CN103195031B - 一种增大水头落差的水电站结构及其施工方法 - Google Patents
一种增大水头落差的水电站结构及其施工方法 Download PDFInfo
- Publication number
- CN103195031B CN103195031B CN201310124822.6A CN201310124822A CN103195031B CN 103195031 B CN103195031 B CN 103195031B CN 201310124822 A CN201310124822 A CN 201310124822A CN 103195031 B CN103195031 B CN 103195031B
- Authority
- CN
- China
- Prior art keywords
- tail water
- power station
- region
- excavation
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310124822.6A CN103195031B (zh) | 2013-04-11 | 2013-04-11 | 一种增大水头落差的水电站结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310124822.6A CN103195031B (zh) | 2013-04-11 | 2013-04-11 | 一种增大水头落差的水电站结构及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195031A CN103195031A (zh) | 2013-07-10 |
CN103195031B true CN103195031B (zh) | 2015-09-16 |
Family
ID=48717836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310124822.6A Active CN103195031B (zh) | 2013-04-11 | 2013-04-11 | 一种增大水头落差的水电站结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195031B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05321232A (ja) * | 1992-05-25 | 1993-12-07 | Shimizu Corp | 水路式発電施設とその施工方法 |
CN101092815A (zh) * | 2006-06-19 | 2007-12-26 | 张国成 | 江河一侧的水电站降低江河水位的系统 |
CN101260660A (zh) * | 2008-04-22 | 2008-09-10 | 宫锡和 | 串联式水利发电站 |
CN102359091A (zh) * | 2011-08-06 | 2012-02-22 | 杜章伟 | 自然落差水流发电系统 |
CN102409643A (zh) * | 2011-05-19 | 2012-04-11 | 郭江新 | 人造地河 |
-
2013
- 2013-04-11 CN CN201310124822.6A patent/CN103195031B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05321232A (ja) * | 1992-05-25 | 1993-12-07 | Shimizu Corp | 水路式発電施設とその施工方法 |
CN101092815A (zh) * | 2006-06-19 | 2007-12-26 | 张国成 | 江河一侧的水电站降低江河水位的系统 |
CN101260660A (zh) * | 2008-04-22 | 2008-09-10 | 宫锡和 | 串联式水利发电站 |
CN102409643A (zh) * | 2011-05-19 | 2012-04-11 | 郭江新 | 人造地河 |
CN102359091A (zh) * | 2011-08-06 | 2012-02-22 | 杜章伟 | 自然落差水流发电系统 |
Non-Patent Citations (1)
Title |
---|
水电站尾水河道疏浚开挖的研究;王卫国等;《西北水电》;20120331(第一期);26-28 * |
Also Published As
Publication number | Publication date |
---|---|
CN103195031A (zh) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102561404B (zh) | 一种型钢混凝土柱式接头及采用该接头的地下连续墙的施工方法 | |
CN102852121A (zh) | 深厚覆盖层上修建粘土堆石坝的人工复合地基及施工方法 | |
CN103132539A (zh) | 地下连续墙套铣接头施工方法 | |
CN104120692A (zh) | 一洞双层导流、放空洞相结合的施工布置方法 | |
CN109469066A (zh) | 土方机械与水力机械全断面立体组合开挖施工方法及系统 | |
CN103290804B (zh) | 导流泄水建筑物下闸后提供下游生态流量的方法及结构 | |
CN205134292U (zh) | 高拱坝施工导流洞结构 | |
CN103195031B (zh) | 一种增大水头落差的水电站结构及其施工方法 | |
CN110144861A (zh) | 一种多沙河流水利发电站的排沙结构及方法 | |
CN105317028B (zh) | 一种适用于长距离有压引水隧洞的调压室结构及施工方法 | |
CN103015459A (zh) | 强涌潮河口水下承台钢套箱施工工法 | |
CN102518093B (zh) | 一种投资少工期短的水电站布局结构及其施工方法 | |
CN202108030U (zh) | 一种窑洞式拱坝坝肩槽结构 | |
CN205116201U (zh) | 一种沉井施工装置 | |
CN208733589U (zh) | 一种修建在陡峻边坡上的岸塔式进水口 | |
CN104047273A (zh) | 水电站消能防冲墙及其施工方法 | |
CN208899441U (zh) | 用于水利发电工程的发电厂房布置结构 | |
CN108677894A (zh) | 一种利用管道型岩溶地下水发电系统及设计方法 | |
CN204753536U (zh) | 一种具有交通功能的导流洞结构 | |
CN211057746U (zh) | 一种多级放空洞水力学监测系统 | |
CN104058071B (zh) | 一种半潜式挖泥船 | |
CN205134355U (zh) | 用于浅覆盖层风力发电机组的基础结构 | |
CN108930257A (zh) | 一种修建在陡峻边坡上的岸塔式进水口 | |
CN203346860U (zh) | 解决引水隧洞检修进人门背后泥沙淤积的结构 | |
CN202440804U (zh) | 厂坝分离式水电站 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 Applicant after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd. Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant before: Northwest Hydro Consulting Engineers, CHECC |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: HYDROCHINA XIBEI ENGINEERING CORPORATION TO: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD. Free format text: CORRECT: APPLICANT; FROM: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING TO: HYDROCHINA XIBEI ENGINEERING CORPORATION |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |