CN103112081A - Concrete prefabricated kerb demoulding auxiliary support frame - Google Patents

Concrete prefabricated kerb demoulding auxiliary support frame Download PDF

Info

Publication number
CN103112081A
CN103112081A CN201310082317XA CN201310082317A CN103112081A CN 103112081 A CN103112081 A CN 103112081A CN 201310082317X A CN201310082317X A CN 201310082317XA CN 201310082317 A CN201310082317 A CN 201310082317A CN 103112081 A CN103112081 A CN 103112081A
Authority
CN
China
Prior art keywords
concrete prefabricated
demoulding
kerb
mould
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310082317XA
Other languages
Chinese (zh)
Inventor
丁建勇
薄涛
韩丕涛
王鹏
马士玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan City Chengjian Material Development Service Center
Original Assignee
Jinan City Chengjian Material Development Service Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan City Chengjian Material Development Service Center filed Critical Jinan City Chengjian Material Development Service Center
Priority to CN201310082317XA priority Critical patent/CN103112081A/en
Publication of CN103112081A publication Critical patent/CN103112081A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention provides a concrete prefabricated kerb demoulding auxiliary support frame. The concrete prefabricated kerb demoulding auxiliary support frame comprises a transverse connection beam and two mould support pieces, wherein cross sections of the two mould support pieces are roughly of a 'b' shape, and the mould support pieces extend in the longitudinal direction. The two mould support pieces are respectively arranged in a seated mode and fixed on two end portions of the connection beam. The two mould support pieces are arranged relatively and located on the same side of the connection beam. Seen from the longitudinal direction, the concrete prefabricated kerb demoulding auxiliary support frame is of a 'b d' shape. When a concrete prefabricated kerb is achieved in a prefabricated mode, fulfills requirements of demoulding and is demoulded, the support frame is utilized to conduct auxiliary demoulding. The kerb and a mould are placed on the demoulding auxiliary support frame in a suspending mode. Two end corner portions in the transverse direction of a concrete prefabricated kerb mould are respectively located and limited on the two mould support pieces. Workers can demould conveniently, and simultaneously the reasonable support frame height guarantees that a kerb manufactured product cannot be broken. The appearance quality of the concrete prefabricated kerb is protected, and the working efficiency is improved.

Description

Concrete prefabricated kerbstone demoulding auxiliary stand
Technical field
The present invention relates to concrete prefabricated kerbstone stripping process, more specifically, relate to the support of the assisted demoulding of using in concrete prefabricated kerbstone stripping process.
Background technology
Kerbstone refers to the boundary stone that is located at pavement edge, is called for short kerb.It is as the rectangular slab of stone that is arranged on the boundary of pavement edge and other structural belt.Kerbstone divides two kinds of vertical curb peace kerbs.Vertical curb is the kerbstone that end face exceeds the road surface, has calibration vehicle trade scope and longitudinal guide to get rid of the effect of road surface water.Flush curb is the kerbstone that end face flushes with the road surface, and the effect of the road surface scope of demarcating, the neat appearance of a street, protection pavement edge is arranged.Usually urban road surfaces edge, form street gutter by vertical curb and flush curb or the road surface of mating formation, and the effect of eliminating road surface water is arranged.The kerbstone that highway is connected with the Class I highway median strip plays guiding, connects and is convenient to draining.The kerbstone that uses in construction of the highway at present mostly is concrete prefabricated kerbstone, and because it beautifies the demand of road surface outward appearance, concrete prefabricated kerbstone has higher requirement to its presentation quality.Concrete prefabricated kerbstone releasing process is larger on its presentation quality impact, irrational stripping means and technique can cause kerbstone originally attractive in appearance to lack the series of problems such as limit, arrisdefect, pitted skin, have a strong impact on product quality, quality of road construction and highway attractive in appearance.At present, concrete prefabricated kerbstone does not form standard, rational releasing process, and stripping means is more and unreasonable, causes kerbstone product appearance quality generally not high.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of concrete prefabricated kerbstone demoulding auxiliary stand.
In order to solve the problems of the technologies described above, technical scheme of the present invention is:
A kind of concrete prefabricated kerbstone demoulding auxiliary stand, comprise horizontal tie-beam and two mould supporting parts that the cross section roughly is " Ь " shape and extends longitudinally, two mould supporting parts are sat respectively the both ends of putting and be fixed on tie-beam, two mould supporting parts are oppositely arranged and are positioned at the same side of tie-beam, vertically see, concrete prefabricated kerbstone demoulding auxiliary stand integral body be " B d" shape.
Above-mentioned concrete prefabricated kerbstone demoulding auxiliary stand, mould supporting parts are by square tube and sit the strip-shaped steel plate be placed on the square tube lateral outer side and be welded and fixed and consist of.
Above-mentioned concrete prefabricated kerbstone demoulding auxiliary stand, tie-beam are two screw-thread steels that longitudinal separation arranges.
Above-mentioned concrete prefabricated kerbstone demoulding auxiliary stand, the long 75cm of screw-thread steel, diameter 16mm, the longitudinal pitch 10cm of two screw-thread steels, outside square tube wall thickness 5mm, long 20cm, cross section, the length of side is 3.5cm, the thick 5mm of strip-shaped steel plate, high 1cm, long 20cm.
Concrete prefabricated kerbstone is prefabricated to be completed when reaching demoulding requirement and carrying out the demoulding; utilize this support to carry out assisted demoulding; unsettled the taking of kerbstone and mould is placed on demoulding auxiliary stand; the transverse ends bight of concrete prefabricated Kerb mould is located respectively and is limited on two mould supporting parts; when facilitating workman's demoulding; reasonably support height has guaranteed that the kerbstone goods can not break, and has protected the presentation quality of concrete prefabricated kerbstone, has improved operating efficiency.Solved because of the poor problem of the kerbstone presentation quality poor impression of the not high quality of road construction that causes, met the requirement of civilized construction, rapid construction.
Description of drawings
The present invention is described in more detail below in conjunction with accompanying drawing:
Fig. 1 is structural representation of the present invention.
Fig. 2 is the structural representation of another angle of the present invention.
In figure: 1 screw-thread steel, 2 square tubes, 3 strip-shaped steel plates.
The specific embodiment
As depicted in figs. 1 and 2, a kind of concrete prefabricated kerbstone demoulding auxiliary stand, comprise horizontal tie-beam and two mould supporting parts that the cross section roughly is " Ь " shape and extends longitudinally, two mould supporting parts are sat respectively the both ends of putting and be fixed on tie-beam, two mould supporting parts are oppositely arranged and are positioned at the same side of tie-beam, vertically see, concrete prefabricated kerbstone demoulding auxiliary stand integral body be " B d" shape.
Based on the consideration of manufacturing process, the mould supporting parts is by square tube 2 and sit the strip-shaped steel plate 3 that is placed on the square tube lateral outer side and be welded and fixed and consist of.
Based on the consideration of manufacturing process, tie-beam is two screw-thread steels 1 that longitudinal separation arranges.
Particularly, the long 75cm of screw-thread steel, diameter 16mm, the longitudinal pitch 10cm of two screw-thread steels, outside square tube wall thickness 5mm, long 20cm, cross section, the length of side is 3.5cm, the thick 5mm of strip-shaped steel plate, high 1cm, long 20cm.
Adopt the present invention to carry out assisted demoulding, replace mixed and disorderly random stripping means with standardized releasing process and mode, the product appearance quality improves greatly, has guaranteed the qualification rate of finished product, has effectively improved quality of road construction and impression.Thoroughly solved because the poor engineering cost of selecting the stone material kerbstone to cause of concrete prefabricated kerbstone presentation quality increases greatly, do not met the problem that environmental protection and civilized construction etc. require.Assisted demoulding of the present invention replaces the random demoulding; stripping rate improves greatly; the average demould time of concrete prefabricated kerbstone rises to the 5s/ piece by the 10s/ piece; time saves 50%; efficient improves 100%; arbitrarily the demoulding is easy to cause the Kerb mould damage of edges and can't uses simultaneously; demoulding support has effectively been protected the Kerb mould edge; making it recycle number of times rises to 30 times/by 20 times/; increase by 50% service life; each mould is saved cost and is about 33%, is the hundreds thousand of units of saving production cost of enterprise.Economic benefit and remarkable.

Claims (4)

1. concrete prefabricated kerbstone demoulding auxiliary stand, it is characterized in that: comprise horizontal tie-beam and two mould supporting parts that the cross section roughly is " Ь " shape and extends longitudinally, two mould supporting parts are sat respectively the both ends of putting and be fixed on tie-beam, two mould supporting parts are oppositely arranged and are positioned at the same side of tie-beam, vertically see, concrete prefabricated kerbstone demoulding auxiliary stand integral body be " B d" shape.
2. concrete prefabricated kerbstone demoulding auxiliary stand according to claim 1 is characterized in that: the mould supporting parts is by square tube and sit the strip-shaped steel plate that is placed on the square tube lateral outer side and be welded and fixed and consist of.
3. concrete prefabricated kerbstone demoulding auxiliary stand according to claim 1 and 2 is characterized in that: tie-beam is two screw-thread steels that longitudinal separation arranges.
4. concrete prefabricated kerbstone demoulding auxiliary stand according to claim 3, it is characterized in that: the long 75cm of screw-thread steel, diameter 16mm, the longitudinal pitch 10cm of two screw-thread steels, outside square tube wall thickness 5mm, long 20cm, cross section, the length of side is 3.5cm, the thick 5mm of strip-shaped steel plate, high 1cm, long 20cm.
CN201310082317XA 2013-03-15 2013-03-15 Concrete prefabricated kerb demoulding auxiliary support frame Pending CN103112081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310082317XA CN103112081A (en) 2013-03-15 2013-03-15 Concrete prefabricated kerb demoulding auxiliary support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310082317XA CN103112081A (en) 2013-03-15 2013-03-15 Concrete prefabricated kerb demoulding auxiliary support frame

Publications (1)

Publication Number Publication Date
CN103112081A true CN103112081A (en) 2013-05-22

Family

ID=48410501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310082317XA Pending CN103112081A (en) 2013-03-15 2013-03-15 Concrete prefabricated kerb demoulding auxiliary support frame

Country Status (1)

Country Link
CN (1) CN103112081A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06167004A (en) * 1992-10-22 1994-06-14 Shinko:Kk Frame for forming road curb stone
CN2692197Y (en) * 2002-08-21 2005-04-13 张明君 Kerb mould
CN201056019Y (en) * 2007-05-28 2008-05-07 徐金山 Large-scale stephanoporate border stone mold
CN102837462A (en) * 2012-09-18 2012-12-26 武汉龙泰开元沥青有限公司 Concrete curb with decorative patterns and production method of concrete curb
WO2013035973A1 (en) * 2011-09-05 2013-03-14 Lee Jong Yong Assembly-type stone barrier support
CN203092745U (en) * 2013-03-15 2013-07-31 济南市城建材料开发服务中心 Concrete precast curb demoulding auxiliary bracket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06167004A (en) * 1992-10-22 1994-06-14 Shinko:Kk Frame for forming road curb stone
CN2692197Y (en) * 2002-08-21 2005-04-13 张明君 Kerb mould
CN201056019Y (en) * 2007-05-28 2008-05-07 徐金山 Large-scale stephanoporate border stone mold
WO2013035973A1 (en) * 2011-09-05 2013-03-14 Lee Jong Yong Assembly-type stone barrier support
CN102837462A (en) * 2012-09-18 2012-12-26 武汉龙泰开元沥青有限公司 Concrete curb with decorative patterns and production method of concrete curb
CN203092745U (en) * 2013-03-15 2013-07-31 济南市城建材料开发服务中心 Concrete precast curb demoulding auxiliary bracket

Similar Documents

Publication Publication Date Title
CN101338677A (en) Synchronous construction method for shield method tunnel
CN204983649U (en) Big inclination cylinder steel form
CN214144682U (en) Early structure of tearing open of floor template and building frame template structure
CN203092745U (en) Concrete precast curb demoulding auxiliary bracket
CN103225394B (en) Big wood template construction method of indoor constructional engineering shear wall
CN203856112U (en) Novel profile steel combined overhung floor structure
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN202148694U (en) Prefabricated T-shaped beam steel bar colligation positioning device
CN204505536U (en) The mobile steel structure pedestal of precast beam
CN103132640A (en) Detachable steel-concrete composite floor
CN103112081A (en) Concrete prefabricated kerb demoulding auxiliary support frame
CN204059420U (en) Late poured band support structure
CN201176551Y (en) Precast slab for roads
CN203145273U (en) Dismountable steel-concrete composite floor
CN202090281U (en) Reinforced concrete ribbed hollow decorative plate
CN203805118U (en) Thickness-adjustable mould for manufacturing reinforcement protection layer cushion blocks
CN103046678A (en) Method for constructing BDF (building distribution frame) hollow floorslab
CN202031328U (en) Fixing device of outer formwork for casting outer concrete wall on floor slab of building
CN202530756U (en) Early-removed template support structure
CN204139070U (en) A kind of chamfering formwork for road and bridge construction
CN105317056A (en) Reinforced inspection well cover plate
CN202627501U (en) Box culvert bottom plate and side wall internal corner part corner template
CN205444917U (en) Concrete high-low grade separator
CN203096578U (en) Road concrete pavement template
CN204418663U (en) A kind of constructing structure of cylinder mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130522