CN103195403A - Large sand quantity anti-pollution sand blower - Google Patents

Large sand quantity anti-pollution sand blower Download PDF

Info

Publication number
CN103195403A
CN103195403A CN2013101359572A CN201310135957A CN103195403A CN 103195403 A CN103195403 A CN 103195403A CN 2013101359572 A CN2013101359572 A CN 2013101359572A CN 201310135957 A CN201310135957 A CN 201310135957A CN 103195403 A CN103195403 A CN 103195403A
Authority
CN
China
Prior art keywords
sand
valve
sliding sleeve
central tube
valve seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101359572A
Other languages
Chinese (zh)
Inventor
张晓君
兰图
赵公利
兰乘宇
刘跃宝
周婷婷
岳湘刚
张国良
佘龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Daqing Oilfield Co Ltd
Original Assignee
Petrochina Co Ltd
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd, Daqing Oilfield Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2013101359572A priority Critical patent/CN103195403A/en
Publication of CN103195403A publication Critical patent/CN103195403A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a large sand amount anti-pollution sand blower used for implementing underground layered fracturing in oil extraction production. An inner hole at the lower end of the upper joint of the sand blaster is connected with a central pipe, the outer wall of the upper joint of the sand blaster is connected with an adjusting ring, a spring and a valve are sequentially sleeved on the outer wall of the central pipe below the adjusting ring, and the lower end of the valve is seated at the upper opening of a valve seat; an annular cavity is arranged between the valve seat and the central pipe, a sand outlet is arranged on the central pipe wall below the valve, and the annular cavity is communicated with the sand outlet; the lower end of the valve seat is connected with the lower joint through a fixing pin; the center tube in suit sliding sleeve to through the pin fixed of sand outlet upper portion, the lower extreme of sliding sleeve connects the direction head, installs the jump ring between the upper end face of direction head and the sliding sleeve. The fracturing string composed of the sand blaster can realize the fracturing of more than four layers of fixed strings, and realizes the maximum sand passing amount of a single sand blaster to be 100m3The reconstruction radius of fracturing reconstruction is increased, and the recovery ratio is improved.

Description

The anti-pollution sandblaster of large sand amount
Technical field
The used anti-pollution sandblaster of a kind of large sand amount when the down-hole being implemented separate stratum fracfturing in producing the present invention relates to recover the oil.
Background technology
At present, when developing oil fields old well, can further improve oil recovery rate by fracturing technology.Adding sand can increase the radius of fracturing reform, has formed higher flow conductivity, is conducive to further improve oil recovery rate.In the employed sandblaster of existing fracturing string, matching used with hydraulic expansion formula packer is exactly spring valve sandblaster, the super only 50m of the maximum sand-passing amount of this fracturing tool sandblaster 3, can not satisfy oil field development far away to the requirement of large sand amount construction.
Summary of the invention
In order to improve monomer sandblaster sand-passing amount, the invention provides the anti-pollution sandblaster of a kind of large sand amount.The fracturing string that this sandblaster is formed can be realized four layers of fracturing without pulling string, has realized that the maximum sand-passing amount of single sandblaster is 100m 3, increased the transformation radius of fracturing reform, improved recovery ratio.
Technical solution of the present invention: the anti-pollution sandblaster of a kind of large sand amount, comprise top connection and lower contact, described top connection lower end endoporus connects central tube, outer wall connects adjustable ring, pocketed springs and valve successively on the central tube outer wall of described adjustable ring below, the lower end of described valve is sitting in the suitable for reading of valve seat; Between valve seat and the central tube ring cavity is arranged, have clearance hole on the center tube wall of valve below, above-mentioned ring cavity communicates with described clearance hole; The lower end of above-mentioned valve seat is connected with described lower contact by fixing pin; Suit sliding sleeve in the described central tube, and fix by the pin on clearance hole top, the lower end of sliding sleeve connects guide head, between the upper surface of guide head and the sliding sleeve jump ring is installed.
Limit, the hole wall thickness of clearance hole approaches greater than the wall thickness at central tube two ends and external diameter and valve seat internal diameter on the above-mentioned central tube, and the aperture that shakes out is the plane.
Be provided with the valve sealing ring between described valve and central tube, be provided with sealing ring between valve seat and the lower contact, be provided with the sliding sleeve sealing ring between sliding sleeve lower end and lower contact.
Beneficial effect of the present invention: the effect of the anti-pollution sandblaster of this large sand amount provides fracturing fluid and fracturing sand to enter the passage on stratum when being pressure break.Connect to form tubing string by a plurality of these sandblasters, play cover step by step by pitching, realize multiple fracturing construction from bottom to top.The outer wall of this central tube clearance hole adopts the step design, the wall thickness of the central tube of the circumferential both sides of clearance hole increases with the valve seat internal diameter approaching, has increased the intensity of central tube, can avoid when accident treatment simultaneously, spring and valve to well, increase intractability from the central tube landing.The fracturing string that this sandblaster is formed, but pressure break is four layers under the situation of fixed tubular column, this sandblaster is owing to increased the external diameter at clearance hole place on the central tube, increased the sectional area at sand export place, increased intensity and the abrasion resistance at clearance hole place, single sandblaster adds the sand amount in 4 hours and reaches 100m 3, by strengthening scope of construction item, increase the fracturing reform radius, improve the degree of gathering of remaining oil and the injection effect of injection well, improve the effect of gathering of remaining oil.Use this sandblaster pressing crack construction simple to operate, save cost, have broad application prospects at latter period of oilfield development.In addition, during non-notes sand, this sandblaster valve and valve seat are in the long state that closes, can barrier oil cover annular space with oil pipe in passage, in the operation of a lower tubular column, anti-pollution function is arranged.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the sectional drawing of A-A among Fig. 1;
Fig. 3 is the structural representation of clearance hole on the sliding sleeve in 1;
Fig. 4 is B-B sectional drawing among Fig. 3.
1-top connection among the figure, 2-adjustable ring, 3-spring, 4-central tube, 5-valve, 6-valve sealing ring, 7-pin, 8-sliding sleeve, 9-valve seat, 10-sealing ring, 11-fixing pin, 12-lower contact, 13-sliding sleeve sealing ring, 14-jump ring, 15-guide head, 16-clearance hole.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing:
By Figure 1 and Figure 2, the anti-pollution sandblaster of this large sand amount comprises top connection 1 and lower contact 11, described top connection 1 lower end inner hole thread connects central tube 4, outer wall thread connects adjustable ring 2, pocketed springs 3 and valve 5 successively on the central tube outer wall of described adjustable ring 2 belows, the lower end of described valve 5 is sitting in the suitable for reading of valve seat 9, between valve seat 9 and the central tube 4 ring cavity is arranged, have clearance hole 16 on the center tube wall of valve below, above-mentioned ring cavity communicates with described clearance hole 16, pressure in the injection of ground fracturing unit truck, compressed through the effect lower spring 3 that the central tube sand export makes progress, valve 5 and spring 3 formed the liquid passage to the motion of top connection 1 direction between valve 5 and the valve seat 9, carried out pressing crack construction; Above-mentioned valve seat 9 increases abrasion resistance through Overheating Treatment, and the lower end is connected with described lower contact 12 by fixing pin 11; Suit sliding sleeve 8 in the described central tube 4, and fixing by the pin 7 on clearance hole 16 tops, and the lower end of sliding sleeve 8 connects guide head 15, between the upper surface of guide head 15 and the sliding sleeve 8 jump ring 14 is installed, as shown in Figure 1.
In addition, the outer wall of clearance hole 16 adopts the step design on this central tube 4, the wall thickness of the central tube of the circumferential both sides of clearance hole increases and approaches with the valve seat internal diameter, only differ 0.1 millimeter, increased the intensity of central tube, can avoid when accident treatment simultaneously, spring 3 and valve 5 to well, increase intractability such as Fig. 2, Fig. 3 and shown in Figure 4 from the central tube landing.
During construction if 1 fractured layer of a pressure break, an anti-pollution sandblaster of large sand amount and the interior no sliding sleeve of using, during as 2~3 fractured layers of need pressure break, need to install 2~3 sandblasters on the fracturing string, except no sliding sleeve in the central tube of next stage sandblaster, fixedly there is sliding sleeve 8 at clearance hole 8 places by pin 7 on the central tube 4 of the sandblaster at the top and middle part, and the lower end screw thread of sliding sleeve 8 is connected with guide head 15, between the upper surface of guide head 15 and the sliding sleeve 8 jump ring 14 is installed.During the pressure break second layer, in tubing string, drop into steel ball, steel ball drops on sliding sleeve 8 tops of middle part sandblaster, destroy sliding sleeve 8, jump ring 14 and guide head 15 under the effect of hydraulic pressure, open clearance hole, it is descending that steel ball heads on sliding sleeve 8 and jump ring 14 and guide head 15, fall the interior step place on the sandblaster clearance hole top of foot, close the sandblaster clearance hole of bottom, jump ring 14 is stuck in the central tube clearance hole lower step of nethermost sandblaster, prevents string on the sliding sleeve 8.Guide head 15 is used for installing the size of jump ring 14 and identification sliding sleeve 8.
In order to make sandblaster have good sealing effectiveness, 4 of described valve 5 and central tubes are provided with valve sealing ring 6, are provided with sealing ring 10 between valve seat 9 and the lower contact 12, and sliding sleeve 8 lower end inwalls and 12 of lower contacts are provided with sliding sleeve sealing ring 13.
During actual the use, at first the top connection upper end with the anti-pollution sandblaster of large sand amount is connected fastening with the lower contact lower end with operating tool string.Can adopt a plurality of sandblasters to combine fixed tubular column during connection according to the situation of fractured well, sit the fracturing string of pressing 1~3 layer, can also increase by 1 fractured layer if propose construction on adopting.The pressure break order from bottom to top, direct pressure break during the pressure break first floor, in tubing string, inject highly pressurised liquid, a highly pressurised liquid part enters and makes packer setting in the packing element, cross the anti-pollution sandblaster clearance hole of this large sand amount through highly pressurised liquid then and enter pre-fractured layer and press off the crack, through making seam, add sand, replacing and finish this lamination and split.Throw φ 38mm steel ball in the pressure break second layer forward direction tubing string, sliding sleeve 8 and jump ring 14 and the guide head 15 of the anti-pollution sandblaster of large sand amount in the middle of destroying under the effect of hydraulic pressure are opened clearance hole, form the oil jacket communication passage.Ball heads on the sand export place that sliding sleeve 8 and jump ring 14 and guide head 15 go downwards to the sandblaster central tube 4 of foot, closes this clearance hole, and fracturing fluid enters second fractured layer through the anti-pollution sandblaster of middle large sand amount.Throw φ 44mm steel ball in the 3rd layer of forward direction tubing string of pressure break, following process is identical with second layer fracturing process.
The fracturing string that this anti-pollution sandblaster is formed, but under the situation of fixed tubular column eight layers of pressure breaks, improved operating efficiency.Use this sandblaster pressing crack construction simple to operate, save cost, safety and environmental protection, have broad application prospects at latter period of oilfield development.

Claims (3)

1. anti-pollution sandblaster of large sand amount, comprise top connection (1) and lower contact (12), it is characterized in that: described top connection (1) lower end endoporus connects central tube (4), outer wall connects adjustable ring (2), pocketed springs (3) and valve (5) successively on the central tube outer wall of described adjustable ring (2) below, the lower end of described valve (5) is sitting in the suitable for reading of valve seat (9); Between valve seat (9) and the central tube (4) ring cavity is arranged, have clearance hole (16) on the center tube wall of valve below, above-mentioned ring cavity communicates with described clearance hole (16); The lower end of above-mentioned valve seat (9) is connected with described lower contact (12) by fixing pin (11); The interior suit sliding sleeve of described central tube (4) (8), and fixing by the pin (7) on clearance hole (16) top, and the lower end of sliding sleeve (8) connects guide head (15), between the upper surface of guide head (15) and the sliding sleeve (8) jump ring (14) is installed.
2. the anti-pollution sandblaster of large sand amount according to claim 1 is characterized in that: limit, the hole wall thickness of clearance hole on the above-mentioned central tube (16) approaches greater than the wall thickness at central tube two ends and external diameter and valve seat internal diameter, and the aperture that shakes out is the plane.
3. the anti-pollution sandblaster of large sand amount according to claim 1, it is characterized in that: be provided with valve sealing ring (6) between described valve (5) and central tube (4), be provided with sealing ring (10) between valve seat (9) and the lower contact (11), be provided with sliding sleeve sealing ring (13) between sliding sleeve (8) lower end and lower contact (12).
CN2013101359572A 2013-04-18 2013-04-18 Large sand quantity anti-pollution sand blower Pending CN103195403A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101359572A CN103195403A (en) 2013-04-18 2013-04-18 Large sand quantity anti-pollution sand blower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101359572A CN103195403A (en) 2013-04-18 2013-04-18 Large sand quantity anti-pollution sand blower

Publications (1)

Publication Number Publication Date
CN103195403A true CN103195403A (en) 2013-07-10

Family

ID=48718202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101359572A Pending CN103195403A (en) 2013-04-18 2013-04-18 Large sand quantity anti-pollution sand blower

Country Status (1)

Country Link
CN (1) CN103195403A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485754A (en) * 2013-10-14 2014-01-01 中国石油化工股份有限公司 Integrated underground hydraulic control fully-opened type sliding sleeve abrasive blasting and packing staged fracturing device
CN110145292A (en) * 2019-05-18 2019-08-20 中国石油天然气股份有限公司 Elastic lock sleeve sand blower
CN115110941A (en) * 2022-06-23 2022-09-27 大庆宏测技术服务有限公司 Sand blower for multi-layer fracturing
CN115704294A (en) * 2021-08-17 2023-02-17 中国石油天然气集团有限公司 Water injection fracturing integrated detachable packer

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4694905A (en) * 1986-05-23 1987-09-22 Acme Resin Corporation Precured coated particulate material
CN2769511Y (en) * 2005-03-02 2006-04-05 大庆油田有限责任公司 Small-diameter fracturing sand blower
CN2861481Y (en) * 2005-08-24 2007-01-24 大庆油田有限责任公司 Dual sliding sleeve sandblast
CN101067373A (en) * 2007-06-15 2007-11-07 新疆石油管理局采油工艺研究院 One line tube column partial pressure three-layer tube column and using method thereof
CN201031679Y (en) * 2007-06-09 2008-03-05 大庆油田有限责任公司 Deep layer gas well multiple fracturing tools string
CN201047279Y (en) * 2007-06-15 2008-04-16 新疆石油管理局采油工艺研究院 On-off connector sanding machines
CN201047278Y (en) * 2007-06-15 2008-04-16 新疆石油管理局采油工艺研究院 Pipe column partial pressure three layers pipe column
CN201170091Y (en) * 2008-02-03 2008-12-24 梁文瑞 Anti-pollution sand spraying device capable of re-washing
US20100071902A1 (en) * 2008-09-20 2010-03-25 Unimin Corporation Method of making proppants used in gas or oil extraction
CN201730603U (en) * 2010-06-24 2011-02-02 大庆油田有限责任公司 Large-delivery capacity and large-sand capacity sand sprayer

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4694905A (en) * 1986-05-23 1987-09-22 Acme Resin Corporation Precured coated particulate material
CN2769511Y (en) * 2005-03-02 2006-04-05 大庆油田有限责任公司 Small-diameter fracturing sand blower
CN2861481Y (en) * 2005-08-24 2007-01-24 大庆油田有限责任公司 Dual sliding sleeve sandblast
CN201031679Y (en) * 2007-06-09 2008-03-05 大庆油田有限责任公司 Deep layer gas well multiple fracturing tools string
CN101067373A (en) * 2007-06-15 2007-11-07 新疆石油管理局采油工艺研究院 One line tube column partial pressure three-layer tube column and using method thereof
CN201047279Y (en) * 2007-06-15 2008-04-16 新疆石油管理局采油工艺研究院 On-off connector sanding machines
CN201047278Y (en) * 2007-06-15 2008-04-16 新疆石油管理局采油工艺研究院 Pipe column partial pressure three layers pipe column
CN201170091Y (en) * 2008-02-03 2008-12-24 梁文瑞 Anti-pollution sand spraying device capable of re-washing
US20100071902A1 (en) * 2008-09-20 2010-03-25 Unimin Corporation Method of making proppants used in gas or oil extraction
CN201730603U (en) * 2010-06-24 2011-02-02 大庆油田有限责任公司 Large-delivery capacity and large-sand capacity sand sprayer

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485754A (en) * 2013-10-14 2014-01-01 中国石油化工股份有限公司 Integrated underground hydraulic control fully-opened type sliding sleeve abrasive blasting and packing staged fracturing device
CN103485754B (en) * 2013-10-14 2016-06-22 中国石油化工股份有限公司 Underground hydraulic-control full-open type sliding sleeve sandblasting and packing integration segmented fracturing device
CN110145292A (en) * 2019-05-18 2019-08-20 中国石油天然气股份有限公司 Elastic lock sleeve sand blower
CN115704294A (en) * 2021-08-17 2023-02-17 中国石油天然气集团有限公司 Water injection fracturing integrated detachable packer
CN115110941A (en) * 2022-06-23 2022-09-27 大庆宏测技术服务有限公司 Sand blower for multi-layer fracturing

Similar Documents

Publication Publication Date Title
CN102071900B (en) Self-constant pressure expanding open hole packer
CN201705275U (en) Packer capable of flushing well
CN103806888B (en) Underground infinite-stage-number-control fracturing sliding sleeve
CN202560158U (en) Drillable Composite Bridge Plug
CN105156088B (en) Binary channels injects multiple-string packer fracturing strings and its application method
CN110295879A (en) A kind of staged fracturing horizontal well in segments period note adopts dual string
CN111101895A (en) Underground multilayer seat pressure one-way plugging type switch
CN112127855B (en) Full latus rectum sand control doublestage mechanism to segmentation fracturing pit shaft
CN103410491A (en) reducing sliding sleeve
CN202157790U (en) Oil pumping device without kill operation
CN103195403A (en) Large sand quantity anti-pollution sand blower
CN202755956U (en) Quantitative water distributor free from throwing and fishing
CN202338315U (en) Diameter-reducing sleeve sliding sleeve
CN201818277U (en) Compression type open hole packer
CN104727796A (en) Construction method of horizontal well core-withdrawable sliding sleeve multistage fracturing completion pipe string
CN103089205A (en) Two-channel oil extraction switch
CN202170789U (en) Sliding sleeve adaptor
CN208456570U (en) A kind of extracting device of oil
CN201730603U (en) Large-delivery capacity and large-sand capacity sand sprayer
CN201620854U (en) Double-element split type plunger gas lift tool
CN204113257U (en) Small-diameter large-sand-amount sand blower
CN201031679Y (en) Deep layer gas well multiple fracturing tools string
CN103573240B (en) Hydraulic fracturing sliding sleeve opening and closing tool
CN205936504U (en) Oil and gas field successive layer setting fracturing packer
CN203175526U (en) Multi-stage anti-pollution sand blower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130710