CN103132449A - Bailey beam with staggered arrangement structure - Google Patents
Bailey beam with staggered arrangement structure Download PDFInfo
- Publication number
- CN103132449A CN103132449A CN2013100896217A CN201310089621A CN103132449A CN 103132449 A CN103132449 A CN 103132449A CN 2013100896217 A CN2013100896217 A CN 2013100896217A CN 201310089621 A CN201310089621 A CN 201310089621A CN 103132449 A CN103132449 A CN 103132449A
- Authority
- CN
- China
- Prior art keywords
- bailey
- unit truss
- rotation
- axis
- bailey beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
A bailey beam with a staggered arrangement structure is assembled of a bailey frame and a sending window. The bailey frame comprises a plurality of unit truss slices, a plurality of page slices and a plurality of rotating shafts. The edge of one end of each page slice is provided with at least two rotating shaft arrangement pipes which are arranged at intervals, and the circle centers of the two rotating shaft arrangement pipes are in the same line. A bolt through hole is arranged in the center portion of the page slice. Two to four page slices are connected through a method of utilizing the rotating shafts to penetrate through the rotating shaft arrangement pipes. The page slice is connected with one end of each unit truss slice, and therefore an elastic mesh-shaped bailey frame structure is composed. The bailey beam has the advantages that the unit truss slice forms the elastic mesh-shaped bailey frame structure through a method of connecting the page slice and the rotating shaft in a rotary mode, due to the fact that the unit truss slices are horizontally connected, horizontal strength and horizontal stability of the whole bailey frame is increased on the premise of not reducing vertical strength of the whole bailey beam, not prolonging a construction period and not increasing budget cost, therefore, a problem of heeling does not appear.
Description
Technical field
The invention belongs to technical field of bridge engineering, particularly relate to a kind of Bailey beam with staggered structure.
Background technology
Bailey beam is the trusses that is assembled by a window that is positioned at two ends by Bailey bracket, and wherein Bailey bracket is comprised of the many groups of Bailey truss that be arranged in parallel, and every group of Bailey truss is connected successively and consisted of by a plurality of unit truss sheet.Set up rapidly because Bailey beam has, the advantage such as mobility strong, therefore be usually used in engineering construction, such as being used for erection construction platform and engineering sidewalk bridge etc.But, there is following point in Bailey beam commonly used at present: although above-mentioned Bailey beam has very large flexural strength, but, as mentioned above, because many group Bailey truss sheets be arranged in parallel, namely laterally do not connect each other, so lateral stiffness is poor, so very possible generation rolls problem with regard to monolithic Bailey truss sheet, thereby affect the integral working of Bailey beam.In addition, need to arrange separately when installing due to above-mentioned many group Bailey truss sheets, so the operating process more complicated, so the construction period is long.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide a kind of Bailey beam with staggered structure that can greatly improve lateral stiffness and can shorten the construction period.
In order to achieve the above object, the Bailey beam with staggered structure provided by the invention is assembled by Bailey bracket and the window of sending out that is connected to Bailey bracket two ends; Described Bailey bracket comprises multi-disc unit truss sheet, multi-disc hinge and Duo Gen axis of rotation; Wherein an end margin of every hinge is provided with the axis of rotation that at least two standoff distance settings and the center of circle be positioned at the same straight line pipe is set, and the centre has been formed through a bolt hole; Two to four hinges arrange pipe with axis of rotation on it and mutually are arranged alternately Cheng Yilie and utilize an axis of rotation to run through the mode that all axis of rotation arrange pipe and link together; Every hinge utilizes the mode of bolt-through bolt hole and an end of a blade unit truss sheet to link together, and consists of thus telescopic grid type Bailey bracket structure.
Described unit truss sheet equal in length or unequal.
Describedly be connected with device for fixing end part in selectable mode between the adjacent two blade unit truss sheet outer ends of Bailey bracket outer end.
Bailey beam with staggered structure provided by the invention has the following advantages:
1) truss sheet in unit is connected with axis of rotation by hinge and is connected and consist of telescopic grid type Bailey bracket structure, connection is also arranged due to unit truss sheet between laterally, so can not reducing the whole longitudinal strength of Bailey beam, not increasing the transverse strength and the lateral stability that increase whole Bailey bracket under the prerequisite of construction period and estimated cost, therefore the inclination problem can not occur.
2) because unit truss sheet, hinge and axis of rotation are standard component, therefore purchase or lease are all more convenient, and are convenient to assembling and constructing operation, and the construction period is short.
3) this structure, high trestle large in bridge span, bridge location basis more complicated, intermediate demand leave passage or be not suitable for full framing condition under have more advantage.
Description of drawings
Fig. 1 is Bailey bracket structure top view in the Bailey beam with staggered structure provided by the invention.
Fig. 2 is the hinge between unit truss sheet and revolute axes configuration top view in above-mentioned Bailey beam.
Fig. 3 is the hinge between unit truss sheet and revolute axes configuration lateral view in above-mentioned Bailey beam.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the Bailey beam with staggered structure provided by the invention is elaborated.
As shown in Figure 1-Figure 3, the Bailey beam with staggered structure provided by the invention is assembled by Bailey bracket and the window of sending out that is connected to Bailey bracket two ends; Described Bailey bracket comprises multi-disc unit truss sheet 1, multi-disc hinge 2 and Duo Gen axis of rotation 3; Wherein an end margin of every hinge 2 is provided with the axis of rotation that at least two standoff distance settings and the center of circle be positioned at the same straight line pipe 4 is set, and the centre has been formed through a bolt hole 5; Two to four hinges 2 arrange pipe 4 with axis of rotation on it and mutually are arranged alternately Cheng Yilie and utilize an axis of rotation 3 to run through the mode that all axis of rotation arrange pipe 4 and link together; Every hinge 2 utilizes the mode of bolt-through bolt hole 5 and an end of a blade unit truss sheet 1 to link together, and consists of thus telescopic grid type Bailey bracket structure.
Described unit truss sheet 1 equal in length or unequal can utilize hinge 2 and axis of rotation 3 to connect into multiple Bailey bracket with different length, to satisfy the needs of different engineerings like this.
Describedly be connected with device for fixing end part 6 in selectable mode between adjacent two blade unit truss sheet 1 outer ends of Bailey bracket outer end.
now the using method with Bailey beam of staggered structure provided by the invention is described below: when needs use this Bailey beam, at first by the staff at the construction field (site) on ground with unit truss sheet 1, hinge 2 and axis of rotation 3 connect into the scalable grid type Bailey bracket that can satisfy Len req and span according to requirements, if needed, can install a fastening devices 6 between adjacent two blade unit truss sheet 1 outer ends in the Bailey bracket outer end, then above-mentioned Bailey bracket is lifted into the installation site with folding mode, make it be latticed the Bailey bracket horizontal spreading afterwards, method according to prior art connects respectively one window at the two ends of Bailey bracket afterwards, namely can be made into thus described Bailey beam with staggered structure.
Claims (3)
1. Bailey beam with staggered structure is characterized in that: described Bailey beam with staggered structure is assembled by Bailey bracket and the window of sending out that is connected to Bailey bracket two ends; Described Bailey bracket comprises multi-disc unit truss sheet (1), multi-disc hinge (2) and many axis of rotation (3); Wherein an end margin of every hinge (2) is provided with the axis of rotation that at least two standoff distance settings and the center of circle be positioned at the same straight line pipe (4) is set, and the centre has been formed through a bolt hole (5); Two to four hinges (2) arrange pipe (4) with axis of rotation on it and mutually are arranged alternately Cheng Yilie and utilize an axis of rotation (3) to run through the mode that all axis of rotation arrange pipe (4) and link together; Every hinge (2) utilizes the mode of bolt-through bolt hole (5) and an end of a blade unit truss sheet (1) to link together, and consists of thus telescopic grid type Bailey bracket structure.
2. the Bailey beam with staggered structure according to claim 1 is characterized in that: described unit truss sheet (1) equal in length or unequal.
3. the Bailey beam with staggered structure according to claim 1 is characterized in that: be connected with device for fixing end part (6) in selectable mode between described adjacent two blade unit truss sheet (1) outer ends that are positioned at the Bailey bracket outer end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310089621.7A CN103132449B (en) | 2013-03-20 | 2013-03-20 | Bailey beam with staggered arrangement structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310089621.7A CN103132449B (en) | 2013-03-20 | 2013-03-20 | Bailey beam with staggered arrangement structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103132449A true CN103132449A (en) | 2013-06-05 |
CN103132449B CN103132449B (en) | 2014-10-15 |
Family
ID=48492858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310089621.7A Active CN103132449B (en) | 2013-03-20 | 2013-03-20 | Bailey beam with staggered arrangement structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103132449B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108691274A (en) * | 2017-04-05 | 2018-10-23 | 新疆顺安众达交通技术服务有限公司 | Load-bearing is adjustable install convenient steel constructed beam technical method |
CN113737631A (en) * | 2021-09-23 | 2021-12-03 | 中交二公局第三工程有限公司 | Transverse turning connection structure of Bailey steel trestle |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1908536A1 (en) * | 1968-02-20 | 1969-09-18 | Thos Storey Eng Ltd | Structure, in particular bridge structure, and devices for erecting the same |
US4007507A (en) * | 1975-11-11 | 1977-02-15 | Hansen Carl E | Bridge composed of individual sections assembled by means of an assembling unit |
GB2074209A (en) * | 1980-04-11 | 1981-10-28 | Collins J E | Lattice girder for bridges etc. |
CN2102349U (en) * | 1991-09-07 | 1992-04-22 | 谢明合 | Arbitrarily positioning hinge |
GB2251018A (en) * | 1990-12-19 | 1992-06-24 | Mabey & Johnson Ltd | Chord member for lattice panel bridge |
US6539571B1 (en) * | 1999-07-07 | 2003-04-01 | Mabey & Johnson Limited | System for constructing lattice panel bridges |
CN1912302A (en) * | 2006-08-30 | 2007-02-14 | 沈阳建筑大学 | Beret truss |
CN201077956Y (en) * | 2007-09-10 | 2008-06-25 | 田友义 | Positive and negative steel truss of arch-setting |
CN201924284U (en) * | 2010-11-23 | 2011-08-10 | 浙江华铁基础工程有限公司 | Screw rod seat pipe double-split Bailey bracket |
CN202266182U (en) * | 2012-02-22 | 2012-06-06 | 河南省电力公司南阳供电公司 | Bidirectional collapsible type multifunctional ladder |
CN102535879A (en) * | 2011-11-30 | 2012-07-04 | 中建钢构有限公司 | Hoop component for bailey bracket |
CN202347828U (en) * | 2011-11-30 | 2012-07-25 | 中建钢构有限公司 | Bailey truss used during installation of steel structure |
CN202483312U (en) * | 2012-02-24 | 2012-10-10 | 瓯宝安防科技股份有限公司 | Hinge |
CN202767483U (en) * | 2012-09-24 | 2013-03-06 | 中国葛洲坝集团股份有限公司 | Multifunctional bailey piece |
-
2013
- 2013-03-20 CN CN201310089621.7A patent/CN103132449B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1908536A1 (en) * | 1968-02-20 | 1969-09-18 | Thos Storey Eng Ltd | Structure, in particular bridge structure, and devices for erecting the same |
US4007507A (en) * | 1975-11-11 | 1977-02-15 | Hansen Carl E | Bridge composed of individual sections assembled by means of an assembling unit |
GB2074209A (en) * | 1980-04-11 | 1981-10-28 | Collins J E | Lattice girder for bridges etc. |
GB2251018A (en) * | 1990-12-19 | 1992-06-24 | Mabey & Johnson Ltd | Chord member for lattice panel bridge |
CN2102349U (en) * | 1991-09-07 | 1992-04-22 | 谢明合 | Arbitrarily positioning hinge |
US6539571B1 (en) * | 1999-07-07 | 2003-04-01 | Mabey & Johnson Limited | System for constructing lattice panel bridges |
CN1912302A (en) * | 2006-08-30 | 2007-02-14 | 沈阳建筑大学 | Beret truss |
CN201077956Y (en) * | 2007-09-10 | 2008-06-25 | 田友义 | Positive and negative steel truss of arch-setting |
CN201924284U (en) * | 2010-11-23 | 2011-08-10 | 浙江华铁基础工程有限公司 | Screw rod seat pipe double-split Bailey bracket |
CN102535879A (en) * | 2011-11-30 | 2012-07-04 | 中建钢构有限公司 | Hoop component for bailey bracket |
CN202347828U (en) * | 2011-11-30 | 2012-07-25 | 中建钢构有限公司 | Bailey truss used during installation of steel structure |
CN202266182U (en) * | 2012-02-22 | 2012-06-06 | 河南省电力公司南阳供电公司 | Bidirectional collapsible type multifunctional ladder |
CN202483312U (en) * | 2012-02-24 | 2012-10-10 | 瓯宝安防科技股份有限公司 | Hinge |
CN202767483U (en) * | 2012-09-24 | 2013-03-06 | 中国葛洲坝集团股份有限公司 | Multifunctional bailey piece |
Non-Patent Citations (2)
Title |
---|
杨振江: "跨多条铁路门式棚架梁吊装施工技术", 《中国铁路》 * |
路殿成等: "扣件式钢管脚手架施工中的安全问题", 《辽宁工程技术大学学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108691274A (en) * | 2017-04-05 | 2018-10-23 | 新疆顺安众达交通技术服务有限公司 | Load-bearing is adjustable install convenient steel constructed beam technical method |
CN113737631A (en) * | 2021-09-23 | 2021-12-03 | 中交二公局第三工程有限公司 | Transverse turning connection structure of Bailey steel trestle |
Also Published As
Publication number | Publication date |
---|---|
CN103132449B (en) | 2014-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203878780U (en) | Connecting joint of cylindrical rib penetrating type steel pipe concrete column and steel beam | |
CN102733489B (en) | H-shaped steel beam and H-shaped steel column strong-axis variable-beam height fabricated node and construction method thereof | |
CN103334579B (en) | Slipping platform used for mounting arched roof truss with steel structure | |
CN206370808U (en) | A kind of photovoltaic plate girder | |
CN103132449B (en) | Bailey beam with staggered arrangement structure | |
CN106656009A (en) | Solar photovoltaic panel truss | |
CN113700145A (en) | Modular assembly type steel structure house system | |
CN105839789B (en) | A kind of weak axis separate type double-T part connection structure of I-shaped column being easily assembled | |
CN202611305U (en) | Power transmission tower frame | |
CN207218588U (en) | The fixation kit and photovoltaic system of photovoltaic module | |
CN206538900U (en) | The bracing means of assembled wall | |
CN204738401U (en) | Assemble integral steel construction secondary beam and absolutely dry formula connection structure of concrete girder lateral part rigid connection | |
CN205713058U (en) | A kind of scaffold board and there is its scaffold | |
CN204162323U (en) | The standard knot of ruggedized construction | |
CN207277373U (en) | A kind of riding track being used in foundation pit construction | |
CN203765494U (en) | Assembling tool | |
CN203320857U (en) | Modularized steel corrugated plate step structure | |
CN101831957A (en) | Joint of industrialization beam column of low-rise steel residential structure | |
CN204959980U (en) | Simple to operate's floor connection structure | |
CN220167135U (en) | Multi-element conversion connection steel structure | |
CN203961237U (en) | A kind of safety type movable multilayer scaffold | |
CN205063350U (en) | Portable assembled horizontal channel | |
CN208309804U (en) | A kind of steel-frame structure of semi-rigid joggle beam | |
CN205276530U (en) | Economical removable antidetonation power consumption node | |
CN205276503U (en) | Beam -column connecting joint of activity board house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |