CN103157884A - Fuel assembly transportation container manufacturing welding process - Google Patents

Fuel assembly transportation container manufacturing welding process Download PDF

Info

Publication number
CN103157884A
CN103157884A CN2011104184227A CN201110418422A CN103157884A CN 103157884 A CN103157884 A CN 103157884A CN 2011104184227 A CN2011104184227 A CN 2011104184227A CN 201110418422 A CN201110418422 A CN 201110418422A CN 103157884 A CN103157884 A CN 103157884A
Authority
CN
China
Prior art keywords
welding
fuel assembly
electric current
weld
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104184227A
Other languages
Chinese (zh)
Inventor
皇甫鸿宾
夏学安
黄飞
郑宗权
刘亮
赖勤
郭翔
雷川莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jianzhong Nuclear Fuel Co Ltd
Original Assignee
China Jianzhong Nuclear Fuel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jianzhong Nuclear Fuel Co Ltd filed Critical China Jianzhong Nuclear Fuel Co Ltd
Priority to CN2011104184227A priority Critical patent/CN103157884A/en
Publication of CN103157884A publication Critical patent/CN103157884A/en
Pending legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention belongs to a radioactive goods transportation container manufacturing process and particularly relates to a VVER fuel assembly transportation container manufacturing welding process. The fuel assembly transportation container manufacturing welding process comprises the following steps: (1) grouping support components in a support grouping tool, (2) welding supports, (3) welding a seamless pipe to a flange to form a positioning pipe, (4) grouping the positioning pipe which is well welded and the support which is well welded in a shell body welding clamp, (5) welding the positioning pipe to the support, and (6) examining the welding. The fuel assembly transportation container manufacturing welding process has the advantages that through using the fuel assembly transportation container manufacturing welding process, welding deformation can be effectively guaranteed in a controllable range, and the quality of assembly is finally guaranteed.

Description

A kind of fuel assembly cask is made welding procedure
Technical field
The invention belongs to a kind of radioactive substance cask manufacturing process, be specifically related to a kind of VVER fuel assembly cask and make welding procedure.
Background technology
VVER fuel assembly cask is applied to the transportation of gulf, field s Nuclear Plant transportation, this assembly is hexagon, approximate circle, adopt seamless steel pipe as the cask shell, two ends add the container casing of flange flat cover sealing, for ease of transportation, two autonomous container assembly weldings arranged side by side are integral on two bearings.
The centre that damping and supporting role have been arranged between housing inner assembly and housing is the wooden tubular liner of hexagon inner chamber, detects the liner cavity floor after assembling with respect to the flatness of pan straddle bottom surface.For lifting, convenient fixing, be welded with hanger and alignment pin.The inside and outside no-movable part of container, simple for structure, two container tube are longer, and form and position tolerance, linearity are had relatively high expectations, and wall thickness is thicker, weld yieldingly, and is difficult for proofreading and correct, and linearity is difficult for assurance, affects packing into of liner.
Therefore, controlled for the welding deformation that guarantees this structure, assembly precision is controlled, need dimensional accuracy and structural strength after a complete effective welding procedure of cover guarantees to make, guarantee radioactive substance cask workmanship.
Summary of the invention
The purpose of this invention is to provide a kind of dimensional accuracy and structural strength after guaranteeing to make, guarantee that the fuel assembly cask of radioactive substance cask workmanship is made welding procedure.
The present invention is achieved in that a kind of fuel assembly cask manufacturing welding procedure, comprises the steps,
(1) bracket component is grouping in to frock in the support group;
(2) welding support;
(3) seamless pipe is become the positioning pipe welding with flange welding;
(4) good support is grouping in the housing weld jig will to weld good positioning pipe and welding;
(5) positioning pipe and support are welded;
(6) Welding Testing.
Described step (2) welding position is angle welding, spot welding location in positioner, and welding parameter is: SMAW, direct current, electric current 90~130A, voltage 18~25V.
Described step (3) is for weld joint on inner side, the positioning pipe horizontal level symmetrical welding that interlocks, and rotate on the side weld limit, keeps welding to be in level, and welding parameter is DC current, electric current 140~170A, voltage 18~25V; For the lateral angle weld seam, during welding, housing is upright, flange level, staggered symmetrical welding, little electric current bottoming, welding parameter is: SMAW, DC current, electric current 90~130A, voltage 18~25V, large electric current capping, SMAW, DC current, electric current 140~170A, voltage 18~25V.
Described step (5) welding position is angle welding, and flip cover during welding guarantees horizontal welding, and welding parameter is: SMAW, and direct current, electric current 140~170A, voltage 18~25V,
Described step (6) is that after welding is completed, all weld seams are done the kerosene leak test, and then does the experiment of weighing of 2000Kg, then detection has or not distortion.
Advantage of the present invention is to have adopted welding procedure provided by the present invention to guarantee that effectively welding deformation in controllable scope, finally guarantees assembly quality.
The specific embodiment
The present invention is described in detail below in conjunction with specific embodiment:
A kind of fuel assembly cask is made welding procedure and is comprised the steps:
(1) bracket component is grouping in to frock in the support group
(2) welding support
Also be angle welding, the spot welding location, adopt manual electric arc welding SMAW in positioner, direct current, and electric current 90~130A, voltage 18~25V,
Be the control buckling deformation, and the appearance of weld appearance looks elegant, during cover welding, guarantee horizontal level, symmetrical welding, SMAW, direct current, electric current 140~170A, voltage 18~25V.
(3) seamless pipe is become the positioning pipe welding with flange welding
Weld joint on inner side, the positioning pipe horizontal level symmetrical welding that interlocks, side weld limit rotate, and keep welding to be in level, and welding parameter is DC current, electric current 140~170A, and voltage 18~25V,
The lateral angle weld seam, for controlling buckling deformation, during welding, housing is upright, flange level, staggered symmetrical welding, little electric current bottoming, SMAW, DC current, electric current 90~130A, voltage 18~25V, large electric current capping, SMAW, DC current, electric current 140~170A, voltage 18~25V
(4) good support is grouping in the housing weld jig will to weld good positioning pipe and welding
(5) positioning pipe and support are welded
Be angle welding, be the control buckling deformation, and the appearance of weld appearance looks elegant, flip cover during welding guarantees horizontal welding, SMAW, and direct current, electric current 140~170A, voltage 18~25V,
(6) Welding Testing
After welding is completed, all weld seams are done the kerosene leak test, and then do the experiment of weighing of 2000Kg, then detection has or not distortion.

Claims (5)

1. a fuel assembly cask is made welding procedure, it is characterized in that: comprise the steps,
(1) bracket component is grouping in to frock in the support group;
(2) welding support;
(3) seamless pipe is become the positioning pipe welding with flange welding;
(4) good support is grouping in the housing weld jig will to weld good positioning pipe and welding;
(5) positioning pipe and support are welded.
(6) Welding Testing.
2. a kind of fuel assembly cask as claimed in claim 1 is made welding procedure, it is characterized in that: described step (2) welding position is angle welding, spot welding location in positioner, welding parameter is: SMAW, direct current, electric current 90~130A, voltage 18~25V.
3. a kind of fuel assembly cask as claimed in claim 1 is made welding procedure, it is characterized in that: described step (3) is for weld joint on inner side, the positioning pipe horizontal level symmetrical welding that interlocks, rotate on the side weld limit, keep welding to be in level, welding parameter is DC current, electric current 140~170A, voltage 18~25V; For the lateral angle weld seam, during welding, housing is upright, flange level, staggered symmetrical welding, little electric current bottoming, welding parameter is: SMAW, DC current, electric current 90~130A, voltage 18~25V, large electric current capping, SMAW, DC current, electric current 140~170A, voltage 18~25V.
4. a kind of fuel assembly cask as claimed in claim 1 is made welding procedure, it is characterized in that: described step (5) welding position is angle welding, flip cover during welding, guarantee horizontal welding, welding parameter is: SMAW, direct current, electric current 140~170A, voltage 18~25V.
5. a kind of fuel assembly cask as claimed in claim 1 is made welding procedure, it is characterized in that: described step (6) is that after welding is completed, all weld seams are done the kerosene leak test, and then does the experiment of weighing of 2000Kg, then detection has or not distortion.
CN2011104184227A 2011-12-14 2011-12-14 Fuel assembly transportation container manufacturing welding process Pending CN103157884A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104184227A CN103157884A (en) 2011-12-14 2011-12-14 Fuel assembly transportation container manufacturing welding process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104184227A CN103157884A (en) 2011-12-14 2011-12-14 Fuel assembly transportation container manufacturing welding process

Publications (1)

Publication Number Publication Date
CN103157884A true CN103157884A (en) 2013-06-19

Family

ID=48581704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104184227A Pending CN103157884A (en) 2011-12-14 2011-12-14 Fuel assembly transportation container manufacturing welding process

Country Status (1)

Country Link
CN (1) CN103157884A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104751925A (en) * 2013-12-29 2015-07-01 西安核设备有限公司 Manufacturing method for CNFC-3G new fuel transportation container
CN105788684A (en) * 2014-12-26 2016-07-20 中核建中核燃料元件有限公司 Transformation method for TVS-2M fuel rod film-coating equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040115072A1 (en) * 2002-12-13 2004-06-17 Takayasu Saito Compressor and aluminum members assembled by arc welding
JP2005329435A (en) * 2004-05-20 2005-12-02 Ishikawajima Harima Heavy Ind Co Ltd Method and apparatus welding container
CN101412157A (en) * 2008-11-21 2009-04-22 中信重工机械股份有限公司 Control method of large-sized mining grinding mill end flange welding deformation
JP2009183963A (en) * 2008-02-05 2009-08-20 Daikin Ind Ltd Method of manufacturing can body, weld joint configuration of can body, and can shell
CN101525048A (en) * 2009-02-27 2009-09-09 沪东中华造船(集团)有限公司 Double-wall pipeline for the connection of fuel-gas valve set and engine on LNG ship and installation method of double-wall pipeline
KR20100078345A (en) * 2008-12-30 2010-07-08 정무수 Welding supporting assembly for electro-gas arc welding of vertical-up type

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040115072A1 (en) * 2002-12-13 2004-06-17 Takayasu Saito Compressor and aluminum members assembled by arc welding
JP2005329435A (en) * 2004-05-20 2005-12-02 Ishikawajima Harima Heavy Ind Co Ltd Method and apparatus welding container
JP2009183963A (en) * 2008-02-05 2009-08-20 Daikin Ind Ltd Method of manufacturing can body, weld joint configuration of can body, and can shell
CN101412157A (en) * 2008-11-21 2009-04-22 中信重工机械股份有限公司 Control method of large-sized mining grinding mill end flange welding deformation
KR20100078345A (en) * 2008-12-30 2010-07-08 정무수 Welding supporting assembly for electro-gas arc welding of vertical-up type
CN101525048A (en) * 2009-02-27 2009-09-09 沪东中华造船(集团)有限公司 Double-wall pipeline for the connection of fuel-gas valve set and engine on LNG ship and installation method of double-wall pipeline

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104751925A (en) * 2013-12-29 2015-07-01 西安核设备有限公司 Manufacturing method for CNFC-3G new fuel transportation container
CN104751925B (en) * 2013-12-29 2017-09-29 西安核设备有限公司 A kind of CNFC 3G fresh fuels shipping container manufacture method
CN105788684A (en) * 2014-12-26 2016-07-20 中核建中核燃料元件有限公司 Transformation method for TVS-2M fuel rod film-coating equipment

Similar Documents

Publication Publication Date Title
CN106624335B (en) The centering butt junction location support device of vertical mixing friction welding tank general assembly circumferential weld
CN103008851B (en) All-welded ball valve body weld narrow-gap welding process and interface structure
CN106583893B (en) Splice the welding method of longitudinal joint for the melon valve component of major diameter spherical tank
WO2012041072A1 (en) Full butted joint structure of connector lug between side frame and cross beam of bogie frame body and group welding technique
CN103157884A (en) Fuel assembly transportation container manufacturing welding process
CN108127310A (en) Hydraulic cylinder body floor welding tooling and welding method
CN204771359U (en) Water heater inner bag welding frock for spot welding locating
CN210548766U (en) Back gas automatic protection device during welding of circumferential weld of low-temperature liquid storage tank
CN103394813B (en) Fixture for welding of liquid injection hole of battery and battery clamping method
CN202780184U (en) Cantilever infrared-positioning welding device
CN105499803B (en) Technology used for assembling and welding irradiating supervision pipe
CN101332529B (en) Welding process of thin-wall hexagonal tube
CN103212953A (en) Assembling and welding technology of middle shell cover, accessories and barrel of hydrogenation reactor
CN102601487B (en) Method for welding water outlet nozzles on nuclear power hanging basket
CN205808962U (en) A kind of pressure vessel longitudinal joint ray detection corollary apparatus
CN101885107B (en) Nickel-hydrogen battery post welding method
RU2456146C1 (en) Method of producing complex combined axially symmetric welded structures
CN205166279U (en) Welding frock of welding burst ball sealing head
CN205327883U (en) Tank container tank jar body and frame attach device
CN209632280U (en) A kind of stud welding gun guide and locating mechanism
EP3650154B1 (en) Tank manufacturing method, mirror plate of tank, and tank
CN102785016A (en) Structural container and welding method thereof
CN203258371U (en) Process manhole structure for deep-refrigeration pressure container
CN205641613U (en) Water heater inner bag inner end cap
CN104759744B (en) Pitching type steel bridge hinge manufacture method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130619