CN103213878A CN2013101578921A CN201310157892A CN103213878A CN 103213878 A CN103213878 A CN 103213878A CN 2013101578921 A CN2013101578921 A CN 2013101578921A CN 201310157892 A CN201310157892 A CN 201310157892A CN 103213878 A CN103213878 A CN 103213878A
Authority
CN
China
Prior art keywords
pipe
sub
plastics
support
sub pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101578921A
Other languages
Chinese (zh)
Other versions
CN103213878B (en
Inventor
殷鹏
苏漪
王亚东
秦翔
吴旌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communication Technology Co Ltd
Original Assignee
China Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communication Technology Co Ltd filed Critical China Communication Technology Co Ltd
Priority to CN201310157892.1A priority Critical patent/CN103213878B/en
Publication of CN103213878A publication Critical patent/CN103213878A/en
Application granted granted Critical
Publication of CN103213878B publication Critical patent/CN103213878B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a plastic sub pipe releasing machine. The plastic sub pipe releasing machine is composed of a sub pipe rotating core, a sub pipe fork, supports and a rotating shaft. The supports are arranged on the two sides of the sub pipe rotating core, and the sub pipe rotating core is fixed on the supports through the rotating shaft. The sub pipe rotating core is composed of a rotating piece, a connecting rod and a fork, a bolt of the rotating piece is a plus thread, a bolt of the fork is a left-hand thread, the connecting rod is rotated after the installation of the sub pipe rotating core is finished, and the distance between the rotating piece and the fork can be increased or shortened, and therefore sub pipe coils with different diameters and sizes are adapted conveniently. The supports comprise a left piece and a right piece, each piece of the supports is formed by welding three iron pipes of which two iron pipes are with an about 6-millimeter diameter and an about 120-millimeter length, and one iron pipe is with an about 100-millimeter length. The plastic sub pipe releasing machine is composed of the sub pipe rotating core, the sub pipe fork, the supports and the rotating shaft. The supports are fixed on the two sides of the sub pipe rotating core, the sub pipe rotating core is fixed on the supports through the rotating shaft, and sub pipes are laid through manual rotation.

Description

Pipeline construction is put the pipe device and is laid sub-pipe construction method and the sub-Guan Fangguan device of plastics
Technical field
The present invention relates to communication technical field, particularly a kind of pipeline construction is put the pipe device and is laid sub-pipe construction method and the sub-Guan Fangguan device of plastics.
Background technology
In the current pipeline construction link, son is managed cloth to be put in the pipeline, its method of operation is essentially manual type, especially in the urban construction field, measure operations such as sub-length of tube when laying, there is bigger potential safety hazard in operation, and is also very comparatively loaded down with trivial details, and measure also accurately inadequately, influenced pipeline construction progress and construction quality.And the present invention can address the above problem better.
Summary of the invention
The object of the invention is to provide a kind of pipeline construction to put the construction method that the pipe device lays sub-pipe, and this method has changed the method that generally lays of the sub-pipes of plastics, lays and changes sub-pipeloop into and erect and lay by putting ground.Ground lays Shi Ziguan and is easy to loop, and makes sub-tubular axis to stressed, directly makes son pipe flattening deformation not utilize use when serious.It is stressed even that setting lays the son pipe, do not exist sub-tubular axis to stressed, and sub-Guan Buhui flattens.The camp site sub-pipe speed that lays also is enhanced about more than once.
The technical solution adopted for the present invention to solve the technical problems is: the invention provides a kind of pipeline construction put the pipe device lay sub-pipe construction method, it comprises the steps:
The first step: safety facilities are set;
Second step: plastics pipe rotor is installed;
Son is managed rotor insert in the sub-pipeloop of plastics, pipe link is regulated in rotation combines closely three forks and the sub-pipeloop of plastics;
The 3rd step: vertical sub-pipeloop, erect and put pipe device support, penetrate turning cylinder;
The sub-pipe of the plastics that fixed is holded up, erected in child pipe both sides and put pipe device support, turning cylinder penetrates rotor earlier, passes the support of iron ring, and then there being the support of socket to hold up, with the plug insertion socket of turning cylinder;
The 4th step: check cable-laying device, extract sub-tube head out;
Put and confirm fixation through checking after pipe device integral erection finishes, an end of sub-pipe is extracted out from the top put to people's well lining;
The 5th step: in pipeline, normally lay the son pipe.
Wherein, also comprise in the above-mentioned first step with between second step:
(1) raise well lid, manhole (hand hole) well draws water;
(2) put people's well ladder;
(3) check whether safety of ground servant's well.
The object of the invention also is to provide a kind of pipeline construction that is used for to put the sub-Guan Fangguan device of plastics that the pipe device lays sub-pipe construction, this puts the pipe device changes core 1, son pipe fork 2, support 3 and turning cylinder 4 by the child pipe and forms, support 3 changes core 1 both sides at the child pipe, the son pipe changes core 1 and is fixed on the support 3 by turning cylinder 4, lays the son pipe by artificial rotation.The son pipe changes core 1 and is made up of tumbler 5, pipe link 6 and fork 7, the bolt of tumbler 5 is that the bolt of plus thread, fork 7 is a minus thread, after the son pipe changes core 1 installation, the bar 6 that is rotationally connected can make the distance between tumbler 5 and the fork 7 increase or shorten, so that adapt to the sub-pipeloop of the different sizes of diameter.About support 3 has two, every support is by about 6 centimetres of two diameters, long about 120 centimetres, and three iron pipes of one long about 100 centimetres are welded; Two one on supports have socket, and one has iron hoop, guarantee that turning cylinder 4 can not come off out in rotation process.Turning cylinder 4 is to be made by the steel pipe of about 6 centimetres of diameters, about 180 centimetres of length, is plug about 20 centimetres in the place of about 30 centimetres at distance turning cylinder 4 one ends length of welding, and plug is to be used for fixing turning cylinder 4.
Every cover of the present invention is put the pipe device can lay a root pipe separately, can lay four root pipes simultaneously in the bassoon of about 10 centimetres of diameters when quadruplet uses together.
Of the present invention to put the pipe device be to design according to the characteristics that sub-pipe lays, and its mentality of designing and departure point lay around sub-pipe and accomplish in work progress to improve operating efficiency and to workmen's protection.Technical index of putting the pipe device of the present invention is: 1, can continuously lay 1 to 4 root pipe, lay, colligation, cutting once finish.2, laying speed is about 10 meters per minutes of four pipes, about 60 meters per minutes of single tube.
Beneficial effect of the present invention:
1, simplifies construction procedure, shortened the engineering time;
2, be fit to the generally sub-pipeloop of the various sizes of use;
3, improve the safety in the work progress, and can not produce the situation that the bounce-back of son pipe is hurted sb.'s feelings;
4, lay and reclaim and can change at any time, comformability is strong;
5, the present invention does not have electrical components, and flammable explosive environments can directly set up use.
 
