CN103184725B CN201310072350.4A CN201310072350A CN103184725B CN 103184725 B CN103184725 B CN 103184725B CN 201310072350 A CN201310072350 A CN 201310072350A CN 103184725 B CN103184725 B CN 103184725B
Authority
CN
China
Prior art keywords
girder
solid web
vierendeel
framed
girders
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310072350.4A
Other languages
Chinese (zh)
Other versions
CN103184725A (en
Inventor
熊仁阶
符晶华
吴良平
何朝安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI JIANKE STRUCTURE STRENGTHENING CO Ltd
Original Assignee
HUBEI JIANKE STRUCTURE STRENGTHENING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI JIANKE STRUCTURE STRENGTHENING CO Ltd filed Critical HUBEI JIANKE STRUCTURE STRENGTHENING CO Ltd
Priority to CN201310072350.4A priority Critical patent/CN103184725B/en
Publication of CN103184725A publication Critical patent/CN103184725A/en
Application granted granted Critical
Publication of CN103184725B publication Critical patent/CN103184725B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A framed girder equivalent deloading and reinforcing method for a building structure is realized in a manner that supports are arranged on the two sides of two end pillars of a framed girder; two truss girders or solid web girders are simply supported and placed on the supports; a force transmission girder provided with the two ends connected with the truss girders or the solid web girders is propped against the bottom surface of the framed girder; and partial floor load is transmitted to the two truss girders or the solid web girders through the force transmission girder, and is transmitted to a frame column through the supports on the frame column, so as to form a complete force transmission way, namely, the partial load of the framed girder is reduced, and the framed girder is reinforced.

Description

Vierendeel girder equivalence off-load reinforcing method
Technical field
The present invention relates to a kind of building structure frame beam equivalence off-load reinforcing method, especially Vierendeel girder is not strengthened, born load only passes to post with the form of Vertical Concentrated Force by ruggedized construction, newly-increased moment of flexure is not produced to original structure, the Vierendeel girder reinforcement means of easy construction.
Background technology
At present, the reinforcing of building structure frame beam adopts the methods such as steel-bonded reinforcement, sticky carbon fiber reinforcement, enlarging section reinforcing or the reinforcing of external prestressing pull bar more.When adopting steel bonding, sticky carbon fiber or enlarging section reinforcement means to reinforce Vierendeel girder, be all carry out reinforcing to the bearing capacity of Vierendeel girder own to improve, the beam-ends moment of flexure of Vierendeel girder can increase to some extent, can increase the moment of flexure burden of post; When adopting external prestressing pull bar reinforcement means to reinforce Vierendeel girder, break floor, wear pull rod construction more difficult, tension stress controls complicated.
Summary of the invention
In order to overcome steel-bonded reinforcement, sticky carbon fiber reinforcement, enlarging section reinforce and the deficiency of external prestressing pull bar reinforcement means, the invention provides a kind of reinforcement means of building structure frame beam, the reinforcement means of this Vierendeel girder is not strengthened Vierendeel girder, born load is only passed to post with the form of Vertical Concentrated Force by ruggedized construction, newly-increased moment of flexure is not produced to original structure, structure is simple, easy construction.
The technical solution adopted for the present invention to solve the technical problems is: in the both sides of Vierendeel girder two newel post, be positioned at certain altitude at the bottom of Vierendeel girder and respectively do a bearing, article two, identical girder truss or solid web girder freely-supported are shelved on the bearing of post both sides, and the end is omited than at the bottom of Vierendeel girder in girder truss or solid web girder top; Article two, girder truss or solid web girder connect a transfer beam at Vierendeel girder mid point position, and this transfer beam holds out against bottom surface in the middle part of Vierendeel girder; Article two, girder truss or solid web girder are connected by many lateral stability bars, ensure stability; As required, two identical girder trusses or solid web girder also can a certain amount of distortion of pre-add, form prestressing force, strengthen effect.
The invention has the beneficial effects as follows, can when not producing moment of flexure to original structure, structure is simple, easy construction.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further described.
Fig. 1 is the structure principle chart of the embodiment of the present invention.
Fig. 2 is the 1-1 sectional view of Fig. 1.
Fig. 3 is the 2-2 sectional view of Fig. 1.
In figure, (1) waits to reinforce Vierendeel girder, (2) floor plate, (3) frame column, (4) post upper bracket, (5) girder truss or solid web girder, (6) transfer beam, (7) lateral stability bar.
Detailed description of the invention
In FIG, post upper bracket (4) is fixed on frame column (3), article two, girder truss or solid web girder (5) are connected by many lateral stability bars (7), freely-supported is shelved on post upper bracket (4), transfer beam (6) two ends are connected with two girder trusses or solid web girder (5), and hold out against the mid point bottom surface waiting to reinforce Vierendeel girder (1).Part floor load is delivered to two girder trusses or solid web girder (5) by transfer beam (6), frame column (3) is passed to again by post upper bracket (4), form complete force path, be equivalent to the fractional load decreasing Vierendeel girder, reach the object that reinforcing frame is set a roof beam in place.

Claims (1)

1. a building structure frame beam equivalence off-load reinforcing method, do bearing in the both sides of Vierendeel girder two newel post, two girder trusses or solid web girder freely-supported are shelved on bearing, and the end is omited than at the bottom of Vierendeel girder in girder truss or solid web girder top; Article two, girder truss or solid web girder connect a transfer beam at Vierendeel girder mid point position, and transfer beam holds out against Vierendeel girder bottom surface, it is characterized in that: two girder trusses or solid web girder hold out against Vierendeel girder bottom surface by transfer beam, and freely-supported is shelved in frame column side supports.
CN201310072350.4A 2013-02-28 2013-02-28 Framed girder equivalent deloading and reinforcing method Expired - Fee Related CN103184725B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310072350.4A CN103184725B (en) 2013-02-28 2013-02-28 Framed girder equivalent deloading and reinforcing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310072350.4A CN103184725B (en) 2013-02-28 2013-02-28 Framed girder equivalent deloading and reinforcing method

Publications (2)

Publication Number Publication Date
CN103184725A CN103184725A (en) 2013-07-03
CN103184725B true CN103184725B (en) 2015-05-06

Family

ID=48676152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310072350.4A Expired - Fee Related CN103184725B (en) 2013-02-28 2013-02-28 Framed girder equivalent deloading and reinforcing method

Country Status (1)

Country Link
CN (1) CN103184725B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854812A (en) * 2021-03-15 2021-05-28 重庆大学 Seismic strengthening method for existing concrete beam containing steel truss

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011132765A (en) * 2009-12-25 2011-07-07 Sumitomo Metal Mining Siporex Kk Reinforcing method and reinforcing structure of floor
CN102493342A (en) * 2011-11-22 2012-06-13 中铁三局集团第六工程有限公司 Static-load bracket preloading construction method of continuous beam
CN202688904U (en) * 2012-05-14 2013-01-23 中交第一公路勘察设计研究院有限公司 Small box girder steel plate adhesive pressurization device
CN102926333A (en) * 2012-12-04 2013-02-13 成都博睿基桥梁技术有限责任公司 External prestressed reinforcement structure for old bridge and construction method thereof
CN102936965A (en) * 2012-11-20 2013-02-20 淮海工学院 Method for strengthening reinforced concrete beam through distributed external prestressing cables

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011132765A (en) * 2009-12-25 2011-07-07 Sumitomo Metal Mining Siporex Kk Reinforcing method and reinforcing structure of floor
CN102493342A (en) * 2011-11-22 2012-06-13 中铁三局集团第六工程有限公司 Static-load bracket preloading construction method of continuous beam
CN202688904U (en) * 2012-05-14 2013-01-23 中交第一公路勘察设计研究院有限公司 Small box girder steel plate adhesive pressurization device
CN102936965A (en) * 2012-11-20 2013-02-20 淮海工学院 Method for strengthening reinforced concrete beam through distributed external prestressing cables
CN102926333A (en) * 2012-12-04 2013-02-13 成都博睿基桥梁技术有限责任公司 External prestressed reinforcement structure for old bridge and construction method thereof

Also Published As

Publication number Publication date
CN103184725A (en) 2013-07-03

Similar Documents

Publication Publication Date Title
CN102758494B (en) Composite steel plate shear wall with angle steel
CN101748796B (en) Large-span mill construction with super heavy-duty steel structure and design method thereof
CN202007535U (en) Supporting reinforcing structure
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN103184725B (en) Framed girder equivalent deloading and reinforcing method
CN105369745A (en) Bridge support exchanging and lifting reaction frame
CN103088950A (en) Floor plate steel truss structure
CN102080383B (en) Suspension type embedded part and hole reserved template fixing method
CN202787563U (en) Combined steel plate shear wall
CN204311359U (en) A kind of steel pipe concrete arch rib bridge arch pin is installed and is used stiffness support
CN202866085U (en) Light-weight roof supporting structure
CN202157410U (en) Semi-rigid steel frame structure of eccentric supports
CN203034610U (en) Connecting panel joint of combined steel and concrete column and reinforced concrete frame beam
CN206370239U (en) A kind of bridge structural model device
CN202202872U (en) Railway tunnel lining jacking frame
CN201420400Y (en) Supporting structure of towering reticulated shell structure
CN104674679A (en) Downward supporting type prestressed strengthened puling rod reinforcing method
CN103216036B (en) Bent-loading light-weight reinforced concrete beam structure
CN204282567U (en) A kind of flexion-proof energy consumption supporting structure
CN204022286U (en) Transfer crane is without corbel type door frame
CN203603377U (en) Inner support frame for frame beam reinforcing steel bars
CN203160686U (en) Novel composite supporting formwork body
CN203256589U (en) Novel steel truss trestle structure
CN202508765U (en) Large double-beam box-type gantry crane
CN203160491U (en) Steel truss structure for floor plates

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Xiong Renjie

Document name: Notification of Acceptance of Patent Application

C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Fu Jinghua

Inventor after: Xiong Renjie

Inventor after: Wu Liangping

Inventor after: He Chaoan

Inventor before: Xiong Renjie

Inventor before: Fu Jinghua

Inventor before: Wu Liangping

Inventor before: He Chaoan

COR Change of bibliographic data
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150506

Termination date: 20190228