CN103147583A - Plate allocation machine for construction of prefabricated plate connection combination device and plate allocation method - Google Patents

Plate allocation machine for construction of prefabricated plate connection combination device and plate allocation method Download PDF

Info

Publication number
CN103147583A
CN103147583A CN2013100950743A CN201310095074A CN103147583A CN 103147583 A CN103147583 A CN 103147583A CN 2013100950743 A CN2013100950743 A CN 2013100950743A CN 201310095074 A CN201310095074 A CN 201310095074A CN 103147583 A CN103147583 A CN 103147583A
Authority
CN
China
Prior art keywords
inside casing
prefabricated
rack section
frame
lining bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100950743A
Other languages
Chinese (zh)
Other versions
CN103147583B (en
Inventor
郭乐工
张婷
郭鲁正
杨萌萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jinghongweite Technology Development Co., Ltd.
Original Assignee
郭乐工
郭鲁正
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郭乐工, 郭鲁正 filed Critical 郭乐工
Priority to CN201310095074.3A priority Critical patent/CN103147583B/en
Publication of CN103147583A publication Critical patent/CN103147583A/en
Application granted granted Critical
Publication of CN103147583B publication Critical patent/CN103147583B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a plate allocation machine for the construction of a prefabricated plate connection combination device, which successfully realizes the lifting and the continuous installation and placement of multiple prefabricated plates in one time, so that the working efficiency is improved exponentially, the construction working hour and the construction fee are decreased obviously and the labor intensity is lowered greatly. The plate allocation machine for the construction of the prefabricated plate connection combination device comprises an exterior casing frame part, an interior casing frame part, an exterior casing frame lifting and control device and an interior casing frame lifting and control device. The invention also provides a plate allocation method of the plate allocation machine for the construction of the prefabricated plate connection combination device.

Description

A kind of connection combination body device of prefabricated plate builds with fabric swatch machine and fabric swatch method
Technical field
The present invention relates to a kind of connection combination body device of prefabricated plate structure and use the fabric swatch machine, also relate to the fabric swatch method of using this fabric swatch machine.
Background technology
When building connection combination body device of prefabricated plate, need to carry out a large amount of prefabricated chunk mounting arrangements construction operations.Tradition lifting fabric swatch mode is carried out the fabric swatch operation and is once lifted by crane and install prefabricated chunk of placement, this fabric swatch operating type expends that man-hour is many, producing cost is high, labour intensity is large, inefficiency, becomes the outstanding restraining factors that impact restriction connection combination body device of prefabricated plate builds duration and cost cost.
Summary of the invention
The object of the invention is to provide a kind of smooth realization once to lift by crane the polylith prefabricated chunk and thereby operating efficiency, the obvious connection combination body device of prefabricated plate structure fabric swatch machine that reduces construct man-hour and operating expenses, greatly reduces labour intensity of significantly improving placed in continuous installation.
To achieve these goals, the present invention adopts following technical scheme: this connection combination body device of prefabricated plate builds and uses the fabric swatch machine, comprises housing rack section, inside casing rack section, the handling of housing frame and control device, the handling of inside casing frame and control device; Described housing rack section comprises four head trees, a plurality of support post, upper lower outside vertical frame beam, upper lower outside horizontal frame beam and horizontal stationary links, wherein each head tree bottom is provided with the transverse link preformed hole that inserts transverse link, each head tree is provided with vertical guided wheel slot, is provided with the outer suspension ring that connect housing frame lifting hawser at upper outside vertical frame top surface of the beam; Described inside casing rack section comprises vertical frame beam in four inner columns, up and down, upper inner cross-frame beam, horizontal lining bar, two transverse support bar, wherein each inner column vertically is provided with the horizontal lining bar preformed hole of a horizontal lining bar of row's fixed bearing, each inner column top is provided with the transverse support bar preformed hole that inserts transverse support bar, each inner column is provided with near a side of head tree the directive wheel that slides up and down along vertical guided wheel slot, is provided with the interior suspension ring that pass and guide inside casing frame lifting hawser at upper interior vertical frame top surface of the beam; The handling of described housing frame and control device comprise housing frame lifting hawser, housing frame suspension hook and outside lifting dynamic power machine, and suspension hook and lower end that housing frame lifting hawser upper end is fixed on outside lifting dynamic power machine connect outer suspension ring; The handling of described inside casing frame and control device comprise inside casing frame lifting hawser, fixed pulley group, fixed pulley group upper end is fixed on housing frame suspension hook and the lower end connects the upper end that the inside casing frame is lifted by crane hawser, and the lower end of inside casing frame lifting hawser is fastened on each inner column horizontal lining bar bottom by interior suspension ring.
Also provide and used this connection combination body device of prefabricated plate to build the fabric swatch method of using the fabric swatch machine, comprised the following steps:
(1) by the suspension hook of the outside lifting dynamic power machine housing rack section of slinging;
(2) after the riding position by outside lifting dynamic power machine handling housing frame to the first prefabricated chunk, start inside casing frame lifting hawser lifting the first horizontal lining bar, make the first horizontal lining bar bear the weight of the deadweight of inside casing rack section and whole prefabricated chunks, then take out the first transverse link;
(3) by inside casing frame lifting hawser through the horizontal lining bar whereabouts inside casing rack section of interior suspension ring to the first, make the inside casing rack section together with whole prefabricated chunks along the downward landing of directive wheel, the position that makes first prefabricated chunk lower than the position of the first transverse link preformed hole the second horizontal lining bar and the first transverse link preformed hole fair;
(4) lift by crane a little the first horizontal lining bar and insert the first transverse link in the first transverse link preformed hole, then loosen inside casing frame lifting hawser, make no longer load of the first horizontal lining bar, make the first transverse link support the deadweight of inside casing rack section and second prefabricated chunk and upper each prefabricated chunk weight thereof;
(5) suspension hook of inside casing frame lifting hawser is taken off from the first horizontal lining bar, after being fixedly attached to the second horizontal lining bar, lifting inside casing rack section, make the second horizontal lining bar support the deadweight of inside casing rack section and second prefabricated chunk and upper each prefabricated chunk weight thereof, then extract the first horizontal lining bar, first prefabricated chunk automatically drops in the lower outside vertical frame beam bottom of housing rack section and accepted by the protection transverse cable; (6) the first transverse link is inserted the first transverse link preformed hole again, then loosen inside casing frame lifting hawser, whereabouts inside casing rack section heavily changes by the first transverse link supporting the deadweight of inside casing rack section and second prefabricated chunk and upper prefabricated chunk plate thereof;
(7) mobile housing rack section makes first prefabricated chunk to the designated mounting position again, lays first prefabricated chunk to the designated mounting position, and second installation to last piece prefabricated chunk completed according to step (1)-(7).
By adopting the application, abandoned and once lifted by crane and installed the old operating type of placing a prefabricated chunk, thus smoothly realization once lift by crane the polylith prefabricated chunk and install continuously place significantly improve operating efficiency, obviously reduce construction man-hour and operating expenses, greatly reduce labour intensity.
Description of drawings
Fig. 1 builds according to connection combination body device of prefabricated plate of the present invention the perspective view of using the fabric swatch machine;
Fig. 2 is the front view of Fig. 1;
Fig. 3 is the lateral view of Fig. 1.
The specific embodiment
As Figure 1-3, this connection combination body device of prefabricated plate builds and uses the fabric swatch machine, comprises housing rack section 1, inside casing rack section 2, the handling of housing frame and control device, the handling of inside casing frame and control device; Described housing rack section comprises four head trees, a plurality of support post, upper lower outside vertical frame beam, upper lower outside horizontal frame beam and horizontal stationary links, wherein each head tree bottom is provided with the transverse link preformed hole that inserts transverse link, each head tree is provided with vertical guided wheel slot, is provided with the outer suspension ring 8 that connect housing frame lifting hawser at upper outside vertical frame top surface of the beam; Described inside casing rack section comprises vertical frame beam in four inner columns, up and down, upper inner cross-frame beam, horizontal lining bar, two transverse support bar 11, wherein each inner column vertically is provided with the horizontal lining bar preformed hole of a horizontal lining bar of row's fixed bearing, each inner column top is provided with the transverse support bar preformed hole that inserts transverse support bar, each inner column is provided with near a side of head tree the directive wheel 10 that slides up and down along vertical guided wheel slot, is provided with the interior suspension ring 80 that pass and guide inside casing frame lifting hawser at upper interior vertical frame top surface of the beam; The handling of described housing frame and control device comprise housing frame lifting hawser 6, housing frame suspension hook 7 and outside lifting dynamic power machine, and suspension hook 5 and lower end that housing frame lifting hawser upper end is fixed on outside lifting dynamic power machine connect outer suspension ring 8; The handling of described inside casing frame and control device comprise inside casing frame lifting hawser 60, fixed pulley group 9, fixed pulley group upper end is fixed on housing frame suspension hook and the lower end connects the upper end that the inside casing frame is lifted by crane hawser, and the lower end of inside casing frame lifting hawser is fastened on each inner column horizontal lining bar bottom by interior suspension ring.
Preferably, be provided with the protection transverse cable 600 that articulates with it in the bottom of lower outside vertical frame beam.
Preferably, this fabric swatch machine also comprises deceleration check brake gear, and this device is one-body molded or independent the setting with the fixed pulley group.
Also provide and used this connection combination body device of prefabricated plate to build the fabric swatch method of using the fabric swatch machine, comprised the following steps:
(1) by the suspension hook of the outside lifting dynamic power machine housing rack section of slinging;
(2) after the riding position by outside lifting dynamic power machine handling housing frame to the first a prefabricated chunk YB1, start inside casing frame lifting hawser lifting the first horizontal lining bar D1, make the first horizontal lining bar bear the weight of the deadweight of inside casing rack section and whole prefabricated chunks, then take out the first transverse link L1;
(3) by inside casing frame lifting hawser through the horizontal lining bar whereabouts inside casing rack section of interior suspension ring to the first, make the inside casing rack section together with whole prefabricated chunks along the downward landing of directive wheel, the position that makes first prefabricated chunk lower than the position of the first transverse link preformed hole the second horizontal lining bar D2 and the first transverse link preformed hole fair;
(4) lift by crane a little the first horizontal lining bar and insert the first transverse link L1 in the first transverse link preformed hole, then loosen inside casing frame lifting hawser, make no longer load of the first horizontal lining bar, make the first transverse link support the deadweight of inside casing rack section and second prefabricated chunk YB2 and upper each prefabricated chunk weight thereof;
(5) suspension hook of inside casing frame lifting hawser is taken off from the first horizontal lining bar, after being fixedly attached to the second horizontal lining bar D2, lifting inside casing rack section, make the second horizontal lining bar support the deadweight of inside casing rack section and second prefabricated chunk and upper each prefabricated chunk weight thereof, then extract the first horizontal lining bar, first prefabricated chunk automatically drops in the lower outside vertical frame beam bottom of housing rack section and accepted by the protection transverse cable;
(6) the first transverse link is inserted the first transverse link preformed hole again, then loosen inside casing frame lifting hawser, whereabouts inside casing rack section heavily changes by the first transverse link supporting the deadweight of inside casing rack section and second prefabricated chunk and upper prefabricated chunk plate thereof;
(7) mobile housing rack section makes first prefabricated chunk to the designated mounting position again, lays first prefabricated chunk to the designated mounting position, and second installation to last piece prefabricated chunk completed according to step (1)-(7).
By adopting the application, abandoned and once lifted by crane and installed the old operating type of placing a prefabricated chunk, thus smoothly realization once lift by crane the polylith prefabricated chunk and install continuously place significantly improve operating efficiency, obviously reduce construction man-hour and operating expenses, greatly reduce labour intensity.。
The above; it is only preferred embodiment of the present invention; be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs to the protection domain of technical solution of the present invention to any simple modification, equivalent variations and modification that above embodiment does.

Claims (4)

1. a connection combination body device of prefabricated plate builds and uses the fabric swatch machine, and it is characterized in that: it comprises housing rack section (1), inside casing rack section (2), the handling of housing frame and control device, the handling of inside casing frame and control device; Described housing rack section comprises four head trees, a plurality of support post, upper lower outside vertical frame beam, upper lower outside horizontal frame beam and transverse link, wherein each head tree bottom is provided with the transverse link preformed hole that inserts transverse link, each head tree is provided with vertical guided wheel slot, is provided with the outer suspension ring (8) that connect housing frame lifting hawser at upper outside vertical frame top surface of the beam; Described inside casing rack section comprises vertical frame beam in four inner columns, up and down, upper inner cross-frame beam, horizontal lining bar, two transverse support bar (11), wherein each inner column vertically is provided with the horizontal lining bar preformed hole of a horizontal lining bar of row's fixed bearing, each inner column top is provided with the transverse support bar preformed hole that inserts transverse support bar, each inner column is provided with near a side of head tree the directive wheel (10) that slides up and down along vertical guided wheel slot, is provided with the interior suspension ring (80) that pass and guide inside casing frame lifting hawser at upper interior vertical frame top surface of the beam; The handling of described housing frame and control device comprise housing frame lifting hawser (6), housing frame suspension hook (7) and outside lifting dynamic power machine, and housing frame lifting hawser upper end is fixed on suspension hook (5) and the lower end connection outer suspension ring (8) of outside lifting dynamic power machine; The handling of described inside casing frame and control device comprise inside casing frame lifting hawser (60), fixed pulley group (9), fixed pulley group upper end is fixed on housing frame suspension hook and the lower end connects the upper end that the inside casing frame is lifted by crane hawser, and the lower end of inside casing frame lifting hawser is fastened on each inner column horizontal lining bar bottom by interior suspension ring.
2. connection combination body device of prefabricated plate according to claim 1 builds and uses the fabric swatch machine, it is characterized in that: be provided with the protection transverse cable (600) that articulates with it in the bottom of lower outside vertical frame beam.
3. connection combination body device of prefabricated plate according to claim 1 and 2 builds and uses the fabric swatch machine, and it is characterized in that: this fabric swatch machine also comprises deceleration check brake gear, and this device is one-body molded or independent the setting with the fixed pulley group.
4. one kind is used connection combination body device of prefabricated plate according to claim 1 to build the fabric swatch method of using the fabric swatch machine, it is characterized in that: comprise the following steps:
(1) by the suspension hook of the outside lifting dynamic power machine housing rack section of slinging;
(2) after the riding position by outside lifting dynamic power machine handling housing frame to the first prefabricated chunk, start inside casing frame lifting hawser lifting the first horizontal lining bar, make the first horizontal lining bar bear the weight of the deadweight of inside casing rack section and whole prefabricated chunks, then take out the first transverse link;
(3) by inside casing frame lifting hawser through the horizontal lining bar whereabouts inside casing rack section of interior suspension ring to the first, make the inside casing rack section together with whole prefabricated chunks along the downward landing of directive wheel, the position that makes first prefabricated chunk lower than the position of the first transverse link preformed hole the second horizontal lining bar and the first transverse link preformed hole fair;
(4) lift by crane a little the first horizontal lining bar and insert the first transverse link in the first transverse link preformed hole, then loosen inside casing frame lifting hawser, make no longer load of the first horizontal lining bar, make the first transverse link support the deadweight of inside casing rack section and second prefabricated chunk and upper each prefabricated chunk weight thereof;
(5) suspension hook of inside casing frame lifting hawser is taken off from the first horizontal lining bar, after being fixedly attached to the second horizontal lining bar, lifting inside casing rack section, make the second horizontal lining bar support the deadweight of inside casing rack section and second prefabricated chunk and upper each prefabricated chunk weight thereof, then extract the first horizontal lining bar, first prefabricated chunk automatically drops in the lower outside vertical frame beam bottom of housing rack section and accepted by the protection transverse cable;
(6) the first transverse link is inserted the first transverse link preformed hole again, then loosen inside casing frame lifting hawser, whereabouts inside casing rack section heavily changes by the first transverse link supporting the deadweight of inside casing rack section and second prefabricated chunk and upper prefabricated chunk plate thereof;
(7) mobile housing rack section makes first prefabricated chunk to the designated mounting position again, lays first prefabricated chunk to the designated mounting position, and second installation to last piece prefabricated chunk completed according to step (1)-(7).
CN201310095074.3A 2013-03-22 2013-03-22 Plate allocation machine for construction of prefabricated plate connection combination device and plate allocation method Active CN103147583B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310095074.3A CN103147583B (en) 2013-03-22 2013-03-22 Plate allocation machine for construction of prefabricated plate connection combination device and plate allocation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310095074.3A CN103147583B (en) 2013-03-22 2013-03-22 Plate allocation machine for construction of prefabricated plate connection combination device and plate allocation method

Publications (2)

Publication Number Publication Date
CN103147583A true CN103147583A (en) 2013-06-12
CN103147583B CN103147583B (en) 2015-07-15

Family

ID=48545874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310095074.3A Active CN103147583B (en) 2013-03-22 2013-03-22 Plate allocation machine for construction of prefabricated plate connection combination device and plate allocation method

Country Status (1)

Country Link
CN (1) CN103147583B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103922220A (en) * 2014-04-18 2014-07-16 郭鲁正 Special movable limiting elevating rack for producing prefabricated plate connector

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05133128A (en) * 1991-11-11 1993-05-28 Sumitomo Heavy Ind Ltd Method for installing plural layer type underground parking equipment and installation working vehicle used for the installation method
JPH1193422A (en) * 1990-10-26 1999-04-06 Misawa Homes Co Ltd Metal hanger for roof panel
JP2000265667A (en) * 1999-03-16 2000-09-26 Taisei Corp Suspension jig
JP2003268980A (en) * 2002-03-18 2003-09-25 Toto Ltd Method for carrying in unit room
CN102071812A (en) * 2010-12-23 2011-05-25 中国一冶集团有限公司 Method for vertically transporting building materials
CN202284390U (en) * 2011-09-19 2012-06-27 沈阳远大铝业工程有限公司 Hoisting machine tools for curtain wall unit plate
CN203160713U (en) * 2013-03-22 2013-08-28 郭乐工 Plate distribution machine for constructing prefabricated plate connection combination device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1193422A (en) * 1990-10-26 1999-04-06 Misawa Homes Co Ltd Metal hanger for roof panel
JPH05133128A (en) * 1991-11-11 1993-05-28 Sumitomo Heavy Ind Ltd Method for installing plural layer type underground parking equipment and installation working vehicle used for the installation method
JP2000265667A (en) * 1999-03-16 2000-09-26 Taisei Corp Suspension jig
JP2003268980A (en) * 2002-03-18 2003-09-25 Toto Ltd Method for carrying in unit room
CN102071812A (en) * 2010-12-23 2011-05-25 中国一冶集团有限公司 Method for vertically transporting building materials
CN202284390U (en) * 2011-09-19 2012-06-27 沈阳远大铝业工程有限公司 Hoisting machine tools for curtain wall unit plate
CN203160713U (en) * 2013-03-22 2013-08-28 郭乐工 Plate distribution machine for constructing prefabricated plate connection combination device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103922220A (en) * 2014-04-18 2014-07-16 郭鲁正 Special movable limiting elevating rack for producing prefabricated plate connector
CN103922220B (en) * 2014-04-18 2016-02-24 郭鲁正 The spacing elevator platform of the fit special mobile formula of a kind of making prefabricated chunk johning knot

Also Published As

Publication number Publication date
CN103147583B (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN207361651U (en) Aircushion vehicle jack up unit
CN202022639U (en) Structure free of car frame of car bottom wheel traction elevator
CN204251133U (en) A kind of rack construction of improved type passenger elevator without machine room
CN203160713U (en) Plate distribution machine for constructing prefabricated plate connection combination device
CN103147583B (en) Plate allocation machine for construction of prefabricated plate connection combination device and plate allocation method
CN109914837A (en) Elevator protective plate, elevator safety protecting method and construction of lift well method
CN205076626U (en) No computer lab elevator cab diverting pulley mounting structure
CN104612391B (en) Construction of prevention work platform for skyscraper
CN205527545U (en) Gantry lifting machine
CN102398849A (en) Method for moving whole crawler crane down to dock
CN205257896U (en) Modified automatic rising bubble water installation
CN205867481U (en) Liftable basketball stand
CN204001898U (en) Efficiently hang modus ponens parking systems
CN201502168U (en) Hoisting device for wholly hoisting building outer bracket
CN208310238U (en) A kind of pulp shooting machine ingredient hoisting mechanism
CN211997868U (en) Electromechanical equipment for coal mine lifting
CN208412883U (en) Type underground dustbin is set in hoisting mechanism
CN216190226U (en) Double-channel middle shell for lifter
CN207566763U (en) A kind of rotor rim punching hanging apparatus
CN209113373U (en) A kind of lifting portal frame
CN210191547U (en) Special support for diversion sheave
CN205638500U (en) Large -scale steel shotcrete of variant formula installation movable trolley
CN205602967U (en) At bottom of arc shape's elevator sedan -chair
CN203603437U (en) Car bottom operating platform for elevator with no machine room
CN205805077U (en) A kind of pneumatic type multi-storied garage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200206

Address after: 405-13, floor 4, building 6 (North), yard 1, Shuangqing Road, Haidian District, Beijing 100085

Patentee after: Beijing Jinghongweite Technology Development Co., Ltd.

Address before: 450002 School of civil engineering, Zhengzhou University, 97 Wenhua Road, Henan, Zhengzhou

Co-patentee before: Guo Luzheng

Patentee before: Guo Legong