CN103118156A - Alarm clock setting method and corresponding device - Google Patents

Alarm clock setting method and corresponding device Download PDF

Info

Publication number
CN103118156A
CN103118156A CN2013100208043A CN201310020804A CN103118156A CN 103118156 A CN103118156 A CN 103118156A CN 2013100208043 A CN2013100208043 A CN 2013100208043A CN 201310020804 A CN201310020804 A CN 201310020804A CN 103118156 A CN103118156 A CN 103118156A
Authority
CN
China
Prior art keywords
alarm clock
event
clock event
time point
concluding time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100208043A
Other languages
Chinese (zh)
Other versions
CN103118156B (en
Inventor
万俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yulong Computer Telecommunication Scientific Shenzhen Co Ltd
Dongguan Yulong Telecommunication Technology Co Ltd
Original Assignee
Yulong Computer Telecommunication Scientific Shenzhen Co Ltd
Dongguan Yulong Telecommunication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yulong Computer Telecommunication Scientific Shenzhen Co Ltd, Dongguan Yulong Telecommunication Technology Co Ltd filed Critical Yulong Computer Telecommunication Scientific Shenzhen Co Ltd
Priority to CN201310020804.3A priority Critical patent/CN103118156B/en
Publication of CN103118156A publication Critical patent/CN103118156A/en
Application granted granted Critical
Publication of CN103118156B publication Critical patent/CN103118156B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Clocks (AREA)

Abstract

The invention discloses an alarm clock setting method and a corresponding device. The alarm clock setting method and the corresponding device obtain an alarm clock event by detecting operating commands set by a user to start an alarm clock, and obtain parameters influencing development of the alarm clock event, thereby obtaining a plurality of alarm clock setting strategies comprising the parameters influencing the development of the alarm clock event. Each of the plurality of alarm clock setting strategy further comprises an alarm clock time corresponding to the clock setting strategy and an end time of the alarm clock event, a final setting time is obtained after statistic analysis, and an alarm is set according to the final setting time. Namely, a time matched with the parameters influencing the development of the alarm clock event to a larger extent is used as the final setting time of the alarm clock, setting of the alarm clock is more convenient, and performance of the alarm clock is better. Diversification of the parameters influencing the development of the alarm clock event enables the setting of the alarm clock to be more unique, a user can reasonably plan self rest time, life can be more regular, and work is more efficient.

Description

A kind of alarm clock setting method and relevant device
Technical field
The application relates to electronic technology field, is specifically related to a kind of alarm clock setting method and relevant device.
Background technology
At present, mobile phone has become the necessity of the modern life, and the additional function of mobile phone is also more and more, and a kind of as the mobile phone additional function of alarm clock function, has become the necessary article of life, has replaced traditional alarm clock, and is convenient for users to use.
The alarm clock function of existing mobile phone can only arrange the time of alarm clock jingle bell, after arriving the time of setting, notifies by music or mode of vibration that the user sets.The user only can be with the subjective purpose of oneself or the time of the judgement setting alarm clock jingle bell of conventional thought, is easy to ignore the impact that objective factor causes the development of thing when trip.Such as the road conditions that rainy weather or sunny weather cause are different, if the user arranges the quarter-bell time according to subjective judgement, easily cause the user can not make rational planning for the daily schedule of oneself, and then make life irregular, operating efficiency is not high.
Summary of the invention
The embodiment of the present application provides a kind of alarm clock setting method and relevant device, has solved existing alarm clock setting method by the manually inconvenience of input setting-up time, and quarter-bell arranges the unreasonable problem that causes the low and weak effect of alarm clock serviceability.
First aspect, the embodiment of the present application provide a kind of alarm clock setting method, comprising:
Detect the user and start the operational order that alarm clock arranges;
Obtain the alarm clock event that described user chooses;
Obtain the parameter of the described alarm clock event development of impact, the parameter of the described alarm clock event development of described impact comprises at least a parameter in weather, route, mode of transportation, data mark;
Obtain the alarm clock Provisioning Policy that some items comprise the parameter of the described alarm clock event development of described impact, each the alarm clock Provisioning Policy in described some items also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and described alarm clock event finishes;
Described some the alarm clock Provisioning Policies of the described alarm clock event of statistical analysis obtain final setup times;
According to described final setup times, quarter-bell is set.
In conjunction with first aspect, in the possible implementation of the first, described method also comprises:
Obtain the concluding time point of described alarm clock event;
Store the parameter of the described alarm clock event development of the concluding time point of described alarm clock event, described final setup times and described impact;
The parameter of alarm clock event development according to the concluding time point of described alarm clock event, described final setup times and described impact generates an alarm clock Provisioning Policy of described alarm clock event;
Store this alarm clock Provisioning Policy.
In conjunction with the possible implementation of the first of first aspect, in the possible implementation of the second, the described concluding time point that obtains described alarm clock event comprises:
Open navigator;
Judge whether to arrive the default objective of described navigator;
If obtain current point in time, as the concluding time point of described alarm clock event.
In conjunction with the possible implementation of the first of first aspect or first aspect or the possible implementation of the second of first aspect, in the third possible implementation, described some the alarm clock Provisioning Policies of the described alarm clock event of described statistical analysis, obtain final setup times, comprise the following steps:
The concluding time point of A, described alarm clock event that described some alarm clock Provisioning Policies are comprised compares, to obtain the concluding time point of described alarm clock event the latest;
B, obtain the concluding time point of the described alarm clock event of described user preset;
C, judge whether the concluding time point of described described alarm clock event the latest surpasses the concluding time point of the described alarm clock event of described user preset;
D, if not determines to comprise that the quarter-bell time started point that the alarm clock Provisioning Policy of the concluding time point of described described alarm clock event the latest comprises is final setup times.
In conjunction with the possible implementation of the first of first aspect or first aspect or the possible implementation of the second of first aspect, in the 4th kind of possible implementation, described some the alarm clock Provisioning Policies of the described alarm clock event of described statistical analysis, obtain final setup times, comprise the following steps:
Obtain the concluding time point of the described alarm clock event of described user preset;
Obtain the concluding time point of the described alarm clock event that in described some, the alarm clock Provisioning Policy comprises early than the alarm clock Provisioning Policy of the concluding time point of the described alarm clock event of described user preset;
The mean value of the quarter-bell time started point that the concluding time point that obtains described alarm clock event comprises early than the alarm clock Provisioning Policy of the concluding time point of the described alarm clock event of described user preset is as final setup times.
Second aspect, the embodiment of the present application provide a kind of alarm clock setting device, comprising:
Receiving element starts for detection of the user operational order that alarm clock arranges;
Acquiring unit is used for obtaining the alarm clock event that the user chooses;
Described acquiring unit also is used for obtaining the parameter of the described alarm clock event development of impact, and the parameter of the described alarm clock event development of described impact comprises at least a parameter in weather, route, mode of transportation, data mark;
Described acquiring unit, also be used for obtaining the alarm clock Provisioning Policy that some items comprise the parameter of the described alarm clock event development of described impact, each the alarm clock Provisioning Policy in described some items also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and described alarm clock event finishes;
Processor, described some the alarm clock Provisioning Policies for the described alarm clock event of statistical analysis obtain final setup times;
Setting unit is used for according to described final setup times, quarter-bell being set.
In conjunction with second aspect, in the possible implementation of the first,
Described acquiring unit is also for the concluding time point that obtains described alarm clock event;
Described memory cell also is used for storing the parameter that the described alarm clock event of the concluding time point of described alarm clock event, described final setup times and described impact develops;
Described processor, the parameter that also is used for alarm clock event development according to the concluding time point of described alarm clock event, described final setup times and described impact generates an alarm clock Provisioning Policy of described alarm clock event;
Described memory cell also is used for this alarm clock Provisioning Policy of storage.
In conjunction with the possible implementation of the first of second aspect, in the possible implementation of the second, described acquiring unit, also be used for opening navigator, judge whether to arrive the default objective of described navigator, if obtain current point in time, as the concluding time point of described alarm clock event.
In conjunction with the possible implementation of the first of second aspect or second aspect or the possible implementation of the second of second aspect, in the third possible implementation, described processor, the concluding time point of concrete described alarm clock event for described some alarm clock Provisioning Policies are comprised compares, to obtain the concluding time point of described alarm clock event the latest; And the concluding time point that obtains the described alarm clock event of described user preset; Judge whether the concluding time point of described described alarm clock event the latest surpasses the concluding time point of the described alarm clock event of described user preset; If not, determine to comprise that the quarter-bell time started point that the alarm clock Provisioning Policy of the concluding time point of described described alarm clock event the latest comprises is final setup times.
In conjunction with the possible implementation of the first of second aspect or second aspect or the possible implementation of the second of second aspect, in the 4th kind of possible implementation, described processor, the concluding time point of concrete described alarm clock event for obtaining described user preset; With obtain described some in the concluding time point of the described alarm clock event that comprises of alarm clock Provisioning Policy early than the alarm clock Provisioning Policy of the concluding time point of the described alarm clock event of described user preset; And the mean value of the quarter-bell time started point that comprises early than the alarm clock Provisioning Policy of the concluding time point of the described alarm clock event of described user preset of the concluding time point that is used for obtaining described alarm clock event, as final setup times.
the embodiment of the present application starts by detecting the user operational order that alarm clock arranges, obtain the alarm clock event that a user chooses, and obtain the parameter of the described alarm clock event of impact development, and then obtain the alarm clock Provisioning Policies that some items comprises the parameter of the described alarm clock event development of described impact, each alarm clock Provisioning Policy in described some also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and described alarm clock event finishes, described some the alarm clock Provisioning Policies of the described alarm clock event of statistical analysis, obtain final setup times, according to described final setup times, quarter-bell to be set.
wherein, the parameter of the described alarm clock event development of described impact comprises weather, route, mode of transportation, at least a parameter in data mark, according at least a parameter in above-mentioned parameter, after the time point of the quarter-bell time started point of each alarm clock Provisioning Policy of the parameter that comprises the development of the described alarm clock event of described impact and the end of described alarm clock event is carried out statistical analysis, can obtain a time point that more mates with the parameter of the described alarm clock event of impact development as the final setup times of alarm clock, make the setting of alarm clock not only convenient, and serviceability is more excellent.The variation that affects the parameter of described alarm clock event development makes the setting of alarm clock more personalized, and the user is made rational planning for the own daily schedule, allows and lives more regularly, works more efficient.
Description of drawings
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, the below will do to introduce simply to the accompanying drawing of required use in embodiment or description of the Prior Art, apparently, accompanying drawing in the following describes is only some embodiment of the application, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
The flow chart of a kind of alarm clock setting method that Fig. 1 provides for the embodiment of the present application;
The structure chart of a kind of alarm clock setting device that Fig. 2 provides for the embodiment of the present application.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is clearly and completely described, obviously, described embodiment is only the application's part embodiment, rather than whole embodiment.Based on the embodiment in the application, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the application's protection.
Below by specific embodiment, be described in detail respectively.
See also Fig. 1, Fig. 1 is the flow chart of a kind of alarm clock setting method of providing of the embodiment of the present application.As shown in Figure 1, the alarm clock setting method that provides of the present embodiment comprises the steps:
S110, detection user start the operational order that alarm clock arranges.
In step S110, the user can input the instruction that quarter-bell is set and enter the interface that alarm is set, and also can press the physical button that quarter-bell is set or click the virtual key that quarter-bell is set that shows on screen to enter the interface that alarm is set.
S120, obtain the alarm clock event that the user chooses.
The mode of specifically obtaining the alarm clock event can be to receive the sign that the user selects according to demand, to start the quarter-bell setting of alarm clock event corresponding to this sign.
Wherein, some information of corresponding alarm clock event are in advance through after statistical test repeatedly, then store in database, namely can obtain this alarm clock event from database.Some information of corresponding alarm clock event comprise the sign of alarm clock event, affects the various parameters that the alarm clock event develops, and the configuration information of each alarm clock of comprising of this alarm clock event.The configuration information of each alarm clock that concrete alarm clock event comprises comprises the time point that quarter-bell time started point and this alarm clock event finish.
For example, the alarm clock event perhaps shows some alarm clock events if " working " receives " working " sign that the user inputs, and receives the button operation that the user obtains this alarm clock event, to obtain " working " alarm clock event.
S130, obtain the parameter that affects alarm clock event development, affect parameter that the alarm clock event develops and comprise at least a parameter in weather, route, mode of transportation, data mark.
In the present embodiment, can the alarm clock event give an example for " working ", the basic parameter of impact " working " alarm clock event development can be mode of transportation, because sit the private car working and use the public transport spent time of working that very big difference is arranged, further use the working of subway public transport and the working of bus-transit instrument that very large difference is also arranged.Specifically, user for the working of driving, having influence on user's drive to go to work parameter of time of expending can be weather, in the situation that fine, can travel according to the velocity standard that normally travels, and then the probability of traffic congestion is very little, and uses the people of public transport working many, and driving to travel can be very unobstructed.For the people who uses the public transport working, also need to further consider the route situation, take subway and do not need the special factor of waiting for bus of considering, that takes pubic transport will consider the factor of waiting for bus, and changes into or what need to change on foot the vehicles midway is all the basic parameter that has influence on " working " alarm clock event development.
Wherein, the mode of specifically obtaining the parameter that affects alarm clock event development can be the configuration information of each alarm clock of comprising through this alarm clock event in the statistical data analysis storehouse, obtain and show the parameter of the alarm clock event that the affects development in configuration information, receive user's selection operation, can be the combination choosing of arbitrary parameter, selection that also can single parameter.Perhaps, directly receive the user and input the operation that crucial word pair database is inquired about.If affect the parameter of alarm clock event development and be the circuit in mode of transportation, the mode of obtaining this parameter can be also the networking operation that receives user's input, enter network service system or receive in the application system that enters the search traffic route of user's input, further select public bus network or subway line, can specifically select the number mark of bus or specifically select point identification and terminal point sign.The type that affects the parameter of alarm clock event development is not subjected to the restriction of the present embodiment, and the mode of obtaining the parameter that affects the development of alarm clock event is not subjected to the restriction of the present embodiment yet.
Wherein, the type of parameter that affects alarm clock event development is more, and the alarm clock setting is more accurate.
S140, obtain the alarm clock Provisioning Policies that some items comprises the parameter that affect development of alarm clock event, each the alarm clock Provisioning Policy in some also comprises quarter-bell time started point that this alarm clock Provisioning Policy is corresponding and the time point of alarm clock event end.Wherein, the quantity of the alarm clock Provisioning Policy that comprises the parameter that this affects the development of alarm clock event of acquisition is more, and the alarm clock setting is more accurate.
specifically, can search from database according to the parameter of the alarm clock event that the affects development of obtaining in step S130 and obtain the alarm clock Provisioning Policy that some items comprise the parameter that affects the development of alarm clock event, if do not find the alarm clock Provisioning Policy that comprises the parameter that affects the development of alarm clock event, might illustrate that the parameter that affects the development of alarm clock event is not right, need to again obtain the parameter that affects the development of alarm clock event, perhaps need to arrange a new alarm clock of this alarm clock event, the parameter that affects this alarm clock event development that the alarm clock Provisioning Policy of new alarm clock comprises is also new, or the new combination of some parameters compositions, the concrete impact in new parameter that this alarm clock event develops or the new alarm clock collocation strategy that is combined in some alarm clocks can not find, namely be equivalent to reset an alarm clock that comprises the new parameter that affects this alarm clock event development.
If with the parameter of weather as the development of impact " working " alarm clock event, receive user's selection operation, select " weather is fine " as the parameter of impact " working " alarm clock event development, perhaps accept user's selection networking operation, enter the Weather information that networked system obtains the same day of alarm clock event development, then database is searched for, obtained four alarm clock Provisioning Policies that comprise " weather is fine " parameter.The configuration information of these four alarm clock Provisioning Policies is as shown in table ().
Table (one)
Figure BDA00002750561400071
If the parameter that develops as impact " working " alarm clock event with weather and data mark, if know that in advance the same day of alarm clock event development is fine, receive user's selection operation, select " weather is fine " and " Monday " as the parameter of impact " working " alarm clock event development, perhaps accept user's selection networking operation, enter the weather that networked system obtains the same day of alarm clock event development, the Weather information that namely obtains Monday is that weather is fine, then database is searched for, obtained two alarm clock Provisioning Policies that comprise " weather is fine " parameter.The configuration information of these two alarm clock Provisioning Policies is as shown in table (two).
Table (two)
Figure BDA00002750561400072
Some alarm clock Provisioning Policies of S150, statistical analysis alarm clock event obtain final setup times.
In the present embodiment take the table (one) as example, four alarm clock Provisioning Policies that his-and-hers watches () illustrate are analyzed, concluding time point to quarter-bell time started point and alarm clock event compares analysis, specifically can pass through a series of algorithm, obtaining the final time that arranges is 08:00, estimates that the point of concluding time the latest of alarm clock event is 08:55.
Perhaps take table (two) as example, two alarm clock Provisioning Policies that his-and-hers watches (two) illustrate are analyzed, concluding time point to quarter-bell time started point and alarm clock event compares analysis, specifically can pass through a series of algorithm, obtaining the final time that arranges is 08:05, estimates that the point of concluding time the latest of alarm clock event is 08:55.
In an embodiment, some alarm clock Provisioning Policies of statistical analysis alarm clock event, the method that obtains final setup times specifically can be carried out as follows:
The concluding time point of A, alarm clock event that some alarm clock Provisioning Policies are comprised compares, to obtain the concluding time point of alarm clock event the latest.In this step, can analyze by his-and-hers watches (), the concluding time point of the alarm clock event that 4 alarm clock Provisioning Policies are comprised is analyzed, and obtaining the latest, the concluding time point is 08:55.If his-and-hers watches (two) analyze, the concluding time of the alarm clock event that 2 alarm clock Provisioning Policies are comprised point is analyzed, and obtaining the latest, the concluding time point is 08:50.
B, obtain the concluding time point of the alarm clock event of user preset.In the present embodiment, user preset 08:57 is the concluding time point of alarm clock event.
Whether the concluding time point of C, judgement alarm clock event the latest surpasses the concluding time point of the alarm clock event of user preset.Analyze for table (), the concluding time point is 08:55 the latest, puts 08:57 with the concluding time of user preset alarm clock event and is analyzed, to judge the morning and evening of two time points.Analyze for table (two), the concluding time point is 08:50 the latest, puts 08:57 with the concluding time of user preset alarm clock event and is analyzed, to judge the morning and evening of two time points.For the analysis result of table () and table (two), the concluding time of alarm clock event the latest point does not all surpass the concluding time point of the alarm clock event of user preset.
D, if not determines to comprise that the quarter-bell time started point that the alarm clock Provisioning Policy of the concluding time point of alarm clock event the latest comprises is final setup times.The point of the concluding time the latest in corresponding table () is final setup times for the quarter-bell time started point 08:10 that the 2nd the alarm clock Provisioning Policy of 08:55 comprises.The point of concluding time the latest in corresponding table (two) is final setup times for the quarter-bell time started point 07:50 that the 1st the alarm clock Provisioning Policy of 08:50 comprises.
Optionally, if determine that the concluding time point of alarm clock event the latest surpasses the concluding time point of the alarm clock event of user preset, order is carried out following step:
E, deletion comprise the alarm clock Provisioning Policy of the concluding time point of alarm clock event the latest.
The concluding time point of F, alarm clock event that other alarm clock Provisioning Policies of removing the alarm clock Provisioning Policy of deletion in some are comprised compares, and to obtain the concluding time point of alarm clock event the latest, then goes to step C, with order execution in step C and step D.
In another embodiment, some alarm clock Provisioning Policies of statistical analysis alarm clock event, the method that obtains final setup times specifically can be carried out as follows:
1), obtain the concluding time point of the alarm clock event of user preset.In the present embodiment, user preset 08:57 is the concluding time point of alarm clock event.
2), obtain the concluding time point of the alarm clock event that in some, the alarm clock Provisioning Policy comprises early than the alarm clock Provisioning Policy of the concluding time point of the alarm clock event of user preset.In the present embodiment, his-and-hers watches (one) analyze, and the concluding time point of the alarm clock event that 4 alarm clock Provisioning Policies comprise respectively is all early than the concluding time point 08:57 of the alarm clock event of user preset.His-and-hers watches (two) analyze, and the concluding time point of the alarm clock event that 2 alarm clock Provisioning Policies comprise respectively is all early than the concluding time point 08:57 of the alarm clock event of user preset.In the present embodiment, if there is the concluding time point of the alarm clock event that or multinomial alarm clock Provisioning Policy comprise respectively to be later than the concluding time point 08:57 of the alarm clock event of user preset, delete this or above-mentioned multinomial alarm clock Provisioning Policy.
3), the mean value of the quarter-bell time started point that comprises early than the alarm clock Provisioning Policy of the concluding time point of the alarm clock event of user preset of the concluding time point that obtains the alarm clock event, as final setup times.Analyze for table (), can obtain by calculating the mean value of 07:50,08:10,07:55 and 08:00, be the value of some average time: computational methods are point take 07:50 as fiducial time, 08:10 divide and 07:50 between differed 20 minutes, difference be 20,07:55 divide and 07:50 between differed 5 minutes, difference is 5, differed between 08:00 and 07:50 10 minutes, difference is 10.The mean value of difference is (20+5+10)/4, and the mean value that obtains difference is 8.75, keeps minute, casts out mantissa, average time point value be 07:58, with 07:58 as final setup times.If analyze for table (two), can obtain by calculating the mean value of 07:50 and 08:00, the value of namely putting average time: computational methods are point take 07:50 as fiducial time, differs between 08:00 and 07:50 10 minutes, and difference is 10.The mean value of difference is 10/2, and the mean value that obtains difference is 5, average time point value be 07:55, with 07:55 as final setup times.
S160, the final setup times of basis arrange quarter-bell.
Another is in example, and alarm clock setting method also comprises the steps:
A, the modification request of obtaining the user;
B, revise the final setup times of quarter-bell according to the request revised.In the present embodiment namely, after system arranged quarter-bell according to final setup times automatically, the user is change manually, makes the quarter-bell setting more flexible, facilitates the user to arrange the daily schedule of oneself.
To sum up statement, the present embodiment starts by detecting the user operational order that alarm clock arranges, obtain an alarm clock event, and obtain the parameter that affects alarm clock event development, and then obtain the alarm clock Provisioning Policies that some items comprises affect the parameter that the alarm clock event develops, each alarm clock Provisioning Policy in some also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and the alarm clock event finishes, some alarm clock Provisioning Policies of statistical analysis alarm clock event, obtain final setup times, according to final setup times, quarter-bell to be set.
Wherein, the parameter that affects alarm clock event development comprises at least a parameter in weather, route, mode of transportation, data mark, according at least a parameter in above-mentioned parameter, on the concluding time of the quarter-bell time started point of some alarm clock Provisioning Policies comprising the parameter that affects alarm clock event development and alarm clock event put carry out statistical analysis after, can obtain a time of more mating with the parameter that affects alarm clock event development as the final setup times of alarm clock, make the setting of alarm clock not only convenient, and serviceability is more excellent.The variation that affects the parameter of alarm clock event development makes the setting of alarm clock more personalized, and the user is made rational planning for the own daily schedule, allows and lives more regularly, works more efficient.
Optionally, namely after step S160, the alarm clock setting method that the present embodiment provides also comprises the steps:
Obtain the concluding time point of alarm clock event;
Store concluding time point, the final setup times of alarm clock event and affect the parameter that the alarm clock event develops;
According to the concluding time point of alarm clock event, final setup times with affect an alarm clock Provisioning Policy of the parameter generation alarm clock event of alarm clock event development;
Store this alarm clock Provisioning Policy.
In the present embodiment, the mode that the concluding time point of alarm clock event is obtained in realization can be the operation that receives user's input, can be specifically receive and store the user manually input time or receive the shortcut operation that the user presses, the time when obtaining button and pressing, carry out automatic record.
wherein, can be with the alarm clock of setting at every turn the concluding time point of corresponding alarm clock event, the quarter-bell time of this alarm clock and the parameter that affects the development of alarm clock event corresponding to this alarm clock are carried out association, specifically can generate the contingency table of the alarm clock Provisioning Policy as shown in table () or table (two), then preserve this contingency table to database, alarm clock as this alarm clock event arranges data source, so that the follow-up alarm clock Provisioning Policy of choosing easily the parameter that affects this alarm clock event and comprising the parameter that affects the development of alarm clock event, and then convenient new alarm clock corresponding to this alarm clock event that arrange fast.And the alarm clock Provisioning Policy of the alarm clock event of storage is more, and the quarter-bell setting is more accurate, and error is less.
Optionally, the concluding time point of the alarm clock event of obtaining that comprises in the above-described embodiment specifically comprises the steps:
Open navigator;
Judge whether to arrive the default objective of navigator;
If obtain current point in time, as the concluding time point of alarm clock event.
Present embodiment mainly knows easily by the function of navigator whether the alarm clock event finishes, in order to further record the concluding time point of alarm clock event, when present embodiment specifically can be used for the alarm clock event and begins to occur and finish, the user is in the setting of the alarm clock of different location, namely can be when the quarter-bell time arrives, just start navigator, objective when obtaining alarm clock event that the user sets and finishing, perhaps started navigator before arriving objective, the objective when obtaining alarm clock event that the user sets and finishing.Wherein, this navigator can be located in the alarm clock setting device, can be also an independent navigator.If in be located in the alarm clock setting device, after can detecting the information of the objective when receiving navigator and determining to arrive alarm clock event that the user sets and finish, automatically record current detection to the time of this information, as the concluding time point of alarm clock event.If this navigator and alarm clock setting device are not wholely set, objective when the alarm clock event of the definite user of arrival setting of navigator finishes, the information of the objective in the time of can sending the alarm clock event end of determining arrival user setting is to the alarm clock setting device, after the information of the objective when detect receiving alarm clock event that definite arrival user that navigator sends sets and finishing, record current detection to the time of this information.After objective when perhaps the alarm clock event of the definite user of arrival setting of this navigator finishes, objective when the prompting user that can give the alarm has arrived alarm clock event that the user sets and finishes, the concluding time point of notifying the user manually to input this alarm clock event, the mode of the concrete concluding time point that records this alarm clock event is unrestricted, and the execution mode of the present embodiment statement is also a kind of mode that records quickly and easily the time of alarm clock event end.
See also Fig. 2, Fig. 2 is the structure chart of a kind of alarm clock setting device of providing of the embodiment of the present application.Wherein, the alarm clock setting device that provides of the present embodiment is the equipment of realizing according to above-mentioned alarm clock setting method.As shown in Figure 2, the alarm clock setting device that provides of the present embodiment comprises: receiving element 21, acquiring unit 22, processor 23 and setting unit 24.
Receiving element 21 starts for detection of the user operational order that alarm clock arranges.Concrete, the user can input the instruction that quarter-bell is set and enter the interface that alarm is set, and also can press the physical button that quarter-bell is set or click the virtual key that quarter-bell is set that shows on screen to enter the interface that alarm is set.
Acquiring unit 22 is used for obtaining the alarm clock event that the user chooses.
The mode of specifically obtaining the alarm clock event can be to receive by this acquiring unit 22 sign that the user selects according to demand, to start the quarter-bell setting of alarm clock event corresponding to this sign.
Wherein, some information of corresponding alarm clock event are in advance through after statistical test repeatedly, then store in database, namely can obtain this alarm clock event from database.Some information of corresponding alarm clock event comprise the sign of alarm clock event, affects the various parameters that the alarm clock event develops, and the configuration information of each alarm clock of comprising of this alarm clock event.The configuration information of each alarm clock that concrete alarm clock event comprises comprises the time point that quarter-bell time started point and this alarm clock event finish.
For example, the alarm clock event perhaps shows some alarm clock events if " working " receives " working " sign that the user inputs, and the button that obtains this alarm clock event that receives the user obtains " working " alarm clock event.
Acquiring unit 22 also is used for obtaining the parameter that affect development of alarm clock event, affects parameter that the alarm clock event develops and comprises at least a parameter in weather, route, mode of transportation, data mark.
In the present embodiment, can give an example take the alarm clock event as " working ", the basic parameter of impact " working " alarm clock event development can be mode of transportation, because sit the private car working and use the public transport spent time of working that very big difference is arranged, further use the working of subway public transport and the working of bus-transit instrument that very large difference is also arranged.Specifically, user for the working of driving, having influence on user's drive to go to work parameter of time of expending can be weather, in the situation that fine, can travel according to the velocity standard that normally travels, and then the probability of traffic congestion is very little, and uses the people of public transport working many, and driving to travel can be very unobstructed.For the people who uses the public transport working, also need to further consider the route situation, take subway and do not need the special factor of waiting for bus of considering, that takes pubic transport will consider the factor of waiting for bus, and changes into or what need to change on foot the vehicles midway is all the basic parameter that has influence on " working " alarm clock event development.
The mode of specifically obtaining the parameter that affects alarm clock event development can be the configuration information of each alarm clock of comprising through this alarm clock event in the statistical data analysis storehouse, obtain and show the parameter of the alarm clock event that the affects development in configuration information, receive user's selection operation, can be the combination choosing of arbitrary parameter, selection that also can single parameter.Perhaps, directly receive the user and input the operation that crucial word pair database is inquired about.If affect the parameter of alarm clock event development and be the circuit in mode of transportation, the mode of obtaining this parameter can be also the networking operation that receives user's input, enter network service system or receive in the application system that enters the search traffic route of user's input, further select public bus network or subway line, can specifically select the number mark of bus or specifically select point identification and terminal point sign.The type that affects the parameter of alarm clock event development is not subjected to the restriction of the present embodiment, and the mode of obtaining the parameter that affects the development of alarm clock event is not subjected to the restriction of the present embodiment yet.
Wherein, the type of parameter that affects alarm clock event development is more, and the alarm clock setting is more accurate.
Acquiring unit 22, also be used for obtaining the alarm clock Provisioning Policy that some items comprise the parameter that affects the development of alarm clock event, each the alarm clock Provisioning Policy in some items also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and the alarm clock event finishes.Concrete acquiring unit 22 obtains some the modes that comprise the alarm clock Provisioning Policy of the parameter that affects the development of alarm clock event and can with reference to the description of alarm clock setting method embodiment, specifically can with reference to the description of step S130, not repeat them here.
Processor 23, some alarm clock Provisioning Policies for statistical analysis alarm clock event obtain final setup times.
Setting unit 24 is used for according to final setup times, quarter-bell being set.
to sum up, the present embodiment detects the user by receiving element 21 and starts the operational order that alarm clock arranges, obtain an alarm clock event, and obtain the parameter that affects alarm clock event development by acquiring unit 22, and then obtain the alarm clock Provisioning Policies that some items comprises affect the parameter that the alarm clock event develops, each alarm clock Provisioning Policy in some also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and the alarm clock event finishes, pass through again some alarm clock Provisioning Policies of processor 23 statistical analysis alarm clock events, obtain final setup times, according to final setup times, quarter-bell to be set by setting unit 24.
Wherein, the parameter that affects alarm clock event development comprises at least a parameter in weather, route, mode of transportation, data mark, according at least a parameter in above-mentioned parameter, after the time point of the end of the quarter-bell time started point of some alarm clock Provisioning Policies comprising the parameter that affects alarm clock event development and alarm clock event is carried out statistical analysis, can obtain a time of more mating with the parameter that affects alarm clock event development as the final setup times of alarm clock, make the setting of alarm clock not only convenient, and serviceability is more excellent.The variation that affects the parameter of alarm clock event development makes the setting of alarm clock more personalized, and the user is made rational planning for the own daily schedule, allows and lives more regularly, works more efficient.
As a kind of optional execution mode, acquiring unit is also for the concluding time point that obtains the alarm clock event;
Memory cell also is used for concluding time point, the final setup times of storage alarm clock event and affects the parameter that the alarm clock event develops;
Processor also is used for concluding time point, the final setup times according to the alarm clock event and affect an alarm clock Provisioning Policy of the parameter generation alarm clock event of alarm clock event development;
Memory cell also is used for this alarm clock Provisioning Policy of storage.
In the present embodiment, the mode that the concluding time point of alarm clock event is obtained in realization can be to receive the operation of user's input by acquiring unit, can be specifically to receive and store the time of the manual input of user or receive the shortcut operation that the user presses, time when obtaining button and pressing, carry out automatic record.
wherein, can be with the alarm clock of setting at every turn the concluding time point of corresponding alarm clock event, the quarter-bell time of this alarm clock and the parameter that affects the development of alarm clock event corresponding to this alarm clock are carried out association, specifically can generate the contingency table of the alarm clock Provisioning Policy as shown in table () or table (two), then preserve this contingency table to database, alarm clock as this alarm clock event arranges data source, so that the follow-up alarm clock Provisioning Policy of choosing easily the parameter that affects this alarm clock event and comprising the parameter that affects the development of alarm clock event, and then convenient new alarm clock corresponding to this alarm clock event that arrange fast.
As a kind of optional execution mode, acquiring unit also is used for opening navigator, judges whether to arrive the default objective of navigator, if obtain current point in time, as the concluding time point of alarm clock event.
Present embodiment mainly knows easily by the function of navigator whether the alarm clock event finishes, in order to further record the concluding time point of alarm clock event, when present embodiment specifically can be used for the alarm clock event and begins to occur and finish, the user is in the setting of the alarm clock of different location, namely can be when the quarter-bell time arrives, just start navigator, objective when obtaining alarm clock event that the user sets and finishing, perhaps started navigator before arriving objective, the objective when obtaining alarm clock event that the user sets and finishing.Wherein, this navigator can be located in the alarm clock setting device, and namely this acquiring unit has the function of navigator.Perhaps acquiring unit and navigator are two separate devices.If be located in navigator in the alarm clock setting device, after the information of the objective in the time of can detecting the alarm clock event end that receives the definite user of arrival setting of navigator, automatically record current detection to the time of this information, as the concluding time point of alarm clock event.If this navigator and alarm clock setting device are not wholely set, objective when the alarm clock event of the definite user of arrival setting of navigator finishes, the information of the objective in the time of can sending the alarm clock event end of determining arrival user setting is to the alarm clock setting device, after the information of the objective when detect receiving alarm clock event that definite arrival user that navigator sends sets and finishing, record current detection to the time of this information.After objective when perhaps the alarm clock event of the definite user of arrival setting of this navigator finishes, objective when the prompting user that can give the alarm has arrived alarm clock event that the user sets and finishes, the concluding time point of notifying the user manually to input this alarm clock event, the mode of the concrete concluding time point that records this alarm clock event is unrestricted, and the execution mode of the present embodiment statement is also a kind of mode that records quickly and easily the time of alarm clock event end.
The present embodiment also provides a kind of mobile phone, and this mobile phone comprises the alarm clock setting device that above-described embodiment provides, and the concrete means that realize can referring to the alarm clock setting device of above-described embodiment description, not repeat them here.
To sum up statement, the embodiment of the present application starts by detecting the user operational order that alarm clock arranges, obtain the alarm clock event that the user chooses, and obtain the parameter that affects alarm clock event development, and then obtain the alarm clock Provisioning Policies that some items comprises affect the parameter that the alarm clock event develops, each alarm clock Provisioning Policy in some also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and the alarm clock event finishes, some alarm clock Provisioning Policies of statistical analysis alarm clock event, obtain final setup times, according to final setup times, quarter-bell to be set.
Wherein, the parameter that affects alarm clock event development comprises at least a parameter in weather, route, mode of transportation, data mark, according at least a parameter in above-mentioned parameter, after the time point of the quarter-bell time started point of some alarm clock Provisioning Policies comprising the parameter that affects alarm clock event development and the end of alarm clock event is carried out statistical analysis, can obtain a time of more mating with the parameter that affects alarm clock event development as the final setup times of alarm clock, make the setting of alarm clock not only convenient, and serviceability is more excellent.The variation that affects the parameter of alarm clock event development makes the setting of alarm clock more personalized, and the user is made rational planning for the own daily schedule, allows and lives more regularly, works more efficient.
In several embodiment that the application provides, should be understood that disclosed equipment and method can realize by another way.For example, apparatus embodiments described above is only schematic, for example, the division of described module or unit, be only that a kind of logic function is divided, during actual the realization, other dividing mode can be arranged, for example a plurality of unit or module can in conjunction with or can be integrated into another system, or some features can ignore, or do not carry out.In addition, shown or discussed coupling each other or direct-coupling or communication connection can be indirect coupling or communication connections by some interfaces, device, module or unit, can be also electric, machinery or other form connect.
Described module or unit as the separating component explanation can or can not be also physically to separate, the parts that show as module or unit can be or can not be also physical module or unit, namely can be positioned at a place, perhaps also can be distributed on a plurality of mixed-media network modules mixed-medias or unit.Can select according to the actual needs wherein some or all of module or the unit purpose that realizes embodiment of the present invention scheme.
In addition, each functional module in each embodiment of the present invention or unit can be integrated in a processing module or unit, can be also that the independent physics in modules or unit exists, can be also that two or more modules or unit are integrated in a module or unit.The form that above-mentioned integrated module or unit both can adopt hardware realizes, also can adopt the form of SFU software functional unit to realize.
If described integrated module or unit are realized with the form of software function module or unit and during as independently production marketing or use, can be stored in a computer read/write memory medium.Based on such understanding, the part that technical scheme of the present invention contributes to prior art in essence in other words, perhaps all or part of form that can software product of this technical scheme embodies, this computer software product is stored in a storage medium, comprise that some instructions are with so that a computer equipment (can be personal computer, server, the perhaps network equipment etc.) carry out all or part of step of the described method of each embodiment of the present invention.And aforesaid storage medium comprises: the various media that can be program code stored such as USB flash disk, portable hard drive, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD.
The above; it is only the specific embodiment of the present invention; but protection scope of the present invention is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; can expect easily modification or the replacement of various equivalences, within these modifications or replacement all should be encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection range of claim.

Claims (10)

1. an alarm clock setting method, is characterized in that, comprising:
Detect the user and start the operational order that alarm clock arranges;
Obtain the alarm clock event that described user chooses;
Obtain the parameter of the described alarm clock event development of impact, the parameter of the described alarm clock event development of described impact comprises at least a parameter in weather, route, mode of transportation, data mark;
Obtain the alarm clock Provisioning Policy that some items comprise the parameter of the described alarm clock event development of described impact, each the alarm clock Provisioning Policy in described some items also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and described alarm clock event finishes;
Described some the alarm clock Provisioning Policies of the described alarm clock event of statistical analysis obtain final setup times;
According to described final setup times, quarter-bell is set.
2. alarm clock setting method as claimed in claim 1, is characterized in that, described method also comprises:
Obtain the concluding time point of described alarm clock event;
Store the parameter of the described alarm clock event development of the concluding time point of described alarm clock event, described final setup times and described impact;
The parameter of alarm clock event development according to the concluding time point of described alarm clock event, described final setup times and described impact generates an alarm clock Provisioning Policy of described alarm clock event;
Store this alarm clock Provisioning Policy.
3. alarm clock setting method as claimed in claim 2, is characterized in that, the described concluding time point that obtains described alarm clock event comprises:
Open navigator;
Judge whether to arrive the default objective of described navigator;
If obtain current point in time, as the concluding time point of described alarm clock event.
4. as arbitrary described alarm clock setting method in claims 1 to 3, it is characterized in that, described some the alarm clock Provisioning Policies of the described alarm clock event of described statistical analysis obtain final setup times, comprise the following steps:
The concluding time point of A, described alarm clock event that described some alarm clock Provisioning Policies are comprised compares, to obtain the concluding time point of described alarm clock event the latest;
B, obtain the concluding time point of the described alarm clock event of described user preset;
C, judge whether the concluding time point of described described alarm clock event the latest surpasses the concluding time point of the described alarm clock event of described user preset;
D, if not determines to comprise that the quarter-bell time started point that the alarm clock Provisioning Policy of the concluding time point of described described alarm clock event the latest comprises is final setup times.
5. as claim 1 or 2 or 3 described alarm clock setting methods, it is characterized in that, described some the alarm clock Provisioning Policies of the described alarm clock event of described statistical analysis obtain final setup times, comprise the following steps:
Obtain the concluding time point of the described alarm clock event of described user preset;
Obtain the concluding time point of the described alarm clock event that in described some, the alarm clock Provisioning Policy comprises early than the alarm clock Provisioning Policy of the concluding time point of the described alarm clock event of described user preset;
The mean value of the quarter-bell time started point that the concluding time point that obtains described alarm clock event comprises early than the alarm clock Provisioning Policy of the concluding time point of the described alarm clock event of described user preset is as final setup times.
6. an alarm clock setting device, is characterized in that, comprising:
Receiving element starts for detection of the user operational order that alarm clock arranges;
Acquiring unit is used for obtaining the alarm clock event that the user chooses;
Described acquiring unit also is used for obtaining the parameter of the described alarm clock event development of impact, and the parameter of the described alarm clock event development of described impact comprises at least a parameter in weather, route, mode of transportation, data mark;
Described acquiring unit, also be used for obtaining the alarm clock Provisioning Policy that some items comprise the parameter of the described alarm clock event development of described impact, each the alarm clock Provisioning Policy in described some items also comprises the time point that quarter-bell time started corresponding to this alarm clock Provisioning Policy puts and described alarm clock event finishes;
Processor, described some the alarm clock Provisioning Policies for the described alarm clock event of statistical analysis obtain final setup times;
Setting unit is used for according to described final setup times, quarter-bell being set.
7. alarm clock setting device as claimed in claim 6, is characterized in that,
Described acquiring unit is also for the concluding time point that obtains described alarm clock event;
Described memory cell also is used for storing the parameter that the described alarm clock event of the concluding time point of described alarm clock event, described final setup times and described impact develops;
Described processor, the parameter that also is used for alarm clock event development according to the concluding time point of described alarm clock event, described final setup times and described impact generates an alarm clock Provisioning Policy of described alarm clock event;
Described memory cell also is used for this alarm clock Provisioning Policy of storage.
8. alarm clock setting device as claimed in claim 7, is characterized in that, described acquiring unit, also be used for opening navigator, judge whether to arrive the default objective of described navigator, if, obtain current point in time, as the concluding time point of described alarm clock event.
9. as arbitrary described alarm clock setting device in claim 6 to 8, it is characterized in that, described processor, the concluding time point of concrete described alarm clock event for described some alarm clock Provisioning Policies are comprised compares, to obtain the concluding time point of described alarm clock event the latest; And the concluding time point that obtains the described alarm clock event of described user preset; Judge whether the concluding time point of described described alarm clock event the latest surpasses the concluding time point of the described alarm clock event of described user preset; If not, determine to comprise that the quarter-bell time started point that the alarm clock Provisioning Policy of the concluding time point of described described alarm clock event the latest comprises is final setup times.
10. as arbitrary described alarm clock setting device in claim 6 to 8, it is characterized in that,
Described processor, the concluding time point of concrete described alarm clock event for obtaining described user preset; With obtain described some in the concluding time point of the described alarm clock event that comprises of alarm clock Provisioning Policy early than the alarm clock Provisioning Policy of the concluding time point of the described alarm clock event of described user preset; And the mean value of the quarter-bell time started point that comprises early than the alarm clock Provisioning Policy of the concluding time point of the described alarm clock event of described user preset of the concluding time point that is used for obtaining described alarm clock event, as final setup times.
CN201310020804.3A 2013-01-18 2013-01-18 Alarm clock setting method and related equipment Active CN103118156B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310020804.3A CN103118156B (en) 2013-01-18 2013-01-18 Alarm clock setting method and related equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310020804.3A CN103118156B (en) 2013-01-18 2013-01-18 Alarm clock setting method and related equipment

Publications (2)

Publication Number Publication Date
CN103118156A true CN103118156A (en) 2013-05-22
CN103118156B CN103118156B (en) 2016-03-09

Family

ID=48416426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310020804.3A Active CN103118156B (en) 2013-01-18 2013-01-18 Alarm clock setting method and related equipment

Country Status (1)

Country Link
CN (1) CN103118156B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104461715A (en) * 2014-12-25 2015-03-25 小米科技有限责任公司 Reminding task executing method and device based on reminding mode
CN104767885A (en) * 2015-03-25 2015-07-08 广东欧珀移动通信有限公司 Alarm clock adjustment method and terminal
CN105608852A (en) * 2016-01-18 2016-05-25 科泰乐讯(北京)通信设备有限公司 Intelligent warning method and apparatus
CN107360329A (en) * 2017-08-21 2017-11-17 深圳市迈迪加科技发展有限公司 A kind of intelligent prompt method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101222696A (en) * 2007-12-29 2008-07-16 深圳市戴文科技有限公司 Routing arrangement method and mobile terminal
CN101621578A (en) * 2009-07-06 2010-01-06 深圳华为通信技术有限公司 Method and terminal for setting alarm clock
US20100130184A1 (en) * 2008-11-25 2010-05-27 Fan Cros Hand-held device for adapting a noticing time based on weather forecast and method thereof
CN102129371A (en) * 2011-03-08 2011-07-20 深圳桑菲消费通信有限公司 Alarm clock reminding method for mobile terminal
CN102158594A (en) * 2011-02-17 2011-08-17 华为终端有限公司 Method for mobile terminal reminding and mobile terminal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101222696A (en) * 2007-12-29 2008-07-16 深圳市戴文科技有限公司 Routing arrangement method and mobile terminal
US20100130184A1 (en) * 2008-11-25 2010-05-27 Fan Cros Hand-held device for adapting a noticing time based on weather forecast and method thereof
CN101621578A (en) * 2009-07-06 2010-01-06 深圳华为通信技术有限公司 Method and terminal for setting alarm clock
CN102158594A (en) * 2011-02-17 2011-08-17 华为终端有限公司 Method for mobile terminal reminding and mobile terminal
CN102129371A (en) * 2011-03-08 2011-07-20 深圳桑菲消费通信有限公司 Alarm clock reminding method for mobile terminal

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104461715A (en) * 2014-12-25 2015-03-25 小米科技有限责任公司 Reminding task executing method and device based on reminding mode
CN104767885A (en) * 2015-03-25 2015-07-08 广东欧珀移动通信有限公司 Alarm clock adjustment method and terminal
CN105608852A (en) * 2016-01-18 2016-05-25 科泰乐讯(北京)通信设备有限公司 Intelligent warning method and apparatus
CN107360329A (en) * 2017-08-21 2017-11-17 深圳市迈迪加科技发展有限公司 A kind of intelligent prompt method and device

Also Published As

Publication number Publication date
CN103118156B (en) 2016-03-09

Similar Documents

Publication Publication Date Title
CN106205186B (en) A kind of method and terminal for recommending parking position
CN108090225B (en) Database instance running method, device and system and computer readable storage medium
CN109684161B (en) Data analysis method, data analysis device, server and storage medium
CN107230046A (en) The reminding method and mobile terminal of a kind of trip information
CN106251889A (en) It is connected to intelligent audio playback during audio output system
CN106164880A (en) Data transmission system, control server and data transmission method
CN109947495A (en) Application program preloads method, apparatus, storage medium and mobile terminal
CN106547615A (en) A kind of management method and management module of background application
CN106713662A (en) Method and device for optimizing performance of positioning system, and mobile terminal
CN108132839B (en) Resource scheduling method and device
CN103118156B (en) Alarm clock setting method and related equipment
CN104240496A (en) Method and device for determining travel route
CN110083633A (en) Public affairs based on big data analysis estimate company evaluation method, apparatus, terminal and medium
CN106872996A (en) The optimization method of alignment system performance, device and mobile terminal
CN111314174A (en) Network dial testing method and device based on block chain and SDN edge computing network system
CN106547870A (en) Point table method and device of data base
CN110197582A (en) Data analysing method, device and traffic prewarning method, apparatus
CN103488525A (en) Determination of user preference relevant to scene
CN113705893B (en) Charging schedule management method, device, computer equipment and readable storage medium
CN105159543A (en) Method and device for providing map service
CN107943570A (en) application management method, device, storage medium and electronic equipment
CN104573083A (en) Automatic map cache service updating method
CN106878945A (en) The optimization method of alignment system performance, device and mobile terminal
CN110018932A (en) A kind of monitoring method and device of container disk
CN109240916A (en) Information output controlling method, device and computer readable storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant