CN103178577A CN201210520805XA CN201210520805A CN103178577A CN 103178577 A CN103178577 A CN 103178577A CN 201210520805X A CN201210520805X A CN 201210520805XA CN 201210520805 A CN201210520805 A CN 201210520805A CN 103178577 A CN103178577 A CN 103178577A
Authority
CN
China
Prior art keywords
mentioned
storage battery
power
information technoloy
technoloy equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210520805XA
Other languages
Chinese (zh)
Other versions
CN103178577B (en
Inventor
山田哲也
松村忠幸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN103178577A publication Critical patent/CN103178577A/en
Application granted granted Critical
Publication of CN103178577B publication Critical patent/CN103178577B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Power Sources (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a cooperative control system and a cooperative control method of IT devices and storage batteries. The characteristics (time, frequency, and spacing) of coming shutdown is judged in advance, the presumed shutdown can be controlled through the cooperation of the IT devices and an uninterrupted power device having the storage batteries, thereby realizing the high efficiency of the charging and discharging of the storage batteries. The cooperative control system includes a commercial power supply (10), a voltage recorder (20) for measuring the voltage of the commercial power supply, an uninterrupted power device (30) connecting with a plurality of storage batteries (32), a power supply connector (40) equipped with a power determining mechanism, and a plurality of IT devices (50) including servers (51) connecting with the power supply connector. Controlling parts (55) inside the servers predict the continuous time of the future shutdown, the power limit value of the IT devices is figured out based on the remain of the storage batteries and the predicted shutdown time, and the power of the IT devices is controlled to satisfy the power limit value.

Description

The cooperation control system of information technoloy equipment and storage battery and cooperation control method
Technical field
The present invention relates to a kind of system that possesses information technoloy equipment and jumbo storage battery, particularly relate to and a kind ofly be suitable for effectively using storage battery and move the information technoloy equipment of information technoloy equipment and the cooperation control system of storage battery long-term and stably.
Background technology
Infrastructure device at power network is equipped with inadequate area, is in the state that has a power failure and take place frequently.Therefore, adopt following method: generator is set in the mansion, and generator operation when having a power failure provides the electric power in the mansion.The lead accumulator array of required several hours further is set in the repairing of generator in order to the fault of generator in server room, carries out providing to the electric power of server and client side PC.The general employing of accumulator array is with the mode of the capacity expansion of the lead accumulator of uninterrupted power supply(ups) (UPS:Uninterruptible Power Supply).Accumulator array is positioned standby as generator, because the use of accumulator array is not high frequency, therefore uses cheap lead accumulator, but volume, weight are large.
On the other hand, just like lower area: although the infrastructure device of power network is equipped with, due to the air-conditioning use in summer etc., according to season and the electric power needs sharply increase, thus power shortage.In this case, compare with unexpected power failure, infringement is few, is implemented in the scheduled outage of the time rolling blackouts that determine every day.The position of generator is set in the mansion, makes generator operation, but have to make information technoloy equipment to stop in the position that there is no generator.On the other hand, there is the position that the accumulator array of type lithium ion is set for business service constantly.Lithium ion battery can charge rapidly, and the number of times that can discharge and recharge (cycle performance) is large, therefore can also tackle scheduled outage.Like this, accumulator array according to the facility of the characteristic that has a power failure, mansion and in different ways, as the means of electric power are provided when having a power failure.
In addition, scheduled outage is by Utilities Electric Co.'s stipulated time, needs side can grasp power failure, needs side also can grasp power failure under unplanned power failure but be desirably in.An example in the method for the generation of the unplanned power failure of prediction shown in patent documentation 1.Disclose following technology in the document: the danger that prediction has a power failure, starter-generator switches from source power supply in advance before having a power failure, and cuts down thus to be connected to the battery capacity of UPS or not need UPS.Prediction herein is to be judged as source power supply " have a power failure within the time that predetermines dangerous large ", is based on to be connected to that the weather information that the internet obtains and the condition that predetermines calculate.That is the moment that, in the prediction in patent documentation 1, the prediction generation has a power failure.
Patent documentation 1: TOHKEMY 2004-355219 communique
In patent documentation 1, purpose is starter-generator before power failure, as long as it is just enough therefore to dope the moment that power failure occurs.As the place that information technoloy equipment (router, interchanger, server, memory etc.) are set, investigate the result of server room, office as can be known in worldwide, the situation that accumulator array is set together with information technoloy equipment is many.Therefore, in the present invention, be conceived to utilize efficiently this accumulator array.As efficient utilization, such as the prolongation of the discharge time of enumerating storage battery, the enough and to spare reduction of discharge capacity, the reduction of unwanted charging rapidly etc.In the situation that the lead accumulator array can be cut down the battery cost by cutting down amount of batteries, and can cut down weight.In the situation that the accumulator array of lithium ion, the power failure of the high frequency of reply is used for replacing generator, the oil expense cost of the generator of several times that can cut down the electric lighting bill thus.Like this, by utilizing efficiently accumulator array, have various advantages.
In the high efficiency of accumulator array, it is useful that prior forecast has a power failure.For example, if know the interval of power failure, just can prevent useless charging rapidly as long as charge with this interval.At this moment, the project that will predict in power failure occurs constantly different from the power failure of patent documentation 1.In addition, not the UPS monomer with storage battery, but make information technoloy equipment cooperate to control with UPS, can further expect thus the high efficiency of storage battery.
Summary of the invention
Therefore, the object of the present invention is to provide following system: the characteristic (time, frequency, interval etc.) of the power failure that estimation in advance will arrive, power failure for this anticipation makes information technoloy equipment and the UPS with storage battery cooperate to control, and realizes thus the high efficiency that discharges and recharges of storage battery.The discharge of controlling efficiently storage battery also can make apparent capacity increase and improve the performance of IT.
Above-mentioned purpose of the present invention and New Characteristics can become clear and definite based on description and the accompanying drawing of this specification.
The present invention is in order to address the above problem, the structure that for example adopts claims to put down in writing.
List an example of the cooperation control system of information technoloy equipment of the present invention and storage battery, comprising: source power supply; The voltage register, the voltage of the above-mentioned source power supply of measurement; Uninterrupted power supply(ups) is connected in above-mentioned source power supply, is connected with a plurality of storage batterys; With the power connection of electric exploration mechanism, be connected in above-mentioned uninterrupted power supply(ups); And information technoloy equipment, comprise and the above-mentioned server that is connected with the power connection of electric exploration mechanism, above-mentioned voltage register, above-mentioned uninterrupted power supply(ups), above-mentioned power connection and above-mentioned server with electric exploration mechanism are connected in network, the duration that the control part prediction of above-mentioned server inside has a power failure, obtain the electrical power limit value of information technoloy equipment based on the surplus of duration of the above-mentioned power failure that dopes and storage battery, control the electric power of above-mentioned information technoloy equipment to satisfy the electrical power limit value.
In addition, list an example of the cooperation control method of information technoloy equipment of the present invention and storage battery, be used for following system, this system comprises: source power supply; The voltage register, the voltage of the above-mentioned source power supply of measurement; Uninterrupted power supply(ups) is connected in above-mentioned source power supply, is connected with a plurality of storage batterys; With the power connection of electric exploration mechanism, be connected in above-mentioned uninterrupted power supply(ups); And information technoloy equipment, comprise and the above-mentioned server that is connected with the power connection of electric exploration mechanism, above-mentioned voltage register, above-mentioned uninterrupted power supply(ups), above-mentioned power connection and above-mentioned server with electric exploration mechanism are connected in network, above-mentioned cooperation control method is characterised in that, comprises the following steps: the step of the duration that prediction has a power failure; Based on the duration of the above-mentioned power failure that dopes and the surplus of storage battery, obtain the step of the electrical power limit value of information technoloy equipment; And the electric power of controlling above-mentioned information technoloy equipment is to satisfy the step of electrical power limit value.
The invention effect
For the power failure that takes place frequently, estimate the characteristic (time, frequency, interval etc.) of power failure, carry out the control that cooperates of information technoloy equipment and storage battery according to this power failure characteristic, thus the service that continues information technoloy equipment and as much as possible rejection carry out efficiently the charge and discharge of accumulator array when reducing.Thus, can reduce the battery capacity of storage battery.From another viewpoint, the capacity of can be enough identical storage battery improves the performance of information technoloy equipment.And, by controlling the charging method of accumulator array, also help the long lifetime of storage battery.
Description of drawings
Fig. 1 means be used to carrying out the figure of information technoloy equipment with an example of the structure of the system of the control that cooperates of storage battery.
Fig. 2 means the figure of an example of the network configuration at a plurality of strong points that comprise system of the present invention.
Fig. 3 means the figure of the action case that the charging interval of off interval prediction arranges.
Fig. 4 means the figure in the action case of large arrangement discharge time of interruption duration prediction performance restriction.
Fig. 5 means the figure in the action case of little arrangement discharge time of interruption duration prediction performance restriction.
Fig. 6 means the interruption duration when repeatedly having a power failure, the figure of the action case in the prediction of interval.
Fig. 7 means the figure of an example of the prediction term purpose table of power failure.
Fig. 8 means the figure of the reply action case the when prediction that has a power failure departs from.
Fig. 9 means the figure of an example of the control part controlled that information technoloy equipment is cooperated with storage battery.
Figure 10 means the figure of an example of the power failure prediction section in control part.
Figure 11 means the figure of an example of the IT power budget section in control part.
Figure 12 means the figure of an example of the flash-over characteristic of storage battery.
Figure 13 means the figure of an example of the IT electric power control part in control part.
Figure 14 means the figure of an example of the action that the low electric power of information technoloy equipment is controlled.
Figure 15 means the figure of an example of the flow chart controlled that information technoloy equipment is cooperated with storage battery.
Description of reference numerals
10: source power supply CPWR; 20: voltage register VLTLOG; 30: uninterrupted power supply(ups) UPS; 31: transducer CNV; 32: accumulator array BAT; 33: storage battery control part CHGCTL; 34: inverter INV; The control part UCTL of 35:UPS; 40: with the power connection PDU of electric exploration mechanism; 50:IT equipment; 51: server S VR1; 52: server S VR2; 53: router RTR; 55: the control part CTL of server; 60:LAN; 70: power failure prediction section POE; 71: the data extraction unit; 72: data store; 73: statistical analysis section; 74: the power failure calculating part; The 80:IT power budget IPB of section; 81: the accumulator array specification; 82: battery application plan section; 90:IT electric power control part IPC; 91: low electric power control part.
Embodiment
Describe in detail based on accompanying drawing and be used for implementing mode of the present invention.In addition, be used for explanation all figure for the mode that carries out an invention, to the additional same title of the key element with same function, symbol, omitting its explanation repeatedly.
An example of the present invention shown in Fig. 1 is related is used for carrying out the major part of information technoloy equipment and the system of the control that cooperates of storage battery.Wiring represents the system of power supply.Electric power is to be provided from generating by source power supply CPWR10.Voltage register VLTLOG 20 is set in the position of the voltage that can measure source power supply.Recording voltage when voltage register 20 can occur by time sequence or event, according to magnitude of voltage can measure surge (swell), fall, wink stops etc., in addition can also measure power failure.Be connected with uninterrupted power supply(ups) UPS 30 on source power supply 10.Commercial mode when normal, online interaction mode are arranged in UPS 30, the variety of way such as inverter mode when normal, but be not particularly limited.Inverter mode when this record is normal.UPS 30 comprises: rectifier; The transducer CNV31 of conversion from AC to DC; Accumulator array BAT 32; Control the storage battery control part CHGCTL 33 of accumulator array; The inverter INV 34 of conversion from DC to AC; The control part UCTL35 of UPS.In the control part 35 of UPS, the surplus with storage battery monitors, network is corresponding, to the shutdown indication of information technoloy equipment, according to the functions such as charging control of common or rapidly charge mode.Connect the power connection PDU 40 with electric exploration mechanism on UPS 30.Power connection PDU 40 with electric exploration mechanism can measure current value and magnitudes of voltage by enough each sockets (consent), has by network to connect switching on and off that Long-distance Control electric power monitoring, power supply provide.Connect each information technoloy equipment 50 on PDU 40.As an example, be made as server S VR1 (51), SVR2 (52), router RTR53, but also can connect modulator-demodulator, fire compartment wall, interchanger, memory.The built-in control part CTL 55 that information technoloy equipment is cooperated with storage battery control of the present invention in server S VR1 (51).
The network structure at a plurality of strong points that comprises the system of embodiments of the invention 1 shown in Fig. 2.Wiring represents the signal of network.The information technoloy equipment of Fig. 1 with the cooperation control system of storage battery (Sys1) by WAN (Wide Area Network: local area network (LAN)) be connected with other system (Sys2, Sys3).In system (Sys1), router (RTR) 53 is connected the WAN of outside with the LAN (Local AreaNetwork) 60 of inside, a plurality of servers (SVR1, SVR2), UPS 30, be connected to router (RTR) 53 with the power connection (PDU) 40 of electric exploration mechanism, form LAN 60.The information exchange of UPS, PDU, router, voltage register (VLTLOG), humiture register (TMPLOG) is crossed LAN60 and can be communicated with server (SVR1, SVR2).This means that server can carry out with LAN supervision and the control of the internal state of miscellaneous equipment.For example list, if the voltage register is voltage, if Temperature Humidity Sensor is temperature, humidity, the storage battery surplus of UPS, the terminal voltage of storage battery, to the pattern of UPS set, the low electric power control of the information technoloy equipments such as power value with each information technoloy equipment in the power connection of electric exploration function, server, router etc.
Speciality technology of the present invention is to carry out the control that cooperates of information technoloy equipment and storage battery according to the characteristic (time, frequency, interval etc.) of the power failure that dopes.Therefore, at first, list the example that has a power failure to have which kind of effect, effectiveness by prediction.The also double explanation of carrying out the action case of information technoloy equipment and storage battery.The duration of off interval and frequency, power failure is arranged as the characteristic that has a power failure, describe in order.
Illustrate by the prediction off interval and make it possible to carry out the situation that charging interval of accumulator array arranges.The example that arranges based on charging interval of the prediction of off interval shown in Fig. 3.When (t1-t2 constantly) used storage battery operation information technoloy equipment in power failure, storage battery discharged, and at moment t2, battery capacity is almost nil.In the situation that do not predict, owing to not knowing then when can have a power failure, therefore need to charge rapidly in order to next time power failure, at moment t3, charging is completed.On the other hand, in the situation that predict, know that to begin be to be arranged before t4 has a power failure constantly the sufficient time due to next time power failure, as long as therefore carry out the charging of low speed.In the situation that without prediction, owing to carrying out superfluous charging rapidly, irrational the dwindling of life-span that particularly causes excide battery.In addition, in power failure next time, after moment t5 finishes to have a power failure, if in the situation that do not predict that carrying out low speed charges, and causes undercharge in the situation that moment t6 occurs to have a power failure, at moment t7, exhaustion of the accumulators, the service of information technoloy equipment can't continue.In the situation that predict, can complete the charging of battery by charging rapidly before moment t6.Like this, by the prediction off interval, the arrangement of time that can charge, the undercharge that can avoid useless charging rapidly, cause because of the low speed charging.
The effect of the duration of prediction power failure then, is shown.In IT service, be desirably in the power failure process also continuous service, performance is high as far as possible, and still, high meaning of performance consumes a large amount of storage batterys, considers that the capacity of storage battery exhausts, so between performance and battery capacity, balance arranged.Therefore, how the prediction that is shown the duration by power failure of the present invention improves performance.By prediction interruption duration, time that can the estimated service life storage battery, the arrangement of time that therefore can discharge.In the situation that do not predict, consider to adopt following method: due to the duration of not knowing to have a power failure, therefore even in advance the use amount of battery is restricted to and makes less that interruption duration is long also can tackle, although perhaps the use amount of battery is large, can't tackle when interruption duration is long.Shown in Fig. 4, at the example of the large situation of the use amount restriction of battery, the use amount of battery shown in Fig. 5 limits the example of little situation.In Fig. 4, have a power failure between moment t1-t2.In the situation that there is no the prediction of interruption duration, because the use amount restriction of battery is large, therefore, although the IT service can continue in the power failure process, performance suppresses to be prf1.In the situation that carry out the prediction of interruption duration, due to the service time of knowing in advance battery, judge and performance can be increased to prf2 in therefore the storage battery surplus being also included within.This is because owing to grasping interruption duration, therefore can cut down the enough and to spare of the surplus of storage battery.In Fig. 5, have a power failure between moment t3-t5.In the situation that there is no the prediction of interruption duration, although performance is high to prf4, the use amount of battery is many, so the moment t4 in the power failure process, and battery exhausts.Therefore, between moment t4-t5, the electric power of information technoloy equipment is zero, has to end the IT service.For being the result of not expecting with the server that operated to prerequisite in 24 hours.In the situation that carry out the prediction of interruption duration, due to the service time of knowing in advance battery, although therefore performance suppresses can continue the use of storage battery for prf3 in interruption duration.Like this, by the prediction interruption duration, the arrangement of time of the discharge of battery can be carried out, the performance of information technoloy equipment can be improved.
New effect when duration that prediction has a power failure and interval further are shown.It is the example when occuring one time in one day of having a power failure in Fig. 4, Fig. 5.When occuring repeatedly to have a power failure in one day, on the basis of setting up plan how to use battery, importantly interruption duration and these both sides' of off interval prediction.Can repeatedly set up the plan about how using battery, when charging.Example when occuring repeatedly to have a power failure shown in Fig. 6.Twice power failure occured.In the situation that do not predict, in the power failure for the first time of moment t6-t7, although performance is restricted to prf7, battery capacity is reduced to C1 from C3, can continue the IT service.In the power failure for the second time of moment t8-t10, if be similarly prf7 with performance limitations for the first time, cause the running down of battery at moment t9, can't continue IT service.In the situation that prediction interruption duration and off interval, according to the kind of battery, two kinds of methods are arranged, therefore describe respectively.The first is to estimate that the total total ascent time that repeatedly has a power failure and the storage battery use amount of determining each time power failure make it possible to the method for the IT service of lasting this time.It is the method for the lead accumulator of spended time in being suitable for charging.Another kind is to estimate each time interruption duration and off interval and charge rapidly to recover battery capacity in outage to be the method that service continues and performance improves that prerequisite realizes IT.It is the method for deteriorated few lithium ion battery of life-span under being suitable for charging rapidly.In first method, by being prf6 with performance limitations, can both use storage battery in twice power failure, service can continue.Battery capacity is being reduced to C2 from C3 in having a power failure for the first time, in having a power failure next time from the C2 vanishing.In the second approach, on the basis that performance is made as higher than the prf7 of prf6, by charge rapidly to recover battery capacity between having a power failure, can take into account continuing and high performance of service.Constantly be in power failure in t6-t7, so battery capacity is reduced to C1 from C3, but implemented charging rapidly before the moment t8 that next time has a power failure, making capacity resuming is C3, in order to the power failure from moment t8.
Like this, the duration that has a power failure by prediction and have a power failure with have a power failure between the interval and estimate, can carry out the arrangement of time of the optimum that discharges and recharges of battery, accompany therewith, have advantages of that the service that can realize information technoloy equipment continues and the performance raising.Given this, in embodiments of the invention 1, the example of the project of prediction in having a power failure shown in Fig. 7.Management unit is made as one day, but is not particularly limited.At this, table is divided into summary and details.As summary, list the having or not of power failure, the frequency of power cut of a day, the longest interruption duration, total total ascent time of power failure, the shortest and maximum duration of off interval.As the data of details, list time started of power failure and concluding time to represent when have a power failure in 24 hours.Can be also to have by each minute the method that has or not that table is put down in writing power failure.About off interval, need to cross over management unit (a day) and calculate.Dope March 1,9:00-12:00,16:00-18:00,20:00-21:00 have a power failure, and frequency of power cut is 3 times, and the longest interruption duration is 3 hours, and the total time that has a power failure is 6 hours, and off interval is minimum is 2 hours, and the longest is 13 hours.The maximum duration of off interval is 21 till 10 o'clock of March 2 13 hours on March 1.
In addition, estimate that the characteristic (time, frequency, interval etc.) that has a power failure changes according to place or week etc.
About the prediction that has a power failure, because being estimates, therefore prediction sometimes can depart from.Prediction departs from the situation that time of having a power failure, having a power failure or interval are the length different from reality that do not occur.Reply method when therefore, the record prediction departs from this patent.Controlling with cooperating of storage battery based on the information technoloy equipment of the prediction that has a power failure is be used to the feedfoward control of avoiding battery allowance to use up.When prediction departs from, switch to the FEEDBACK CONTROL that judges according to battery allowance.Its example shown in Figure 8.For the ease of observing figure, with between performance prf1 and prf2, compress between battery capacity C1 and C2 and put down in writing.Be following situation: the estimation of interruption duration is moment t1-t2, but actual specific t1-t2 is long, and power failure has occured t1-t5 in the moment.In the situation that longer than the time that dopes, feed back based on the actual measurement of battery allowance.In the situation that not for the countermeasure of time lengthening, cause the running down of battery at moment t3, can't move information technoloy equipment during moment t3-t5.Therefore, when surpassing the time of the plan dope, strictly carry out the performance limitations of information technoloy equipment based on the actual measurement of the power value of the surplus of battery and information technoloy equipment.Also tail off along with surplus and improve gradually frequency the opportunity of actual measurement.The interval of t2-t3, t3-t4, t4-t5 shortens successively constantly.Like this, feed back to by the measured value with the surplus of battery the method that performance limitations makes the capacity that has battery in outage, be made as the reply in the situation that prediction departs from.
By more than, show the control example that the reply when departing from is predicted in the action of advantage that prediction has a power failure, information technoloy equipment and storage battery, the cooperate example controlled and power failure.In view of the action case that cooperates and control of information technoloy equipment and storage battery, the detailed construction of information technoloy equipment and the control part that cooperates of storage battery is described then.
The structure of the control part CTL 55 of the control that information technoloy equipment is cooperated with storage battery of the first embodiment of the present invention shown in Fig. 9.Control part CTL 55 moves in server S VR.Control part 55 both can consist of with hardware such as microcomputers, also can be made of software.Comprise: power failure prediction section POE (Power Outages Estimation) 70, it has the interface with voltage monitor, and the time that prediction has a power failure and frequency are also set up the plan that has a power failure, the actual current power failure information that whether is in power failure of expression; The IT power budget IPB of section (IT Power consumption Budget) 80, it has the interface with UPS 30, determines the electrical power limit value of information technoloy equipment based on the storage battery surplus of the interruption duration that dopes and UPS; IT electric power control part IPC (IT low-Power Control) 90, the interface that it has with power connection PDU 40 hangs down the electrical power limit value that electric power controls to satisfy determined information technoloy equipment.The action summary of control part CTL55 is as follows.Predict the time, the interval that have a power failure, determine the electrical power limit value of information technoloy equipment based on battery allowance, make information technoloy equipment to move in the interruption duration that estimates.Then, the low electric power that carries out information technoloy equipment is controlled and is made the electrical power limit value that converges to determined information technoloy equipment.
The structure of each functional module then, is described.The structure of the prediction section of power failure shown in Figure 10 POE 70.The generation that the measured value output expression of power failure prediction section POE use voltage register 20 has a power failure and end, the current actual power failure information that whether is in power failure, with the voltage data of data extraction unit storage voltage register, the voltage data of storing is carried out statistical analysis set up the power failure plan.The date and time data of obtaining with the voltage data of 71 couples of voltage register VLTLOG 20 of data extraction unit, from OS are carried out format, the extraction of data.Both can by the time sequential extraction procedures, also can extract according to the event of variation in voltage.To being kept in data store 72 with the time series form after the additional date and time of the data of extracting with data extraction unit 71.In statistical analysis section 73, the time series data of data storage part 72 is carried out statistical analysis, generate time series models.Rolling average (MA), autoregression model (AR), ARMA model (ARMA), broad sense autoregressive conditional different Variance model (GARCH) etc. are arranged in time series models, but be not defined.In statistical analysis section 73, with the Data Update time series models of every day.For time series data, the prediction that also can be used as Sunday is got simply weekly the average grade on Sunday and is carried out general statistical disposition.In addition, also can learn to improve precision by ensemble machine.In power failure calculating part 74, the power failure plan of the information at the timing of setting with timer, the frequency that for example 0:00 sets up the power failure that dopes the same day, time, interval is also preserved planning data, and notice is to IT power budget section 80.
The structure of the IT power budget IPB of section 80 of the first embodiment of the present invention shown in Figure 11.In IT power budget section 80, has following function: determine IT electrical power limit value as the restriction power value of information technoloy equipment based on the storage battery surplus of the power failure plan of power failure prediction section 70 and UPS30, based on the interval determination charge mode of the power failure that goes out by the power failure plan forecast.From UPS 30 with the specification 81 of the surplus of storage battery and voltage, the power failure plan from power failure prediction section POE 70, actual power failure information and accumulator array as input, in battery application plan section 82, based on determining that battery charging plan that battery at which time band charges with which kind of pattern and battery allowance and the power failure scheduled time calculate IT electrical power limit value.According to battery charging plan, charge mode is notified to UPS 30.Regularly or aperiodically measure the storage battery surplus of UPS 30 with timer when having a power failure, calculate IT electrical power limit value based on duration and its storage battery surplus of the power failure shown in power failure in the works at every turn.
Calculate the method for IT electrical power limit value in this explanation.What for continuous service information technoloy equipment in the interruption duration that is estimated by power failure prediction section POE 70, need to determine to the mobile electric current of information technoloy equipment 50 based on battery allowance and the terminal voltage of UPS 30.For this reason, need to calculate based on the flash-over characteristic of storage battery.One example of the flash-over characteristic of storage battery shown in Figure 12.In order to simplify, use the storage battery of a 12V.Suitably parallel connectionization, series connectionization are considered to get final product in accumulator array.When rated capacity was made as C, the discharge time of storage battery, the size according to discharging current CA changed.Under 1CA 40 minutes, but be 20 hours under 0.05CA.Therefore, determine that in the scope that satisfies the interruption duration that estimates discharging current gets final product.This becomes IT electrical power limit value.For example in order to have the interruption duration of 2 hours, as long as discharging current is set as below 0.25CA.
Then, the structure of the electric power of IT shown in Figure 13 control part IPC90.The electric power data of each information technoloy equipment that IT electric power control part IPC90 gets with the power connection PDU 40 that uses with electric exploration, the IT electrical power limit value that calculates with the IT power budget IPB of section 80 are carried out the low electric power of each information technoloy equipment and are controlled as input.
The action case of electric power control of information technoloy equipment being hanged down for the IT electrical power limit value in outage shown in Figure 14.Hang down electric power and control the IT electrical power limit value that calculates based on storage battery surplus and power failure predicted time to satisfy.Measure termly battery allowance and reexamine IT electrical power limit value, use up with the surplus of avoiding battery in remaining power failure predicted time.Set IT electrical power limit value with the mensuration power value of reality.
It is more than the structure of the control part CTL 55 that controls that information technoloy equipment is cooperated with storage battery.Then, use flowchart text to use the control software that consists of this control part how to carry out whole control.Flow chart shown in Figure 15.At timing (S1), for example 0:00, the interruption duration of predicting one day, the frequency of power failure, interval (S2).When having a power failure (S3), mate with the power failure that goes out in timing estimation, read duration and the interval of power failure.Measured battery surplus (S4) is based on the limits value (S5) of the duration setting IT electric power that has a power failure.The minimum value that the limits value of IT electric power is minimum with the power consumption of information technoloy equipment under the state that limits electric power fully (electrical power limit fully) compares (S10), in the situation that IT electrical power limit value is large, carries out the low electric power of IT and controls.IT electrical power limit value is large in the situation that the electric power measured value of IT electrical power limit value and IT is compared (S11), and owing to reaching budget, the low electric power of IT is controlled and do not carried out electrical power limit.In the situation that IT electrical power limit value is little, owing to not reaching budget, hang down electric power and controls that to make IT electric power be (S12) below IT electrical power limit value.By way of exception process, in the situation that minimum power value and the IT electrical power limit value of information technoloy equipment compared and the minimum value of information technoloy equipment large (S10), can't continue the IT service because battery capacity is not enough, therefore to other website notice (S13), (S14) shuts down.Interrupt carrying out termly battery allowance actual measurement (S7) in (S6) at timer, by carrying out reset (S5) of IT electrical power limit value, can use to greatest extent battery in the power failure process and improve the IT performance.When restoring electricity (S8), remove the low electric power of the IT in having a power failure and control (S9), according to the off interval that dopes, be set in that off interval is made as rapidly charging in short-term and the charge mode (S15) that is made as common charging when long continues to process.This is the action in flow chart.
Measure termly battery allowance on one side, set IT electrical power limit value on one side, when the low electric power of needs is controlled, form the circulation of S6 → S7 → S5 → S8 → S10 → S11 → S12 → S6, when not needing low electric power to control, form the circulation of S6 → S7 → S5 → S8 → S10 → S11 → S6.The triggering of circulation is regular battery allowance actual measurement.By more than, the prediction interruption duration for the performance of information technoloy equipment within this time reduces as much as possible little and continuous service, can be controlled with the low electric power that the mode that satisfies battery allowance be carried out information technoloy equipment.

Claims (12)

1. the cooperation control system of an information technoloy equipment and storage battery, is characterized in that,
Comprise: source power supply;
The voltage register, the voltage of the above-mentioned source power supply of measurement;
Uninterrupted power supply(ups) is connected in above-mentioned source power supply, is connected with a plurality of storage batterys;
With the power connection of electric exploration mechanism, be connected in above-mentioned uninterrupted power supply(ups); And
Information technoloy equipment comprises and the above-mentioned server that is connected with the power connection of electric exploration mechanism,
Above-mentioned voltage register, above-mentioned uninterrupted power supply(ups), above-mentioned power connection and above-mentioned server with electric exploration mechanism are connected in network,
The duration that the prediction of the control part of above-mentioned server inside has a power failure, obtain the electrical power limit value of information technoloy equipment based on the surplus of duration of the above-mentioned power failure that dopes and storage battery, control the electric power of above-mentioned information technoloy equipment to satisfy the electrical power limit value.
2. the cooperation control system of information technoloy equipment according to claim 1 and storage battery, is characterized in that,
Above-mentioned control part regularly or is aperiodically measured the surplus of above-mentioned storage battery, when carrying out this mensuration at every turn, obtain the electrical power limit value of information technoloy equipment based on the surplus of duration of the above-mentioned power failure that dopes and the above-mentioned storage battery that determines, control the electric power of above-mentioned information technoloy equipment to satisfy the electrical power limit value.
3. the cooperation control system of information technoloy equipment according to claim 1 and storage battery, is characterized in that,
Above-mentioned control part comprises: the power failure prediction section, store the voltage data of above-mentioned voltage register, and based on the voltage data of storing, the duration that prediction has a power failure;
IT power budget section based on the duration of the power failure that dopes and the surplus of the above-mentioned storage battery that determines, obtains the electrical power limit value of information technoloy equipment; And
IT electric power control part based on by the electric power data of the above-mentioned information technoloy equipment of obtaining with the power connection of electric exploration mechanism and the electrical power limit value of above-mentioned information technoloy equipment, hangs down electric power and controls.
4. the cooperation control system of information technoloy equipment according to claim 3 and storage battery, is characterized in that,
Above-mentioned power failure prediction section is carried out statistical analysis to the time series data of storing and is generated time series models.
5. the cooperation control system of information technoloy equipment according to claim 1 and storage battery, is characterized in that,
Above-mentioned control part is in the situation that interruption duration is longer than the interruption duration of prediction, based on the measured value of the surplus of above-mentioned storage battery, carries out the FEEDBACK CONTROL of the performance limitations of above-mentioned information technoloy equipment.
6. the cooperation control system of information technoloy equipment according to claim 1 and storage battery, is characterized in that,
Above-mentioned control part is also predicted the interval of power failure, based on the above-mentioned off interval that dopes, controls the charge mode of above-mentioned storage battery.
7. the cooperation control system of information technoloy equipment according to claim 6 and storage battery, is characterized in that,
The voltage data of the above-mentioned voltage register of above-mentioned control part storage is based on the interval of the voltage data prediction power failure of storing.
8. the cooperation control method of an information technoloy equipment and storage battery, be used for following system, and this system comprises:
Source power supply;
The voltage register, the voltage of the above-mentioned source power supply of measurement;
Uninterrupted power supply(ups) is connected in above-mentioned source power supply, is connected with a plurality of storage batterys;
With the power connection of electric exploration mechanism, be connected in above-mentioned uninterrupted power supply(ups); And
Information technoloy equipment comprises and the above-mentioned server that is connected with the power connection of electric exploration mechanism,
Above-mentioned voltage register, above-mentioned uninterrupted power supply(ups), above-mentioned power connection and above-mentioned server with electric exploration mechanism are connected in network,
Above-mentioned cooperation control method is characterised in that, comprises the following steps:
The step of the duration that prediction has a power failure;
Based on the duration of the above-mentioned power failure that dopes and the surplus of storage battery, obtain the step of the electrical power limit value of information technoloy equipment; And
Control the electric power of above-mentioned information technoloy equipment to satisfy the step of electrical power limit value.
9. the cooperation control method of information technoloy equipment according to claim 8 and storage battery, is characterized in that, and is further comprising the steps of:
Regularly or aperiodically measure the step of the surplus of above-mentioned storage battery;
When carrying out this mensuration, obtain the step of the electrical power limit value of information technoloy equipment based on duration and the surplus of the above-mentioned storage battery that determines of the above-mentioned power failure that dopes at every turn; And
Control the electric power of above-mentioned information technoloy equipment to satisfy the step of electrical power limit value.
10. the cooperation control method of information technoloy equipment according to claim 8 and storage battery, is characterized in that,
In the step of the duration that above-mentioned prediction has a power failure, store the voltage data of above-mentioned voltage register, based on the duration of the voltage data prediction power failure of storing.
11. the cooperation control method of information technoloy equipment according to claim 8 and storage battery is characterized in that, and is further comprising the steps of:
The step at the interval that prediction has a power failure; And
Control the step of the charge mode of above-mentioned storage battery based on the above-mentioned off interval that dopes.
12. the cooperation control method of information technoloy equipment according to claim 11 and storage battery is characterized in that,
In the step at the interval that above-mentioned prediction has a power failure, store the voltage data of above-mentioned voltage register, based on the interval of the voltage data prediction power failure of storing.
CN201210520805.XA 2011-12-26 2012-12-06 Cooperative control system and cooperative control method of IT device and storage battery Expired - Fee Related CN103178577B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011283238A JP5801706B2 (en) 2011-12-26 2011-12-26 IT equipment and storage battery linkage control system and linkage control method
JP2011-283238 2011-12-26

Publications (2)

Publication Number Publication Date
CN103178577A true CN103178577A (en) 2013-06-26
CN103178577B CN103178577B (en) 2015-04-01

Family

ID=48638260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210520805.XA Expired - Fee Related CN103178577B (en) 2011-12-26 2012-12-06 Cooperative control system and cooperative control method of IT device and storage battery

Country Status (2)

Country Link
JP (1) JP5801706B2 (en)
CN (1) CN103178577B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107005081A (en) * 2014-11-27 2017-08-01 东芝三菱电机产业系统株式会社 Uninterrupted power supply(ups)
CN109995132A (en) * 2019-03-28 2019-07-09 武汉普天新能源有限公司 A kind of high frequency switch power supply system
CN114142593A (en) * 2021-10-27 2022-03-04 华为数字能源技术有限公司 Management method and related device for standby power duration of base station
CN115764848A (en) * 2023-01-09 2023-03-07 苏州浪潮智能科技有限公司 Power supply and standby network of communication equipment

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10003197B2 (en) 2014-03-27 2018-06-19 Nec Corporation Energy management method and system for energy supply system
JP6317987B2 (en) * 2014-04-21 2018-04-25 京セラ株式会社 Power control system, power control apparatus, and power control method
JP2015211616A (en) * 2014-04-30 2015-11-24 株式会社Nttファシリティーズ Demand management device
JP2016085669A (en) 2014-10-28 2016-05-19 ファナック株式会社 Numerical control device for detecting installation place by using ip address
JP6165191B2 (en) * 2015-05-14 2017-07-19 三菱電機株式会社 Power supply system
JP7257107B2 (en) * 2018-03-12 2023-04-13 株式会社Nttファシリティーズ SECONDARY BATTERY CONTROL DEVICE AND SECONDARY BATTERY CONTROL METHOD
US10958082B2 (en) * 2018-04-25 2021-03-23 Microsoft Technology Licensing, Llc Intelligent battery cycling for lifetime longevity
CN108539828A (en) * 2018-05-30 2018-09-14 深圳市鑫悦购网络科技有限公司 Charging circuit for electric vehicles and electric vehicle charging equipment
US11929477B2 (en) * 2021-02-24 2024-03-12 Baidu Usa Llc Optimization of thermal management control of lithium-ion battery system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1465517A (en) * 2002-06-12 2004-01-07 三菱电机株式会社 Elevator controller
JP2004355219A (en) * 2003-05-28 2004-12-16 Nec Fielding Ltd System, device, method and program for power supply control in power failure
CN102200568A (en) * 2010-03-24 2011-09-28 力旺电子股份有限公司 Method of estimating remaining capacity and run-time of a battery device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3920275B2 (en) * 2004-03-10 2007-05-30 株式会社東芝 Control device, control system, device control method, and device control program
JP5204030B2 (en) * 2009-04-22 2013-06-05 富士通テレコムネットワークス株式会社 Communications system
JP2011010471A (en) * 2009-06-26 2011-01-13 Tamura Seisakusho Co Ltd Power control system during power failure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1465517A (en) * 2002-06-12 2004-01-07 三菱电机株式会社 Elevator controller
JP2004355219A (en) * 2003-05-28 2004-12-16 Nec Fielding Ltd System, device, method and program for power supply control in power failure
CN102200568A (en) * 2010-03-24 2011-09-28 力旺电子股份有限公司 Method of estimating remaining capacity and run-time of a battery device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹志鹏等: "便携式仪表锂电池充电管理和电量检测的实现", 《电子器件》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107005081A (en) * 2014-11-27 2017-08-01 东芝三菱电机产业系统株式会社 Uninterrupted power supply(ups)
CN107005081B (en) * 2014-11-27 2019-11-05 东芝三菱电机产业系统株式会社 Uninterrupted power supply
CN109995132A (en) * 2019-03-28 2019-07-09 武汉普天新能源有限公司 A kind of high frequency switch power supply system
CN114142593A (en) * 2021-10-27 2022-03-04 华为数字能源技术有限公司 Management method and related device for standby power duration of base station
CN115764848A (en) * 2023-01-09 2023-03-07 苏州浪潮智能科技有限公司 Power supply and standby network of communication equipment
CN115764848B (en) * 2023-01-09 2023-07-25 苏州浪潮智能科技有限公司 Supply network for a communication device

Also Published As

Publication number Publication date
CN103178577B (en) 2015-04-01
JP2013134550A (en) 2013-07-08
JP5801706B2 (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN103178577B (en) Cooperative control system and cooperative control method of IT device and storage battery
US20230327178A1 (en) Systems and methods for series battery charging
CN103038977B (en) Cell base station power system management, manages including battery circuit
JP5924346B2 (en) Battery status monitoring system
CN102918747A (en) Rack-based uninterruptible power supply
WO2012043134A1 (en) Storage battery charging/discharging control device and storage battery charging/discharging control method
US20130113287A1 (en) Method and apparatus for effective utilization of energy storage components within a microgrid
KR20140068331A (en) Battery management system and method with a hierarchical structure
CN104137382A (en) System and method of smart energy storage in a ups
JPWO2019021627A1 (en) Power supply monitoring data processing device, power supply monitoring data processing method, and power supply monitoring data processing program
CN115664932B (en) Energy block parallel communication method and device
JP4163699B2 (en) Control method and apparatus for self-supporting power supply system
WO2018043315A1 (en) Power storage device, information processing device, reporting method, estimation method, recording medium, and power storage system
KR101839128B1 (en) Stable battery management system and method in the solar power generation
CN116191626B (en) Battery management method, device and system for household energy storage system
KR101474296B1 (en) Energy storage system for power plant and the control method thereof
JP2018019552A (en) Information processing device, power storage system, estimation method, and program
US11617282B2 (en) System and method for reshaping power budget of cabinet to facilitate improved deployment density of servers
JP6721170B1 (en) Remote monitoring system for emergency charger/discharger
CN109546695B (en) Battery management method, device, equipment and system
JP6717308B2 (en) Secondary battery charging/discharging device, power storage system using secondary battery, secondary battery charging/discharging method, and secondary battery charging/discharging program
JP6511632B2 (en) Storage battery system, method and program
WO2018157534A1 (en) Balancing method and device for energy storage battery management system and energy storage battery management system
US11360531B1 (en) Redeployment of energy storage units
KR101833321B1 (en) Automatic control method of plural energy storage systems in closed network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150401