15 中铁六局集团有限公司 Subway passenger information system construction method
CN105417296B (en) * 2015-12-03 2017-08-29 青岛华凯海洋科技有限公司 A kind of safe draw off gear of hawser and hawser lay recovery method
CN107765385A (en) * 2016-09-06 2018-03-06 北京新创迪克系统集成技术有限公司 A kind of light current cable laying method
CN108957670A (en) * 2017-05-19 2018-12-07 浙江浙天通信工程有限公司 A kind of working procedure of lightguide cable link
CN109256724B (en) * 2018-09-27 2020-09-01 中冶建工集团有限公司 Wall electric concealed pipe threading method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101728790A (en) * 2009-12-29 2010-06-09 广东省工业设备安装公司 Method for laying vertical cables for extra-high building
CN102570353A (en) * 2011-12-01 2012-07-11 河南科技大学 Construction method for piping and wiring by using chemical fibers

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004246176A (en) * 2003-02-14 2004-09-02 Fujikura Ltd Cord for traction, cord insertion method and method for air pressure feeding of cable
JP2010213421A (en) * 2009-03-09 2010-09-24 Kansai Electric Power Co Inc:The Method for removing insulating layer in cable

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101728790A (en) * 2009-12-29 2010-06-09 广东省工业设备安装公司 Method for laying vertical cables for extra-high building
CN102570353A (en) * 2011-12-01 2012-07-11 河南科技大学 Construction method for piping and wiring by using chemical fibers

Also Published As

Publication number Publication date
CN103219674A (en) 2013-07-24

Similar Documents

Publication Publication Date Title
CN103219674B (en) A kind of optical cable and the laying method of cable
US11029477B2 (en) Optical fiber cable
CN104570251A (en) All-dielectric large-core-number high-density micro pipeline wiring cable and manufacturing method thereof
JP5914408B2 (en) Fiber optic cable
BRPI1007442A2 (en) fiber optic cable and method of laying it
CN212111900U (en) Indoor and outdoor laid leading-in optical cable
JP2011015585A (en) Device and method for installing new cable
TW200900772A (en) Optical cable
CN203838384U (en) Self-supporting optical cable
CN212111901U (en) 8-shaped cable with protection device
CN211955926U (en) Highway prevents ant type micro cable
JP2004069939A (en) Optical fiber cable
JP2004125914A (en) Multiple optical fiber drop cable and wiring method using the cable
CN207020355U (en) A kind of font self-support cable of half dry type non-stop layer reinforcer formula 8
CN201796652U (en) Photoelectric composite cable
CN201444206U (en) Ellipsoidal optical fiber suitable for fiber to the home
CN104749725A (en) Novel layer-stranded optical cable
CN217007802U (en) OPGW optical cable with soft covering structure
CN217846721U (en) Self-supporting mixed optical fiber ribbon branch optical cable
JP2001215374A (en) Optical cable and method for pulling down cable
JP4881837B2 (en) Optical fiber cable and information wiring system
CN210488074U (en) Weather-resistant rural home-entry leading-in optical cable
JPS6361207A (en) Formation of optical fiber cable line
JP2010060724A (en) Optical fiber cable and information wiring system
CN211180319U (en) Beam tube type self-supporting optical cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 017010 the Inner Mongolia Autonomous Region Ordos Ulan New District of Kangbashi City, the South Bank of the Mulun River Xingtai Business Plaza (CBD) T4 tower room 2207

Patentee after: INNER MONGOLIA XINGTAI CONSTRUCTION GROUP CO., LTD.

Patentee after: Inner Mongolia Electronic Technology Co., Ltd.

Address before: The Inner Mongolia Autonomous Region city Dongsheng District 017000 Erdos ejinhuro Street No. 7 Room 308

Patentee before: Inner Mongolia Xingtai Construction Co., Ltd.

Patentee before: Inner Mongolia Xingtai Electronic Technology Limited Liability Company

CP03 Change of name, title or address

Address after: The Inner Mongolia Autonomous Region city Dongsheng District 017000 Ordos ejinhuro Street No. 7

Co-patentee after: INNER MONGOLIA ELECTRONIC TECHNOLOGY Co.,Ltd.

Patentee after: Xingtai Construction Group Co., Ltd

Address before: 017010 the Inner Mongolia Autonomous Region Ordos Ulan New District of Kangbashi City, the South Bank of the Mulun River Xingtai Business Plaza (CBD) T4 tower room 2207

Co-patentee before: INNER MONGOLIA ELECTRONIC TECHNOLOGY Co.,Ltd.

Patentee before: INNER MONGOLIA XINGTAI CONSTRUCTION GROUP Co.,Ltd.

CP03 Change of name, title or address