CN103200655A - Method and device for energy conservation of remote radio frequency system - Google Patents

Method and device for energy conservation of remote radio frequency system Download PDF

Info

Publication number
CN103200655A
CN103200655A CN201210004307XA CN201210004307A CN103200655A CN 103200655 A CN103200655 A CN 103200655A CN 201210004307X A CN201210004307X A CN 201210004307XA CN 201210004307 A CN201210004307 A CN 201210004307A CN 103200655 A CN103200655 A CN 103200655A
Authority
CN
China
Prior art keywords
power
carrier frequencies
processing unit
baseband processing
logic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210004307XA
Other languages
Chinese (zh)
Inventor
程严
李平
陶冠阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201210004307XA priority Critical patent/CN103200655A/en
Publication of CN103200655A publication Critical patent/CN103200655A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

The invention provides a method and a device for energy conservation of a remote radio frequency system. The method includes the step that telephone traffic of a cell is detected by a base station controller, and if the detected telephone traffic of each line in the cell is smaller than a first threshold, partial or all logic carrier frequency in the cell is chosen to be in power-off. The method and the device can achieve power-on and power-off of an automatic control single plate, and can save energy.

Description

A kind of power-economizing method of radio frequency stretch system and device
Technical field
The present invention relates to the energy saving of system consumption reduction mechanism in the GSM mobile communications network, relate in particular to and a kind ofly separate with radio frequency based on base band, base station system energy-saving and cost-reducing.
Background technology
GSM (Global System of Mobile communication, global system for mobile communications) base station sub-system (BSS) can be divided into base transceiver station (BTS) and base station controller (BSC) two parts, and BTS is responsible for wireless transmission, BSC is responsible for control and management.BTS can dispose a plurality of residential quarters, and each residential quarter is made of one or more radio receiving-transmitting units (TRX), and each TRX handles signal processing, wireless receiving and the wireless transmission on eight physical slot by time.On principle, TRX can be divided into baseband processing unit and RF processing unit.In the design of mobile communication system, along with the variation of traffic density, coverage radius of cell is also different thereupon, and in each residential quarter, the network maintenance staff can distribute conversation and the data of one or more radio receiving-transmitting unit process user according to the estimation of telephone traffic.
In whole GSM, the energy consumption of base station system mainly is the power amplifier of transmitting-receiving letter module (DTRU), radiofrequency signal and the quiescent dissipation of each veneer self running.In the real network environment, when being distributed in the network planning, the covering of residential quarter just determined, can guarantee when telephone traffic is many, also can not cause subscriber signal to insert because of heavy traffic.But the distribution in time of the traffic carrying capacity of every day is very unbalanced, especially at night.Under the normal condition, user's access amount at night seldom, only can account for mean value 30% or lower.Thus, under the lower situation of user's access amount, each module still keeps and the same consumption of peak value period, must cause the base station energy waste, increases operation cost.
Traditional communication apparatus is made the field, and the base-band resource of BTS and radio system are bound in a system, are not easy to respectively base-band resource and radio system be operated separately.But in recent years, a kind of radio frequency stretch system is just progressively paid close attention to, and typical framework is that baseband processing unit (BBU) and the remote radio unit (RRU) (RRU) BTS separates, and forms distributed base station.BBU is connected by optical fiber with RRU.BBU is made up of base band polylith disposable plates (Baseband Process is called for short BP), and base-band resource is shared for a plurality of RRU by certain method of salary distribution, and RRU provides the radio frequency processing of signal.The system architecture of this radio frequency stretch system can power on base-band resource or during configuration change at website, carry out the associated allocation of BSC carrier frequency, base-band resource and radio frequency RRU resource according to certain rule, this rule generally can have mean allocation, concentrate distribution etc., primary distribution is finished generally speaking, and incidence relation namely remains unchanged.Here there is a problem, if namely less at certain time period internal traffic, under the situation that the disposal ability of a BP veneer just can be finished, may needs two even more veneer participation business because the relations of distribution are constant, increased energy consumption.
Summary of the invention
The technical problem to be solved in the present invention provides power-economizing method and the device in a kind of radio frequency stretch system, realizes the power-on and power-off of control veneer automatically, with energy savings.
In order to solve the problems of the technologies described above, the invention provides the power-economizing method in a kind of radio frequency stretch system, comprising:
The telephone traffic of base station controller detected cells, as the telephone traffic that detects every line in the residential quarter is then selected part or all of logic carrier frequencies from described residential quarter and is descended less than first thresholding.
Further, said method also has following characteristics: described base station controller is selected part or all of logic carrier frequencies and is descended electricity to implement under the following conditions from described residential quarter:
The switch that detects electricity under the permission carrier frequency of described cell configuration is in open mode.
Further, said method also has following characteristics: select part or all of logic carrier frequencies from described residential quarter and descend after the electricity, also comprise:
Take the selected calling of the logic carrier frequencies of electricity down if described base station controller receives, then described call migration is arrived not the logic carrier frequencies of electricity down.
Further, said method also has following characteristics: described base station controller is selected part or all of logic carrier frequencies and is descended after the electricity from described residential quarter, also comprise:
The power-on and power-off state of the logic carrier frequencies of described residential quarter is sent to base transceiver station.
Further, said method also has following characteristics: select part or all of logic carrier frequencies from described residential quarter and descend after the electricity, also comprise:
Described base station controller is if the telephone traffic that detects every line in the described residential quarter greater than second thresholding, then goes up electric treatment with all logic carrier frequencies in the described residential quarter, and second thresholding is greater than first thresholding.
Further, said method also has following characteristics:
The telephone traffic of described base station controller detected cells is carried out in the section at the fixed time.
In order to address the above problem, the present invention also provides a kind of base station controller, comprising:
Detection module is for detection of the telephone traffic of residential quarter;
Processing module is used for detecting under the situation of telephone traffic less than first thresholding of every line in the residential quarter at described detection module, selects part or all of logic carrier frequencies from described residential quarter and descends.
Further, above-mentioned base station controller also has following characteristics:
Described detection module, also whether the switch for detection of electricity under the permission carrier frequency of described cell configuration is in open mode;
Described processing module, be detect every line in the residential quarter at described detection module telephone traffic less than first thresholding, and described switch is under the situation of open mode, selects part or all of logic carrier frequencies from described residential quarter and descends electricity.
Further, above-mentioned base station controller also has following characteristics:
Described processing module also is used for if receive and take the selected calling of the logic carrier frequencies of electricity down, then with described call migration to the logic carrier frequencies of electricity down not.
Further, above-mentioned base station controller also has following characteristics:
Described processing module is selected part or all of logic carrier frequencies from described residential quarter and also is used for after descending electricity, and the power-on and power-off state of the logic carrier frequencies of described residential quarter is sent to base transceiver station.
Further, above-mentioned base station controller also has following characteristics:
Described processing module, from described residential quarter select part or all of logic carrier frequencies descend the electricity after also be used for, if the telephone traffic that detects every line in the described residential quarter then goes up electric treatment with all logic carrier frequencies in the described residential quarter greater than second thresholding, second thresholding is greater than first thresholding.
In order to address the above problem, the present invention also provides the method for the power-economizing method in a kind of radio frequency stretch system, comprising:
Base transceiver station receives the power-on and power-off state of the logic carrier frequencies of base station controller transmission;
If judge that the power-on and power-off state of described logic carrier frequencies is inconsistent with the data of local storage, then the power-on and power-off state according to described logic carrier frequencies carries out power-on and power-off control.
Further, said method also has following characteristics: described base transceiver station carries out power-on and power-off control according to the power-on and power-off state of described logic carrier frequencies and comprises:
Close the transmitting-receiving letter module on the remote radio unit (RRU) related with the logic carrier frequencies of power-down state (RRU).
Further, said method also has following characteristics: the transmitting-receiving that described base transceiver station is closed on the RRU related with the logic carrier frequencies of power-down state is believed after the module, also comprises:
All close if judge all the transmitting-receiving letter modules of the power amplifier subordinate on the described RRU, then close described power amplifier.
Further, said method also has following characteristics:
Described base transceiver station carries out power-on and power-off control according to the power-on and power-off state of described logic carrier frequencies and comprises:
If judge that the logic carrier frequencies of binding on the LTE Baseband Processing Unit on the baseband processing unit (BBU) all is power-down state, and the Broadcast Control Channel carrier frequency of this residential quarter, logic carrier frequencies place is all electric down, then described LTE Baseband Processing Unit is descended electric treatment.
Further, said method also has following characteristics: described base transceiver station carries out power-on and power-off control according to the power-on and power-off state of described logic carrier frequencies, also comprises:
Have electricity and the carrier frequency that powers on down simultaneously if judge the logic carrier frequencies of binding on a plurality of LTE Baseband Processing Unit on the described BBU, judge then whether described LTE Baseband Processing Unit satisfies the condition of adjusting resource, as satisfying, then the following electric carrier frequency on power on carrier frequency and other LTE Baseband Processing Unit on one or more described LTE Baseband Processing Unit is exchanged, till the carrier frequency that do not power on described one or more described LTE Baseband Processing Unit, close described one or more described LTE Baseband Processing Unit then.
Further, said method also has following characteristics:
Described base transceiver station is if judge all carrier frequency resources of described a plurality of LTE Baseband Processing Unit and the number of the carrier frequency that powers on it poor, greater than the maximum carrier frequency number that any is supported in the described LTE Baseband Processing Unit, then be considered as described LTE Baseband Processing Unit and satisfy the condition of adjusting resource.
In order to address the above problem, the present invention also provides a kind of base transceiver station, comprising: baseband processing unit (BBU) and remote radio unit (RRU) (RRU), wherein,
Main control module on the described BBU, behind the power-on and power-off state for the logic carrier frequencies that receives the base station controller transmission, if judge that the power-on and power-off state of described logic carrier frequencies is inconsistent with the data of local storage, then the power-on and power-off state according to described logic carrier frequencies carries out power-on and power-off control.
Further, above-mentioned base transceiver station also has following characteristics:
Described main control module carries out power-on and power-off control and comprises: closes the transmitting-receiving letter module on the described RRU related with the logic carrier frequencies of power-down state; Perhaps, if the logic carrier frequencies of binding on the LTE Baseband Processing Unit on the described BBU of judgement all is power-down state, and the Broadcast Control Channel carrier frequency of this residential quarter, logic carrier frequencies place is all electric down, then described LTE Baseband Processing Unit is descended electric treatment; Perhaps, have electricity and the carrier frequency that powers on down simultaneously if judge the logic carrier frequencies of binding on a plurality of LTE Baseband Processing Unit on the described BBU, judge then whether described LTE Baseband Processing Unit satisfies the condition of adjusting resource, as satisfying, then the following electric carrier frequency on power on carrier frequency and other LTE Baseband Processing Unit on one or more described LTE Baseband Processing Unit is exchanged, till the carrier frequency that do not power on described one or more described LTE Baseband Processing Unit, close described one or more described LTE Baseband Processing Unit then.
Further, above-mentioned base transceiver station also has following characteristics:
Described main control module also is used for after closing described transmitting-receiving letter module, all closes if judge all the transmitting-receiving letter modules of the power amplifier subordinate on the described RRU, then closes described power amplifier.
Further, above-mentioned base transceiver station also has following characteristics:
Described main control module, if all carrier frequency resources of the described a plurality of LTE Baseband Processing Unit of judgement and the number of the carrier frequency that powers on it is poor, greater than the maximum carrier frequency number of any support in the described LTE Baseband Processing Unit, then be considered as described LTE Baseband Processing Unit and satisfy the condition of adjusting resource.
In order to address the above problem, the present invention also provides a kind of radio frequency stretch system, comprising: above-mentioned base station controller and above-mentioned base transceiver station.
The invention provides power-economizing method and device in a kind of radio frequency stretch system, can realize controlling automatically the power-on and power-off of veneer, can energy savings.
Description of drawings
Fig. 1 is the schematic diagram of the BSC of the embodiment of the invention;
Fig. 2 is the schematic diagram of the BTS of the embodiment of the invention;
Fig. 3 is the flow chart of the power-economizing method in a kind of radio frequency stretch system of the embodiment of the invention one;
Fig. 4 is the flow chart of the power-economizing method in a kind of radio frequency stretch system of the embodiment of the invention two;
Fig. 5 is the schematic diagram that a gsm system resource status distributes;
Fig. 6 is that a gsm system carries out the schematic diagram after resource is adjusted.
Embodiment
Problem in view of above-mentioned prior art existence, if can be by detecting automatically, in the prerequisite that does not influence network service quality, suitably regulate the operating state of peripheral single board and power amplifier amplifier, can be by dynamically adjusting in the practical application, service set in a spot of BP resource, and is descended electricity with the BP of free time, with the reduction power consumption of maximum.In the actual application scenarios, the outage of RRU external power source can be supported a period of time by internal electric source, to keep user's access.In this case, if can close some idle DTRU, all be a kind of raising of stealth for the repairing of network and the service quality of network.
In view of the foregoing, the embodiment of the invention provides a kind of radio frequency stretch system, comprises BSC and BTS, can be implemented in the user configured special time period, detects the telephone traffic of carrier frequency by BSC, and the carrier frequency of free time is descended.BTS can be further to electricity under LTE Baseband Processing Unit, radio-frequency power amplifier and the transceiver unit of free time, and the quiescent dissipation of the equipment of effectively demoting is saved operation maintenance cost.Electric time point can be determined by artificial down, and after following electricity started, system can cut out operation to the business in usefulness in the Preset Time scope, can not cause harmful effect to user's impression and network.
For making the purpose, technical solutions and advantages of the present invention clearer, hereinafter will be elaborated to embodiments of the invention by reference to the accompanying drawings.Need to prove that under the situation of not conflicting, the embodiment among the application and the feature among the embodiment be combination in any mutually.
Fig. 1 is the schematic diagram of the BSC of the embodiment of the invention, and as shown in Figure 1, the BSC of present embodiment comprises:
Detection module is for detection of the telephone traffic of residential quarter;
Processing module is used for detecting under the situation of telephone traffic less than first thresholding of every line in the residential quarter at described detection module, selects part or all of logic carrier frequencies from described residential quarter and descends.
Wherein, described detection module can also be used for, and whether the switch that detects electricity under the permission carrier frequency of described cell configuration is in open mode;
Described processing module be detect every line in the residential quarter at described detection module telephone traffic less than first thresholding, and described switch is under the situation of open mode, selects part or all of logic carrier frequencies from described residential quarter and descends electricity.
Wherein, described processing module can also be used for, and takies the selected calling of the logic carrier frequencies of electricity down if receive, and then described call migration is arrived not the logic carrier frequencies of electricity down.
Wherein, described processing module is selected part or all of logic carrier frequencies and can also be used for after descending electricity from described residential quarter, and the power-on and power-off state of the logic carrier frequencies of described residential quarter is sent to base transceiver station.
Wherein, described processing module from described residential quarter select part or all of logic carrier frequencies descend the electricity after can also be used for, if detect the telephone traffic of every line in the described residential quarter greater than second thresholding, then all logic carrier frequencies in the described residential quarter are gone up electric treatment, second thresholding is greater than first thresholding.
Fig. 2 is the schematic diagram of the BTS of the embodiment of the invention, and as shown in Figure 2, the BTS of present embodiment comprises: main control module and veneer, wherein,
Main control module behind the power-on and power-off state for the logic carrier frequencies that receives the base station controller transmission, if the data that store the power-on and power-off state of the described logic carrier frequencies of judgement and this locality are inconsistent, is then gone up electric control according to the power-on and power-off state of described logic carrier frequencies.
Wherein, described main control module described veneer is gone up electric control can be including, but not limited to following three kinds of schemes:
Close the transmitting-receiving letter module on the RRU related with the logic carrier frequencies of power-down state; Perhaps,
If judge that the logic carrier frequencies of binding on the LTE Baseband Processing Unit on the BBU all is power-down state, and the Broadcast Control Channel carrier frequency of this residential quarter, logic carrier frequencies place is all electric down, then described LTE Baseband Processing Unit is descended; Perhaps,
Have electricity and the carrier frequency that powers on down simultaneously if judge the logic carrier frequencies of binding on a plurality of LTE Baseband Processing Unit, judge then whether described LTE Baseband Processing Unit satisfies the condition of adjusting resource, as satisfying, then the following electric carrier frequency on power on carrier frequency and other LTE Baseband Processing Unit on one or more described LTE Baseband Processing Unit is exchanged, till the carrier frequency that do not power on described one or more described LTE Baseband Processing Unit, close described one or more described LTE Baseband Processing Unit then.
Wherein, described main control module can also be used for after closing described transmitting-receiving letter module, if judge on the described RRU all transmitting-receiving letter modules of power amplifier subordinate all close, then close described power amplifier.
Wherein, described main control module is if judge all carrier frequency resources of described a plurality of LTE Baseband Processing Unit and the number of the carrier frequency that powers on it poor, greater than the maximum carrier frequency number of any support in the described LTE Baseband Processing Unit, then be considered as described LTE Baseband Processing Unit and satisfy the condition of adjusting resource.
Fig. 3 is the flow chart of the power-economizing method in a kind of radio frequency stretch system of the embodiment of the invention one, and as shown in Figure 3, present embodiment comprises following step at BSC:
The telephone traffic of S10, BSC detected cells, as the telephone traffic that detects every line in the residential quarter is then selected part or all of logic carrier frequencies from described residential quarter and is descended less than first thresholding.
Fig. 4 is the flow chart of the power-economizing method in a kind of radio frequency stretch system of the embodiment of the invention two, and as shown in Figure 4, present embodiment comprises following step at BTS:
S20, BTS if judge that the power-on and power-off state of described logic carrier frequencies is inconsistent with the data of local storage, then go up electric control according to the power-on and power-off state of described logic carrier frequencies after receiving the power-on and power-off state of the logic carrier frequencies that base station controller sends.
In the method for present embodiment, BSC can detect user's access amount automatically, can carry out business migration business migration is carried out in user's conversation, and control by thresholding, following electricity part (perhaps whole) carrier frequency that priority is lower, and BTS can carry out dynamic assignment to base-band resource, reduce effectively the base station on the peak beyond the energy consumption of period just become possibility.
With a specific embodiment power-economizing method of the present invention is elaborated below, present embodiment may further comprise the steps:
101, be configured respectively in BSC side and BTS;
Wherein, the BSC side can the configuration feature time point, the following electric switch of cell level.Whether the BTS side can dispose our station and support under the intelligence of veneer.
102, the telephone traffic of BSC detects automatically;
Carrier frequency to the free time descends electricity, and when on the carrier frequency for the treatment of down electricity traffic being arranged, then informing business is moved to the traffic on the current carrier frequency on the carrier frequency of other high priority.
103, the power-on and power-off state of the every T2 periodic report of BTS current carrier frequency and and the corresponding relation (physical logic relation) of physics transceiver unit;
After BSC receives physical logic relation, change if find the physics logical relation, then respond whole carrier frequency to BTS and power on, professional reliable to guarantee, otherwise BSC responds up-to-date carrier frequency power-on and power-off state according to the detection of step 102 to BTS.
104, BTS detects the power-on and power-off state of the logic carrier frequencies that BSC responds and the data of current preservation compare, and when the power-on and power-off state of logic carrier frequencies changes, judges then whether our station supports intelligence electricity down, if support that then execution in step 105; If do not support that then execution in step 103.
105, the carrier frequency of the carrier frequency of these power-on and power-off of BTS and power-on and power-off before has change, and then the power-on and power-off state of the logic carrier frequencies of responding according to BSC carries out peripheral single board power on operation or electricity operation down.
107, the electric current journey finishes under the peripheral single board, carries out the detection of next cycle.
Further, BSC has corresponding judgement at the power-on and power-off of the carrier frequency in the residential quarter, and the flow process of step 102 also comprises:
102.1, the performance measurement data that reports of the every T1 cycle detection of BSC BTS, measurement data comprises the telephone traffic of every line, but in order to prevent changing frequently, the design anti-trembling function, whether dispose the permission switch of electricity down every K1 time period detected cells, switch opens is just carried out the following electric treatment of carrier frequency, otherwise all carrier frequency of residential quarter all power on.
102.2, the telephone traffic of every line is lower than down electric switch limit N1 in the residential quarter, the carrier frequency of selecting (perhaps whole) from this residential quarter descends.
The telephone traffic of described every line equals telephone traffic/number of available channels.
If the carrier frequency for selected electricity down also has the situation about taking of calling out, can arrive not the carrier frequency of electricity down to call migration according to client's demand.
102.3, the telephone traffic of every line does not reach down electric switch limit N1 in the residential quarter, but do not reach the thresholding N2 that powers on yet, select (perhaps all carrier frequency) carrier frequency from this residential quarter and power on.
Wherein, N2>N1.
102.4, the telephone traffic of every line reaches the thresholding N2 that powers in the residential quarter, then is considered as telephone traffic and increases severely, and will initiate promptly to power on, carrier frequency all in the residential quarter is all powered on.
The power-on and power-off cycle of BTS system peripherals veneer is different, wherein BP powers on slower, if the TCH of residential quarter is (Traffic Channel, Traffic Channel) electricity under the BP of carrier frequency association, and BCCH (Broadcast Control Channel, Broadcast Control Channel) carrier frequency is in power-up state, BSC detects telephone traffic to be increased, require TCH to power on, but BP powers on the cycle long, will cause network congestion.Therefore, carry out different processing modes at different peripheral single board.
The electric current journey also comprises under the RRU of step 103 and the veneer of BBU:
103.1, transmitting-receiving letter module (DTRU): when carrier frequency is closed, the transmitting-receiving letter module related with this carrier frequency closed, outside transmitting power.
103.2, the power amplifier (PA) of far end radio frequency: when all DTRU of this PA subordinate close, then this PA closes, and PA opens to have a DTRU to open then.
103.3, LTE Baseband Processing Unit: when certain LTE Baseband Processing Unit BP (being assumed to be BPi, the maximum BP number of i<system) not related with logical resource, then under the LTE Baseband Processing Unit.Have needs to power in the logic carrier frequencies that BPi binds, then this BPi veneer keeps powering on.The logic carrier frequencies that goes up binding as BPi is all electric down, and down whether the BCCH carrier frequency of residential quarter, decision logic carrier frequency place.
103.3.1, when the BCCH carrier frequency of certain residential quarter CELL (cellular cell, be called for short " residential quarter ") (being assumed to be CELLj, the maximum carrier frequency number that j<BP plate is supported) need power on, then BPi keeps powering on;
103.3.2, go up the whole electricity down of BCCH carrier frequency of residential quarter at the logic carrier frequencies place of binding as BPi, then under the BPi.
103.3.3, the logic carrier frequencies of on a plurality of BP plates, the binding carrier frequency that electricity down all arranged simultaneously and power on, this moment, any one BP can not descend electricity, considered the BP base-band resource is dynamically adjusted, so that more resources is descended electric less power consumption.
Have electricity and the carrier frequency that powers on down simultaneously if judge the logic carrier frequencies of binding on a plurality of LTE Baseband Processing Unit, judge then whether described LTE Baseband Processing Unit satisfies the condition of adjusting resource, as satisfying, then the following electric carrier frequency on power on carrier frequency and other LTE Baseband Processing Unit on one or more described LTE Baseband Processing Unit is exchanged, till the carrier frequency that do not power on described one or more described LTE Baseband Processing Unit, close described one or more described LTE Baseband Processing Unit then.
Dynamic resource adjustment flow process comprises among the step 103.3.3:
103.3.3.1, judge whether satisfy to adjust the condition (namely judging whether to have the situation that BP can following electricity) of resource;
Judgment principle in the present embodiment is: deduct the difference of the carrier frequency number P that ought all power on as all resource S of BP greater than Q (Q is the maximum carrier frequency number that a BP plate is supported), then think to have possibility electric under the BP.
In the present embodiment, with the binding relationship of logic carrier frequencies and RRU and BP copy copy, judge with copy that adopting copy to judge can be so that data rewind swap fault the time can not have influence on current binding relationship.
Judging under the condition that satisfies the adjustment resource, the following electric carrier frequency on power on carrier frequency and other BP on one or more BP is exchanged, till the carrier frequency that do not power on described one or more BP, close described one or more BP then.Method was carried out the adjustment of resource below present embodiment adopted:
103.3.3.2, inquire about maximum and minimum two BP (being assumed to be BPi and BPj) of carrier frequency that existence powers in all BP plates
103.3.3.3, do not reach thresholding M when the load of BPi, with among the BPi down among the carrier frequency of electricity and the BPj not down the carrier frequency of electricity (comprising not the resource with the logic carrier frequencies binding) exchange in advance, judge whether the load of BPi this moment reaches thresholding M.Do not reach thresholding, then exchange, continue to judge, otherwise the state of record BPi is not commutative, enter step 103.3.3.2 and continue to judge;
103.3.3.4, when the state of all BPi all is set to not commutatively, think and judge and finish, the exchange result of copy is analyzed.
103.3.3.5, when there is under the BP electricity in the exchange result, think that then there is meaning in exchange, upgrade binding relationship, and qualified veneer descend electricity, otherwise think and exchange no any effect, swap fault.Step 103.3 flow process finishes.
Certainly, adjust resource and be not limited to said method, for example, deduct at all resource S that judge BP under the situation of difference greater than Q (Q is the maximum carrier frequency number that a BP supports) of the carrier frequency number P that ought all power on, also the carrier frequency that powers on the BP of Q correspondence can be exchanged on other BP, can directly discharge the BP of Q correspondence like this.
Fig. 5 is the schematic diagram that a gsm system resource status distributes, and as shown in Figure 5, in BBU, main control module is responsible for carrying out associated allocation and the peripheral single board power-on and power-off operation of BSC carrier frequency, base-band resource and radio frequency RRU resource, has assigned the formation tlv triple as figure:
[{R11},{BP1},{RRU2}],
[{R12},{BP1},{RRU1}],
[{R21},{BP1},{RRU2}],
[{R22},{BP2},{RRU2}],
[{R31},{BP2},{RRU2}]。
With { Sectori, Trxi} are designated as Rii, and wherein R11 is the BCCH carrier frequency of residential quarter 1, and R21 is the BCCH carrier frequency of residential quarter 2.
For remote radio unit (RRU) RRU1, owing to have only the binding of a physical carrier and logic carrier frequencies, and this logic carrier frequencies is in down, so the PA of this RRU can turn-off, for remote radio unit (RRU) RRU2, the PA of this RRU powers on owing to there is the carrier frequency of binding to be in, so must keep powering on to guarantee that business is normal.For the RF remote resource of RRU1 and RRU2, as long as the carrier frequency of binding is closed condition, then this resource all can be closed.
For BBU, (R11, so R12) electricity down, but R22 electricity down are the electric condition of the discontented foot of BP1 when BP1 goes up the logic carrier frequencies of binding.When the logic carrier frequencies R21 of the last binding of BP2 not descends, also be discontented with the electric condition of foot, all two BP veneers all are in and power on, but because the carrier frequency number that all powers on is 3, the whole available base-band resource 2*Q-3>Q of BP (wherein, Q is the maximum resource number that every BP supports) are so dynamically carry out the resource adjustment, the adjustment result is shown in Figure 6, and BP1 can descend electricity with consumption reduction after adjustment finished.
Resource binding relation after the adjustment
[{R11},{BP1},{RRU2}],
[{R12},{BP1},{RRU1}],
[{R21},{BP2},{RRU2}],
[{R22},{BP2},{RRU2}],
[{R31},{BP2},{RRU2}]。
The power-economizing method of the radio frequency stretch system of the embodiment of the invention allows operator to set up the time period on their own, and when the telephone traffic of base station descended, closed portion did not have professional energy consumption in this time period, to reduce old of operation.During the consumption reduction, do not change and to move business, can not bring the unusual call drop of system, consider the shortcoming that the BP Board Power up is slow, under carrying out BP, can further judge the power-on and power-off state of residential quarter BCCH carrier frequency in the electricity operation, under the situation that prevents the BCCH operate as normal, telephone traffic is uprushed and is required TCH to power on, the network congestion that LTE Baseband Processing Unit can not in time power on and occur.Consider the dynamic adjustment of base-band resource in addition, so that under the situation that does not influence user's experience, farthest carry out energy-conservation.
One of ordinary skill in the art will appreciate that all or part of step in the said method can instruct related hardware to finish by program, described program can be stored in the computer-readable recording medium, as read-only memory, disk or CD etc.Alternatively, all or part of step of above-described embodiment also can use one or more integrated circuits to realize.Correspondingly, each the module/unit in above-described embodiment can adopt the form of hardware to realize, also can adopt the form of software function module to realize.The present invention is not restricted to the combination of the hardware and software of any particular form.
Below only be the preferred embodiments of the present invention; certainly; the present invention also can have other various embodiments; under the situation that does not deviate from spirit of the present invention and essence thereof; those of ordinary skill in the art work as can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection range of the appended claim of the present invention.

Claims (22)

1. the power-economizing method in the radio frequency stretch system comprises:
The telephone traffic of base station controller detected cells, as the telephone traffic that detects every line in the residential quarter is then selected part or all of logic carrier frequencies from described residential quarter and is descended less than first thresholding.
2. the method for claim 1, it is characterized in that: described base station controller is selected part or all of logic carrier frequencies from described residential quarter and is descended electricity to implement under the following conditions:
The switch that detects electricity under the permission carrier frequency of described cell configuration is in open mode.
3. the method for claim 1 is characterized in that: select part or all of logic carrier frequencies from described residential quarter and descend after the electricity, also comprise:
Take the selected calling of the logic carrier frequencies of electricity down if described base station controller receives, then described call migration is arrived not the logic carrier frequencies of electricity down.
4. as each described method of claim 1-3, it is characterized in that: described base station controller is selected part or all of logic carrier frequencies and is descended after the electricity from described residential quarter, also comprise:
The power-on and power-off state of the logic carrier frequencies of described residential quarter is sent to base transceiver station.
5. the method for claim 1 is characterized in that: select part or all of logic carrier frequencies from described residential quarter and descend after the electricity, also comprise:
Described base station controller is if the telephone traffic that detects every line in the described residential quarter greater than second thresholding, then goes up electric treatment with all logic carrier frequencies in the described residential quarter, and second thresholding is greater than first thresholding.
6. as claim 1 or 5 described methods, it is characterized in that:
The telephone traffic of described base station controller detected cells is carried out in the section at the fixed time.
7. base station controller comprises:
Detection module is for detection of the telephone traffic of residential quarter;
Processing module is used for detecting under the situation of telephone traffic less than first thresholding of every line in the residential quarter at described detection module, selects part or all of logic carrier frequencies from described residential quarter and descends.
8. base station controller as claimed in claim 7 is characterized in that:
Described detection module, also whether the switch for detection of electricity under the permission carrier frequency of described cell configuration is in open mode;
Described processing module, be detect every line in the residential quarter at described detection module telephone traffic less than first thresholding, and described switch is under the situation of open mode, selects part or all of logic carrier frequencies from described residential quarter and descends electricity.
9. base station controller as claimed in claim 7 is characterized in that:
Described processing module also is used for if receive and take the selected calling of the logic carrier frequencies of electricity down, then with described call migration to the logic carrier frequencies of electricity down not.
10. as each described base station controller of claim 7-9, it is characterized in that:
Described processing module is selected part or all of logic carrier frequencies from described residential quarter and also is used for after descending electricity, and the power-on and power-off state of the logic carrier frequencies of described residential quarter is sent to base transceiver station.
11. base station controller as claimed in claim 7 is characterized in that:
Described processing module, from described residential quarter select part or all of logic carrier frequencies descend the electricity after also be used for, if the telephone traffic that detects every line in the described residential quarter then goes up electric treatment with all logic carrier frequencies in the described residential quarter greater than second thresholding, second thresholding is greater than first thresholding.
12. the method for the power-economizing method in the radio frequency stretch system comprises:
Base transceiver station receives the power-on and power-off state of the logic carrier frequencies of base station controller transmission;
If judge that the power-on and power-off state of described logic carrier frequencies is inconsistent with the data of local storage, then the power-on and power-off state according to described logic carrier frequencies carries out power-on and power-off control.
13. method as claimed in claim 12 is characterized in that, described base transceiver station carries out power-on and power-off control according to the power-on and power-off state of described logic carrier frequencies and comprises:
Close the transmitting-receiving letter module on the remote radio unit (RRU) related with the logic carrier frequencies of power-down state (RRU).
14. method as claimed in claim 13 is characterized in that, the transmitting-receiving that described base transceiver station is closed on the RRU related with the logic carrier frequencies of power-down state is believed after the module, also comprises:
All close if judge all the transmitting-receiving letter modules of the power amplifier subordinate on the described RRU, then close described power amplifier.
15. method as claimed in claim 12 is characterized in that, described base transceiver station carries out power-on and power-off control according to the power-on and power-off state of described logic carrier frequencies and comprises:
If judge that the logic carrier frequencies of binding on the LTE Baseband Processing Unit on the baseband processing unit (BBU) all is power-down state, and the Broadcast Control Channel carrier frequency of this residential quarter, logic carrier frequencies place is all electric down, then described LTE Baseband Processing Unit is descended electric treatment.
16., it is characterized in that described base transceiver station carries out power-on and power-off control according to the power-on and power-off state of described logic carrier frequencies, also comprises as each described method of claim 12-15:
Have electricity and the carrier frequency that powers on down simultaneously if judge the logic carrier frequencies of binding on a plurality of LTE Baseband Processing Unit on the described BBU, judge then whether described LTE Baseband Processing Unit satisfies the condition of adjusting resource, as satisfying, then the following electric carrier frequency on power on carrier frequency and other LTE Baseband Processing Unit on one or more described LTE Baseband Processing Unit is exchanged, till the carrier frequency that do not power on described one or more described LTE Baseband Processing Unit, close described one or more described LTE Baseband Processing Unit then.
17. method as claimed in claim 16 is characterized in that,
Described base transceiver station is if judge all carrier frequency resources of described a plurality of LTE Baseband Processing Unit and the number of the carrier frequency that powers on it poor, greater than the maximum carrier frequency number that any is supported in the described LTE Baseband Processing Unit, then be considered as described LTE Baseband Processing Unit and satisfy the condition of adjusting resource.
18. a base transceiver station comprises: baseband processing unit (BBU) and remote radio unit (RRU) (RRU), wherein,
Main control module on the described BBU, behind the power-on and power-off state for the logic carrier frequencies that receives the base station controller transmission, if judge that the power-on and power-off state of described logic carrier frequencies is inconsistent with the data of local storage, then go up electric control according to the power-on and power-off state of described logic carrier frequencies.
19. base transceiver station as claimed in claim 18 is characterized in that,
Described main control module, last electric control comprises: close the transmitting-receiving letter module on the described RRU related with the logic carrier frequencies of power-down state; Perhaps, if the logic carrier frequencies of binding on the LTE Baseband Processing Unit on the described BBU of judgement all is power-down state, and the Broadcast Control Channel carrier frequency of this residential quarter, logic carrier frequencies place is all electric down, then described LTE Baseband Processing Unit is descended electric treatment; Perhaps, have electricity and the carrier frequency that powers on down simultaneously if judge the logic carrier frequencies of binding on a plurality of LTE Baseband Processing Unit on the described BBU, judge then whether described LTE Baseband Processing Unit satisfies the condition of adjusting resource, as satisfying, then the following electric carrier frequency on power on carrier frequency and other LTE Baseband Processing Unit on one or more described LTE Baseband Processing Unit is exchanged, till the carrier frequency that do not power on described one or more described LTE Baseband Processing Unit, close described one or more described LTE Baseband Processing Unit then.
20. base transceiver station as claimed in claim 19 is characterized in that,
Described main control module also is used for after closing described transmitting-receiving letter module, all closes if judge all the transmitting-receiving letter modules of the power amplifier subordinate on the described RRU, then closes described power amplifier.
21. base transceiver station as claimed in claim 19 is characterized in that,
Described main control module, if all carrier frequency resources of the described a plurality of LTE Baseband Processing Unit of judgement and the number of the carrier frequency that powers on it is poor, greater than the maximum carrier frequency number of any support in the described LTE Baseband Processing Unit, then be considered as described LTE Baseband Processing Unit and satisfy the condition of adjusting resource.
22. a radio frequency stretch system comprises: as each described base station controller of claim 7-11 with as each described base transceiver station of claim 18-21.
CN201210004307XA 2012-01-06 2012-01-06 Method and device for energy conservation of remote radio frequency system Pending CN103200655A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210004307XA CN103200655A (en) 2012-01-06 2012-01-06 Method and device for energy conservation of remote radio frequency system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210004307XA CN103200655A (en) 2012-01-06 2012-01-06 Method and device for energy conservation of remote radio frequency system

Publications (1)

Publication Number Publication Date
CN103200655A true CN103200655A (en) 2013-07-10

Family

ID=48722974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210004307XA Pending CN103200655A (en) 2012-01-06 2012-01-06 Method and device for energy conservation of remote radio frequency system

Country Status (1)

Country Link
CN (1) CN103200655A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016179953A1 (en) * 2015-05-14 2016-11-17 中兴通讯股份有限公司 Power saving method and apparatus for communication device
WO2017012498A1 (en) * 2015-07-17 2017-01-26 中兴通讯股份有限公司 Power saving control method for remote radio unit, and related device
CN107277926A (en) * 2017-06-22 2017-10-20 哈尔滨海能达科技有限公司 A kind of digital trunking system channel moving method and device
WO2018098763A1 (en) * 2016-11-30 2018-06-07 华为技术有限公司 Method and apparatus for controlling remote radio unit
CN110798880A (en) * 2018-08-02 2020-02-14 中兴通讯股份有限公司 Method, apparatus and storage medium for powering on and powering off indoor distribution system
CN113766619A (en) * 2020-06-02 2021-12-07 中国联合网络通信集团有限公司 RRU dynamic scheduling method, device, electronic equipment and storage medium
CN113873618A (en) * 2020-06-30 2021-12-31 中国移动通信集团吉林有限公司 Base station energy-saving control method and system based on Internet of things
WO2023000303A1 (en) * 2021-07-23 2023-01-26 华为技术有限公司 Chip turn-off dynamic control method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6584330B1 (en) * 2000-07-18 2003-06-24 Telefonaktiebolaget Lm Ericsson (Publ) Adaptive power management for a node of a cellular telecommunications network
CN101291510A (en) * 2008-06-03 2008-10-22 中兴通讯股份有限公司 Intelligent power-off method for carrier frequency
CN101702822A (en) * 2009-10-23 2010-05-05 中兴通讯股份有限公司 Method for realizing carrier control and system
CN101932020A (en) * 2009-06-18 2010-12-29 大唐移动通信设备有限公司 De-electrification control method, equipment and system of BBU

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6584330B1 (en) * 2000-07-18 2003-06-24 Telefonaktiebolaget Lm Ericsson (Publ) Adaptive power management for a node of a cellular telecommunications network
CN101291510A (en) * 2008-06-03 2008-10-22 中兴通讯股份有限公司 Intelligent power-off method for carrier frequency
CN101932020A (en) * 2009-06-18 2010-12-29 大唐移动通信设备有限公司 De-electrification control method, equipment and system of BBU
CN101702822A (en) * 2009-10-23 2010-05-05 中兴通讯股份有限公司 Method for realizing carrier control and system

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106304282B (en) * 2015-05-14 2021-05-04 中兴通讯股份有限公司 Energy-saving method and device for communication equipment
CN106304282A (en) * 2015-05-14 2017-01-04 中兴通讯股份有限公司 A kind of communication equipment energy-saving method and device
WO2016179953A1 (en) * 2015-05-14 2016-11-17 中兴通讯股份有限公司 Power saving method and apparatus for communication device
WO2017012498A1 (en) * 2015-07-17 2017-01-26 中兴通讯股份有限公司 Power saving control method for remote radio unit, and related device
WO2018098763A1 (en) * 2016-11-30 2018-06-07 华为技术有限公司 Method and apparatus for controlling remote radio unit
CN109479240A (en) * 2016-11-30 2019-03-15 华为技术有限公司 The control method and device of Remote Radio Unit
CN107277926A (en) * 2017-06-22 2017-10-20 哈尔滨海能达科技有限公司 A kind of digital trunking system channel moving method and device
CN107277926B (en) * 2017-06-22 2020-07-31 哈尔滨海能达科技有限公司 Channel migration method and device for digital cluster system
CN110798880A (en) * 2018-08-02 2020-02-14 中兴通讯股份有限公司 Method, apparatus and storage medium for powering on and powering off indoor distribution system
CN113766619A (en) * 2020-06-02 2021-12-07 中国联合网络通信集团有限公司 RRU dynamic scheduling method, device, electronic equipment and storage medium
CN113873618A (en) * 2020-06-30 2021-12-31 中国移动通信集团吉林有限公司 Base station energy-saving control method and system based on Internet of things
CN113873618B (en) * 2020-06-30 2023-11-03 中国移动通信集团吉林有限公司 Base station energy-saving control method and system based on Internet of things
WO2023000303A1 (en) * 2021-07-23 2023-01-26 华为技术有限公司 Chip turn-off dynamic control method and device

Similar Documents

Publication Publication Date Title
CN103200655A (en) Method and device for energy conservation of remote radio frequency system
CN102172082B (en) Manage method, terminal device, network side equipment and the communication system of power supply
CN103597867B (en) For the apparatus and method for the power for saving base station
WO2012148442A1 (en) Techniques to manage energy savings for interoperable radio access technology networks
CN103068019B (en) A kind of method that WLAN is energy-conservation and device
WO2012019547A1 (en) Control processing method of energy-saving cell and base station
BRPI1107465A2 (en) Apparatus and method for controlling a node of a wireless communication system
CN101572899A (en) Switching device based on multi-system network and method thereof
CN104272857A (en) Methods and apparatus for intelligent wireless technology selection
WO2009146660A1 (en) Mobile communication control method, base station controller, base station and system
CN103249097A (en) Communications system
WO2021109746A1 (en) Method for controlling active room distribution system, electronic device, and storage medium
US20200252875A1 (en) Power consumption control method and apparatus
CN101827435A (en) Energy saving method, access entity and user device for communication system device
EP2381723B1 (en) Method and system for realizing energy saving control of bs
EP2779725B1 (en) Carrier control method and corresponding base station device
US20220346004A1 (en) Base station control method, operations support system oss, and distributed base station system dbs
CN105636138A (en) Network switching method, network switching device and terminal
WO2016000349A1 (en) Power-saving control method and device for base station, and storage medium
CN103906203A (en) Base station energy saving method and system through cover compensation
CN104105151B (en) Base station handles method, apparatus and base station
Jorguseski et al. Energy saving in wireless access networks
CN101932020B (en) De-electrification control method, equipment and system of BBU
CN104159277A (en) Base station energy saving apparatus and method
WO2023246101A1 (en) Energy-saving method, and base station and terminal device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130710