Description of drawings
Fig. 1 is the diagram of circuit of construction method of the present invention.
Fig. 2 is that son pipe of the present invention changes the cored structure scheme drawing.
Description of reference numerals: 5-tumbler; The 6-pipe link; The 7-fork.
Fig. 3 is a supporting structure scheme drawing of the present invention.
Fig. 4 is a rotation shaft structure scheme drawing of the present invention.
Fig. 5 is the sub-Guan Fangguan device of a plastics of the present invention structural representation.
Description of reference numerals: 1-pipe changes core; 2-manages fork; The 3-support; The 3-turning cylinder.
The specific embodiment
Below in conjunction with Figure of description the invention is described in further detail.
Embodiment one
In the present embodiment one, pipeline construction is put concrete steps that the pipe device lays sub-pipe construction method as shown in Figure 1, and its concrete implementation step is:
The first step: safety facilities are set;
Around people's well head safety facilities such as safe fence, red flag, safety mark board, safety warning light must be set,, guarantee safety so that causing pedestrian or vehicle notes.Special messenger's traffic that takes charge should be arranged simultaneously, should ask the traffic police to assist in case of necessity.
Second step: plastics pipe rotor is installed;
Son is managed rotor insert in the sub-pipeloop of plastics, pipe link is regulated in rotation combines closely three forks and the sub-pipeloop of plastics.
The 3rd step: vertical sub-pipeloop, erect and put pipe device support, penetrate turning cylinder;
The sub-pipe of the plastics that fixed is holded up, erected in child pipe both sides and put pipe device support, turning cylinder penetrates rotor earlier, passes the support of iron ring, and then there being the support of socket to hold up, with the plug insertion socket of turning cylinder.
The 4th step: check cable-laying device, extract sub-tube head out.
Put and confirm fixation through checking after pipe device integral erection finishes, an end of sub-pipe is extracted out from the top put to people's well lining.
The 5th step: in pipeline, normally lay the son pipe.
Wherein, also comprise in the above-mentioned first step with between second step:
(1) raise well lid, manhole (hand hole) well draws water;
(2) put people's well ladder;
(3) check whether safety of ground servant's well.
Lay the son pipe by normally laying sub-tube side method, when laying three to four root pipes at the same time, 3~4 meters usefulness 2.0 iron wire colligations tube bank at interval.
Embodiment two
Among Fig. 2, Fig. 3, Fig. 4 and the embodiment two shown in Figure 5, a kind of pipeline construction that is used for is put the sub-Guan Fangguan device of plastics that the pipe device lays sub-pipe construction, this puts the pipe device changes core 1, son pipe fork 2, support 3 and turning cylinder 4 by the child pipe and forms, support 3 changes core 1 both sides at the child pipe, the son pipe changes core 1 and is fixed on the support 3 by turning cylinder 4, lays the son pipe by artificial rotation.The son pipe changes core 1 and is made up of tumbler 5, pipe link 6 and fork 7, the bolt of tumbler 5 is that the bolt of plus thread, fork 7 is a minus thread, after the son pipe changes core 1 installation, the bar 6 that is rotationally connected can make the distance between tumbler 5 and the fork 7 increase or shorten, so that adapt to the sub-pipeloop of the different sizes of diameter.About support 3 has two, every support is by about 6 centimetres of two diameters, long about 120 centimetres, and three iron pipes of one long about 100 centimetres are welded; Two one on supports have socket, and one has iron hoop, guarantee that turning cylinder 4 can not come off out in rotation process.Turning cylinder 4 is to be made by the steel pipe of about 6 centimetres of diameters, about 180 centimetres of length, is plug about 20 centimetres in the place of about 30 centimetres at distance turning cylinder 4 one ends length of welding, and plug is to be used for fixing turning cylinder 4.
Every cover of the present invention is put the pipe device can lay a root pipe separately, can lay four root pipes simultaneously in the bassoon of about 10 centimetres of diameters when quadruplet uses together.
Of the present invention to put the pipe device be to design according to the characteristics that sub-pipe lays, and its mentality of designing and departure point lay around sub-pipe and accomplish in work progress to improve operating efficiency and to workmen's protection.Technical index of putting the pipe device of the present invention is: 1, can continuously lay 1 to 4 root pipe, lay, colligation, cutting once finish.2, laying speed is about 10 meters per minutes of four pipes, about 60 meters per minutes of single tube.
Around people's well head safety facilities such as safe fence, red flag, safety mark board, safety warning light must be set during use,, guarantee safety so that causing pedestrian or vehicle notes.Special messenger's traffic that takes charge should be arranged simultaneously, should ask the traffic police to assist in case of necessity.Son is managed rotor insert in the sub-pipeloop of plastics, pipe link is regulated in rotation combines closely three forks and the sub-pipeloop of plastics.The sub-pipe of the plastics that fixed is holded up, erected in child pipe both sides and put pipe device support, turning cylinder penetrates rotor earlier, passes the support of iron ring, and then there being the support of socket to hold up, with the plug insertion socket of turning cylinder.Put and confirm fixation through checking after pipe device integral erection finishes, an end of sub-pipe is extracted out from the top put to people's well lining.Lay the son pipe by normally laying sub-tube side method, when laying three to four root pipes at the same time, 3~4 meters usefulness 2.0 iron wire colligations tube bank at interval.

Claims (8)

1. a pipeline construction is put the pipe device and is laid sub-pipe construction method, it is characterized in that, comprises the steps:
The first step: safety facilities are set;
Second step: plastics pipe rotor is installed;
Son is managed rotor insert in the sub-pipeloop of plastics, pipe link is regulated in rotation combines closely three forks and the sub-pipeloop of plastics;
The 3rd step: vertical sub-pipeloop, erect and put pipe device support, penetrate turning cylinder;
The sub-pipe of the plastics that fixed is holded up, erected in child pipe both sides and put pipe device support, turning cylinder penetrates rotor earlier, passes the support of iron ring, and then there being the support of socket to hold up, with the plug insertion socket of turning cylinder;
The 4th step: check cable-laying device, extract sub-tube head out;
Put and confirm fixation through checking after pipe device integral erection finishes, an end of sub-pipe is extracted out from the top put to people's well lining;
The 5th step: in pipeline, normally lay the son pipe.
2. a kind of pipeline construction according to claim 1 is put the pipe device and is laid sub-pipe construction method, it is characterized in that: also comprise in the described first step with between second step:
(1) raise well lid, manhole (hand hole) well draws water;
(2) put people's well ladder;
(3) check whether safety of ground servant's well.
3. sub-Guan Fangguan device of plastics, it is characterized in that: the sub-Guan Fangguan device of these plastics changes core (1), son pipe fork (2), support (3) and turning cylinder (4) by the child pipe to be formed, and support (3) changes core (1) both sides at the child pipe, the son pipe changes core (1) and is fixed on the support (3) by turning cylinder (4); The son pipe changes core (1) to be made up of tumbler (5), pipe link (6) and fork (7), and the bolt of tumbler (5) is that the bolt of plus thread, fork (7) is a minus thread; About support (3) has two, two (3) one on supports have socket, and one has iron hoop; Turning cylinder (4) one end solder plug, plug fixed bias circuit (4).
4. the sub-Guan Fangguan device of a kind of plastics according to claim 3, it is characterized in that: after the son pipe changes core (1) installation, the bar (6) that is rotationally connected can make the distance between tumbler (5) and the fork (7) increase or shorten, to adapt to the sub-pipeloop of different-diameter size.
5. the sub-Guan Fangguan device of a kind of plastics according to claim 3 is characterized in that: every support (3) is by 6 centimetres of two diameters, 120 centimetres of length, and three iron pipes of one long 100 centimetres are welded.
6. the sub-Guan Fangguan device of a kind of plastics according to claim 3 is characterized in that: turning cylinder (4) is to be made by the steel pipe of 6 centimetres of diameters, 180 centimetres of length.
7. the sub-Guan Fangguan device of a kind of plastics according to claim 3 is characterized in that: place length of welding that turning cylinder (4) one ends are 30 centimetres is 20 centimetres plug.
8. the sub-Guan Fangguan device of a kind of plastics according to claim 3 is characterized in that: the sub-Guan Fangguan device of plastics is to lay the son pipe by artificial rotation.
CN201310157892.1A 2013-05-02 2013-05-02 Pipeline construction is put pipe device and is laid sub-pipe construction method Active CN103213878B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310157892.1A CN103213878B (en) 2013-05-02 2013-05-02 Pipeline construction is put pipe device and is laid sub-pipe construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310157892.1A CN103213878B (en) 2013-05-02 2013-05-02 Pipeline construction is put pipe device and is laid sub-pipe construction method

