CN103194949B - Structure and method for repairing cracks of oblique prestressed cement concrete pavement - Google Patents

Structure and method for repairing cracks of oblique prestressed cement concrete pavement Download PDF

Info

Publication number
CN103194949B
CN103194949B CN201310115758.5A CN201310115758A CN103194949B CN 103194949 B CN103194949 B CN 103194949B CN 201310115758 A CN201310115758 A CN 201310115758A CN 103194949 B CN103194949 B CN 103194949B
Authority
CN
China
Prior art keywords
cement concrete
boring
prestressing force
oblique
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310115758.5A
Other languages
Chinese (zh)
Other versions
CN103194949A (en
Inventor
张东省
徐希娟
李娜
韩微微
贾德生
张威
杨清宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201310115758.5A priority Critical patent/CN103194949B/en
Publication of CN103194949A publication Critical patent/CN103194949A/en
Application granted granted Critical
Publication of CN103194949B publication Critical patent/CN103194949B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Repair (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及水泥混凝土路面裂缝修补技术,公开了一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法。所述斜向预应力水泥混凝土路面包括预应力钢筋和滑动层,其特征在于,所述预应力钢筋的上部设有沿着裂缝开设的开缝槽,开缝槽底部沿裂缝方向间隔设有连通所述滑动层的多个钻孔,所述开缝槽内设有水平钢筋笼子,所述钻孔内设有竖直钢筋笼子,所述开缝槽和所述钻孔内灌浆有无收缩灌浆料;该修补方法包括开缝钻孔、预灌浆和扎筋灌浆,能使斜向预应力水泥混凝土路面产生的横向裂缝进行快速修补,方法简单,可靠性强。

The invention relates to a repairing technology for cement concrete pavement cracks, and discloses an oblique prestressed cement concrete pavement crack repairing structure and a repairing method. The oblique prestressed cement concrete pavement includes prestressed steel bars and a sliding layer, and is characterized in that the upper part of the prestressed steel bars is provided with slotted slots along the cracks, and the bottom of the slotted slots is provided with interconnected slots at intervals along the direction of the cracks. In the plurality of boreholes of the sliding layer, horizontal reinforcement cages are provided in the slots, and vertical reinforcement cages are provided in the drilling holes. Whether the grouting in the slots and the boreholes has shrinkage grouting material; the repair method includes slot drilling, pre-grouting and bar-tie grouting, which can quickly repair the transverse cracks generated in the oblique prestressed cement concrete pavement, and the method is simple and reliable.

Description

一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法An oblique prestressed cement concrete pavement crack repair structure and repair method

技术领域technical field

本发明涉及水泥混凝土路面裂缝修补技术,特别涉及一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法。The invention relates to a technology for repairing cracks in cement concrete pavements, in particular to a structure and method for repairing cracks in obliquely prestressed cement concrete pavements.

背景技术Background technique

近年来,随着交通运输的发展,在重荷重载交通及沥青价位居高不下的情况下,水泥路面的新应用研究进入了一个全新的阶段。水泥混凝土路面具有得天独厚的优点,其路面强度高,稳定性好,使用寿命长,但路面容易存在大量的伸缩缝,导致经常发生挤碎、拱起、错台、唧泥等病害;同时,大量的伸缩缝也会增加路面噪声,影响行车的舒适性。预应力混凝土路面可以采用很少的横向接缝达到表面平整和消除裂缝的要求。In recent years, with the development of transportation, under the circumstances of heavy-duty traffic and high asphalt prices, the new application research of cement pavement has entered a new stage. Cement concrete pavement has unique advantages, such as high strength, good stability, and long service life. However, there are a large number of expansion joints on the pavement, which often cause diseases such as crushing, arching, misalignment, and mud pumping; at the same time, a large number of Large expansion joints will also increase road noise and affect driving comfort. Prestressed concrete pavement can use few transverse joints to achieve surface smoothness and eliminate cracks.

预应力混凝土路面具有承载力高、抗变形能力强,路面耐久性高、行车舒适性好等特点,二十世纪四十年代在国外有所研究和发展。最早的使用是在法国,后来英国和其它欧洲国家先后将其用于道路路面或机场道面上。美国、日本和前苏联等国家也都修建了一定数量的预应力混凝土路面和机场道面。这些路面预应力钢筋均为纵向布设,且施工周期长,施工复杂,纵向预应力的施加大大提高了路面的纵向承荷能力,但对横向几乎无影响。Prestressed concrete pavement has the characteristics of high bearing capacity, strong deformation resistance, high pavement durability, and good driving comfort. It was researched and developed abroad in the 1940s. The earliest use was in France, and later Britain and other European countries used it on road pavement or airport pavement. Countries such as the United States, Japan and the former Soviet Union have also built a certain number of prestressed concrete pavement and airport pavement. These pavement prestressed steel bars are arranged longitudinally, and the construction period is long and the construction is complicated. The application of longitudinal prestressed force greatly improves the longitudinal bearing capacity of the pavement, but has almost no effect on the transverse direction.

斜向预应力水泥混凝土路面是一种新型的水泥混凝土路面结构型式,这种路面结构是在路面布置两层斜向预应力钢筋,在路面横向和纵向产生预应力,路面的承载能力大幅度提高,并增加其使用寿命,提高行车舒适性。Oblique prestressed cement concrete pavement is a new type of cement concrete pavement structure. This pavement structure is to arrange two layers of oblique prestressed steel bars on the pavement, and generate prestress in the transverse and longitudinal directions of the pavement. The bearing capacity of the pavement is greatly improved. , and increase its service life, improve driving comfort.

但斜向预应力水泥混凝土路面由于混凝土板较长,在温度变化下,混凝土板底面的摩阻应力可能导致路面产生裂缝,裂缝处易产生剥落,并且水从裂缝处进入,导致路面基层破坏,从而造成路面结构的破坏。However, because the oblique prestressed cement concrete pavement has a long concrete slab, under temperature changes, the frictional stress on the bottom of the concrete slab may cause cracks on the pavement, and the cracks are prone to spalling, and water enters from the cracks, resulting in damage to the pavement base. resulting in damage to the pavement structure.

发明内容Contents of the invention

本发明的目的在于提供一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法,能使斜向预应力水泥混凝土路面产生的横向裂缝进行快速修补,方法简单,可靠性强。The object of the present invention is to provide an oblique prestressed cement concrete pavement crack repair structure and repair method, which can quickly repair the transverse cracks generated in the oblique prestressed cement concrete pavement, and the method is simple and reliable.

为达到上述目的,本发明采用以下技术方案予以实现。In order to achieve the above object, the present invention adopts the following technical solutions to achieve.

(1)一种斜向预应力水泥混凝土路面裂缝的修补结构,其中,所述斜向预应力水泥混凝土路面包括预应力钢筋和滑动层,其特征在于,所述预应力钢筋的上部设有沿着裂缝开设的开缝槽,开缝槽底部沿裂缝方向间隔设有连通所述滑动层的多个钻孔,所述开缝槽内设有水平钢筋笼子,所述钻孔内设有竖直钢筋笼子,所述开缝槽和所述钻孔内灌浆有无收缩灌浆料。(1) A crack repair structure for oblique prestressed cement concrete pavement, wherein the oblique prestressed cement concrete pavement includes prestressed steel bars and a sliding layer, and is characterized in that the upper part of the prestressed steel bars is provided with A slotted slot opened along the crack, the bottom of the slotted slot is provided with a plurality of drill holes connecting the sliding layer at intervals along the direction of the crack, a horizontal reinforcement cage is arranged in the slotted slot, and a vertical reinforcement cage is arranged in the drilled hole. There is no shrinkage grouting material for grouting in the steel cage, the slots and the boreholes.

本技术方案的特点和进一步改进在于:The characteristics and further improvement of this technical solution are:

所述水平钢筋笼子是截面为矩形的钢筋笼子,包括四根平行设置的水平构造钢筋和沿所述水平构造钢筋方向间隔设置的矩形箍筋。The horizontal reinforcement cage is a reinforcement cage with a rectangular cross-section, including four horizontal structural reinforcements arranged in parallel and rectangular stirrups arranged at intervals along the direction of the horizontal structural reinforcements.

所述竖直钢筋笼子为柱状钢筋笼子,包括至少三根在外圆周上轴向设置的竖直构造钢筋以及沿所述竖直构造钢筋方向设置的环形箍筋。The vertical reinforcement cage is a columnar reinforcement cage, including at least three vertical structural reinforcements arranged axially on the outer circumference and annular stirrups arranged along the direction of the vertical structural reinforcements.

所述竖直钢筋笼子的顶面与所述水平钢筋笼子的顶面在同一水平面上且低于路面高度,所述竖直钢筋笼子的顶面与所述水平钢筋笼子的顶面相互连接。The top surface of the vertical reinforcement cage is on the same level as the top surface of the horizontal reinforcement cage and is lower than the road surface, and the top surface of the vertical reinforcement cage is connected to the top surface of the horizontal reinforcement cage.

(2)一种斜向预应力水泥混凝土路面裂缝的修补方法,其中,所述斜向预应力水泥混凝土路面包括预应力钢筋和滑动层,其特征在于,包括以下步骤:(2) A method for repairing cracks in an oblique prestressed cement concrete pavement, wherein the oblique prestressed cement concrete pavement includes prestressed steel bars and a sliding layer, characterized in that it includes the following steps:

(a)开缝钻孔:沿着裂缝开设一条宽度为W的开缝槽,开缝槽底面位于预应力钢筋以上,W为横向裂缝的最小修补宽度,然后在开缝槽底部沿裂缝方向间隔钻有连通所述滑动层的多个钻孔。(a) Slot drilling: open a slot with a width of W along the crack, the bottom of the slot is located above the prestressed steel bar, W is the minimum repair width of the transverse crack, and then space along the direction of the crack at the bottom of the slot A plurality of boreholes communicating with the sliding layer are drilled.

(b)预灌浆:冲洗开缝槽和钻孔,把无收缩灌浆料加水混合搅拌至均匀无结块,熟化后再搅拌,并灌浆到钻孔内,然后用压浆机在钻孔内加压,使钻孔内的浆液流入周围滑动层顶部的空隙里。本技术方案的特点和进一步改进在于:(b) Pre-grouting: Rinse the slotted groove and the drilled hole, mix the non-shrinkable grouting material with water until it is uniform without agglomeration, stir after aging, and grout into the drilled hole, and then use a grouting machine to add Press the pressure to make the slurry in the borehole flow into the void at the top of the surrounding sliding layer. The characteristics and further improvement of this technical solution are:

所述无收缩灌浆料为波士胶NS60通用无收缩灌浆料,其与水的混合重量比为25:4.4。The non-shrinkage grouting material is Bostik NS60 general-purpose non-shrinkage grouting material, and its mixing weight ratio with water is 25:4.4.

(c)扎筋灌浆:先将竖直钢筋笼子布置在钻孔内,钻孔内灌入无收缩灌浆料;然后,将水平钢筋笼子置于开缝槽内,其顶面与竖直钢筋笼子的顶面水平,且相互搭接后,用无收缩灌浆料进行浇灌、插捣,使新浇筑的路面和相邻的旧路面平整连接。本技术方案的特点和进一步改进在于:(c) Reinforcement grouting: first arrange the vertical reinforcement cage in the drilled hole, and pour non-shrinkage grouting material into the drilled hole; then, place the horizontal reinforcement cage in the slot, and its top surface and the vertical reinforcement cage After the top surfaces of the roads are horizontal and overlapped with each other, pour and tamp with non-shrinkage grouting materials to make the newly poured road surface and the adjacent old road surface evenly connected. The characteristics and further improvement of this technical solution are:

所述无收缩灌浆料为波士胶NS60、碎石(直径为10-20mm)与水的混合物,其中波士胶NS60与碎石的重量比为7:3~6:4,水与波士胶NS60的重量比为0.18。The non-shrinkage grouting material is a mixture of Bostik NS60, crushed stone (10-20mm in diameter) and water, wherein the weight ratio of Bostik NS60 to crushed stone is 7:3-6:4, water and Bostik The weight ratio of glue NS60 is 0.18.

本发明的一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法,针对斜向预应力水泥混凝土路面的裂缝给出了具体的修补措施和方法,在预应力钢筋层进行钻孔修补,同时用波士胶进行填补,强度较大,使用的无收缩灌浆料受环境温度等影响小,能与旧的路面达到平整无缝修补,修补方法简单易行,可靠性强。A kind of oblique prestressed cement concrete pavement crack repair structure and repair method of the present invention provides specific repair measures and methods for the cracks in oblique prestressed cement concrete pavement, and the prestressed reinforcement layer is drilled and repaired, and at the same time Bost glue is used for filling, which has high strength, and the non-shrinkage grouting material used is less affected by the ambient temperature, etc., and can be flat and seamlessly repaired with the old road surface. The repair method is simple and reliable.

附图说明Description of drawings

下面结合附图和具体实施方式对本发明加以进一步详细说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

图1为本发明的一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法的纵向立面图;Fig. 1 is the longitudinal elevation view of a kind of oblique prestressed cement concrete pavement crack repair structure and repair method of the present invention;

图2为图1中所示的斜向预应力水泥混凝土路面裂缝修补结构及修补方法的横断面立面图;Fig. 2 is the cross-sectional elevation view of oblique prestressed cement concrete pavement crack repair structure and repair method shown in Fig. 1;

图3为图1中所示的斜向预应力水泥混凝土路面裂缝修补结构及修补方法的水平钢筋笼子的平面图;Fig. 3 is the plane view of the horizontal reinforcement cage of oblique prestressed cement concrete pavement crack repair structure and repair method shown in Fig. 1;

图4为图1中所示的斜向预应力水泥混凝土路面裂缝修补结构及修补方法的竖直钢筋笼子的平面图。Fig. 4 is the plane view of the vertical reinforcement cage of the oblique prestressed cement concrete pavement crack repair structure and repair method shown in Fig. 1 .

图中:1、水平钢筋笼子;2、竖直钢筋笼子;3、钻孔;4、水平构造钢筋;5、矩形箍筋;6、环形箍筋;7、竖直构造钢筋。In the figure: 1, horizontal reinforcement cage; 2, vertical reinforcement cage; 3, drilling; 4, horizontal structural reinforcement; 5, rectangular stirrup; 6, circular stirrup; 7, vertical structural reinforcement.

具体实施方式Detailed ways

参照图1、图2,为本发明的一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法的纵向立面图和横断面立面图。其中,设该斜向预应力水泥混凝土路面的宽度为B,水泥混凝土板的高度为h,沿着路面裂缝用切割机切割有开缝槽,开缝槽的宽度为W,W为裂缝的最小修补宽度(当裂缝与路面横向线成θ角度时,W=B*tgθ),开缝槽底面位于预应力钢筋以上,为h/2。在预应力钢筋底部用电钻钻有直径为10cm的钻孔3,钻孔3每间隔20cm排布,钻孔深度为h/2,钻孔3连通滑动层。开缝槽内设有水平钢筋笼子1,钻孔3内设有竖直钢筋笼子2。Referring to Fig. 1 and Fig. 2, it is a longitudinal elevation view and a cross-sectional elevation view of a kind of oblique prestressed cement concrete pavement crack repair structure and repair method of the present invention. Wherein, it is assumed that the width of the oblique prestressed cement concrete pavement is B, the height of the cement concrete slab is h, and there are slots cut with a cutting machine along the cracks in the road surface. The width of the slots is W, and W is the minimum of the crack. The width of the repair (when the crack is at an angle of θ to the transverse line of the road surface, W=B*tgθ), the bottom surface of the slot is located above the prestressed steel bar, which is h/2. Drill holes 3 with a diameter of 10 cm at the bottom of the prestressed steel bars with an electric drill, the holes 3 are arranged at intervals of 20 cm, the depth of the holes is h/2, and the holes 3 communicate with the sliding layer. A horizontal reinforcement cage 1 is arranged in the slotted slot, and a vertical reinforcement cage 2 is arranged in the borehole 3 .

参照图3、图4,为图1中所示的斜向预应力水泥混凝土路面裂缝修补结构及修补方法的水平钢筋笼子和竖直钢筋笼子的平面图。水平钢筋笼子1截面为矩形的钢筋笼子,包括四根平行设置的水平构造钢筋4和沿水平构造钢筋4方向间隔设置的矩形箍筋5,矩形箍筋5之间间隔20cm进行设置,水平构造钢筋4的直径为8mm,矩形箍筋5的直径为6mm,矩形箍筋5的宽度为(W-6)cm,长度为(B-10)cm,高度为安装好后低于路面高度3cm;竖直钢筋笼子2为柱状钢筋笼子,包括至少三根在外圆周上轴向设置的竖直构造钢筋7以及沿竖直构造钢筋7方向设置的环形箍筋6,竖直构造钢筋7的直径为8mm,环形箍筋6的直径为6mm,竖直钢筋笼子2的直径为5cm;竖直钢筋笼子2的顶面与水平钢筋笼子1的顶面在同一水平面上且低于路面高度3cm,竖直钢筋笼子2的顶面与水平钢筋笼子1的顶面相互连接。Referring to Fig. 3 and Fig. 4, it is a plan view of the horizontal reinforcement cage and the vertical reinforcement cage of the oblique prestressed cement concrete pavement crack repair structure and repair method shown in Fig. 1 . Horizontal reinforcement cage 1 is a reinforcement cage with a rectangular section, including four horizontal structural reinforcements 4 arranged in parallel and rectangular stirrups 5 arranged at intervals along the direction of the horizontal structural reinforcements 4. The rectangular stirrups 5 are arranged at intervals of 20 cm, and the horizontal structural reinforcements The diameter of 4 is 8mm, the diameter of rectangular stirrup 5 is 6mm, the width of rectangular stirrup 5 is (W-6) cm, the length is (B-10) cm, and the height is 3 cm lower than the road surface after installation; The straight reinforcement cage 2 is a columnar reinforcement cage, comprising at least three vertical structural reinforcements 7 axially arranged on the outer circumference and annular stirrups 6 arranged along the direction of the vertical structural reinforcements 7, the diameter of the vertical structural reinforcements 7 is 8 mm, and The diameter of stirrup 6 is 6mm, and the diameter of vertical reinforcement cage 2 is 5cm; The top surface of vertical reinforcement cage 2 and the top surface of horizontal reinforcement cage 1 are on the same level and lower than road surface height 3cm, vertical reinforcement cage 2 The top surface of and the top surface of the horizontal reinforcement cage 1 are interconnected.

本发明的斜向预应力水泥混凝土路面裂缝的修补方法步骤如下:The repair method step of oblique prestressed cement concrete pavement crack of the present invention is as follows:

(a)开缝钻孔:沿着裂缝开设一条宽度为W的开缝槽,开缝槽底面位于预应力钢筋以上,即开缝槽的深度为h/2,W为横向裂缝的最小修补宽度,然后在开缝槽底部沿裂缝方向间隔用电钻钻有连通滑动层的多个钻孔3,钻孔3的直径为10cm,钻孔3每间隔20cm排布,钻孔3的深度为h/2。(a) Slot drilling: open a slot with a width of W along the crack, the bottom of the slot is located above the prestressed steel bar, that is, the depth of the slot is h/2, and W is the minimum repair width of the transverse crack , then at the bottom of the slit groove along the direction of the crack, drill a plurality of boreholes 3 connecting the sliding layer with an electric drill at intervals. The diameter of the boreholes 3 is 10cm, and the boreholes 3 are arranged at intervals of 20cm. The depth of the boreholes 3 is h/ 2.

(b)预灌浆:用高压水枪冲洗开缝槽和钻孔3,把波士胶NS60通用无收缩灌浆料加水混合搅拌至均匀无结块(波士胶NS60通用无收缩灌浆料与水的混合重量比为25:4.4),熟化后再搅拌,并灌浆到钻孔3内,到达钻孔3的一半高度,然后用压浆机在钻孔3内加压,使钻孔内的浆液流入周围滑动层顶部的空隙里。(b) Pre-grouting: Use a high-pressure water gun to rinse the slotted groove and drill hole 3, add Bostik NS60 general-purpose non-shrinkage grouting material and water and mix until uniform without agglomeration (mixing Bostik NS60 general-purpose non-shrinkage grouting material with water The weight ratio is 25:4.4), stir after aging, and grout into the borehole 3 to reach half the height of the borehole 3, and then use a grouting machine to pressurize the borehole 3 to make the grout in the borehole flow into the surrounding in the gap at the top of the slide layer.

(c)扎筋灌浆:先将竖直钢筋笼子2布置在钻孔3内,钻孔3内灌入专用无收缩灌浆料;然后,将水平钢筋笼子1置于开缝槽内,其顶面与竖直钢筋笼子的顶面水平(低于路面高度3cm),且相互搭接后,用专用无收缩灌浆料进行浇灌、插捣,使新浇筑的路面和相邻的旧路面平整连接。专用无收缩灌浆料制备方法如下:波士胶NS60与碎石(直径为10-20mm)重量比为7:3~6:4,水与波士胶NS60的重量比为0.18进行搅拌混合。(c) Grouting for bars: First, arrange the vertical reinforcement cage 2 in the drilled hole 3, and pour special non-shrinkage grouting material into the drilled hole 3; then, place the horizontal reinforcement cage 1 in the slot, and its top After being level with the top surface of the vertical steel cage (3cm below the road surface height) and overlapped with each other, the special non-shrinkage grouting material is used for pouring, inserting and tamping, so that the newly poured road surface and the adjacent old road surface are connected smoothly. The preparation method of the special non-shrink grouting material is as follows: the weight ratio of Bostik NS60 to crushed stone (10-20mm in diameter) is 7:3-6:4, and the weight ratio of water to Bostik NS60 is 0.18 for stirring and mixing.

该专用无收缩灌浆料的强度如下:The strength of the special non-shrinkage grouting material is as follows:

7d的抗压强度49MPa;The compressive strength of 7d is 49MPa;

28d的抗压强度62.1MPa;The compressive strength of 28d is 62.1MPa;

28d的抗折强度6.07MPa;The flexural strength of 28d is 6.07MPa;

3d的收缩量0.012mm。The shrinkage of 3d is 0.012mm.

本发明的竖直和水平并不是绝对的,是相对于路面言。本发明针对斜向预应力水泥混凝土路面的裂缝给出了具体的修补结构和方法,修补方法简单易行,可靠性强。The vertical and horizontal of the present invention are not absolute, but are relative to the road surface. The invention provides a specific repair structure and method for the cracks on the oblique prestressed cement concrete pavement, and the repair method is simple, easy and reliable.

尽管以上结合附图对本发明的实施方案进行了描述,但本发明并不局限于上述的具体实施方案,上述的具体实施方案仅仅是示意性的、指导性的,而不是限制性的。本领域的普通技术人员在本说明书的启示下,在不脱离本发明权利要求所保护的范围的情况下,还可以做出很多种的形式,这些均属于本发明保护之列。Although the embodiments of the present invention have been described above with reference to the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments, and the above-mentioned specific embodiments are only illustrative, instructive, and not restrictive. Under the enlightenment of this description, those skilled in the art can also make many forms without departing from the protection scope of the claims of the present invention, and these all belong to the protection of the present invention.

Claims (7)

1. the preparing structure of an oblique prestressing force cement concrete cracks, wherein, described oblique prestressing force cement concrete pavement comprises prestressed reinforcement and sliding layer, it is characterized in that, the top of described prestressed reinforcement is provided with the slot driller offered along crack, be interval with the multiple borings being communicated with described sliding layer along fractuer direction bottom slot driller, horizontal reinforcement cage is provided with in described slot driller, be provided with vertical reinforcing steel bar cage in described boring, described slot driller and the interior grouting of described boring have contraction-free grouting concrete.
2. the preparing structure of oblique prestressing force cement concrete cracks according to claim 1, it is characterized in that, the reinforcing steel bar cage of described horizontal reinforcement cage to be cross section be rectangle, comprises four horizontal tectonics reinforcing bars be arranged in parallel and along the spaced rectangle hoop in described horizontal tectonics reinforcing bar direction.
3. the preparing structure of oblique prestressing force cement concrete cracks according to claim 1, it is characterized in that, described vertical reinforcing steel bar cage is column reinforcing steel bar cage, the ring-shaped stirrup comprising at least three vertical distributing bars circumferentially axially arranged outside and arrange along described vertical distributing bar direction.
4. the preparing structure of oblique prestressing force cement concrete cracks according to claim 1, it is characterized in that, the end face of described vertical reinforcing steel bar cage and the end face of described horizontal reinforcement cage are in same level and lower than pavement-height, the end face of described vertical reinforcing steel bar cage and the end face of described horizontal reinforcement cage are interconnected.
5. a method for repairing and mending for oblique prestressing force cement concrete cracks, wherein, described oblique prestressing force cement concrete pavement comprises prestressed reinforcement and sliding layer, it is characterized in that, comprises the following steps:
(1) to crack boring: offering a width along crack is the slot driller of W, slot driller bottom surface is positioned at more than prestressed reinforcement, W is the minimum repairing width of transverse crack, bottom slot driller, be then drilled with the multiple borings being communicated with described sliding layer along fractuer direction interval;
(2) pregrouting: rinse slot driller and boring, contraction-free grouting concrete is added water and mixes to evenly without caking, stir again after slaking, and be grouted in boring, then with pneumatic mortar machine pressurization in boring, the slurries in boring are made to flow in the space at sliding layer top around;
(3) muscle grouting is pricked: be first arranged in boring by vertical reinforcing steel bar cage, in boring, pour into contraction-free grouting concrete; Then, horizontal reinforcement cage is placed in slot driller, the end face level of its end face and vertical reinforcing steel bar cage, and mutually after overlap joint, carries out watering, plugging and pounding with contraction-free grouting concrete, make the road surface of newly building and the smooth connection of adjacent old pavement.
6. the method for repairing and mending of oblique prestressing force cement concrete cracks according to claim 5, it is characterized in that, contraction-free grouting concrete in described step (2) is the general contraction-free grouting concrete of boss's glue NS60, and it is 25:4.4 with the mixed weight ratio of water.
7. the method for repairing and mending of oblique prestressing force cement concrete cracks according to claim 5, it is characterized in that, contraction-free grouting concrete in described step (3) is boss's glue NS60, diameter is the rubble of 10-20mm and the mixture of water, wherein the weight ratio of boss's glue NS60 and rubble is 7:3 ~ 6:4, and the weight ratio of water and boss's glue NS60 is 0.18.
CN201310115758.5A 2013-04-03 2013-04-03 Structure and method for repairing cracks of oblique prestressed cement concrete pavement Expired - Fee Related CN103194949B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310115758.5A CN103194949B (en) 2013-04-03 2013-04-03 Structure and method for repairing cracks of oblique prestressed cement concrete pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310115758.5A CN103194949B (en) 2013-04-03 2013-04-03 Structure and method for repairing cracks of oblique prestressed cement concrete pavement

Publications (2)

Publication Number Publication Date
CN103194949A CN103194949A (en) 2013-07-10
CN103194949B true CN103194949B (en) 2015-05-20

Family

ID=48717755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310115758.5A Expired - Fee Related CN103194949B (en) 2013-04-03 2013-04-03 Structure and method for repairing cracks of oblique prestressed cement concrete pavement

Country Status (1)

Country Link
CN (1) CN103194949B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032641A (en) * 2014-01-10 2014-09-10 江苏鼎泰工程材料有限公司 Method for prolonging service life of concrete pavement
CN104674627B (en) * 2015-02-13 2016-08-17 南通大学 A kind of seam construction method preventing old cement concrete road to add black top reflection crack
CN108797292A (en) * 2017-04-26 2018-11-13 福建省第公路工程公司 A kind of cement concrete cracks breakage raggle formula patching
CN107447616A (en) * 2017-09-01 2017-12-08 西安汉河环保科技有限公司 A kind of oblique prestressed concrete modularization construction process
CN108360352B (en) * 2018-01-31 2021-01-22 杨波 Horizontal prestress grouting repair method for road crack diseases
CN110453579B (en) * 2019-09-09 2021-05-18 济南通达公路工程有限公司 Super-curing seal construction method for cement concrete pavement
CN113106802A (en) * 2021-04-19 2021-07-13 交通运输部公路科学研究所 Method and equipment for rapidly recovering load transfer capacity of assembled concrete pavement slab

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0288803A (en) * 1988-09-22 1990-03-29 P S Concrete Co Ltd Jointing of precast concrete pavement slab to existing concrete pavement
EP0676505A2 (en) * 1994-04-08 1995-10-11 Director General Of Otaru Development And Construction Department Of Hokkaido Development Bureau. Joint structure for coupling precast concrete pavement slabs
CN101775772A (en) * 2010-02-01 2010-07-14 张东省 Sloping tensioning method two-way prestressed concrete pavement construction method
CN202766943U (en) * 2012-09-24 2013-03-06 河南万里路桥集团有限公司 Filling and sealing structure for cement concrete pavement slit
CN203174459U (en) * 2013-04-03 2013-09-04 西安公路研究院 Crack repair structure for slantwise prestressed cement concrete pavement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0288803A (en) * 1988-09-22 1990-03-29 P S Concrete Co Ltd Jointing of precast concrete pavement slab to existing concrete pavement
EP0676505A2 (en) * 1994-04-08 1995-10-11 Director General Of Otaru Development And Construction Department Of Hokkaido Development Bureau. Joint structure for coupling precast concrete pavement slabs
CN101775772A (en) * 2010-02-01 2010-07-14 张东省 Sloping tensioning method two-way prestressed concrete pavement construction method
CN202766943U (en) * 2012-09-24 2013-03-06 河南万里路桥集团有限公司 Filling and sealing structure for cement concrete pavement slit
CN203174459U (en) * 2013-04-03 2013-09-04 西安公路研究院 Crack repair structure for slantwise prestressed cement concrete pavement

Also Published As

Publication number Publication date
CN103194949A (en) 2013-07-10

Similar Documents

Publication Publication Date Title
CN103194949B (en) Structure and method for repairing cracks of oblique prestressed cement concrete pavement
CN104847014B (en) The vertical connecting structure of assembly concrete shear wall and construction method
CN103758031B (en) A method for preparing assembled bridge piers using steel fiber self-compacting concrete
CN106012697B (en) Ballastless track roadbed high polymer grouting lifting method
CN111335943B (en) A method of point source interval grouting using roof caving and swell filling and directional drilling
CN108677924B (en) Double-row miniature steel pipe pile grouting wall-forming partition structure and method
CN108915691B (en) Waterproof impervious concrete single-layer lining construction method in water-containing bedrock environment
CN106592440B (en) A kind of construction method of prefabricated subsection type bridge pier
CN103470270B (en) Deep well ingate supporting structure and construction method thereof
CN109440571A (en) The construction method for building road is faced in a kind of laying of prefabricated board
CN106320120A (en) Construction process for pile slab type non-soil roadbed highway
CN107989049A (en) A kind of construction method of frame bank protection
CN108360352B (en) Horizontal prestress grouting repair method for road crack diseases
CN102425155B (en) A superficial reinforcement method of overlying rock mass in goaf
CN109252691A (en) A kind of reinforced steel concrete framed floor structure and reinforcement means
CN107034894A (en) Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method
CN206408515U (en) Precast pier section assembling structure
CN112878316A (en) Method for reinforcing base of rigid sleeve valve pipe pile
CN205501749U (en) A roadbed widening structure
CN103276645A (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN110820455A (en) Construction process for lapping and expanding roadbed of asphalt concrete highway
CN109281239B (en) Removal method of tapered slope of ribbed abutment in road operation state
CN111455973A (en) Composite foundation structure of prefabricated solid CFG piles and its construction method
CN213508795U (en) Concrete modular inspection shaft shaft structure and concrete modular bricks
CN203174459U (en) Crack repair structure for slantwise prestressed cement concrete pavement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20190403