A kind of gear rack upright post type tidal power generating cabin promotes locking device
Technical field
What the present invention relates to is a kind of tidal generating set, specifically the tidal power generating auxiliary device.
Background technique
Along with the exhaustion day by day of fossil energy and improving constantly of countries in the world environmental consciousness, development and use and the demand of all kinds of new energy are also paid attention to further.Trend can receive publicity in a plurality of countries as a kind of renewable energy sources of cleanliness without any pollution, and various technology and the device that can develop about trend also constantly occur.
At present, it is several that marine tidal current energy generating equipment mainly contains floating carrier formula, pile foundation formula and seat bottom type.
Seat bottom type is applicable to than the shallow water territory, construction technical requirement height when pedestal and unit are installed and overhauled, and expense is also high; The pile foundation formula is adapted to be mounted within the neritic area, but installation difficulty is big, the cost height; The floating carrier formula is suitable for than deepwater field, and it is simple in structure, and fabricating cost is low, but the marine maintaining difficulty of electricity generating device.
Summary of the invention
The object of the present invention is to provide a kind of gear rack upright post type tidal power generating cabin that is fit to floating type horizontal axis tidal generating set to promote locking device.
The object of the present invention is achieved like this:
A kind of gear rack upright post type of the present invention tidal power generating cabin promotes locking device, it is characterized in that: comprise the lifting locking unit, described lifting locking unit comprises cylindrical tube and generator bay, cylindrical tube connects generator bay by flange, lifting rack is installed in the cylindrical tube, promote gear, lifting rack links to each other with the cylindrical tube inwall, promote the engagement of gear and lifting rack, and by connect to promote the driven by motor lifting rack and then drive cylindrical tube and generator bay moves up and down, lifting rack arranges guide rail outward, lifting rack moves along guide rail, and locking device is installed on the lifting rack.
The present invention can also comprise:
1, described locking device comprises locking motor, worm and gear device, the locking rack that links to each other successively, and locking rack meshes with lifting rack under locking motor control or disconnects.
2, described lifting locking unit has two, and two lifting locking units are installed on the platform, and two generator bays that promote locking units are towards identical.
Advantage of the present invention is: the present invention is simple in structure, produces and low cost of manufacture, and the installation and maintenance maintenance is convenient, economical, is fit to the installation and maintenance operation of floating type horizontal axis tidal generating set generator bay.
Description of drawings
Fig. 1 is lifting locking unit structural representation of the present invention;
Fig. 2 is lifting locking unit plan view of the present invention;
Fig. 3 is lifting structure of the present invention and locking mechanism partial schematic diagram;
Fig. 4 is lifting structure of the present invention and locking mechanism partial top view;
Fig. 5 is the structural representation when comprising two lifting locking units.
Embodiment
For example the present invention is done description in more detail below in conjunction with accompanying drawing:
In conjunction with Fig. 1~5, a kind of gear rack upright post type of the present invention tidal power generating cabin promotes locking device, comprise the lifting locking unit, promote locking unit and comprise cylindrical tube 1 and generator bay 8, cylindrical tube 1 connects generator bay 8 by flange, 1 li installation lifting rack 2 of cylindrical tube, promote gear 3, lifting rack 2 links to each other with cylindrical tube 1 inwall, promote gear 3 and lifting rack 2 engagements, and drive lifting racks 2 and then drive cylindrical tube 1 and generator bay 8 moves up and down by connecting motor 4, outside the lifting rack 2 guide rail 9 is set, lifting rack 2 moves along guide rail 9, and locking device 7 is installed on the lifting rack 2.Locking device 7 comprises locking motor 6, worm and gear device, the locking rack 5 that links to each other successively, and locking rack 5 meshes with lifting rack 2 under locking motor 6 controls or disconnects.Promoting locking unit has two, and two lifting locking units are installed on the platform, and two generator bays 8 that promote locking units are towards identical.
Lifting device and locking rack sequence of operation when generator bay drops to the precalculated position
1) electric control box power supply energising drives it by mancarried device control motor 4 and promotes gear 3, promotes gear 3 and drives lifting racks 2 and then make cylindrical tube 1(lifting device) upwards fine motion, power is transferred to by locking rack 5 and is promoted on the gear 3;
When 2) range estimation locking rack 5 is in free state, disable motor 4;
3) the manually-operable locking device 7, locking rack 5 is pulled out put in place; All locking racks 5 are pulled out in operation successively;
4) start motor 4 again, drive lifting gear 3 and make cylindrical tube 1(lifting device) move downward along guide track 9, after generator bay 8 is put into predetermined water level, disable motor 4;
5) position between range estimation locking rack 5 and the spud leg tooth bar 2, as improper, then drive motor 4 makes cylindrical tube 1(lifting device) fine setting up or down, 5 make between locking rack and the spud leg tooth bar 2 and are in the optimum position;
6) handle locking device 7 by mancarried device and promote locking rack 5 and 2 engagements of spud leg tooth bar;
7) handle locking device 7 successively and make all locking racks 5 and 2 engagements of spud leg tooth bar;
8) complete " release---promotes or decline---locking " process is finished;
Lifting device and locking rack sequence of operation when generator bay rises to the precalculated position
According to above-mentioned antipodal operating process, can realize the position of generator bay from predetermined water level promoting water outlet to maintenance.