Publications (2)

Publication Number Publication Date
CN103213878A true CN103213878A (en) 2013-07-24
CN103213878B CN103213878B (en) 2016-06-22

Family

ID=48812118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310157892.1A Active CN103213878B (en) 2013-05-02 2013-05-02 Pipeline construction is put pipe device and is laid sub-pipe construction method

Country Status (1)

Country Link
CN (1) CN103213878B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111924641A (en) * 2020-08-10 2020-11-13 南京蔚特尔智能科技有限公司 Automatic paying-off device for laying communication pipelines

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5806787A (en) * 1997-09-04 1998-09-15 Schneider; Wayne A. Folding wire reel stand
CN2528753Y (en) * 2002-01-22 2003-01-01 湖南省永州市哈陵焊接器材有限责任公司 Wire paying-out reel
US7270293B1 (en) * 2005-03-23 2007-09-18 John Karoly Spindle support bracket
GB2450742A (en) * 2007-07-05 2009-01-07 Martin Paul Flack Cable reel support
CN203428644U (en) * 2013-05-02 2014-02-12 中邮建技术有限公司 Plastic sub pipe laying device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5806787A (en) * 1997-09-04 1998-09-15 Schneider; Wayne A. Folding wire reel stand
CN2528753Y (en) * 2002-01-22 2003-01-01 湖南省永州市哈陵焊接器材有限责任公司 Wire paying-out reel
US7270293B1 (en) * 2005-03-23 2007-09-18 John Karoly Spindle support bracket
GB2450742A (en) * 2007-07-05 2009-01-07 Martin Paul Flack Cable reel support
CN203428644U (en) * 2013-05-02 2014-02-12 中邮建技术有限公司 Plastic sub pipe laying device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111924641A (en) * 2020-08-10 2020-11-13 南京蔚特尔智能科技有限公司 Automatic paying-off device for laying communication pipelines

Also Published As

Publication number Publication date
CN103213878B (en) 2016-06-22

Similar Documents

Publication Publication Date Title
CN102605780B (en) Recyclable anchor rod for foundation pit support and construction method thereof
CN204277316U (en) The on-the-spot processing mold of a kind of circular steel reinforcement cage
CN104264670A (en) Porous electric heating recyclable anchorage device combined type component and construction method using same
CN202299573U (en) Concrete pole for erecting distribution lines
CN203428644U (en) Plastic sub pipe laying device
CN206112253U (en) Earth source heat pump ground pipe laying low tube device
CN103213878A (en) Pipeline construction pipe releasing machine laying sub pipe construction method and plastic sub pipe releasing machine
CN206474615U (en) A kind of circular frame trestle steel reinforcement cage system of processing
CN105350812A (en) Glass fiber reinforced plastic telegraph pole
CN204456862U (en) The fixing guard member of pre-embedded pipe in a kind of cast-in-situ floor
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN202543907U (en) Operating platform for concreting construction of cast-in-place pile or concrete-filled steel tube column
CN205314372U (en) Steel reinforcement cage protective layer cushion
CN203856225U (en) Assembled type stair section safety protection handrail system
CN210152382U (en) Steel pipe pole
CN203475418U (en) Support for assisting cast-in-place pile protective cylinder location
CN207001891U (en) Spiral wire terminal Winder
CN202390850U (en) Quick mounting structure for foundation of machine tool
CN206608209U (en) Draining blind pipe exports erecting device on a kind of tunnel inside lining abutment wall
CN206495649U (en) The disconnected bar of threaded connection rod member takes lever apparatus
CN208167780U (en) A kind of foundation bolt mounting device
CN211285571U (en) Asymmetric screw sleeve connecting device for main reinforcement of bridge drilling cast-in-place pile reinforcement cage
CN204343291U (en) Split type reusable anchor pole
CN213654204U (en) Basket scaffold pre-buried sleeve fixing part
CN204850409U (en) Repeatedly usable's pre -buried device of reinforcing bar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant