CN103208858A - Factory station side link reconstruction method of transformer substation International Electrotechnical Commission (IEC) 870-5-101 communication protocol - Google Patents
Factory station side link reconstruction method of transformer substation International Electrotechnical Commission (IEC) 870-5-101 communication protocol Download PDFInfo
- Publication number
- CN103208858A CN103208858A CN2013100944600A CN201310094460A CN103208858A CN 103208858 A CN103208858 A CN 103208858A CN 2013100944600 A CN2013100944600 A CN 2013100944600A CN 201310094460 A CN201310094460 A CN 201310094460A CN 103208858 A CN103208858 A CN 103208858A
- Authority
- CN
- China
- Prior art keywords
- station
- factory
- main website
- control equipment
- message
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
Landscapes
- Selective Calling Equipment (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310094460.0A CN103208858B (en) | 2013-03-24 | 2013-03-24 | Factory station side link reconstruction method of transformer substation International Electrotechnical Commission (IEC) 870-5-101 communication protocol |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310094460.0A CN103208858B (en) | 2013-03-24 | 2013-03-24 | Factory station side link reconstruction method of transformer substation International Electrotechnical Commission (IEC) 870-5-101 communication protocol |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103208858A true CN103208858A (en) | 2013-07-17 |
CN103208858B CN103208858B (en) | 2015-04-01 |
Family
ID=48755981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310094460.0A Active CN103208858B (en) | 2013-03-24 | 2013-03-24 | Factory station side link reconstruction method of transformer substation International Electrotechnical Commission (IEC) 870-5-101 communication protocol |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103208858B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105243613A (en) * | 2015-11-19 | 2016-01-13 | 南京南瑞集团公司 | Hydropower dispatching information composite acquisition method |
CN105656720A (en) * | 2016-01-26 | 2016-06-08 | 云南电网有限责任公司电力科学研究院 | Test method based on IEC60870-5-101 protocol of telecontrol device |
CN110854687A (en) * | 2019-06-06 | 2020-02-28 | 国网浙江省电力有限公司杭州供电公司 | Uninterrupted power transmission reconstruction method for reconstruction and expansion of intelligent substation 3/2 wiring |
CN113891367A (en) * | 2021-10-19 | 2022-01-04 | 许继集团有限公司 | Link interaction method suitable for forwarding data through wireless module |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100844551B1 (en) * | 2006-11-15 | 2008-07-08 | 대아티아이(주) | System and method for displaying schedule train course in railway and subway |
CN101626318A (en) * | 2009-08-05 | 2010-01-13 | 上海可鲁系统软件有限公司 | Multilevel communication system and communication detection method thereof |
CN102098199A (en) * | 2009-12-09 | 2011-06-15 | 上海可鲁系统软件有限公司 | Communication fault detection method |
CN102497306A (en) * | 2011-11-15 | 2012-06-13 | 航天科工深圳(集团)有限公司 | Method for realizing data transmission of distribution network substation and system thereof |
-
2013
- 2013-03-24 CN CN201310094460.0A patent/CN103208858B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100844551B1 (en) * | 2006-11-15 | 2008-07-08 | 대아티아이(주) | System and method for displaying schedule train course in railway and subway |
CN101626318A (en) * | 2009-08-05 | 2010-01-13 | 上海可鲁系统软件有限公司 | Multilevel communication system and communication detection method thereof |
CN102098199A (en) * | 2009-12-09 | 2011-06-15 | 上海可鲁系统软件有限公司 | Communication fault detection method |
CN102497306A (en) * | 2011-11-15 | 2012-06-13 | 航天科工深圳(集团)有限公司 | Method for realizing data transmission of distribution network substation and system thereof |
Non-Patent Citations (2)
Title |
---|
周宁伟: "IEC870-5-101规约在银川地区调度系统的应用", 《宁夏电力》, no. 4, 30 April 2007 (2007-04-30), pages 10 - 17 * |
李贵存等: "配电自动化馈线终端的信息采集与通信规约", 《电网技术》, vol. 24, no. 7, 31 July 2000 (2000-07-31), pages 56 - 58 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105243613A (en) * | 2015-11-19 | 2016-01-13 | 南京南瑞集团公司 | Hydropower dispatching information composite acquisition method |
CN105243613B (en) * | 2015-11-19 | 2019-01-04 | 南京南瑞集团公司 | The compound acquisition method of water power scheduling information |
CN105656720A (en) * | 2016-01-26 | 2016-06-08 | 云南电网有限责任公司电力科学研究院 | Test method based on IEC60870-5-101 protocol of telecontrol device |
CN110854687A (en) * | 2019-06-06 | 2020-02-28 | 国网浙江省电力有限公司杭州供电公司 | Uninterrupted power transmission reconstruction method for reconstruction and expansion of intelligent substation 3/2 wiring |
CN113891367A (en) * | 2021-10-19 | 2022-01-04 | 许继集团有限公司 | Link interaction method suitable for forwarding data through wireless module |
CN113891367B (en) * | 2021-10-19 | 2024-05-10 | 许继集团有限公司 | Link interaction method suitable for forwarding data through wireless module |
Also Published As
Publication number | Publication date |
---|---|
CN103208858B (en) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110672962A (en) | State monitoring system for electric equipment | |
CN103208858A (en) | Factory station side link reconstruction method of transformer substation International Electrotechnical Commission (IEC) 870-5-101 communication protocol | |
CN104410067A (en) | Zone area power failure analyzing method based on common transformer and analysis of big data acquired by users | |
CN103368263B (en) | The detection method of dispatch automated system IEC104 stipulations communication state | |
CN101859275A (en) | Method, system and mobile terminal for monitoring application program | |
CN110445682B (en) | Method, server, equipment and system for monitoring survival state of networking node | |
CN105242626A (en) | Line safety intelligent auxiliary monitoring system | |
CN109067560B (en) | Self-description terminal plug and play method based on open communication | |
CN105223949A (en) | Electrical equipment and communication fault diagnosis method and device thereof | |
EP2866388B1 (en) | Method for detecting correctness of optic fiber connection based on radio remote unit (rru) looped network, and base band unit (bbu) | |
CN104052016A (en) | Fixed value modification method and equipment based on purson system and fixed value setting system | |
CN109785557B (en) | Intelligent power optical cable anti-external loss monitoring and early warning system and monitoring and early warning method thereof | |
CN210864009U (en) | Cable intermediate head monitoring system | |
CN103997533A (en) | System and method for remotely maintaining dynamic terminals based on wireless network | |
KR101349065B1 (en) | System and method for monitoring solar inverter using smart phone | |
CN108199477B (en) | Remote intelligent monitoring method and equipment for faults of AC/DC system of transformer substation | |
CN107342789A (en) | A kind of group-net communication method of cable anti-theft monitoring system | |
CN204480426U (en) | Based on the household fire monitoring system of Internet of Things and mobile phone terminal | |
CN106169813A (en) | Wireless network maintaining method for transformer station | |
CN103795773A (en) | Remote networking monitoring method and system of high-voltage direct-current power supply devices | |
CN201839079U (en) | Remote maintenance system of substation automation system | |
CN105119381A (en) | Device for remotely restarting power of transformer station communication manager | |
CN110782176A (en) | Internet-based electric power intelligent system | |
CN102764504B (en) | Information output method and electronic equipment | |
CN205091588U (en) | Supplementary monitoring system of circuit safety intelligence |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Meng Xiangbo Inventor after: Li Yunde Inventor after: Du Lei Inventor before: Meng Xiangbo Inventor before: Liu Yang Inventor before: Li Ping Inventor before: Liao Wang Inventor before: Li Yunde Inventor before: Du Lei Inventor before: Zhu Yu Inventor before: Liu Hang Inventor before: Zhao Bo Inventor before: Niu Ben Inventor before: Hu Yanfeng Inventor before: Chen Tianbi |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: MENG XIANGBO LI YUNZHI DU LEI ZHU YU LIU HANG ZHAO BO NIU BEN HU YANFENG CHEN TIANBI LIU YANG LI PING LIAO WANG TO: MENG XIANGBO LI YUNZHI DU LEI |
|
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |