CN103197277B - Special transformer acquisition terminal full performance testing system - Google Patents

Special transformer acquisition terminal full performance testing system Download PDF

Info

Publication number
CN103197277B
CN103197277B CN201310105680.9A CN201310105680A CN103197277B CN 103197277 B CN103197277 B CN 103197277B CN 201310105680 A CN201310105680 A CN 201310105680A CN 103197277 B CN103197277 B CN 103197277B
Authority
CN
China
Prior art keywords
input port
test
acquisition terminal
energy meter
quantity input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310105680.9A
Other languages
Chinese (zh)
Other versions
CN103197277A (en
Inventor
王新刚
关宏
朱彬若
张垠
沈滢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201310105680.9A priority Critical patent/CN103197277B/en
Publication of CN103197277A publication Critical patent/CN103197277A/en
Application granted granted Critical
Publication of CN103197277B publication Critical patent/CN103197277B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a special transformer acquisition terminal full performance testing system. A special transformer acquisition terminal comprises a communication interface, an alternating current analog quantity input port, a direct current analog quantity input port, a state quantity input port, a pulse quantity input port, a control output port and an energy meter data acquisition port. The special transformer acquisition terminal full performance testing system comprises a communication device, a computer, a program control three-phase power source, a direct current signal source, a state quantity execution indicator, a pulse signal generator, a control execution indicator and an energy meter; the computer is connected with the communication interface through the communication device; the program control three-phase power source is connected with the alternating current analog quantity input port; the direct current signal source is connected with the direct current analog quantity input port; the state quantity execution indicator is connected with the state quantity input port; the pulse signal generator is connected with the pulse quantity input port, the control execution indicator is connected with the control output port; and the energy meter is connected with the energy meter data acquisition port. Compared with the prior art, the special transformer acquisition terminal full performance testing system increases work efficiency and is convenient to use.

Description

A kind of specially change acquisition terminal full performance test system
Technical field
The present invention relates to electric energy meter performance detecting system, especially relate to a kind of specially change acquisition terminal full performance test system.
Background technology
Special change acquisition terminal is as the Site Service of the power consumer management of power use, distribution transformer monitoring, remote meter reading and office terminal product, under distribution network automated overall situation, special change acquisition terminal needs the power supply quality that can ensure user, having very real meaning, is also the important component part realizing demand management.Special change acquisition terminal needs to realize the functions such as acquisition and processing function to AC analogue information, the acquisition and processing function of user power utilization information, electric energy quality monitoring function, user power utilization load controlling function and user power utilization control, and manages and transmitted in both directions image data.
Need before special change acquisition terminal dispatches from the factory to use proving installation to test.General survey project of establishing comprises function test, data transmission channel test, unification of communication protocol test, climate effect test etc., these test events need to adopt different test units to carry out respectively respectively at present, waste time and energy, therefore the present invention develops a kind of pilot system of special change acquisition terminal.
Summary of the invention
Object of the present invention is exactly provide a kind of to overcome defect that above-mentioned prior art exists specially to become acquisition terminal full performance test system.
Object of the present invention can be achieved through the following technical solutions:
A kind of specially change acquisition terminal full performance test system, for detecting the full performance specially becoming acquisition terminal, specially becoming acquisition terminal and comprising communication interface, ac analog input port, DC analogue quantity input port, quantity of state input port, pulsed quantity input port, control output end mouth and electric energy meter data acquisition port, this system comprises communication facilities, computing machine, program control three phase power source, DC signal source, quantity of state performs indicator, pulse signal generator, control to perform indicator and electric energy meter, described computing machine is connected with communication interface by communication facilities, described program control three phase power source is connected with ac analog input port, described DC signal source is connected with DC analogue quantity input port, described quantity of state performs indicator and is connected with quantity of state input port, described pulse signal generator is connected with pulsed quantity input port, described control performs indicator and is connected with control output end mouth, and described electric energy meter is connected with electric energy meter data acquisition port.
Described program control three phase power source is connected with three-phase standard scale simultaneously.
Described DC signal source is connected with direct current standard scale simultaneously.
Described electric energy meter is connected with current source.
Can carry out full performance test to specially becoming acquisition terminal by native system, test event comprises data transmission channel test, unification of communication protocol test, power supply impact (power supply break phase, change in voltage) test, power consumption test, to be energized stability test, climate effect test, voltage dip and short interruptions test, dielectric test, electromagnetic compatibility test etc. continuously.Each test event is undertaken by corresponding device, and temperature when using native system to test is 15 ~ 35 DEG C, and relative humidity is 25% ~ 75%, during test, Power Supplies Condition is: frequency 50Hz, frequency: 50Hz, permissible variation-2% ~+1%, voltage: 220V, permissible variation ± 5%.
Compared with prior art, the present invention can carry out full performance test to specially becoming acquisition terminal, and the present invention meets the requirement simultaneously carrying out each performance test, in experimentation, compatible between the device of native system, invention increases work efficiency, easy to use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
In figure, 1 for specially to become acquisition terminal, and 2 is communication interface, and 3 is ac analog input port, 4 is DC analogue quantity input port, 5 is quantity of state input port, and 6 is pulsed quantity input port, and 7 is control output end mouth, 8 is electric energy meter data acquisition port, 9 is communication facilities, and 10 is computing machine, and 11 is program control three phase power source, 12 is DC signal source, 13 is quantity of state execution indicator, and 14 is pulse signal generator, and 15 perform indicator for controlling, 16 is electric energy meter, 17 is current source, and 18 is three-phase standard scale, and 19 is direct current standard scale.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
Embodiment
A kind of specially change acquisition terminal full performance test system, as shown in Figure 1, for detecting the full performance specially becoming acquisition terminal 1, specially becoming acquisition terminal 1 and comprising communication interface 2, ac analog input port 3, DC analogue quantity input port 4, quantity of state input port 5, pulsed quantity input port 6, control output end mouth 7 and electric energy meter data acquisition port 8, this system comprises communication facilities 9, computing machine 10, program control three phase power source 11, DC signal source 12, quantity of state performs indicator 13, pulse signal generator 14, control to perform indicator 15 and electric energy meter 16, computing machine 10 is connected with communication interface 2 by communication facilities 9, program control three phase power source 11 is connected with ac analog input port 3, DC signal source 12 is connected with DC analogue quantity input port 4, quantity of state performs indicator 13 and is connected with quantity of state input port 5, pulse signal generator 14 is connected with pulsed quantity input port 6, and control to perform indicator 15 and be connected with control output end mouth 7, electric energy meter 16 is connected with electric energy meter data acquisition port 8.Wherein, program control three phase power source 11 is connected with three-phase standard scale 18 simultaneously.DC signal source 12 is connected with direct current standard scale 19 simultaneously.Electric energy meter 16 is connected with current source 17.
Can carry out full performance test to specially becoming acquisition terminal 1 by native system, test event comprises data transmission channel test, unification of communication protocol test, power supply impact (power supply break phase, change in voltage) test, power consumption test, to be energized stability test, climate effect test, voltage dip and short interruptions test, dielectric test, electromagnetic compatibility test etc. continuously.Each test event is undertaken by corresponding device, and temperature when using native system to test is 15 ~ 35 DEG C, and relative humidity is 25% ~ 75%, during test, Power Supplies Condition is: frequency 50Hz, frequency: 50Hz, permissible variation-2% ~+1%, voltage: 220V, permissible variation ± 5%.

Claims (2)

1. specially become an acquisition terminal full performance test system, for detecting the full performance specially becoming acquisition terminal, specially becoming acquisition terminal and comprising communication interface, ac analog input port, DC analogue quantity input port, quantity of state input port, pulsed quantity input port, control output end mouth and electric energy meter data acquisition port, is characterized in that, this system comprises communication facilities, computing machine, program control three phase power source, DC signal source, quantity of state performs indicator, pulse signal generator, control to perform indicator and electric energy meter, described computing machine is connected with communication interface by communication facilities, described program control three phase power source is connected with ac analog input port, described DC signal source is connected with DC analogue quantity input port, described quantity of state performs indicator and is connected with quantity of state input port, described pulse signal generator is connected with pulsed quantity input port, described control performs indicator and is connected with control output end mouth, and described electric energy meter is connected with electric energy meter data acquisition port,
Described program control three phase power source is connected with three-phase standard scale simultaneously;
Described DC signal source is connected with direct current standard scale simultaneously;
Native system carries out full performance test to specially becoming acquisition terminal, test event comprises data transmission channel test, unification of communication protocol is tested, power supply impact test, power consumption is tested, continuous energising stability test, climate effect is tested, voltage dip and short interruptions test, dielectric test, electromagnetic compatibility test, each test event is undertaken by corresponding device, temperature when using native system to test is 15 ~ 35 DEG C, relative humidity is 25% ~ 75%, during test, Power Supplies Condition is: frequency 50Hz, permissible variation-2% ~+1%, voltage: 220V, permissible variation ± 5%.
2. one according to claim 1 specially becomes acquisition terminal full performance test system, it is characterized in that, described electric energy meter is connected with current source.
CN201310105680.9A 2013-03-28 2013-03-28 Special transformer acquisition terminal full performance testing system Active CN103197277B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310105680.9A CN103197277B (en) 2013-03-28 2013-03-28 Special transformer acquisition terminal full performance testing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310105680.9A CN103197277B (en) 2013-03-28 2013-03-28 Special transformer acquisition terminal full performance testing system

Publications (2)

Publication Number Publication Date
CN103197277A CN103197277A (en) 2013-07-10
CN103197277B true CN103197277B (en) 2015-07-22

Family

ID=48719954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310105680.9A Active CN103197277B (en) 2013-03-28 2013-03-28 Special transformer acquisition terminal full performance testing system

Country Status (1)

Country Link
CN (1) CN103197277B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198835A (en) * 2014-07-31 2014-12-10 国家电网公司 Metering type special change acquisition terminal upstream channel detection method special for automatic calibration system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5737551A (en) * 1994-11-28 1998-04-07 Cascade Technology Corp., Inc. Switching circuit for computer/data acquisition terminal
CN202330594U (en) * 2011-11-29 2012-07-11 浙江省电力试验研究院 Computer program-controlled testing platform for intelligent distribution transformer terminal

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203178475U (en) * 2013-03-28 2013-09-04 国家电网公司 Full-performance test system of data acquisition terminal of special transformer

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5737551A (en) * 1994-11-28 1998-04-07 Cascade Technology Corp., Inc. Switching circuit for computer/data acquisition terminal
CN202330594U (en) * 2011-11-29 2012-07-11 浙江省电力试验研究院 Computer program-controlled testing platform for intelligent distribution transformer terminal

Also Published As

Publication number Publication date
CN103197277A (en) 2013-07-10

Similar Documents

Publication Publication Date Title
WO2012059061A1 (en) Method and device for quality-monitoring of high-voltage electrical energy
Babu et al. An intelligent controller for smart home
CN105486914A (en) AC sampling device of electricity larceny preventive power load monitoring system
Jadhav et al. Development of a novel iot-enabled power-monitoring architecture with real-time data visualization for use in domestic and industrial scenarios
CN203178475U (en) Full-performance test system of data acquisition terminal of special transformer
CN203337792U (en) Motor type test system
CN103197277B (en) Special transformer acquisition terminal full performance testing system
JP2009014659A (en) Deemed power value output current monitoring device by own power source system
US20120259566A1 (en) Device for measuring two phase power with single voltage input
CN202093088U (en) Electrical parameter measuring device
Ranjith et al. Futuristic smart energy meter-design based on embedded perspective
JP6215520B2 (en) Power usage management system
CN202393858U (en) Correcting unit for reverse connection of current wires of field electric meter
CN204166082U (en) On-line monitoring device for identifying falls in distribution network voltage temporarily
CN201177647Y (en) Multiple waveform aging test apparatus of lightning arrester
CN204101664U (en) A kind of frequency converter performance testing device
CN104200635A (en) Wireless switch with function of electrical quantity metering and acquisition method
CN201600440U (en) Comprehensive energy efficiency quality test device
EP2477001A2 (en) Systems, methods, and apparatus for powering an AMI communication board
CN203502470U (en) Adaptive circuit for transformer area relation test host and transformer area relation test host
CN203167356U (en) Street lamp illumination monitoring terminal
CN103576020A (en) Power quality monitoring system based on network
CN202111368U (en) Remote monitoring high-voltage switch cabinet
CN209356569U (en) Long-range secondary voltage drop test macro
CN104485729A (en) High-reliability power supply circuit suitable for embedded field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant