CN103195032A - 一种用于导流隧洞的封堵结构 - Google Patents

一种用于导流隧洞的封堵结构 Download PDF

Info

Publication number
CN103195032A
CN103195032A CN2013101110339A CN201310111033A CN103195032A CN 103195032 A CN103195032 A CN 103195032A CN 2013101110339 A CN2013101110339 A CN 2013101110339A CN 201310111033 A CN201310111033 A CN 201310111033A CN 103195032 A CN103195032 A CN 103195032A
Authority
CN
China
Prior art keywords
section
diversion tunnel
plugging
class olive
occluding body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101110339A
Other languages
English (en)
Other versions
CN103195032B (zh
Inventor
雷运华
刘国勇
何兴勇
王小波
魏丽琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN201310111033.9A priority Critical patent/CN103195032B/zh
Publication of CN103195032A publication Critical patent/CN103195032A/zh
Application granted granted Critical
Publication of CN103195032B publication Critical patent/CN103195032B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一封堵结构,尤其是公开了一种用于导流隧洞的封堵结构,属于水工建筑物设计施工技术领域。提供一种封堵施工工作量小,封堵效果好的用于导流隧洞的封堵结构。所述封堵结构包括设置在隐体内的导流隧洞和位于所述导流隧洞内的封堵体,在所述导流隧洞上设置有一段纵剖面呈两端小中间大的类橄榄型封堵段,所述封堵体为与所述类橄榄型封堵段形状相适配的类橄榄形封堵体,所述类橄榄形封堵体位于所述类橄榄型封堵段的最大横截面位置处。

Description

一种用于导流隧洞的封堵结构
技术领域
本发明涉及一种封堵结构,尤其是涉及一种用于导流隧洞的封堵结构,属于水工建筑物设计施工技术领域。
背景技术
目前在水利水电工程中,导流隧洞在完成导流任务后需进行封堵,一般传统的封堵方式是在导流隧洞内浇筑一段较长的混凝土来将导流隧洞填满,利用封堵混凝土与导流隧洞周围岩石的摩擦和粘结力抵抗上游水压力。这种封堵方式的主要问题是:1)封堵混凝土与导流隧洞洞身的顶拱和边墙的粘结效果差,尽管采用回填灌浆、接触灌浆,但混凝土热胀冷缩的性能注定使各种灌浆都使得封堵效果十分不佳,存在较大的安全隐患;2)采用这种封堵方式封堵混凝土的长度较长,工程量大,投资成本高;3)由于导流隧洞一般只能在河道枯期封堵,需较快完成封堵施工并挡水,但这种封堵方式由于封堵量大,同时混凝土热量大,需等混凝土冷却后灌浆,一个枯期完成施工压力大。
发明内容
本发明所要解决的技术问题是:提供一种封堵施工工作量小,封堵效果好的用于导流隧洞的封堵结构。
为解决上述技术问题所采用的技术方案是:一种用于导流隧洞的封堵结构,包括设置在隐体内的导流隧洞和位于所述导流隧洞内的封堵体,在所述导流隧洞上设置有一段纵剖面呈两端小中间大的类橄榄型封堵段,所述封堵体为与所述类橄榄型封堵段形状相适配的类橄榄形封堵体,所述类橄榄形封堵体位于所述类橄榄型封堵段的最大横截面位置处。
进一步的是,在所述导流隧洞类橄榄型封堵段中部的最大横截面位置处具有一段等截面的水平段,所述类橄榄形封堵体位于该等截面的水平段上。
进一步的是,所述类橄榄形封堵体在水平面内的投影为凸向迎水面的圆弧结构。
进一步的是,所述类橄榄形封堵体在纵垂面内的投影为凸出迎水面的圆弧结构。
进一步的是,所述类橄榄形封堵体为混凝土支护结构。
进一步的是,所述的隐体为山体或地下的土体,所述类橄榄型封堵段以及类橄榄形封堵体均位于所述的山体或地下的土体中。
本发明的有益效果是:通过在所述导流隧洞上设置一段纵剖面呈两端小中间大的类橄榄型封堵段,并把所述封堵体设置为与所述类橄榄型封堵段形状相适配的类橄榄形封堵体,然后再将所述类橄榄形封堵体设置到所述类橄榄型封堵段的最大横截面位置处。由于类橄榄形封堵体的截面大于除类橄榄型封堵段以外的其它部位的导流隧洞的截面,这样,在进行导流隧洞的封堵时,便不再仅靠封堵体与导流隧洞周围岩石的摩擦和粘结力抵抗上游水压力,而主要是依靠截面小于封堵体截面的导流隧洞本身来抵抗上游水压力,从而有效果的提高了导流隧洞的封堵效果。同时,由于是依靠截面小于封堵体截面的导流隧洞本身来抵抗上游水压力,所以可以将封堵体的长度设置得较小,而且不需要进行回填灌浆、接触灌浆,这样,还可以大大的降低封堵施工工作量,节约封堵成本。
附图说明
图1为本发明一种用于导流隧洞的封堵结构的纵剖面示意图;
图2为本图1的A-A剖视图。
图中标记为:导流隧洞1、类橄榄型封堵段2、类橄榄形封堵体3、水平段4。
具体实施方式
如图1、图2所示是本发明提供的一种封堵施工工作量小,封堵效果好的用于导流隧洞的封堵结构。所述封堵结构包括设置在隐体内的导流隧洞1和位于所述导流隧洞1内的封堵体,在所述导流隧洞1上设置有一段纵剖面呈两端小中间大的类橄榄型封堵段2,所述封堵体为与所述类橄榄型封堵段2形状相适配的类橄榄形封堵体3,所述类橄榄形封堵体3位于所述类橄榄型封堵段2的最大横截面位置处。上述通过在所述导流隧洞1上设置一段纵剖面呈两端小中间大的类橄榄型封堵段2,并把所述封堵体设置为与所述类橄榄型封堵段2形状相适配的类橄榄形封堵体3,然后再将所述类橄榄形封堵体3设置到所述类橄榄型封堵段2的最大横截面位置处。由于类橄榄形封堵体3的截面大于除类橄榄型封堵段2以外的其它部位的导流隧洞1的截面,这样,在进行导流隧洞1的封堵时,便不再仅靠封堵体与导流隧洞1周围岩石的摩擦和粘结力抵抗上游水压力,而主要是依靠截面小于封堵体截面的导流隧洞1本身来抵抗上游水压力,从而有效果的提高了导流隧洞的封堵效果。同时,由于是依靠截面小于封堵体截面的导流隧洞1本身来抵抗上游水压力,所以可以将封堵体的长度设置得较小,而且不需要进行回填灌浆、接触灌浆,这样,还可以大大的降低封堵施工工作量,节约封堵成本。
上述实施方式中,为了便于所述类橄榄型封堵段2的施工,在所述导流隧洞类橄榄型封堵段2中部的最大横截面位置处具有一段等截面的水平段4,所述类橄榄形封堵体3位于该等截面的水平段4上。进一步的,为了提高类橄榄形封堵体3自身的封堵能力和封堵强度,所述类橄榄形封堵体3在水平面内的投影和在纵垂直平面内的投影分别或同时设置为凸向迎水面的圆弧结构。再结合现有技中所述的封堵体为混凝土支护结构,所述的隐体为山体或地下的土体的特点,也将所述类橄榄形封堵体3为混凝土支护结构,将所述类橄榄型封堵段2以及类橄榄形封堵体3均设置在所述的山体或地下的土体中,以减小高边坡的开挖工作量。

Claims (6)

1.一种用于导流隧洞的封堵结构,包括设置在隐体内的导流隧洞(1)和位于所述导流隧洞(1)内的封堵体,其特征在于:在所述导流隧洞(1)上设置有一段纵剖面呈两端小中间大的类橄榄型封堵段(2),所述封堵体为与所述类橄榄型封堵段(2)形状相适配的类橄榄形封堵体(3),所述类橄榄形封堵体(3)位于所述类橄榄型封堵段(2)的最大横截面位置处。
2.根据权利要求1所述的一种用于导流洞的封堵结构,其特征在于:在所述导流隧洞类橄榄型封堵段(2)中部的最大横截面位置处具有一段等截面的水平段(4),所述类橄榄形封堵体(3)位于该等截面的水平段(4)上。
3.根据权利要求1所述的一种用于导流洞的封堵结构,其特征在于:所述类橄榄形封堵体(3)在水平面内的投影为凸向迎水面的圆弧结构。
4.根据权利要求1所述的一种用于导流洞的封堵结构,其特征在于:所述类橄榄形封堵体(3)在纵垂面内的投影为凸出迎水面的圆弧结构。
5.根据权利要求1~4中任一项所述的一种用于导流洞的封堵结构,其特征在于:所述类橄榄形封堵体(3)为混凝土支护结构。
6.根据权利要求5所述的一种用于导流洞的封堵结构,其特征在于:所述的隐体为山体或地下的土体,所述类橄榄型封堵段(2)以及类橄榄形封堵体(3)均位于所述的山体或地下的土体中。
CN201310111033.9A 2013-04-01 2013-04-01 一种用于导流隧洞的封堵结构 Active CN103195032B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310111033.9A CN103195032B (zh) 2013-04-01 2013-04-01 一种用于导流隧洞的封堵结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310111033.9A CN103195032B (zh) 2013-04-01 2013-04-01 一种用于导流隧洞的封堵结构

Publications (2)

Publication Number Publication Date
CN103195032A true CN103195032A (zh) 2013-07-10
CN103195032B CN103195032B (zh) 2016-02-24

Family

ID=48717837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310111033.9A Active CN103195032B (zh) 2013-04-01 2013-04-01 一种用于导流隧洞的封堵结构

Country Status (1)

Country Link
CN (1) CN103195032B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104195986A (zh) * 2014-09-17 2014-12-10 新疆兵团水利水电工程集团有限公司 一种用于隧洞的封堵装置
CN114233390A (zh) * 2021-12-20 2022-03-25 中铁二院工程集团有限责任公司 一种适用于软弱围岩的辅助坑道封堵结构及其计算方法
CN115094845A (zh) * 2022-05-21 2022-09-23 徐康瑞 一种适于tbm施工的抽水蓄能硐室及施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0633436A (ja) * 1992-07-15 1994-02-08 Kubota Corp 水路トンネル内面の補修構造
CN101775786A (zh) * 2008-05-03 2010-07-14 李兰静 盲谷建库
CN101881015A (zh) * 2010-05-31 2010-11-10 长江水利委员会长江勘测规划设计研究院 气动抛投散粒体地洞堵水的方法
CN102277862A (zh) * 2011-05-11 2011-12-14 中国水利水电科学研究院 一种侧壁掺气坎及其设置有侧壁掺气坎的明流隧洞
CN102322047A (zh) * 2011-08-05 2012-01-18 四川大学 折线进口型洞塞消能工
CN203144985U (zh) * 2013-04-01 2013-08-21 中国水电顾问集团成都勘测设计研究院 一种用于导流隧洞的封堵结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0633436A (ja) * 1992-07-15 1994-02-08 Kubota Corp 水路トンネル内面の補修構造
CN101775786A (zh) * 2008-05-03 2010-07-14 李兰静 盲谷建库
CN101881015A (zh) * 2010-05-31 2010-11-10 长江水利委员会长江勘测规划设计研究院 气动抛投散粒体地洞堵水的方法
CN102277862A (zh) * 2011-05-11 2011-12-14 中国水利水电科学研究院 一种侧壁掺气坎及其设置有侧壁掺气坎的明流隧洞
CN102322047A (zh) * 2011-08-05 2012-01-18 四川大学 折线进口型洞塞消能工
CN203144985U (zh) * 2013-04-01 2013-08-21 中国水电顾问集团成都勘测设计研究院 一种用于导流隧洞的封堵结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姚福海: "论水工隧洞封堵设计", 《2002年水工专委会学术交流会议学术论文集》, 31 December 2002 (2002-12-31), pages 189 - 198 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104195986A (zh) * 2014-09-17 2014-12-10 新疆兵团水利水电工程集团有限公司 一种用于隧洞的封堵装置
CN104195986B (zh) * 2014-09-17 2016-01-13 新疆兵团水利水电工程集团有限公司 一种用于隧洞的封堵装置
CN114233390A (zh) * 2021-12-20 2022-03-25 中铁二院工程集团有限责任公司 一种适用于软弱围岩的辅助坑道封堵结构及其计算方法
CN115094845A (zh) * 2022-05-21 2022-09-23 徐康瑞 一种适于tbm施工的抽水蓄能硐室及施工方法

Also Published As

Publication number Publication date
CN103195032B (zh) 2016-02-24

Similar Documents

Publication Publication Date Title
CN203498799U (zh) 一种预制空心管桩临水围护结构
CN203144985U (zh) 一种用于导流隧洞的封堵结构
CN103195032B (zh) 一种用于导流隧洞的封堵结构
CN202881945U (zh) 一种注浆锚杆端头式多级止浆塞
CN203475420U (zh) 三段式变截面抗滑桩
CN204436407U (zh) 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的结构
CN103806919B (zh) 用于膨胀性土层隧道初期的钢格栅钢拱架联合支护
CN203822325U (zh) 用于膨胀性土层隧道初期的钢格栅钢拱架联合支护
CN204386617U (zh) 一种低水头引水隧洞的固结灌浆结构
CN204530643U (zh) 一种组合式混凝土渠槽
CN203741782U (zh) 一种高面板堆石坝多段面板结构
CN103147449A (zh) 分块锚固压片式护坡砖结构及其施工铺设方法
CN104141286A (zh) 施工支洞封堵结构
CN202991053U (zh) 地下洞室衬砌结构
CN203346857U (zh) 一种衬砌梯形渠道预制构件
CN203394539U (zh) 大跨度重荷载推力拱式明洞结构
CN102953742A (zh) 一种注浆锚杆端头式多级止浆塞及使用方法
CN203081467U (zh) 有压隧洞拱形封堵结构
CN203347805U (zh) 一种岩溶地区有压隧洞底部承载防渗结构
CN103206221B (zh) 大跨度重荷载推力拱式明洞结构
CN204139052U (zh) 再生混凝土带u肋哑铃型柱式桥墩
CN202483590U (zh) 埋藏式高压水道或隧洞防渗衬砌结构
CN203782644U (zh) 施工支洞封堵结构
CN108867587A (zh) 一种水利导流洞永久堵头的封堵结构
CN204551367U (zh) 一种小流量岩质排水洞结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant