CN103216092A - Method and device of loading and unloading construction materials - Google Patents
Method and device of loading and unloading construction materials Download PDFInfo
- Publication number
- CN103216092A CN103216092A CN2013101464988A CN201310146498A CN103216092A CN 103216092 A CN103216092 A CN 103216092A CN 2013101464988 A CN2013101464988 A CN 2013101464988A CN 201310146498 A CN201310146498 A CN 201310146498A CN 103216092 A CN103216092 A CN 103216092A
- Authority
- CN
- China
- Prior art keywords
- construction material
- material platform
- dolly
- platform
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a method and a device of loading and unloading construction materials. The method of loading and unloading the construction materials comprises the following steps of loading the construction materials on a construction material trolley, pushing the construction material trolley to a construction material platform and fixing the construction material trolley on the construction material platform, craning the construction material platform to a target floor and fixing one end of the construction material platform on floor boards, drawing the construction material trolley to the floor boards of the floor, pushing the construction material trolley into the construction material platform and fixing the construction material trolley on the construction material platform, and using a tower crane for craning the construction material platform on the ground. Construction devices of the method comprise the construction material platform and the construction material trolley. By the utilization of the technical scheme, loading and unloading of the construction materials are enabled to be adjusted in material unloading locations at any time along with the different distributed locations of the construction materials, the material unloading locations can also be changed at any time along with different working faces of other professional construction, and the material unloading locations are completely free of influences of working faces of all professional construction.
Description
Technical field
The present invention relates to a kind of construction techniques and equipment thereof, especially a kind of handling method of the material of constructing and equipment thereof.
Background technology
Traditional fixed construction material platform, the material platform of will constructing are encorbelmented and are fixed in construction floor edge, utilize crane gear such as the tower crane material of will construct to be promoted in the construction material platform, and the back utilizes and manually is transported in the floor of constructing.Because in high building structure construction, particularly in the super-high building structure construction, all kinds of pipe lengths are long, quantity is many, Heavy Weight, have a very wide distribution.The material transhipment if the traditional fixed construction material platform of employing is constructed, construction material platform need repeatedly be installed, dismantle, the construction material cycling often, waste time and energy, and it is longer that fixed construction material platform takies the floor scope of operation time, influences its construction speed thereby may take other professional construction scope of operations.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of construction material handling method, it can be along with the distributing position difference of construction material is adjusted discharge position at any time, can not influenced by each professional construction scope of operation along with other professional construction scope of operations require to change discharge position at any time yet.
To achieve these goals, the invention provides a kind of new construction material handling method, and the construction material handling equipment that uses in this method.
Technical scheme of the present invention comprises a kind of construction material handling method, and this method comprises: design one construction material platform; The material of will constructing is installed in a construction material dolly; The material dolly of will constructing is pushed into construction material platform and is fixed on the construction material platform; Lifting by crane described construction material platform is fixed on the floor to destination and with the one end; Construction material dolly is drawn to the floor of described floor;
The material dolly of will constructing pushes construction material platform and is fixed on the construction material platform; Utilize the tower crane material platform of will constructing to winch to ground.
The present invention further improves and is: described construction material platform comprises a movable extension, after described construction material platform is fixed on destination layer floor edge, docks and extends on the destination layer floor with the movable extension material platform of will constructing.
The present invention further improves and is: described construction material platform and described movable extension are provided with track, and construction material dolly is along described slide when the described construction material dolly of traction.
The present invention further improves and is: place the fixing construction of postive stop baffle material dolly when the described construction material platform of lifting before and after construction material dolly.
Technical scheme of the present invention also comprises a kind of construction material handling equipment, and this equipment comprises: a construction material platform, and described construction material platform is provided with first track and Heave Here; One construction material dolly, described construction material dolly is arranged on first track of described construction material platform.
The present invention further improves and is: described equipment also includes a movable extension, and described movable extension is provided with second track that cooperates described first track.
The present invention further improves and is: described construction material platform is provided with a plurality of Heave Heres, be provided with construction material platform around the described construction material platform and go along with sb. to guard him face, be provided with a construction material platform at the described construction material platform face of going along with sb. to guard him near the one side of building and go along with sb. to guard him door.
The present invention further improves and is: described construction material dolly bottom is provided with the wheel that cooperates with described first track and second track, is provided with construction material dolly in the both sides of described construction material dolly and goes along with sb. to guard him face.
The present invention further improves and is: described construction material dolly is provided with towing pad, and described construction material dolly is along described first track and second orbital motion during traction.
The present invention is owing to adopted technique scheme, make the loading and unloading of construction material to adjust discharge position at any time along with the distributing position difference of construction material, can not influenced by each professional construction scope of operation along with other professional construction scope of operations require to change discharge position at any time yet.
Description of drawings
Fig. 1 is the construct general illustration of material handling platform of the present invention
Fig. 2 is the construct elevation of material platform of the present invention
Fig. 3 is the construct lateral view of material platform of the present invention
Fig. 4 is the construct opposite side view of material platform of the present invention
Fig. 5 is the construct vertical view of movable extension of material platform of the present invention
Fig. 6 is the construct lateral view of material dolly of the present invention
Fig. 7 is the present invention construct material dolly and construction material platform joint portion partial enlarged drawing
Fig. 8 works the process that winches to destination for the present invention's material platform of will constructing
Fig. 9 draws process to destination for the present invention's material dolly of will constructing
Figure 10 is pushed into the process of construction material platform for the present invention's material dolly of will constructing
Figure 11 works the process that winches to order ground for the present invention's material platform of will constructing
The specific embodiment
Below in conjunction with the accompanying drawing illustrated embodiment the present invention is elaborated.
As shown in Figure 1, construction material handling apparatus of the present invention mainly comprises construction material platform 10 and construction material dolly 20.
As shown in Figure 2, the bottom of construction material platform 10 is construction material platform stress frames 11 of being made by the i iron welding.Construction material platform stress frame 11 is provided with the parallel rail beam of twice 12, and rail beam 12 is made by i iron, is welded on the construction material platform stressed 11.On rail beam 12, be welded with by reinforcing bar and make first track 13.On construction material platform stress frame 11, lay and weld the construction material platform operations face of making by steel plate 14.Omitted the face of going along with sb. to guard him 18 of construction material platform 10 among Fig. 2.
As shown in Figure 3, construction material platform stress frame 11 both sides are welded with a plurality of hangers 15, wherein the hanger 15 near building is used for construction material platform is fixed on the destination layer floor, is distributed in the Heave Here of construction material platform hanger 15 all around as construction material platforms.At rail beam 12 fixed dam 16 of end welding away from building, this baffle plate and sideboard 17 engagement limits dollies moves in the lifting process of construction material platform 10.
As shown in Figure 4, around construction material platform 10, be welded with construction material platform and go along with sb. to guard him face 18.Be provided with a construction material platform in the side of material platform maintenance panel of constructing and go along with sb. to guard him door 19 near building.
As shown in Figure 5, the bottom of movable extension 101 is the extensions of being made by i iron, is welded with the track of being made by reinforcing bar 102 above movable extension 101.
As Fig. 6 and shown in, the bottom of construction material dolly 20 is dolly stress frames 21 of being made by steel work, respectively is welded with 3 wheels 22 in the both sides of dolly stress frame 21, is provided with towing pad 23 at an end of dolly stress frame 21.Be welded with construction material dolly in construction material dolly 20 both sides and go along with sb. to guard him face 24.
As shown in Figure 7, construction material dolly 20 is erected on first track 13 of construction material platform 10 by wheel 22.Traction construction material dolly 20, construction material dolly 20 will slide along first track 13.
Another aspect of the present invention, utilize said apparatus to realize that the method for the loading and unloading of construction material comprises:
The material of will constructing is installed in a construction material dolly 20, and binding is fixing;
The material dolly 20 of will constructing is placed postive stop baffle in material dolly 20 front and back after being pushed into construction material platform 10, and construction material dolly is fixed in the process of lifting on first track 13 of construction material platform 10;
Lifting construction material platform 10 is to destination layer floor next door as shown in Figure 8, is fixed on the edge of destination layer floor by will construct two Heave Heres 15 of material platform 10 close buildings of wire rope then.After fixing construction material platform 10, movable extension 19 is connected to construction material platform 10, first track 13 on the construction material platform 10 and second track 192 on the movable extension 19 are combined together the orbit as construction material dolly 20, and the material dolly 20 of will constructing as shown in Figure 9 then is drawn on the movable extension 19 that is positioned on the destination layer floor from construction material platform 10;
After construction material on the construction material dolly 20 was unloaded to the destination layer floor, the material dolly of will construct as shown in figure 10 pushed back to construction material platform 10, and then the front and back placement postive stop baffle of construction material dolly;
Below embodiment has been described in detail the present invention in conjunction with the accompanying drawings, and those skilled in the art can make the many variations example to the present invention according to the above description.Thereby some details among the embodiment should not constitute limitation of the invention, and the scope that the present invention will define with appended claims is as protection scope of the present invention.
Claims (9)
1. construction material handling method is characterized in that may further comprise the steps:
Design one construction material platform;
The material of will constructing is installed in a construction material dolly;
The material dolly of will constructing is pushed into construction material platform and is fixed on the construction material platform;
Lifting by crane described construction material platform is fixed on the floor to destination and with the one end;
Construction material dolly is drawn to the floor of described floor;
The material dolly of will constructing pushes construction material platform and is fixed on the construction material platform;
Utilize the tower crane material platform of will constructing to winch to ground.
2. the method for claim 1, it is characterized in that: described construction material platform comprises a movable extension, after described construction material platform is fixed on destination layer floor edge, extend on the destination layer floor with will the construct material platform butt joint of described movable extension.
3. the method for claim 1, it is characterized in that: described construction material platform and described movable extension are provided with track, and construction material dolly is along described slide when the described construction material dolly of traction.
4. the method for claim 1 is characterized in that: place the fixing construction of postive stop baffle material dolly when the described construction material platform of lifting before and after construction material dolly.
5. one kind is used for the construction material handling equipment of method according to claim 1, it is characterized in that described equipment comprises: a construction material platform, and described construction material platform is provided with first track and Heave Here; One construction material dolly, described construction material dolly is arranged on first track of described construction material platform.
6. construction material handling equipment as claimed in claim 5 is characterized in that described equipment also includes a movable extension, and described movable extension is provided with second track that cooperates described first track.
7. construction material handling equipment as claimed in claim 5, it is characterized in that described construction material platform is provided with a plurality of Heave Heres, be provided with construction material platform around the described construction material platform and go along with sb. to guard him face, be provided with a construction material platform at the described construction material platform face of going along with sb. to guard him near the one side of building and go along with sb. to guard him door.
8. construction material handling equipment as claimed in claim 5 is characterized in that described construction material dolly bottom is provided with the wheel that cooperates with described first track and second track, is provided with construction material dolly in the both sides of described construction material dolly and goes along with sb. to guard him face.
9. construction material handling equipment as claimed in claim 5 is characterized in that described construction material dolly is provided with towing pad, and described construction material dolly is along described first track and second orbital motion during traction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310146498.8A CN103216092B (en) | 2013-04-25 | 2013-04-25 | Construction material handling method and equipment thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310146498.8A CN103216092B (en) | 2013-04-25 | 2013-04-25 | Construction material handling method and equipment thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103216092A true CN103216092A (en) | 2013-07-24 |
CN103216092B CN103216092B (en) | 2016-01-20 |
Family
ID=48814212
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310146498.8A Active CN103216092B (en) | 2013-04-25 | 2013-04-25 | Construction material handling method and equipment thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103216092B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106854933A (en) * | 2015-12-08 | 2017-06-16 | 中交第公路工程局有限公司 | A kind of novel high-altitude large cantilever steel structure decoration is installed with mobile trolley used |
CN110747896A (en) * | 2019-10-12 | 2020-02-04 | 中建三局第一建设工程有限责任公司 | Automatic guiding walking device for movable formwork and method thereof |
CN111335655A (en) * | 2020-04-21 | 2020-06-26 | 中信国安建工集团有限公司 | Safe discharging platform for high-rise building and operation method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05346061A (en) * | 1992-06-16 | 1993-12-27 | Fujita Corp | Combination-storage-replacement method for construction work machine device |
JP2001227161A (en) * | 2000-02-16 | 2001-08-24 | Shimizu Corp | Construction method for a group of buildings |
CN2646325Y (en) * | 2003-09-18 | 2004-10-06 | 江苏金土木建设集团有限公司第七分公司 | Semi automatic safety door of headframe material gig floor platform for construction |
CN102635226A (en) * | 2012-05-04 | 2012-08-15 | 常州第一建筑集团有限公司 | Flexible hanging self-expansion operating platform and construction method |
CN102661033A (en) * | 2012-05-14 | 2012-09-12 | 佛山市南海保达建筑机械设备有限公司 | Drawer type building receiving platform |
CN202483180U (en) * | 2012-01-12 | 2012-10-10 | 佛山市南海保达建筑机械设备有限公司 | Movable building material loading and unloading platform |
CN203213622U (en) * | 2013-04-25 | 2013-09-25 | 中国建筑第八工程局有限公司 | Construction material handling equipment |
-
2013
- 2013-04-25 CN CN201310146498.8A patent/CN103216092B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05346061A (en) * | 1992-06-16 | 1993-12-27 | Fujita Corp | Combination-storage-replacement method for construction work machine device |
JP2001227161A (en) * | 2000-02-16 | 2001-08-24 | Shimizu Corp | Construction method for a group of buildings |
CN2646325Y (en) * | 2003-09-18 | 2004-10-06 | 江苏金土木建设集团有限公司第七分公司 | Semi automatic safety door of headframe material gig floor platform for construction |
CN202483180U (en) * | 2012-01-12 | 2012-10-10 | 佛山市南海保达建筑机械设备有限公司 | Movable building material loading and unloading platform |
CN102635226A (en) * | 2012-05-04 | 2012-08-15 | 常州第一建筑集团有限公司 | Flexible hanging self-expansion operating platform and construction method |
CN102661033A (en) * | 2012-05-14 | 2012-09-12 | 佛山市南海保达建筑机械设备有限公司 | Drawer type building receiving platform |
CN203213622U (en) * | 2013-04-25 | 2013-09-25 | 中国建筑第八工程局有限公司 | Construction material handling equipment |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106854933A (en) * | 2015-12-08 | 2017-06-16 | 中交第公路工程局有限公司 | A kind of novel high-altitude large cantilever steel structure decoration is installed with mobile trolley used |
CN110747896A (en) * | 2019-10-12 | 2020-02-04 | 中建三局第一建设工程有限责任公司 | Automatic guiding walking device for movable formwork and method thereof |
CN111335655A (en) * | 2020-04-21 | 2020-06-26 | 中信国安建工集团有限公司 | Safe discharging platform for high-rise building and operation method |
Also Published As
Publication number | Publication date |
---|---|
CN103216092B (en) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203213622U (en) | Construction material handling equipment | |
CN104060543A (en) | Installation device of prefabricated bridge deck | |
CN203247031U (en) | Hoisting device for curtain board transporting | |
CN103216092A (en) | Method and device of loading and unloading construction materials | |
CN102661033B (en) | Drawer type building receiving platform | |
CN202483180U (en) | Movable building material loading and unloading platform | |
CN206554524U (en) | A kind of construction discharging platform | |
CN103086276A (en) | Construction method for hoisting bridge type crane in high-rise well tower type building | |
CN106315407A (en) | Method for sliding dismounting of ultra-large type crane beam in narrow space | |
CN107313356A (en) | The fortune beam method that a kind of double-decker bridge is built | |
CN204282843U (en) | The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction | |
DE112014000114B4 (en) | Adjustable false floor of a large double-decker conveyor basket and adjustment and movement of the same | |
CN104294763B (en) | A kind of mobile formwork reinforced mesh transporter | |
CN204585194U (en) | A kind of floor discharge rack | |
CN207847118U (en) | A kind of safe and efficient discharging platform | |
CN105731268A (en) | Cargo transportation, hoisting and transferring device | |
CN207063484U (en) | Movable operating platform for corridor construction | |
CN105800472A (en) | Logistics transfer device | |
CN103287986A (en) | Curtain board transport lifting device and method for mounting curtain board by using device | |
CN103206076A (en) | Movable building loading and unloading platform and moving method | |
CN103498418B (en) | Device for shifting hanging basket assembly pieces and construction method | |
CN203960753U (en) | A kind of erecting device of prefabricated bridge | |
CN105752853B (en) | Port and pier cargo transportation device | |
CN204139067U (en) | A kind of mobile formwork reinforced mesh transporter | |
CN207792530U (en) | A kind of system for transporting prefabricated components in subway station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |