CN202508765U - Large double-beam box-type gantry crane - Google Patents
Large double-beam box-type gantry crane Download PDFInfo
- Publication number
- CN202508765U CN202508765U CN2012201371861U CN201220137186U CN202508765U CN 202508765 U CN202508765 U CN 202508765U CN 2012201371861 U CN2012201371861 U CN 2012201371861U CN 201220137186 U CN201220137186 U CN 201220137186U CN 202508765 U CN202508765 U CN 202508765U
- Authority
- CN
- China
- Prior art keywords
- main beam
- girder
- box
- supporting leg
- support leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
The utility model discloses a large double-beam box-type gantry crane which comprises support legs and a main beam supported by the support legs, wherein each support leg comprises a lower section support leg arranged under the main beam, and an upper section support leg arranged above the main beam; and a reinforcing rod piece used for enhancing the strength and the rigidity of the main beam is connected between the upper part of each upper section support leg arranged above the main beam and the main beam. After the structure is adopted by the large double-beam box-type gantry crane, the reinforcing rod piece used for enhancing the strength and the rigidity of the main beam is connected between the upper part of each upper section support leg arranged above the main beam and the main beam, so that the thickness of the box-type main beam is not needed to be increased, the steel is saved, and the production cost is further lowered.
Description
Technical field
The utility model relates to a kind of gauntry crane, especially relates to the box gauntry crane of a kind of large-scale twin beams.
Background technology
In the past at the outdoor box gauntry crane of twin beams of doing industry, mainly comprise supporting leg, girder, dolly, cart and electric etc., the hoisting capacity majority is all below 32 tons, and the span majority is all below 30 meters, and beam length is general all at 45 meters.The box gauntry crane of twin beams of large-tonnage (above 32 tons), large span (span is above 30 meters), girder long (beam length is above 45 meters) girder steady when guaranteeing the hoisting crane operation; Usually need increase the thickness of box girder, to improve the strength and stiffness of girder.But when improving the strength and stiffness of girder, can increase the manufacturing cost of the box gauntry crane of twin beams, the waste great deal of steel by the thickness that increases box girder.
The utility model content
The technical matters that the utility model will solve provide a kind of when hoisting crane moves girder operate steadily and need not increase box girder thickness and then save the box gauntry crane of large-scale twin beams that steel reduce manufacturing cost.
For solving the problems of the technologies described above; The box gauntry crane of a kind of large-scale twin beams of the utility model; Comprise supporting leg and the girder that supports by supporting leg; Said supporting leg comprises hypomere supporting leg that is positioned at said girder below and the epimere supporting leg that is positioned at the girder top, is connected with the reinforcing member that is used to strengthen the girder strength and stiffness between said top and the girder at the epimere supporting leg above the girder.
Adopt the box gauntry crane of large-scale twin beams of said structure; Owing between the top of the epimere supporting leg above the girder and girder, be connected with the reinforcing member that is used to strengthen the girder strength and stiffness, thereby need not increase box girder thickness and then save steel and reduced manufacturing cost.
Description of drawings
Below in conjunction with accompanying drawing the utility model is done to specify further.
Fig. 1 is the main TV structure scheme drawing of the box gauntry crane of the large-scale twin beams of the utility model.
Fig. 2 is the plan structure scheme drawing of the box gauntry crane of the large-scale twin beams of the utility model.
The specific embodiment
Referring to Fig. 1, Fig. 2; The box gauntry crane of the large-scale twin beams of the utility model; Comprise supporting leg 1 and the girder 2 that supports by supporting leg 1; Said supporting leg 1 comprises hypomere supporting leg 3 that is positioned at said girder 2 belows and the epimere supporting leg 4 that is positioned at girder 2 tops, is connected with the reinforcing member 5 that is used to strengthen the girder strength and stiffness between said top and the girder 2 at the epimere supporting leg 4 above the girder 2.
Claims (1)
1. box gauntry crane of large-scale twin beams; Comprise supporting leg and the girder that supports by supporting leg; Said supporting leg comprises and it is characterized in that hypomere supporting leg that is positioned at said girder below and the epimere supporting leg that is positioned at the girder top: be connected with the reinforcing member that is used to strengthen the girder strength and stiffness between said top and the girder at the epimere supporting leg above the girder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201371861U CN202508765U (en) | 2012-04-03 | 2012-04-03 | Large double-beam box-type gantry crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201371861U CN202508765U (en) | 2012-04-03 | 2012-04-03 | Large double-beam box-type gantry crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202508765U true CN202508765U (en) | 2012-10-31 |
Family
ID=47061263
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201371861U Expired - Fee Related CN202508765U (en) | 2012-04-03 | 2012-04-03 | Large double-beam box-type gantry crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202508765U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105110174A (en) * | 2015-08-06 | 2015-12-02 | 傅欣荣 | Method for manufacturing or transforming main beams of crane |
-
2012
- 2012-04-03 CN CN2012201371861U patent/CN202508765U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105110174A (en) * | 2015-08-06 | 2015-12-02 | 傅欣荣 | Method for manufacturing or transforming main beams of crane |
CN105110174B (en) * | 2015-08-06 | 2017-04-19 | 傅欣荣 | Method for manufacturing or transforming main beams of crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201999647U (en) | Ladle crane with structure of two trolleys and two main beams | |
CN202508765U (en) | Large double-beam box-type gantry crane | |
CN202214125U (en) | Crane girder combined hoisting device with auxiliary truss | |
CN202518942U (en) | Long-span double-beam truss type gantry crane | |
CN203159050U (en) | Crane end beam | |
CN202271550U (en) | Upper beam reinforcing mechanism for crane beam | |
CN202148639U (en) | Composite building steel column | |
CN202245737U (en) | Upper part mechanism used in crane girder | |
CN204022286U (en) | Transfer crane is without corbel type door frame | |
CN202000494U (en) | Spliced enhancing structure for steel structure | |
CN204057706U (en) | A kind of bridging crane main beam body structure | |
CN103848370A (en) | Scissors fork type lifting platform mechanism | |
CN204545047U (en) | A kind of craneway bender | |
CN202064492U (en) | Brace fixing mechanism used for steel structure | |
CN102765675A (en) | Structurally improved frame of hydraulic horizontal jack | |
CN203199907U (en) | Novel lightweight energy-saving crane | |
CN203213289U (en) | Purline and pull-bar mechanism for steel structure | |
CN203213283U (en) | Pull bar expansion mechanism for steel structure | |
CN202073186U (en) | Purline connecting mechanism for steel structure | |
CN201932821U (en) | Crane position mechanism for steel structures | |
CN202767569U (en) | Trailer coach suitable for being lifted | |
CN202785305U (en) | Double-side crane beam mechanism for crane beam structure | |
CN202831396U (en) | Box column side extension mechanism | |
CN202272628U (en) | Connecting node of crane beam and steel column | |
CN203079556U (en) | Novel double-beam trolley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121031 Termination date: 20150403 |
|
EXPY | Termination of patent right or utility model |