CN103106300A CN2013100216745A CN201310021674A CN103106300A CN 103106300 A CN103106300 A CN 103106300A CN 2013100216745 A CN2013100216745 A CN 2013100216745A CN 201310021674 A CN201310021674 A CN 201310021674A CN 103106300 A CN103106300 A CN 103106300A
Authority
CN
China
Prior art keywords
wind energy
turbine set
energy turbine
plane
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100216745A
Other languages
English (en)
Other versions
CN103106300B (zh
Inventor
顾华杰
王峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201310021674.5A priority Critical patent/CN103106300B/zh
Publication of CN103106300A publication Critical patent/CN103106300A/zh
Application granted granted Critical
Publication of CN103106300B publication Critical patent/CN103106300B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Abstract

本发明涉及一种用于风电场场内道路设计的自动优化选线方法,该方法包括以下步骤:1)对风电场的卫星地图进行预处理,获取风电场的等高线地形图和等高线树;2)根据等高线树和等高线地形图确定风电场中任意两个风机机位之间的连接路线;3)重复步骤2)直至生成包括所有机位之间连接路线的完全图,并对该完全图进行全局选线优化,获取风电场场内道路的最优连接路线。与现有技术相比,本发明可以对地形复杂的风电场场内道路进行快速优化,减少工作量,提高最优路线选择的效率,极具工程实用价信。

Description

一种用于风电场场内道路设计的自动优化选线方法
技术领域
本发明涉及一种风电场微观选址技术,尤其是涉及一种用于风电场场内道路设计的自动优化选线方法。
背景技术
风电场场内道路是指风电机组间道路和风电机组与升压变电站之间道路。道路是建设风电场的先决条件,也是风电场建设占用土地的主要因素,合理的道路设计对风电场的投资和运营起着非常重要的作用。
然而目前国内外对风电场场内道路自动优化选线的研究甚少,企业通常依据工程经验人工地进行道路设计,重复工作量大且工作效率相对较低,无法保证道路的最优选线。陆上风电场多处于山区,复杂的地形、地貌会使设计难度和工作量剧增。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种用于风电场场内道路设计的自动优化选线方法,该方法可以对地形复杂的风电场场内道路进行快速优化,减少工作量,提高最优路线选择的效率。
本发明的目的可以通过以下技术方案来实现:
1.一种用于风电场场内道路设计的自动优化选线方法,其特征在于,该方法包括以下步骤:
1)对风电场的卫星地图进行预处理,获取风电场的等高线地形图和等高线树;
2)根据等高线树和等高线地形图确定风电场中任意两个风机机位之间的连接路线;
3)重复步骤2)直至生成包括所有机位之间连接路线的完全图,并对该完全图进行全局选线优化,获取风电场场内道路的最优连接路线。
2.根据权利要求1所述的一种用于风电场场内道路设计的自动优化选线方法,其特征在于,步骤1)中预处理具体包括以下步骤:
11)从风电场的卫星地图中提取数字高程数据;
12)根据数字高程数据生成风电场的等高线地形图;
13)根据等高线地形图计算出风电场的等高线树。
3.根据权利要求1所述的一种用于风电场场内道路设计的自动优化选线方法,其特征在于,步骤2)具体包括以下步骤:
21)根据风电场中风机机位的高程数据,确定其所属等高线树的结点标号;
22)根据步骤21)中得到的结点标号搜索等高线树,计算出两结点间的连接路径,以确定两个风机机位之间的邻接等高线逻辑跨越路径;
23)根据步骤22)中两个风机机位之间的邻接等高线逻辑跨越路径,采用等坡度线算法在等高线地形图中设计出两个风机机位之间的连接路线。
4.根据权利要求1所述的一种用于风电场场内道路设计的自动优化选线方法,其特征在于,步骤3)中对完全图进行全局选线优化采用最小生成树算法,以道路修建成本为权值,计算出所有风机机位的最小生成树,得到风电场场内道路的最优连接路线。
与现有技术相比,本发明解决了现有风电场微观选址技术缺少一种用于风电场场内道路设计的自动优化选线方法的问题,减少了风电场场内道路选线过程中的工作量,提高了工作效率,全局优化风电场场内道路选线,方便微观选址工程师快速地判断不同风机机位布置下对应道路选线的可行性及经济性,进而加快风电场建设进程,提高整个风电场的经济效益,极具工程实用价值。
附图说明
图1为本发明的简明处理流程图;
图2为本发明的具体实现流程图;
图3为实施例中风电场的等高线地形图;
图4为实施例中风电场等高线地形图的对应等高线树;
图5为实施例中风电场中利用本发明设计的23台风机间的最优连接道路;
图6为实施例中风电场中利用本发明设计的49台风机间的最优连接道路。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
如图1所示,一种用于风电场场内道路设计的自动优化选线方法,该方法包括以下三个步骤:
1)地图数据预处理:从风电场的卫星地图获取风电场的等高线地形图和等高线树。
2)两机位间道路自动设计:根据等高线树和等高线地形图确定风电场中任意两个风机机位之间的连接路线。
3)场内道路的全局最优选线:重复步骤2)直至生成包括所有机位之间连接路线的完全图,并对该完全图进行全局选线优化,获取风电场场内道路的最优连接路线。
其中,每一步骤的具体过程如图2所示,在步骤1)中地图数据预处理具体包括以下步骤:
11)从风电场的卫星地图中提取数字高程(DEM)数据;
12)根据数字高程数据生成风电场的等高线地形图,如图3所示;
13)根据等高线地形图计算出风电场的等高线树,如图4所示,其中结点1~23分别代表图3中的各条等高线及其所包含的内部空间,结点间的边(连线)代表子结点(子等高线)被父结点(父等高线)所包含。
步骤2)具体包括以下步骤:
21)确定风电场中风机机位所属等高线树的结点标号:首先根据各个风机机位的高程值确定其被等高线地形图中的哪条等高线包含,然后搜索该等高线在等高线树中所属结点的标号,即为机位所属等高线树结点的标号。
22)分析两个风机机位之间的道路走向:根据步骤21)中得到的结点标号搜索等高线树,计算出两结点间的连接路径,以确定两个风机机位之间的邻接等高线逻辑跨越路径,即为道路走向。
此处,两个风机机位之间的道路走向定义如下:在等高线地形图中,从起始机位至终点机位修建合理道路,道路路线所需跨越的最少的邻接等高线所组成的向量即为道路走向。邻接等高线向量中的元素为等高线,用等高线在等高线树中对应的结点标号表示。
23)生成两机位间连接路线:根据步骤22)中两机位间的邻接等高线逻辑跨越路径(道路走向),采用等坡度线算法,按照风电场场内道路坡度的设计要求,在等高线地形图中设计出两机位间的连接路线。
其中,等坡度线算法如下:坡度g是坡面的铅直高度h和水平距离l之比,h取为等高距,g由用户自定义。以道路起点为圆心,h/g为半径作辅助圆,存储辅助圆与下一条等高线的交点并将该交点设为新的起点,然后重复以上过程,迭代直至道路终点。这里下一条等高线由步骤22)中两机位间的道路走向给出。如果辅助圆与下一条等高线出现2个交点,则根据道路经济性指标选择其中一个交点;如果没有交点,则取当前起点与道路终点所成直线和下一条等高线的交点。连接存储的所有交点形成两机位间的连接路线。
在步骤3)中,具体包括以下两个步骤:
31)生成完全图:重复执行步骤2)计算出风电场中任意两个风机机位之间的连接路线,生成所有机位的完全图;
32)计算最小生成树:对完全图进行全局选线优化采用最小生成树算法,以道路修建成本为权值,计算出所有风机机位的最小生成树,得到风电场场内道路的最优连接路线,并输出。
采用该方法对如图3所示的风电场进行场内道路自动优化选线,如在该风电场内设置23台风机,则其场内道路选线结果如图5所示;如在该风电场内设置49台风机,则其场内道路选线结果如图6所示,其中黑色圆点表示风机机位,而黑色圆点间的折线表示连接路线。显然,采用人工选线的方式很难短时间内高效且最优地设计出数量众多的风机机位间的连接路线,而本发明利用计算机可以在几秒内迅速地计算出数量众多的风机机位间的全局最优道路选线,方便微观选址工程师快速地判断不同风机机位布置下对应道路选线的可行性及经济性,极具工程实用价值。

Claims (4)

1.一种用于风电场场内道路设计的自动优化选线方法,其特征在于,该方法包括以下步骤:
1)对风电场的卫星地图进行预处理,获取风电场的等高线地形图和等高线树;
2)根据等高线树和等高线地形图确定风电场中任意两个风机机位之间的连接路线;
3)重复步骤2)直至生成包括所有机位之间连接路线的完全图,并对该完全图进行全局选线优化,获取风电场场内道路的最优连接路线。
2.根据权利要求1所述的一种用于风电场场内道路设计的自动优化选线方法,其特征在于,步骤1)中预处理具体包括以下步骤:
11)从风电场的卫星地图中提取数字高程数据;
12)根据数字高程数据生成风电场的等高线地形图;
13)根据等高线地形图计算出风电场的等高线树。
3.根据权利要求1所述的一种用于风电场场内道路设计的自动优化选线方法,其特征在于,步骤2)具体包括以下步骤:
21)根据风电场中风机机位的高程数据,确定其所属等高线树的结点标号;
22)根据步骤21)中得到的结点标号搜索等高线树,计算出两结点间的连接路径,以确定两个风机机位之间的邻接等高线逻辑跨越路径;
23)根据步骤22)中两个风机机位之间的邻接等高线逻辑跨越路径,采用等坡度线算法在等高线地形图中设计出两个风机机位之间的连接路线。
4.根据权利要求1所述的一种用于风电场场内道路设计的自动优化选线方法,其特征在于,步骤3)中对完全图进行全局选线优化采用最小生成树算法,以道路修建成本为权值,计算出所有风机机位的最小生成树,得到风电场场内道路的最优连接路线。
CN201310021674.5A 2013-01-21 2013-01-21 一种用于风电场场内道路设计的自动优化选线方法 Expired - Fee Related CN103106300B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310021674.5A CN103106300B (zh) 2013-01-21 2013-01-21 一种用于风电场场内道路设计的自动优化选线方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310021674.5A CN103106300B (zh) 2013-01-21 2013-01-21 一种用于风电场场内道路设计的自动优化选线方法

Publications (2)

Publication Number Publication Date
CN103106300A true CN103106300A (zh) 2013-05-15
CN103106300B CN103106300B (zh) 2015-10-28

Family

ID=48314154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310021674.5A Expired - Fee Related CN103106300B (zh) 2013-01-21 2013-01-21 一种用于风电场场内道路设计的自动优化选线方法

Country Status (1)

Country Link
CN (1) CN103106300B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067004A (zh) * 2015-09-14 2015-11-18 武大吉奥信息技术有限公司 一种基于地形的路径搜索方法
CN106407566A (zh) * 2016-09-20 2017-02-15 河海大学 复杂地形风电场一体化优化方法
CN107885960A (zh) * 2017-12-07 2018-04-06 北京天润新能投资有限公司 一种基于风电场场内施工道路自动选线的土方量估算系统及估算方法
CN107908899A (zh) * 2017-12-07 2018-04-13 北京天润新能投资有限公司 一种用于风电场建设施工道路的选线系统及选线方法
CN108062438A (zh) * 2017-12-07 2018-05-22 北京天润新能投资有限公司 一种用于风电场运行道路的选线系统及选线方法
CN111652436A (zh) * 2020-06-03 2020-09-11 中铁二院工程集团有限责任公司 一种基于等高线的施工便道自动选线方法
CN111666693A (zh) * 2020-06-12 2020-09-15 四川电力设计咨询有限责任公司 一种山地风电场优化设计系统及方法
US11441915B2 (en) 2019-06-18 2022-09-13 M. A. Mortenson Company Circuits for electricity-generating units

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030229874A1 (en) * 2002-06-05 2003-12-11 Ken Saito Floorplanning apparatus deciding floor plan using logic seeds associated with hierarchical blocks
CN101540020A (zh) * 2009-04-01 2009-09-23 江西省交通设计院 一种公路三维选线方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030229874A1 (en) * 2002-06-05 2003-12-11 Ken Saito Floorplanning apparatus deciding floor plan using logic seeds associated with hierarchical blocks
CN101540020A (zh) * 2009-04-01 2009-09-23 江西省交通设计院 一种公路三维选线方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭景兴: "基于GIS三维地形可视化在地质公园规划中的应用研究", 《中国地质大学(北京)硕士学位论文》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067004A (zh) * 2015-09-14 2015-11-18 武大吉奥信息技术有限公司 一种基于地形的路径搜索方法
CN105067004B (zh) * 2015-09-14 2017-10-20 武大吉奥信息技术有限公司 一种基于地形的路径搜索方法
CN106407566A (zh) * 2016-09-20 2017-02-15 河海大学 复杂地形风电场一体化优化方法
CN107885960A (zh) * 2017-12-07 2018-04-06 北京天润新能投资有限公司 一种基于风电场场内施工道路自动选线的土方量估算系统及估算方法
CN107908899A (zh) * 2017-12-07 2018-04-13 北京天润新能投资有限公司 一种用于风电场建设施工道路的选线系统及选线方法
CN108062438A (zh) * 2017-12-07 2018-05-22 北京天润新能投资有限公司 一种用于风电场运行道路的选线系统及选线方法
CN107908899B (zh) * 2017-12-07 2021-04-09 北京天润新能投资有限公司 一种用于风电场建设施工道路的选线系统及选线方法
US11441915B2 (en) 2019-06-18 2022-09-13 M. A. Mortenson Company Circuits for electricity-generating units
CN111652436A (zh) * 2020-06-03 2020-09-11 中铁二院工程集团有限责任公司 一种基于等高线的施工便道自动选线方法
CN111666693A (zh) * 2020-06-12 2020-09-15 四川电力设计咨询有限责任公司 一种山地风电场优化设计系统及方法
CN111666693B (zh) * 2020-06-12 2023-08-08 四川电力设计咨询有限责任公司 一种山地风电场优化设计系统及方法

Also Published As

Publication number Publication date
CN103106300B (zh) 2015-10-28

Similar Documents

Publication Publication Date Title
CN103106300B (zh) 一种用于风电场场内道路设计的自动优化选线方法
Sun et al. A GIS-based multi-criteria decision making method for the potential assessment and suitable sites selection of PV and CSP plants
Bina et al. A comprehensive approach for wind power plant potential assessment, application to northwestern Iran
CN107909222B (zh) 一种基于风机智能分组的风电场集电线路三维路径规划方法及系统
Lu et al. A GIS-based assessment of Tibet's potential for pumped hydropower energy storage
Kays et al. The generation of distribution grid models on the basis of public available data
CN103116865A (zh) 一种多维度协同电网规划的方法
Feizizadeh et al. GIS-based procedures of hydropower potential for Tabriz basin, Iran
CN105139269B (zh) 一种多期风电场微观选址方法
CN108649611B (zh) 一种全球大型风电基地开发潜力评估方法
CN113128786B (zh) 一种基于空间网格搜索的风光水互补容量与选址优化方法
Huang Efficient hybrid distributed genetic algorithms for wind turbine positioning in large wind farms
CN111815016A (zh) 一种输电线路路径优化方法及计算机程序产品
CN107908899A (zh) 一种用于风电场建设施工道路的选线系统及选线方法
Yin et al. Planning of electric vehicle charging station based on real time traffic flow
CN103177300A (zh) 输电线路杆塔定位方法
Achbab et al. Developing and applying a GIS-Fuzzy AHP assisted approach to locating a hybrid renewable energy system with high potential: Case of Dakhla region–Morocco
CN109710994A (zh) 基于数字地球的机场障碍物限制面超限分析方法
Loukakis et al. Feasibility study of microgrid village with renewable energy sources
Jiang et al. Review of wind power forecasting methods: From multi-spatial and temporal perspective
CN108062438A (zh) 一种用于风电场运行道路的选线系统及选线方法
Shrestha et al. Optimal grid network for rural electrification of Upper Karnali hydro project affected area
KR102426413B1 (ko) 신재생에너지 자원지도 생성 장치 및 방법
CN109299495B (zh) 一种风电场微观智能布机方法
Sheng et al. A GIS+ MCDA based assessment method of potential onshore wind power development sites in Mongolia

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028

Termination date: 20180121