CN103147387B - A kind of double combined combined bridge structure - Google Patents

A kind of double combined combined bridge structure Download PDF

Info

Publication number
CN103147387B
CN103147387B CN201310102079.4A CN201310102079A CN103147387B CN 103147387 B CN103147387 B CN 103147387B CN 201310102079 A CN201310102079 A CN 201310102079A CN 103147387 B CN103147387 B CN 103147387B
Authority
CN
China
Prior art keywords
bridge section
bridge
described left
wing plate
connecting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310102079.4A
Other languages
Chinese (zh)
Other versions
CN103147387A (en
Inventor
李荣生
巩立辉
张文山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Dafang Industry Co ltd
Original Assignee
Zhengzhou Dafang Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Dafang Industry Co ltd filed Critical Zhengzhou Dafang Industry Co ltd
Priority to CN201310102079.4A priority Critical patent/CN103147387B/en
Publication of CN103147387A publication Critical patent/CN103147387A/en
Application granted granted Critical
Publication of CN103147387B publication Critical patent/CN103147387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of double combined combined bridge structure, including the left bridge section of at least a section can be sequentially connected with in the longitudinal direction, right bridge section, described left bridge section, the top of right bridge section are formed for the bridge floor for vehicle pass-through, described left bridge section, the bottom of right bridge section are supported by bridge pier, the right side of described left bridge section has left connecting portion, the left side of described right bridge section has right connecting portion, and described left bridge section, right bridge section are spliced into one by described left connecting portion, right connecting portion.The present invention manufactures respectively by bridge structure is divided into left and right two sections, transport respectively, splicing completes, bridge member maximizes as far as possible, batch production, to shorten the bridge location engineering time, it is achieved that science of bridge building is by the transformation of " construction " to " manufacture ", its structure optimization, assembled easy, the installation truly realizing bridge is rapid.

Description

A kind of double combined combined bridge structure
Technical field
The present invention relates to a kind of double combined combined bridge structure.
Background technology
Along with the high speed development of China's economic, domestic each big and medium-sized cities population, vehicle rapidly increase, and cause road traffic flow to increase severely, and road imbalance between supply and demand is the most sharp-pointed.Increase city existing road autos only ability and mainly changed the measures such as grade separation, overhead and tunnel multilevel traffic by existing road widening upgrading, level crossing, elevated bridge is a kind of common solution, there is long construction period in conventional elevated bridge method of construction, floor space is big, traffic and surrounding enviroment are affected the series of problems such as big, the structure of bridge be it is also proposed higher requirement.
Summary of the invention
It is an object of the invention to provide a kind of realize large-scale component factorial praluction, use special integration of transporting and building car transport install double combined combined bridge structure.
For reaching above-mentioned purpose, the technical solution used in the present invention is:
A kind of double combined combined bridge structure, including the left bridge section of at least a section can be sequentially connected with in the longitudinal direction, right bridge section, bridge floor for vehicle pass-through is formed at described left bridge section, the top of right bridge section, described left bridge section, the bottom of right bridge section are supported by bridge pier, the right side of described left bridge section has left connecting portion, the left side of described right bridge section has right connecting portion, and described left bridge section, right bridge section are spliced into one by described left connecting portion, right connecting portion.
Preferably, described left connecting portion offers left shear connector / Groove, left shear connector described in correspondence on described right connecting portion / Groove offers right shearing groove / Key, when described left connecting portion, right connecting portion splice mutually, described left shear connector / Groove, right shearing groove / Key matches.
Preferably, when described left connecting portion, right connecting portion splice mutually, both are fastened by bolt.
Preferably, it is provided with prestressing with bond bundle between described left bridge section, the inside of right bridge section;It is provided with external pre-stress bundle between described left bridge section, the outside of right bridge section.
Preferably, the upper right quarter of described left bridge section is provided with left anti-collision wall / Guardrail, the upper left quarter of described right bridge section are provided with right anti-collision wall / Guardrail, when described left bridge section, right bridge section, described left anti-collision wall / Guardrail, right anti-collision wall / Guardrail is fastened by bolt.
Preferably, the left side of described left bridge section connects left wing plate, and described left wing plate can overturn to the upper right side of described left bridge section;The right side of described right bridge section connects right wing plate, described right wing plate can overturn to the upper left side of described right bridge section, when described left wing plate, right wing plate launch, described left wing plate, right wing plate upper surface flush with described left bridge section, the upper surface of right bridge section, and are collectively forming the bridge floor for vehicle pass-through.
It is further preferred that the left side of described left wing plate is provided with left guardrail;The right side of described right wing plate is provided with right guardrail.
It is further preferred that the right of described left wing plate is connected along rotating with the left margin of described left bridge section;The left margin of described right wing plate is connected along rotating with the right of described right bridge section.
Preferably, described left bridge section, the symmetrical setting of right bridge section.
Owing to technique scheme is used, the present invention compared with prior art has the advantage that
The present invention manufactures respectively by bridge structure is divided into left and right two sections, transport respectively, splicing completes, bridge member maximizes as far as possible, batch production, to shorten the bridge location engineering time, it is achieved that science of bridge building is by the transformation of " construction " to " manufacture ", its structure optimization, assembled easy, the installation truly realizing bridge is rapid.
Accompanying drawing explanation
Accompanying drawing 1 Schematic diagram is split for bridge section left in the present invention, right bridge section;
Accompanying drawing 2 For bridge section left in the present invention or the schematic side view of right bridge section;
Accompanying drawing 3 For bridge section left in the present invention, right bridge section assembly schematic diagram;
Accompanying drawing 4 Application schematic diagram for the present invention.
Wherein: 1 , left bridge section; 10 , left connecting portion; 11 , left shear connector / Groove; 12 , left anti-collision wall / Guardrail; 13 , left wing plate; 14 , left guardrail; 2 , right bridge section; 20 , right connecting portion; 21 , right shearing groove / Key; 22 , right anti-collision wall / Guardrail; 23 , right wing plate; 24 , right guardrail; 3 , bridge floor; 4 , prestressing with bond bundle; 5 , external pre-stress bundle; 6 , vehicle.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment the invention will be further described:
A kind of double combined combined bridge structure as depicted, including the left bridge section of at least a section can be sequentially connected with in the longitudinal direction 1 , right bridge section 2 , left bridge section 1 , right bridge section 2 Top formed for vehicle 6 Current bridge floor 3 , left bridge section 1 , right bridge section 2 Bottom supported by bridge pier.
Such as figure 1 2 Shown in: left bridge section 1 Right side there is left connecting portion 10 , right bridge section 2 Left side there is right connecting portion 20 , specifically: left connecting portion 10 On offer left shear connector / Groove 11 , right connecting portion 20 The left shear connector of upper correspondence / Groove 11 Offer right shearing groove / Key 21
Left bridge section 1 Upper right quarter be provided with left anti-collision wall / Guardrail 12 , right bridge section 2 Upper left quarter be provided with right anti-collision wall / Guardrail 22 .When left bridge section 1 , right bridge section 2 When splicing mutually, first by left shear connector / Groove 11 , right shearing groove / Key 21 Coordinate, then by left connecting portion 10 , right connecting portion 20 Between by multiple bolts 4 Fasten, meanwhile, left anti-collision wall / Guardrail 12 , right anti-collision wall / Guardrail 22 Between also by bolt 4 It is fastened.Left bridge section 1 , right bridge section 2 Inside between carry out prestressing with bond bundle 4 Installation stretch-draw;Left bridge section 1 , right bridge section 2 Outside between carry out external pre-stress bundle again 5 Installation stretch-draw.So, left bridge section 1 , right bridge section 2 I.e. it is spliced into one, such as figure 3 Shown in.
Left bridge section 1 Left side connect left wing plate 13 , left wing plate 13 Can bridge section to the left 1 Upper right side upset;Right bridge section 2 Right side connect right wing plate 23 , right wing plate 23 Can bridge section to the right 2 Upper left side upset.In the present embodiment: left wing plate 13 The right along by rotating shaft and left bridge section 1 Left margin rotate connection;Right wing plate 23 Left margin and right bridge section 2 By rotating shaft with the right be connected along rotating.Additionally, left wing plate 13 Left side be provided with left guardrail 14 ;Right wing plate 23 Right side be provided with right guardrail 24 , in the present embodiment, left guardrail 14 , right guardrail 24 It is vertically arranged in left wing plate 13 , right wing plate 23 On.
Wing plate structure has folded state, deployed condition: when in the expanded state: left wing plate 13 , right wing plate 23 Upper surface and left bridge section 1 , right bridge section 2 Upper surface flush, and be collectively forming the bridge floor for vehicle pass-through 3 , such as figure 3 Shown in;When positioned in the folded position: left wing plate 13 Bridge section to the left 1 Upper right side upset, make left wing plate 13 It is shelved on left bridge section 1 On;Right wing plate 23 Bridge section to the right 2 Upper left side upset, make right wing plate 23 It is shelved on right bridge section 2 On, such as figure 1 Shown in.Wing plate can be folded when transport, convenient transport;Complete exterior after by wing plate launch, increase road surface width.
In the present embodiment, the most left bridge section 1 , right bridge section 2 Batch making, the stability etc. of stress after assembly, both are arranged to symmetrical structure.
Above-described embodiment only for technology design and the feature of the present invention are described, its object is to allow person skilled in the art will appreciate that present disclosure and to implement according to this, can not limit the scope of the invention with this.All equivalence changes made according to spirit of the invention or modification, all should contain within protection scope of the present invention

Claims (6)

1. a double combined combined bridge structure, it is characterized in that: include at least one section of left bridge section can being sequentially connected with in the longitudinal direction, right bridge section, described left bridge section, bridge floor for vehicle pass-through is formed at the top of right bridge section, described left bridge section, the bottom of right bridge section is supported by bridge pier, the right side of described left bridge section has left connecting portion, the left side of described right bridge section has right connecting portion, described left bridge section, right bridge section is by described left connecting portion, right connecting portion is spliced into one, described left connecting portion, when right connecting portion splices mutually, both are fastened by bolt;
Left shear connector/groove is offered on described left connecting portion, on described right connecting portion, the left shear connector/groove described in correspondence offers right shearing groove/key, when described left connecting portion, right connecting portion splice mutually, described left shear connector/groove, right shearing groove/key match
The upper right quarter of described left bridge section is provided with left anti-collision wall/guardrail, the upper left quarter of described right bridge section is provided with right anti-collision wall/guardrail, when described left bridge section, right bridge section, described left anti-collision wall/guardrail, right anti-collision wall/guardrail are fastened by bolt.
A kind of double combined combined bridge structure the most according to claim 1, it is characterised in that: it is provided with prestressing with bond bundle between described left bridge section, the inside of right bridge section;It is provided with external pre-stress bundle between described left bridge section, the outside of right bridge section.
A kind of double combined combined bridge structure the most according to claim 1, it is characterised in that: the left side of described left bridge section connects left wing plate, and described left wing plate can overturn to the upper right side of described left bridge section;The right side of described right bridge section connects right wing plate, described right wing plate can overturn to the upper left side of described right bridge section, when described left wing plate, right wing plate launch, described left wing plate, right wing plate upper surface flush with described left bridge section, the upper surface of right bridge section, and are collectively forming the bridge floor for vehicle pass-through.
A kind of double combined combined bridge structure the most according to claim 3, it is characterised in that: the left side of described left wing plate is provided with left guardrail;The right side of described right wing plate is provided with right guardrail.
A kind of double combined combined bridge structure the most according to claim 3, it is characterised in that: the right of described left wing plate is connected along rotating with the left margin of described left bridge section;The left margin of described right wing plate is connected along rotating with the right of described right bridge section.
A kind of double combined combined bridge structure the most according to claim 1, it is characterised in that: described left bridge section, the symmetrical setting of right bridge section.
CN201310102079.4A 2013-03-27 2013-03-27 A kind of double combined combined bridge structure Active CN103147387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310102079.4A CN103147387B (en) 2013-03-27 2013-03-27 A kind of double combined combined bridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310102079.4A CN103147387B (en) 2013-03-27 2013-03-27 A kind of double combined combined bridge structure

Publications (2)

Publication Number Publication Date
CN103147387A CN103147387A (en) 2013-06-12
CN103147387B true CN103147387B (en) 2016-12-07

Family

ID=48545680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310102079.4A Active CN103147387B (en) 2013-03-27 2013-03-27 A kind of double combined combined bridge structure

Country Status (1)

Country Link
CN (1) CN103147387B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695320B (en) * 2015-02-15 2016-08-24 中铁第四勘察设计院集团有限公司 A kind of board-like concrete box girder in the rotatable edge of a wing and construction method thereof
CN106948258B (en) * 2017-05-10 2019-04-16 安徽省交通控股集团有限公司 A kind of property regulation device and its construction method for the girder great cantilever concrete edge of a wing
CN108589508A (en) * 2018-05-16 2018-09-28 李明 A kind of double combined combined bridge structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4305098A1 (en) * 1993-02-19 1994-08-25 Krupp Industrietech Device for unfolding and folding a pontoon unit
US5603134A (en) * 1995-06-27 1997-02-18 Coastal Lumber Company Portable bridge system
GB2351750A (en) * 1999-07-07 2001-01-10 Mabey & Johnson Ltd Lattice panel bridge
CN1936184A (en) * 2006-10-23 2007-03-28 钟宝驹 Frame type combined structure man-vehicle passage
CN201268827Y (en) * 2008-09-18 2009-07-08 钟宝驹 Frame component for changing road traffic structure
CN201305119Y (en) * 2008-11-25 2009-09-09 湖北华舟重工有限责任公司 Fixed washplate for four-fold pontoon bridge
DE102010055574A1 (en) * 2010-12-21 2012-06-21 General Dynamics European Land Systems-Germany Gmbh Modular bridge element
CN202672021U (en) * 2011-11-03 2013-01-16 上海同济城市规划设计研究院 Combination type bridge
CN203200643U (en) * 2013-03-27 2013-09-18 郑州市大方实业有限公司 Double-splicing mode combined bridge structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB779411A (en) * 1954-10-05 1957-07-17 Thomas Harley Haddow Improvements in joints or coupling devices for structural members
CN102286921A (en) * 2011-05-25 2011-12-21 河南省九建工程有限公司 bridge widening splicing structure and construction method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4305098A1 (en) * 1993-02-19 1994-08-25 Krupp Industrietech Device for unfolding and folding a pontoon unit
US5603134A (en) * 1995-06-27 1997-02-18 Coastal Lumber Company Portable bridge system
GB2351750A (en) * 1999-07-07 2001-01-10 Mabey & Johnson Ltd Lattice panel bridge
CN1936184A (en) * 2006-10-23 2007-03-28 钟宝驹 Frame type combined structure man-vehicle passage
CN201268827Y (en) * 2008-09-18 2009-07-08 钟宝驹 Frame component for changing road traffic structure
CN201305119Y (en) * 2008-11-25 2009-09-09 湖北华舟重工有限责任公司 Fixed washplate for four-fold pontoon bridge
DE102010055574A1 (en) * 2010-12-21 2012-06-21 General Dynamics European Land Systems-Germany Gmbh Modular bridge element
CN202672021U (en) * 2011-11-03 2013-01-16 上海同济城市规划设计研究院 Combination type bridge
CN203200643U (en) * 2013-03-27 2013-09-18 郑州市大方实业有限公司 Double-splicing mode combined bridge structure

Also Published As

Publication number Publication date
CN103147387A (en) 2013-06-12

Similar Documents

Publication Publication Date Title
CN205024907U (en) Vary joint construction of wide flange I -beam roof beam of prestressing force hollow floor and edge of a wing
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN105064511A (en) Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof
CN109457599B (en) Splicing structure of hollow pier and bearing platform and construction method
CN103147387B (en) A kind of double combined combined bridge structure
CN109537929B (en) Reinforcing device and reinforcing method for extracting column reconstruction
CN203021884U (en) Internal double-layer prefabricated carriageway structure of shield tunnel
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN205224288U (en) Connection node of reinforced concrete superposed beam and steel pipe column
CN203200643U (en) Double-splicing mode combined bridge structure
CN104278635B (en) The forward method of earth anchored suspension bridge cat road track cable
CN202731938U (en) Super-soft rock stratum coal bunker well wall ring beam support device
CN204475536U (en) With the precast member for reinforcing bar concrete that rigid joint connects
CN205024843U (en) Joint construction of prestressing force hollow floor and H shaped steel roof beam
CN204151675U (en) The bogie of earth anchored suspension bridge cat road track cable
CN106401191B (en) Grouting device for steel shear structure assembly type building and construction method thereof
CN103790156A (en) Square buckle plate mechanical pile splicing method for precast square piles
CN203129011U (en) Bridge end transition slab
CN103696370B (en) A kind of Quick bridge construction method and structure
CN203654193U (en) Quick bridge construction structure
CN204060731U (en) Buried steel limit waterstop fixture during tunnel is longitudinal
CN203383578U (en) Transparent rail
CN103194960B (en) Without pier rigid frame bridge system implementation method
CN203008127U (en) Connecting node of steel bar of composite structure
CN203768783U (en) Novel composite splicing type shock absorption bridge structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant