CN101260660A - 串联式水利发电站 - Google Patents
串联式水利发电站 Download PDFInfo
- Publication number
- CN101260660A CN101260660A CNA200810015713XA CN200810015713A CN101260660A CN 101260660 A CN101260660 A CN 101260660A CN A200810015713X A CNA200810015713X A CN A200810015713XA CN 200810015713 A CN200810015713 A CN 200810015713A CN 101260660 A CN101260660 A CN 101260660A
- Authority
- CN
- China
- Prior art keywords
- stage
- water
- surge
- chamber
- sluice
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
一种串联式水电站,其特征是:只需建一道拦水坝,就可根据水的落差,再续建若干级水利发电站,水自水库中流出,经一级压力引水管、一级调压室,一级闸门、一级压力水管后冲击一级水轮发电机做功发电,尾水流入一级尾水调压室;经二级压力引水管、二级调压室,二级闸门、二级压力水管后冲击二级水轮发电机做功发电,尾水流入二级尾水调压室;三级压力引水管再流入下一级的水轮发电机,如此类推下去,只要水流落差达到要求,便可以续建一级水利发电站。为了防止其中某一级电站出现问题,所以在调压室之间都设有备用管道,备用管道中设有备用管道闸门,假如一级水轮发电机出现故障,需停机维修,则可关闭一级闸门,打开备用管道一级闸门,使二级水轮发电机继续做功发电,以上所有管道都可以埋入地下,以保持自然景观的原貌。
Description
技术领域
本发明涉及一种水利发电方法,具体地说是一种串联式水利发电站。
背景技术
目前公知,现在被很多人誉为绿色电力——无污染,不需消耗能源,不增加二氧化碳排放——的水电正在备受各大水电公司推崇。建水电站一般模式都是先建拦水坝蓄水,然后利用水的落差,冲击水轮发电机发电。冲击水轮发电机的水作为尾水被排放,为了最大限度的利用水能,所以又出现了梯级电站,即在第一级电站的下游,再依次续建若干级电站,但每一级电站都要建拦水坝,只要建拦水坝,就会出现库区被淹没,就会破坏生态,甚至导致一系列隐患。
发明内容
本发明所要解决的技术问题是克服上述现有技术的不足,提供一种只需建一道拦水坝,就可以建多级水利发电站的串联式水利发电站。
本发明解决其上述技术问题所采用的技术方案是:一种串联式水电站,其特征是:只需建一道拦水坝,就可根据水的落差,再续建若干级水利发电站,水自水库中流出,经一级压力引水管、一级调压室,一级闸门、一级压力水管后冲击一级水轮发电机做功发电,尾水流入一级尾水调压室(溢流式);经二级压力引水管、二级调压室,二级闸门、二级压力水管后冲击二级水轮发电机做功发电,尾水流入二级尾水调压室(溢流式);三级压力引水管再流入下一级的水轮发电机,如此类推下去,只要水流落差达到要求,便可以续建一级水利发电站。为了防止其中某一级电站出现问题,所以在调压室之间都设有备用管道,备用管道中设有备用管道闸门,假如一级水轮发电机出现故障,需停机维修,则可关闭一级闸门,打开备用管道一级闸门,使二级水轮发电机继续做功发电,以上所有管道都可以埋入地下,以保持自然景观的原貌。
本发明的有益效果是:只需建一道拦水坝,就可以建多级水利发电站,解决了由梯级水电站而出现库区淹没的问题。
附图说明
下面结合附图对本发明进一步说明。
附图是本发明的剖面结构示意图。
图中:1.拦水坝,2.一级压力引水管,3.一级调压室,4.一级闸门,5.一级压力水管,6.一级水轮发电机,7.一级尾水调压室(溢流式),8.二级压力引水管,9.二级调压室,10.二级闸门,11.二级压力水管,12.二级水轮发电机13.二级尾水调压室(溢流式),14.三级压力引水管,15.备用管道一级闸门,16.备用管道。
具体实施方式
在图中,只需建一道拦水坝1,就可根据水的落差,再续建若干级水利发电站,水流自水库中流出,经一级压力引水管2、一级调压室3,一级闸门4、一级压力水管5后冲击一级水轮发电机6做功发电,尾水流入一级尾水调压室(溢流式)7;经二级压力引水管8、二级调压室9,二级闸门10、二级压力水管11后冲击二级水轮发电机12做功发电,尾水流入二级尾水调压室(溢流式)13;三级压力引水管14再流入下一级的水轮发电机,如此类推下去,只要水流落差达到要求,便可以续建一级水利发电站。为了防止其中某一级电站出现问题,所以在调压室之间都设有备用管道16,备用管道中设有备用管道闸门15,假如一级水轮发电机6出现故障,需停机维修,则可关闭一级闸门4,打开备用管道一级闸门15,使二级水轮发电机12继续做功发电,以上所有管道都可以埋入地下,以保持自然景观的原貌。
Claims (1)
1.一种串联式水电站,其特征是:只需建一道拦水坝,就可根据水的落差,再续建若干级水利发电站。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200810015713XA CN101260660A (zh) | 2008-04-22 | 2008-04-22 | 串联式水利发电站 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200810015713XA CN101260660A (zh) | 2008-04-22 | 2008-04-22 | 串联式水利发电站 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101260660A true CN101260660A (zh) | 2008-09-10 |
Family
ID=39961329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA200810015713XA Pending CN101260660A (zh) | 2008-04-22 | 2008-04-22 | 串联式水利发电站 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101260660A (zh) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195031A (zh) * | 2013-04-11 | 2013-07-10 | 中国水电顾问集团西北勘测设计研究院 | 一种增大水头落差的水电站结构及其施工方法 |
CN103291528A (zh) * | 2013-06-21 | 2013-09-11 | 王月明 | 利用水力发电尾水多级发电系统 |
CN103982364A (zh) * | 2014-05-26 | 2014-08-13 | 梁耀榕 | 发电装置 |
CN104099912A (zh) * | 2013-04-11 | 2014-10-15 | 段世杰 | 梯级升管壳堤平拥水力发电站 |
CN104234017A (zh) * | 2014-08-29 | 2014-12-24 | 薛士成 | 水力发电站 |
CN104674774A (zh) * | 2015-02-04 | 2015-06-03 | 高留中 | 一站多级式水电站 |
CN105421282A (zh) * | 2015-11-20 | 2016-03-23 | 西北师范大学 | 一种季节性洪水集聚利用的方法 |
CN105569912A (zh) * | 2016-03-01 | 2016-05-11 | 朱安心 | 一种综合水力发电系统 |
WO2015186145A3 (en) * | 2014-06-07 | 2016-06-09 | Puthiyaveedu Mohammed Ibrahim | Turlink hydro tech step-up redgen power system |
CN106436660A (zh) * | 2016-09-26 | 2017-02-22 | 昆明理工大学 | 一种不同位置的引水式电站发电厂房布置 |
CN107532396A (zh) * | 2015-01-30 | 2018-01-02 | 普鲁格尼希思公司 | 水利发电设施 |
CN108266302A (zh) * | 2017-01-02 | 2018-07-10 | 向兴华 | 能使落差高的水电站发电量增加1-3倍的一种压力钢管 |
CN108716444A (zh) * | 2018-05-08 | 2018-10-30 | 张明如 | 一种河流与蓄水池联合管道排放生产高压喷力发电方法 |
CN111486045A (zh) * | 2020-04-27 | 2020-08-04 | 倪俊 | 一种高效节能发电设备及其发电方法 |
CN115094848A (zh) * | 2022-07-28 | 2022-09-23 | 中国电建集团成都勘测设计研究院有限公司 | 地下洞群式调节池及多级串联式电站系统 |
-
2008
- 2008-04-22 CN CNA200810015713XA patent/CN101260660A/zh active Pending
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104099912A (zh) * | 2013-04-11 | 2014-10-15 | 段世杰 | 梯级升管壳堤平拥水力发电站 |
CN103195031A (zh) * | 2013-04-11 | 2013-07-10 | 中国水电顾问集团西北勘测设计研究院 | 一种增大水头落差的水电站结构及其施工方法 |
CN103195031B (zh) * | 2013-04-11 | 2015-09-16 | 中国电建集团西北勘测设计研究院有限公司 | 一种增大水头落差的水电站结构及其施工方法 |
CN103291528A (zh) * | 2013-06-21 | 2013-09-11 | 王月明 | 利用水力发电尾水多级发电系统 |
CN103291528B (zh) * | 2013-06-21 | 2016-05-11 | 王月明 | 利用水力发电尾水多级发电系统 |
CN103982364A (zh) * | 2014-05-26 | 2014-08-13 | 梁耀榕 | 发电装置 |
WO2015186145A3 (en) * | 2014-06-07 | 2016-06-09 | Puthiyaveedu Mohammed Ibrahim | Turlink hydro tech step-up redgen power system |
CN104234017A (zh) * | 2014-08-29 | 2014-12-24 | 薛士成 | 水力发电站 |
US10947687B2 (en) | 2015-01-30 | 2021-03-16 | Progenesys | Hydropower installation |
CN107532396A (zh) * | 2015-01-30 | 2018-01-02 | 普鲁格尼希思公司 | 水利发电设施 |
CN104674774A (zh) * | 2015-02-04 | 2015-06-03 | 高留中 | 一站多级式水电站 |
CN105421282B (zh) * | 2015-11-20 | 2017-04-12 | 西北师范大学 | 一种季节性洪水集聚利用的方法 |
CN105421282A (zh) * | 2015-11-20 | 2016-03-23 | 西北师范大学 | 一种季节性洪水集聚利用的方法 |
CN105569912A (zh) * | 2016-03-01 | 2016-05-11 | 朱安心 | 一种综合水力发电系统 |
CN106436660A (zh) * | 2016-09-26 | 2017-02-22 | 昆明理工大学 | 一种不同位置的引水式电站发电厂房布置 |
CN108266302A (zh) * | 2017-01-02 | 2018-07-10 | 向兴华 | 能使落差高的水电站发电量增加1-3倍的一种压力钢管 |
CN108716444A (zh) * | 2018-05-08 | 2018-10-30 | 张明如 | 一种河流与蓄水池联合管道排放生产高压喷力发电方法 |
CN111486045A (zh) * | 2020-04-27 | 2020-08-04 | 倪俊 | 一种高效节能发电设备及其发电方法 |
CN115094848A (zh) * | 2022-07-28 | 2022-09-23 | 中国电建集团成都勘测设计研究院有限公司 | 地下洞群式调节池及多级串联式电站系统 |
CN115094848B (zh) * | 2022-07-28 | 2023-08-22 | 中国电建集团成都勘测设计研究院有限公司 | 地下洞群式调节池及多级串联式电站系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101260660A (zh) | 串联式水利发电站 | |
CN100443667C (zh) | 阶梯式水力发电站 | |
Gaius-obaseki | Hydropower opportunities in the water industry | |
CN203546687U (zh) | 自适应尾水位变化的水电站尾水调压室 | |
CN201473931U (zh) | 一种引水发电及输水系统 | |
CN204825816U (zh) | 多级水利发电站 | |
CN1811162A (zh) | 水电站水能多级发电装置 | |
CN209067405U (zh) | 虹吸式水力发电装置 | |
CN203514276U (zh) | 一种泄洪发电消能水电站 | |
CN202140228U (zh) | 水轮发电机组尾水余压供水冷却系统 | |
KR200349016Y1 (ko) | 수리계통의 잉여낙차를 활용한 소수력 발전설비 | |
CN204704059U (zh) | 高效水力发电系统 | |
CN202789301U (zh) | 水增力循环发电机组 | |
CN210974885U (zh) | 利用水电站冷却供水系统余压发电制氢装置 | |
CN102102619A (zh) | 供水管网中流体能量的利用方法及供水管网发电系统 | |
CN206721845U (zh) | 一种引水隧洞 | |
CN201202109Y (zh) | 一种水自转式水电站 | |
CN203144983U (zh) | 应用于峡谷弱抗冲地质的竖井水垫式消能工 | |
CN202390814U (zh) | 一种带有动力提水功能的水力发电站 | |
CN216044140U (zh) | 可移动式利用水库水势资源发电制氢的装置 | |
CN204061963U (zh) | 具有中腔平压的水轮机用固定式进水球阀 | |
CN106351184A (zh) | 一种减小度汛缺口占压施工工期的窄河谷重力坝及方法 | |
CN207597352U (zh) | 一种可净水的受水位自动控制的景观喷水闸门 | |
CN101655062A (zh) | 蓄水循环节能发电 | |
CN202031762U (zh) | 管池式水电站 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20080910 |