CN103205962A - 沉陷地坪注浆抬升的方法 - Google Patents

沉陷地坪注浆抬升的方法 Download PDF

Info

Publication number
CN103205962A
CN103205962A CN2013101537616A CN201310153761A CN103205962A CN 103205962 A CN103205962 A CN 103205962A CN 2013101537616 A CN2013101537616 A CN 2013101537616A CN 201310153761 A CN201310153761 A CN 201310153761A CN 103205962 A CN103205962 A CN 103205962A
Authority
CN
China
Prior art keywords
terrace
slip
slip casting
casting
depression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101537616A
Other languages
English (en)
Inventor
杨峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013101537616A priority Critical patent/CN103205962A/zh
Publication of CN103205962A publication Critical patent/CN103205962A/zh
Pending legal-status Critical Current

Links

Images

Abstract

一种沉陷地坪注浆抬升的方法是将钻孔灌注桩的排放废泥浆的混合浆液用高压注浆泵注入地坪下土中,扩大土体体积,使地坪隆起。采用废泥浆加适量外掺物注入土体,不但解决了泥浆排放污染环境的问题,而且使注浆成本大幅下降,一举二得。

Description

沉陷地坪注浆抬升的方法
技术领域
本发明涉及岩土工程领域,尤其涉及地基注浆处理技术。
背景技术
软土地区因地坪大面积回填塘碴或土造成地坪严重不均匀沉降,“锅底”形地坪给使用带来许多不便,如敲掉重做不但影响生产而且代价大,过去也有采用水泥浆等注浆抬升的报道,但因以水泥为主的浆液注浆量大,造价有时比敲掉重做还高,因此应用很少。一种利用钻孔灌注桩废泥浆的低成本抬升沉陷地坪的方法还未见报道。
发明内容
本发明所要解决的技术问题在于克服上述现有技术之不足,提供一种成本省、又保护环境的沉陷地坪注浆抬升的方法。
按照本发明提供的一种沉陷地坪注浆抬升的方法,是将钻孔灌注桩的排放的废泥浆制备的混合浆液,用高压注浆泵将混合浆液注入地坪下的土中,扩大土体体积,使地坪隆起,其特征是包括以下步骤:
A、运输钻孔灌注桩排放的废泥浆倒入泥浆池;
B、将泥浆与掺合料在浆桶中制备成混合浆液;
C、地坪砼钻通孔;
D、在所述通孔处预埋套管及插注浆钢管;
E、高压注浆泵通过注浆钢管注浆总管和支管将混合浆液压入土层中;
F、重复多次注浆,将土体分步抬升。
所述步骤B的掺合料为水泥或粉煤灰或石灰,所述掺合料用量为泥浆重量的5-20%。
所述步骤B的掺合料为石屑(又称石粉)或砂,所述掺合料用量为泥浆重量的40-70%。
所述高压注浆泵为砂浆泵或细石砼泵或砼泵,注浆压力1-10MPa。
所述步骤D的预埋套管为钢管,其与地坪砼密封固定。
所述注浆钢管联有调压阀,所述高压注浆泵与所述注浆钢管之间通过注浆总管和注浆支管相连接,所述注浆钢管的下端插入土中,上端与所述注浆支管相联,所述注浆支管与所述注浆总管相联,所述注浆总管一端联于所述高压注浆泵。
所述步骤C的砼地坪钻孔设于沉陷的较低处,所述通孔穿过砼层和垫层。
按照本发明提供的一种沉陷地坪注浆抬升的方法与现有技术相比具有如下优点:
1、利用废泥浆加适量外掺物注入土体,不但解决了泥浆排放污染环境的问题,而且使注浆成本大幅下降,一举二得。
2、高压注浆既抬升了沉陷地坪,同时又使回填土密实度提高,可有效控制地坪的后期再沉降量。
3、对生产干扰少,施工过程基本不影生产,大大减少迁移和停产的损失。
附图说明
图1为本发明系统图。
具体实施方法
参见图1,按照本发明提供的一种沉陷地坪注浆抬升的方法,是将钻孔灌注桩排放的废泥浆制备混合浆液,用高压注浆泵将混合浆液注入地坪下的土中,扩大土体体积,使地坪隆起,具体按以下步骤:
A、运输钻孔灌注桩排放的废泥浆倒入泥浆池1;
B、将泥浆与掺合料在浆桶中2制备成混合浆液;
C、地坪砼3钻通孔4;
D、在所述通孔处预埋套管41及插注浆钢管5;
E、高压注浆泵通过注浆钢管5将混合浆液压入土层中;
F、重复多次注浆,将土体分步抬升。
采用钻孔灌注桩排放的废泥浆作为注浆的主要材料,不但变废为宝,减少了排放泥浆对环境的污染,而且大幅降低了注浆成本,使注浆法抬升沉陷地坪技术在经济上具备了应用阶值,地坪抬升还不会影响日常使用。钻孔灌注桩泥浆用专用运输车运至混浆池中,针对不同的工程,采用各种配合比的泥浆浓度,用不同的压力,将混合浆液注入土中,分步抬升沉陷的地坪。
参见图1,在本发明给出的上述实施例中,所述步骤B的掺合料为水泥或粉煤灰或石灰,采用水泥、粉煤灰或石灰掺入泥浆内既能使混合浆液浓度提高,又能使浆液注入土体空隙后快速固结硬化。
参见图1,在本发明给出的上述实施例中,泥浆中加入细颗粒或砂,不但成本低,而且注浆后压力消散快,回复量小。
参见图1,在本发明给出的上述实施例中,采用可以输送较粗颗粒浆液的细砼泵或砼泵,其流量大,压力高,或大大加快地坪抬升速度。
参见图1,在本发明给出的上述实施例中,所述步骤D的预埋套管为钢管,其与地坪砼密封固定,所述注浆钢管5联有调压阀51,所述高压注浆泵7与所述注浆钢管5之间通过注浆总管61和注浆支管62相连接,所述注浆钢管5的下端插入土中,上端与所述注浆支管61相联,所述注浆支管与所述注浆总管相联,所述注浆总管一端联于高压注浆泵7。采用套管与地坪砼固定,能防止多压注浆过程中冒浆,而调压阀可调节注浆压力和在注浆结束时防止浆液回流。
在本发明给出的上述实施例中,所述步骤C的砼地坪钻孔设于沉陷的较低处,所述通孔穿过砼层和垫层,从而能够将混合浆液注入土中。

Claims (7)

1.一种沉陷地坪注浆抬升的方法,是将钻孔灌注桩排放的废泥浆制备混合浆液,用高压注浆泵将混合浆液注入地坪下的土中,扩大土体体积,使地坪隆起,其特征是包括以下步骤:
A、运输钻孔灌注桩排放的废泥浆倒入泥浆池;
B、将泥浆与掺合料在浆桶中制备成混合浆液;
C、地坪砼钻通孔;
D、在所述通孔处预埋套管及插注浆钢管;
E、高压注浆泵通过注浆钢管将混合浆液压入土层中;
F、重复多次注浆,将土体分步抬升。
2.如权利要求1所述的沉陷地坪注浆抬升的方法,其特征是所述步骤B的掺合料为水泥或粉煤灰或石灰,所述掺合料用量为泥浆重量的5-20%。
3.如权利要求1所述的沉陷地坪注浆抬升的方法,其特征是所述步骤B的掺合料为石屑(又称石粉)或砂,所述掺合料用量为泥浆重量的40-70%。
4.如权利要求1所述的沉陷地坪注浆抬升的方法,其特征是所述高压注浆泵为砂浆泵或细石砼泵或砼泵,注浆压力1-10MPa。
5.如权利要求1所述的沉陷地坪注浆抬升的方法,其特征是所述步骤D的预埋套管为钢管,其与地坪砼密封固定。
6.如权利要求1所述的沉陷地坪注浆抬升的方法,其特征是所述注浆钢管联有调压阀,所述高压注浆泵与所述注浆钢管之间通过注浆总管和注浆支管相连接,所述注浆钢管的下端插入土中,上端与所述注浆支管相联,所述注浆支管与所述注浆总管相联,所述注浆总管一端联于所述高压注浆泵。
7.如权利要求1所述的沉陷地坪注浆抬升的方法,其特征是所述步骤C的砼地坪钻孔设于沉陷的较低处,所述通孔穿过砼层和垫层。
CN2013101537616A 2013-04-27 2013-04-27 沉陷地坪注浆抬升的方法 Pending CN103205962A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101537616A CN103205962A (zh) 2013-04-27 2013-04-27 沉陷地坪注浆抬升的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101537616A CN103205962A (zh) 2013-04-27 2013-04-27 沉陷地坪注浆抬升的方法

Publications (1)

Publication Number Publication Date
CN103205962A true CN103205962A (zh) 2013-07-17

Family

ID=48753354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101537616A Pending CN103205962A (zh) 2013-04-27 2013-04-27 沉陷地坪注浆抬升的方法

Country Status (1)

Country Link
CN (1) CN103205962A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884424A (zh) * 2017-04-10 2017-06-23 中国水利水电科学研究院 一种在粉细砂地层进行微生物固化的装置及施工方法
CN108411895A (zh) * 2018-02-13 2018-08-17 上海港湾基础建设(集团)股份有限公司 管排泵泥注浆地基处理方法
CN109518728A (zh) * 2018-12-11 2019-03-26 河海大学 一种防治进水塔周边沉降引起土工膜破坏的设施和方法
CN110258676A (zh) * 2018-05-25 2019-09-20 北京恒祥宏业基础加固技术有限公司 既有建筑物地坪不均匀沉降加固调平修复方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2134350C1 (ru) * 1995-08-31 1999-08-10 Всероссийский научно-исследовательский и проектно-конструкторский институт добычи угля гидравлическим способом Способ крепления горных выработок, пройденных в породах, склонных к пучению
CN2520346Y (zh) * 2001-01-12 2002-11-13 北京城建地铁地基市政工程有限公司 机场跑道基层注浆加固施工设备
CN1513799A (zh) * 2003-07-24 2004-07-21 上海隧道工程股份有限公司 控制压密注浆工法注浆浆液
CN1514071A (zh) * 2003-07-24 2004-07-21 上海隧道工程股份有限公司 可控制压密注浆施工工艺
CN101538852A (zh) * 2009-04-15 2009-09-23 中国十七冶建设有限公司 一种用于冶炼车间粉煤灰土层与回填山石层地坪地基的压密注浆加固工艺
CN102230382A (zh) * 2011-05-20 2011-11-02 中国矿业大学 一种底板渐进掩护增压式注浆加固技术

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2134350C1 (ru) * 1995-08-31 1999-08-10 Всероссийский научно-исследовательский и проектно-конструкторский институт добычи угля гидравлическим способом Способ крепления горных выработок, пройденных в породах, склонных к пучению
CN2520346Y (zh) * 2001-01-12 2002-11-13 北京城建地铁地基市政工程有限公司 机场跑道基层注浆加固施工设备
CN1513799A (zh) * 2003-07-24 2004-07-21 上海隧道工程股份有限公司 控制压密注浆工法注浆浆液
CN1514071A (zh) * 2003-07-24 2004-07-21 上海隧道工程股份有限公司 可控制压密注浆施工工艺
CN101538852A (zh) * 2009-04-15 2009-09-23 中国十七冶建设有限公司 一种用于冶炼车间粉煤灰土层与回填山石层地坪地基的压密注浆加固工艺
CN102230382A (zh) * 2011-05-20 2011-11-02 中国矿业大学 一种底板渐进掩护增压式注浆加固技术

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郏冠栋: ""灌浆法在处理地坪不均匀沉降事故中的应用"", 《科技资讯》, no. 27, 30 September 2006 (2006-09-30) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884424A (zh) * 2017-04-10 2017-06-23 中国水利水电科学研究院 一种在粉细砂地层进行微生物固化的装置及施工方法
CN108411895A (zh) * 2018-02-13 2018-08-17 上海港湾基础建设(集团)股份有限公司 管排泵泥注浆地基处理方法
CN110258676A (zh) * 2018-05-25 2019-09-20 北京恒祥宏业基础加固技术有限公司 既有建筑物地坪不均匀沉降加固调平修复方法
CN109518728A (zh) * 2018-12-11 2019-03-26 河海大学 一种防治进水塔周边沉降引起土工膜破坏的设施和方法
CN109518728B (zh) * 2018-12-11 2019-07-30 河海大学 一种防治进水塔周边沉降引起土工膜破坏的设施和方法

Similar Documents

Publication Publication Date Title
CN101423364B (zh) 一种可泵送湿拌砂浆
CN107401159A (zh) 一种预拌流态固化土
CN101806059B (zh) 高速公路下伏采空区地表钻孔注浆投沙工艺
CN101581093B (zh) 复合高性能水泥土砂浆桩的施工方法
CN107572956A (zh) 一种预拌流态固化土
CN104612134A (zh) 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN101798810A (zh) 一种插入钢筋混凝土芯材的水泥土复合桩
CN109940755A (zh) 一种填筑材料的分选和配制方法
CN103205962A (zh) 沉陷地坪注浆抬升的方法
CN101899838B (zh) 注浆扩底小直径预应力管桩复合地基施工方法
CN105113496A (zh) 一种水泥土搅拌桩的施工方法
CN106996104A (zh) 注浆成型扩底桩及其施工方法
CN101775803A (zh) 一种有效控制沉降的蘑菇型搅拌复合桩及施工方法
CN111676987A (zh) 振冲浆夯法建筑肥槽回填施工方法
CN103195060A (zh) 软土地基预应力锚杆加固结构及其用途
CN100513708C (zh) 既有建筑地基横向加筋灌浆托换方法
CN103174135B (zh) 不达标后注浆灌注桩的修补方法
JP5278856B2 (ja) 地盤改良工法
CN104746512A (zh) 一种水泥土劲性复合桩及其成桩方法
CN104452767A (zh) 一种岩溶地区钻孔桩废浆处理施工工艺
CN101892665A (zh) 一种注浆振冲碎石桩复合地基的施工方法
CN103806524B (zh) 一种下水井治理方法和快凝水泥砂浆干混料
CN101704649A (zh) 一种非取土引孔预应力管桩或预制方桩沉桩工艺的浆液配方
CN201738324U (zh) 软土地基防工程桩偏位结构
CN202448232U (zh) 一种浆液制备设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130717