CN103178469A - 35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法 - Google Patents
35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法 Download PDFInfo
- Publication number
- CN103178469A CN103178469A CN2013100915843A CN201310091584A CN103178469A CN 103178469 A CN103178469 A CN 103178469A CN 2013100915843 A CN2013100915843 A CN 2013100915843A CN 201310091584 A CN201310091584 A CN 201310091584A CN 103178469 A CN103178469 A CN 103178469A
- Authority
- CN
- China
- Prior art keywords
- suspension type
- bucket
- type porcelain
- insulation
- insulated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明提供一种35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法,该方法为利用绝缘斗臂车对直线杆悬式瓷瓶进行更换的中间电位绝缘手套作业法,该方法主要包括停用检修线路重合闸、作业工器具检测、斗内作业人员穿戴绝缘装备并通过绝缘斗臂车进入电场、做绝缘遮蔽、安装作业用具、更换悬式瓷瓶、遮蔽拆除、作业人员撤场并恢复检修线路重合闸等步骤;本发明无需采取现有技术中通常所用的停电方式下进行更换的方法,能够实现对35kV架空配电线路的直线杆悬式瓷瓶进行带电更换,经济和社会效益显著,检修工作人员的人身安全保障的可靠性大为提高。
Description
技术领域
本发明涉及电力系统高压配电线路检修作业方法,具体涉及一种35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法。
背景技术
35kV线路属于我国配电线路中一个重要的组成部分,在我国一些负荷大和供电半径大的地区应用较广。35kV线路较之10kV配电线路具有输送容量大和线路损耗小等优点,但35kV线路具有设备多、绝缘水平低、直接面向用户等问题,在大气过电压、污秽或其他外界因素作用下易发生故障,配电线路一旦发生故障,将直接影响用户的正常生产和生活。35kV线路在杆塔、绝缘子和金具等结构上更为相似于110kV以上输电线路,其直线杆悬式瓷瓶易出故障,出现故障后需要进行更换。目前在35kV线路带电检修作业时仍采用输电线路中较为常用的等电位作业法,由于35kV线路杆塔间隙相对输电线路而言较小,采用等电位作业法对作业人员的人身安全带来较严重的安全隐患,因而,当前对35kV线路检修过程中,除非万不得已一般不会进行带电作业,通常均采用停电检修方式。而采用停电检修方式,却使因某一设备或线路上的某一节点的缺陷造成整条线路或某个区域的强迫停电,从而严重影响企事业单位的正常生产工作秩序、影响居民的正常生活,给经济和社会发展带来较大损失。因此,改进当前35kV配电线路通行的停电检修方法,采用带电检修作业方法,对提高35kV配电线路的安全运行水平和供电可靠性、对促进经济和社会发展具有较大意义。
发明内容
本发明的目的是:克服现有技术的不足,提供一种在持续供电也即对用户不断电的情况下实现对35kV架空配电线路的直线杆悬式瓷瓶进行更换的作业方法,提高35kV配电线路的安全运行水平和供电可靠性。
本发明的技术方案是:本发明的35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法,包括以下步骤:
①停用作业线路重合闸;
②绝缘斗臂车进入检修地点,放绝缘斗臂车支撑腿、车辆接地并进行空斗试验;
③使用兆欧表对作业器具中的绝缘材料部分、安全防护用具中的绝缘服、绝缘毯的沿面分别进行绝缘性能检测:若绝缘电阻大于700兆欧则为合格,否则予以更换;作业人员穿戴满足35kV线路带电作业要求的绝缘服、绝缘靴、绝缘手套和绝缘安全帽;
④作业所需的导线遮蔽罩、绝缘子罩、绝缘毯、横担遮蔽罩和绝缘绳装入绝缘斗臂车的绝缘斗;
⑤斗内作业人员操作绝缘斗臂车进入作业点电场,按照先带电体、后接地体原则和由近到远、从下到上的顺序,通过导线遮蔽罩、绝缘子罩、绝缘毯和横担遮蔽罩分别对导线、绝缘子、横担进行绝缘遮蔽;
⑥斗内作业人员安装导线提升及保险装置,悬挂更换悬式瓷瓶所需的绝缘绳;
⑦斗内作业人员提升导线,当导线垂直荷载从绝缘子串上转移且绝缘子串处于合适松弛状态时,脱掉碗头,更换悬式瓷瓶,恢复安装好碗头后松开并拆除导线提升及保险装置及绝缘绳;
⑧斗内作业人员按照与步骤⑤所述的遮蔽顺序相反的顺序拆除绝缘遮蔽;
⑨重复步骤⑤、步骤⑥、步骤⑦和步骤⑧对其余各相的悬式瓷瓶进行更换作业;
⑩斗内作业人员操作绝缘斗臂车撤出电场,返回地面,恢复该线路重合闸。
本发明具有积极的效果:(1)采用本发明的35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法,能够实现对35kV架空配电线路的直线杆悬式瓷瓶进行带电更换,无需采用现有技术中通常所用的停电方式下进行更换;不停电检修的直接经济效益:若按每条35kV线路每年减少停电一次、每次停电时间4小时、线路平均负荷30A计算,则每条线路年多供电量达7.27千千瓦时,直接经济效益十分可观;因减少停电,能够保障企业连续生产,避免企业因停电带来的巨大损失;提高了供电可靠性,确保社会生产和生活秩序正常、有序,因此,经济和社会效益显著。(2)采用本发明的35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法,检修工作人员的人身安全保障的可靠性大为提高。
附图说明
图1为本发明的35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法的流程图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细的说明。
(实施例1)
见图1,本实施例的35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法,是一种利用绝缘斗臂车对35kV架空配电线路直线杆悬式瓷瓶进行更换的中间电位绝缘手套作业法,由检修负责人、绝缘斗内电工和地面配合电工配合进行作业。作业前先由检修负责人查勘现场、填写施工查勘单并编写作业指导书及危险点预控卡;尔后检修负责人宣读工作票、向工作人员交待任务、讲解危险点预控措施并明确工作人员的分工。具体的作业方法主要包括以下步骤:
①停用作业线路重合闸;
②绝缘斗臂车进入检修地点,放绝缘斗臂车支撑腿、车辆接地并进行空斗试验;
③使用兆欧表对作业器具中的绝缘材料部分、安全防护用具中的绝缘服、绝缘毯的沿面分别进行绝缘性能检测:若绝缘电阻大于700兆欧则为合格,否则予以更换;作业人员穿戴满足35kV线路带电作业要求的绝缘服、绝缘靴、绝缘手套和绝缘安全帽;
④作业所需的导线遮蔽罩、绝缘子罩、绝缘毯、横担遮蔽罩和绝缘绳装入绝缘斗臂车的绝缘斗;
⑤斗内作业人员操作绝缘斗臂车进入作业点电场,按照先带电体、后接地体原则和由近到远、从下到上的顺序,通过导线遮蔽罩、绝缘子罩、绝缘毯和横担遮蔽罩分别对导线、绝缘子、横担进行绝缘遮蔽;
⑥斗内作业人员安装导线提升及保险装置,悬挂更换悬式瓷瓶所需的绝缘绳;
⑦斗内作业人员提升导线,当导线垂直荷载从绝缘子串上转移且绝缘子串处于合适松弛状态时,脱掉碗头,更换悬式瓷瓶,恢复安装好碗头后松开并拆除导线提升及保险装置及绝缘绳;
⑧斗内作业人员按照与步骤⑤所述的遮蔽顺序相反的顺序拆除绝缘遮蔽;
⑨重复步骤⑤、步骤⑥、步骤⑦和步骤⑧对其余各相的悬式瓷瓶进行更换作业;
⑩斗内作业人员操作绝缘斗臂车撤出电场,返回地面,恢复该线路重合闸。
各步骤中的作业人员应为有资质的电工。
从上述步骤可见,本实施例的35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法,能够实现对35kV架空配电线路的直线杆悬式瓷瓶进行带电更换,无需象现有技术中通常所用的停电方式下进行更换。
不停电检修的直接经济效益:若按每条35kV线路每年减少停电一次、每次停电时间4小时、线路平均负荷30A计算,则每条线路年多供电量达7.27千千瓦时,按2012年底常州地区187条35kV配电线路计算,可多供电量1360千千瓦时,直接经济效益十分可观;
不停电检修的间接效益:因减少停电,能够保障企业连续生产,避免企业因停电带来的巨大损失。
不停电检修的社会效益:减少停电,提高供电可靠性,确保社会生产和生活秩序正常、有序。
而且,本实施例的35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法,检修工作人员的人身安全保障的可靠性大为提高。
以上实施例是对本发明的具体实施方式的说明,而非对本发明的限制,有关技术领域的技术人员在不脱离本发明的精神和范围的情况下,还可以做出各种变换和变化而得到相对应的等同的技术方案,因此所有等同的技术方案均应该归入本发明的专利保护范围。
Claims (1)
1.一种35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法,其特征在于:包括以下步骤:
①停用作业线路重合闸;
②绝缘斗臂车进入检修地点,放绝缘斗臂车支撑腿、车辆接地并进行空斗试验;
③使用兆欧表对作业器具中的绝缘材料部分、安全防护用具中的绝缘服、绝缘毯的沿面分别进行绝缘性能检测:若绝缘电阻大于700兆欧则为合格,否则予以更换;作业人员穿戴满足35kV线路带电作业要求的绝缘服、绝缘靴、绝缘手套和绝缘安全帽;
④作业所需的导线遮蔽罩、绝缘子罩、绝缘毯、横担遮蔽罩和绝缘绳装入绝缘斗臂车的绝缘斗;
⑤斗内作业人员操作绝缘斗臂车进入作业点电场,按照先带电体、后接地体原则和由近到远、从下到上的顺序,通过导线遮蔽罩、绝缘子罩、绝缘毯和横担遮蔽罩分别对导线、绝缘子、横担进行绝缘遮蔽;
⑥斗内作业人员安装导线提升及保险装置,悬挂更换悬式瓷瓶所需的绝缘绳;
⑦斗内作业人员提升导线,当导线垂直荷载从绝缘子串上转移且绝缘子串处于合适松弛状态时,脱掉碗头,更换悬式瓷瓶,恢复安装好碗头后松开并拆除导线提升及保险装置及绝缘绳;
⑧斗内作业人员按照与步骤⑤所述的遮蔽顺序相反的顺序拆除绝缘遮蔽;
⑨重复步骤⑤、步骤⑥、步骤⑦和步骤⑧对其余各相的悬式瓷瓶进行更换作业;
⑩斗内作业人员操作绝缘斗臂车撤出电场,返回地面,恢复该线路重合闸。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100915843A CN103178469A (zh) | 2013-03-20 | 2013-03-20 | 35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100915843A CN103178469A (zh) | 2013-03-20 | 2013-03-20 | 35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103178469A true CN103178469A (zh) | 2013-06-26 |
Family
ID=48638158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100915843A Pending CN103178469A (zh) | 2013-03-20 | 2013-03-20 | 35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103178469A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105426671A (zh) * | 2015-11-11 | 2016-03-23 | 重庆大学 | 一种雷暴天气下架空配电线路的可靠性评测方法 |
CN105811302A (zh) * | 2014-02-27 | 2016-07-27 | 江苏省电力公司常州供电公司 | 35kV直线绝缘子更换作业方法 |
CN110441557A (zh) * | 2019-09-10 | 2019-11-12 | 上海萌烨电力科技有限公司 | 配电线路瓷瓶型有线传输电流及电场数据采集装置 |
CN115102089A (zh) * | 2022-06-24 | 2022-09-23 | 国网江苏省电力有限公司南京供电分公司 | 不停电作业人员的空中运动区域标定方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101640391A (zh) * | 2009-07-15 | 2010-02-03 | 武汉科瑞德电力科技有限公司 | 35kV配电线路带电作业更换绝缘子的作业方法 |
CN102545094A (zh) * | 2010-12-16 | 2012-07-04 | 上海市电力公司 | 带电调换10kV供电线路的耐张绝缘子的方法 |
CN102611035A (zh) * | 2012-03-15 | 2012-07-25 | 福建省电力有限公司三明电业局 | 带电更换中相耐张绝缘子专用工具及方法 |
-
2013
- 2013-03-20 CN CN2013100915843A patent/CN103178469A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101640391A (zh) * | 2009-07-15 | 2010-02-03 | 武汉科瑞德电力科技有限公司 | 35kV配电线路带电作业更换绝缘子的作业方法 |
CN102545094A (zh) * | 2010-12-16 | 2012-07-04 | 上海市电力公司 | 带电调换10kV供电线路的耐张绝缘子的方法 |
CN102611035A (zh) * | 2012-03-15 | 2012-07-25 | 福建省电力有限公司三明电业局 | 带电更换中相耐张绝缘子专用工具及方法 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105811302A (zh) * | 2014-02-27 | 2016-07-27 | 江苏省电力公司常州供电公司 | 35kV直线绝缘子更换作业方法 |
CN105426671A (zh) * | 2015-11-11 | 2016-03-23 | 重庆大学 | 一种雷暴天气下架空配电线路的可靠性评测方法 |
CN105426671B (zh) * | 2015-11-11 | 2018-02-16 | 重庆大学 | 一种雷暴天气下架空配电线路的可靠性评测方法 |
CN110441557A (zh) * | 2019-09-10 | 2019-11-12 | 上海萌烨电力科技有限公司 | 配电线路瓷瓶型有线传输电流及电场数据采集装置 |
CN110441557B (zh) * | 2019-09-10 | 2024-03-08 | 上海萌烨电力科技有限公司 | 配电线路瓷瓶型有线传输电流及电场数据采集装置 |
CN115102089A (zh) * | 2022-06-24 | 2022-09-23 | 国网江苏省电力有限公司南京供电分公司 | 不停电作业人员的空中运动区域标定方法 |
CN115102089B (zh) * | 2022-06-24 | 2023-09-15 | 国网江苏省电力有限公司南京供电分公司 | 不停电作业人员的空中运动区域标定方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101567530B (zh) | 带电进入660kV直流线路直线塔等电位的安全方法 | |
CN202661560U (zh) | 无线遥控高压试验带电测试小车 | |
CN102931609B (zh) | 带负荷更换10kV跌落式熔断器的作业方法 | |
CN103066531B (zh) | 一种10千伏线路带电导线支撑架 | |
CN103178469A (zh) | 35kV架空配电线路带电更换直线杆悬式瓷瓶作业方法 | |
CN102545094A (zh) | 带电调换10kV供电线路的耐张绝缘子的方法 | |
CN104283148A (zh) | 一种用于66kV输电线路带电作业的绝缘斗臂车 | |
CN103001142A (zh) | 带负荷更换10kV柱上隔离开关的作业方法 | |
CN104113007A (zh) | 35kV架空配电线路带电更换耐张绝缘子的作业方法 | |
CN203242776U (zh) | 一种10kV绝缘穿刺验电接地环 | |
CN102403672B (zh) | 超/特高压交直流混压线路带电作业等电位转移安全方法 | |
CN103474908A (zh) | 利用远控收紧装置地电位更换多回路直线绝缘子串作业法 | |
CN203932808U (zh) | 带电更换绝缘子导线提升装置 | |
CN201910386U (zh) | 用于跌落式熔断器带电更换熔丝管的临时连接装置 | |
CN104113006A (zh) | 35kV架空配电线路带电更换直线杆角钢横担作业方法 | |
CN103474903A (zh) | 一种进入500kV同塔双回垂直排列紧凑型输电线路等电位的方法 | |
CN202846443U (zh) | 带电检修扳手 | |
CN205882560U (zh) | 配电带电作业地电位专用循环绳架装置 | |
CN104037648A (zh) | 35kV架空线路绝缘手套法带电断、接空载线路引线的作业方法 | |
CN204905828U (zh) | 一种架空输电线防雷装置 | |
CN204205403U (zh) | 一种用于66kV输电线路带电作业的绝缘斗臂车 | |
CN104184071B (zh) | 无人机装设110kV‑500kV线路安全地线装置 | |
CN204167854U (zh) | 一种电缆终端塔装置 | |
CN203026397U (zh) | 接地挂钩 | |
CN103474907A (zh) | 一种强制性限制作业人员活动空间的带电作业方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130626 |