CN103208058A - Resource management system of material assets - Google Patents
Resource management system of material assets Download PDFInfo
- Publication number
- CN103208058A CN103208058A CN201310095473XA CN201310095473A CN103208058A CN 103208058 A CN103208058 A CN 103208058A CN 201310095473X A CN201310095473X A CN 201310095473XA CN 201310095473 A CN201310095473 A CN 201310095473A CN 103208058 A CN103208058 A CN 103208058A
- Authority
- CN
- China
- Prior art keywords
- date
- time
- resource management
- management systems
- option
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a resource management system of material assets. The resource management system of the material assets comprises a purchase order, a purchase inspection sheet and a GRN (Goods Receive Note); the purchase order is provided with first choice options which are provided with a dispatch date of a supplier, transportation time, checkout time and a delivery date; the delivery date is a sum of the dispatch date, the transportation time and the checkout time; the purchase inspection sheet is provided with second choice options which comprise the checkout time; the warehouse warrant comprises third choice options which comprise a storage date; and the storage date is after the checkout time. The resource management system of the material assets has the advantages of making up the defects of an original ERP (Enterprise Resource Planning) system, reducing faults of the date of the delivery and causing no production delay.
Description
Technical field
The present invention relates to purchase and supply chain management domain, particularly relate to a kind of Material Resource Management Systems.
Background technology
ERP is Enterprise Resource Planning(Enterprise Resources Plan) abbreviation, be eighties of last century U.S.'s nineties one tame IT company according to computerized information, IT technical development and enterprise at that time to the demand of supply chain management, prediction is in the development trend of information age management information system in enterprise from now on and soon change, and has proposed this concept.ERP is at materials and equipment resources management (logistics), human resource management (stream of people), financial resources management (wealth stream), the integrated business management software of the management of information resources (information flow), but, existing Material Resource Management Systems only relates to buying, material, production, finished product and sale, transport and but do not include supplier proving time in and hand over interim, purchasing department is deciding through consultation that with supplier friendship is during the phase like this, in case the haulage time of not shooting off and proving time, very likely can incur loss through delay the carrying out of production.
Summary of the invention
The technical matters that the present invention mainly solves provide a kind of simple to operate, use Material Resource Management Systems flexibly.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: a kind of Material Resource Management Systems is provided, comprise: purchase order, receiving inspection list and storage bill, be provided with first in the described purchase order and select option, described first selects option to be provided with supplier's shipment date, haulage time, proving time and dilivery date, be the shipment date described dilivery date, haulage time, proving time sum, described receiving inspection has set up second and has selected option, described second selects option to comprise proving time, described storage bill comprises that the 3rd selects option, the described the 3rd selects option to comprise the warehouse-in date, and the described warehouse-in date is after proving time.
In a preferred embodiment of the present invention, described haulage time is 0.5 day integral multiple.
In a preferred embodiment of the present invention, be 0.5 day integral multiple described proving time.
In a preferred embodiment of the present invention, described proving time is by the complexity comprehensive assessment of the installation accuracy of parts, significance level, specification size, check.
The invention has the beneficial effects as follows: Material Resource Management Systems of the present invention has remedied the deficiency of original ERP system, and slip up still less dilivery date, can not cause the delay of production.
Description of drawings
Fig. 1 is the operating process synoptic diagram of Material Resource Management Systems one preferred embodiment of the present invention.
Embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present invention is described in detail, thereby so that advantages and features of the invention can be easier to be it will be appreciated by those skilled in the art that protection scope of the present invention is made more explicit defining.
See also Fig. 1, a kind of Material Resource Management Systems, comprise: purchase order 1, receiving inspection list 2 and storage bill 3, be provided with first in the described purchase order 1 and select option, described first selects option to be provided with supplier's shipment date 11, haulage time 12, proving time 13 and dilivery date 14, be the shipment date 11 described dilivery date 14, haulage time 12, proving times 13 sum, described receiving inspection list 2 is provided with second and selects option, described second selects option to comprise proving time 13, described storage bill 3 comprises that the 3rd selects option, the described the 3rd selects option to comprise the warehouse-in date 31, and the described warehouse-in date 31 is after proving time 13.In ERP system, insert one first and select option, so just can in buying, namely haulage time 12 and proving time 13 be counted, avoid influencing the progress of production.
In addition, described haulage time 12 is 0.5 day integral multiple.Certainly according to actual conditions, also can select least unit is 1 hour, 2 hours equal time units, still for convenience of the statistics of dilivery date 14, least unit is decided to be 0.5 day mostly.
In addition, be 0.5 day integral multiple described proving time 13.
In addition, described proving time 13 is by the complexity comprehensive assessment of the installation accuracy of parts, significance level, specification size, check.Certainly also will be according to the date of manufacture, suitable delivers goods and the inspection of stocking up in advance, checks the defective deliver goods phenomenon again that causes to prevent that parts from stocking up.
Material Resource Management Systems of the present invention is adjusted haulage time and proving time in dilivery date, and production avoids delay.
Be different from prior art, Material Resource Management Systems of the present invention has remedied the deficiency of original ERP system, and slip up still less dilivery date, can not cause the delay of production.
The above only is embodiments of the invention; be not so limit claim of the present invention; every equivalent structure or equivalent flow process conversion that utilizes instructions of the present invention and accompanying drawing content to do; or directly or indirectly be used in other relevant technical fields, all in like manner be included in the scope of patent protection of the present invention.
Claims (4)
1. Material Resource Management Systems, it is characterized in that, comprise: purchase order, receiving inspection list and storage bill, be provided with first in the described purchase order and select option, described first selects option to be provided with supplier's shipment date, haulage time, proving time and dilivery date, be the shipment date described dilivery date, haulage time, proving time sum, described receiving inspection has set up second and has selected option, described second selects option to comprise proving time, described storage bill comprises that the 3rd selects option, the described the 3rd selects option to comprise the warehouse-in date, and the described warehouse-in date is after proving time.
2. Material Resource Management Systems according to claim 1 is characterized in that, described haulage time is 0.5 day integral multiple.
3. Material Resource Management Systems according to claim 1 is characterized in that, be 0.5 day integral multiple described proving time.
4. Material Resource Management Systems according to claim 1 is characterized in that, described proving time is by the complexity comprehensive assessment of the installation accuracy of parts, significance level, specification size, check.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310095473XA CN103208058A (en) | 2013-03-25 | 2013-03-25 | Resource management system of material assets |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310095473XA CN103208058A (en) | 2013-03-25 | 2013-03-25 | Resource management system of material assets |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103208058A true CN103208058A (en) | 2013-07-17 |
Family
ID=48755275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310095473XA Pending CN103208058A (en) | 2013-03-25 | 2013-03-25 | Resource management system of material assets |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103208058A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105303306A (en) * | 2015-10-15 | 2016-02-03 | 国家电网公司 | Electric power material dispatching platform system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1737833A (en) * | 2004-08-20 | 2006-02-22 | 鸿富锦精密工业(深圳)有限公司 | Procurement price managing and control system and method |
CN102117433A (en) * | 2009-12-31 | 2011-07-06 | 青岛海尔软件有限公司 | Warehouse management system |
-
2013
- 2013-03-25 CN CN201310095473XA patent/CN103208058A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1737833A (en) * | 2004-08-20 | 2006-02-22 | 鸿富锦精密工业(深圳)有限公司 | Procurement price managing and control system and method |
CN102117433A (en) * | 2009-12-31 | 2011-07-06 | 青岛海尔软件有限公司 | Warehouse management system |
Non-Patent Citations (2)
Title |
---|
张宇: "ERP模式下中小企业生产计划系统的研究和实现", 《中国优秀博硕士学位论文全文数据库(硕士)信息科技辑》 * |
李卧龙: "M公司ERP应用研究", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105303306A (en) * | 2015-10-15 | 2016-02-03 | 国家电网公司 | Electric power material dispatching platform system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tsao et al. | Sustainable newsvendor models under trade credit | |
Tang et al. | Dynamic pricing in the newsvendor problem with yield risks | |
Wilson et al. | Grain pricing and transportation: dynamics and changes in markets | |
Choi et al. | Reducing supply risks by supply guarantee deposit payments in the fashion industry in the “new normal after COVID-19” | |
Sepehri | Inventory management under carbon emission policies: A systematic literature review | |
Routroy et al. | A study of apparel supply chain risks. | |
Sahu | Inflation dynamics in India: A hybrid new Keynesian Phillips curve approach | |
CN101599139A (en) | Logistic service electronic trading system | |
CN103208058A (en) | Resource management system of material assets | |
CN109102348A (en) | A kind of cloud distribution system | |
CN103679533A (en) | System and method for processing account service | |
Mohanty et al. | Vendor-buyer integrated production-inventory system for imperfect quality item under trade credit finance and variable setup cost | |
Udayakumar et al. | Supply chain coordination with controllable lead time under imperfect production process | |
Li et al. | Strategy decision of business interruption insurance and emergency supply strategy based on supply disruptions | |
Jiao et al. | A model for the optimization of the petroleum supply chain in China and its empirical analysis | |
Mohammadi et al. | A mixed integer programming model formulation for solving the lot-sizing problem | |
Jacyna-Gołda | Chosen problems of effective supply chain management of companies | |
CN105894355A (en) | Automatic document processing method and system | |
Park et al. | Optimal guaranteed service time and service level decision with time and service level sensitive demand | |
Wu et al. | Author's Accepted Manuscript | |
Icenhour | Reverse Logistics Planning: A Strategic Way to Address Environmental Sustainability While Creating a Competitive Advantage | |
Popa | Supply Chain Management–Key Factors | |
TAUFIK et al. | Radio Frequency Identification (RFID) Technology for Support Supply Chain Strategic to Achieve High Performance in Textile and Apparel Industries of Indonesia. | |
Despoudi et al. | An Investigation of the Environmental Turbulence Factors and their Sources in the Collaboration-Post-harvest Food Loss Relationship | |
Pratiwi et al. | Proposed improvement of performance calculation of supply chain management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130717 |