CN103104909A - Throttling device for high pressure water-feeding pump of industrial boiler - Google Patents

Throttling device for high pressure water-feeding pump of industrial boiler Download PDF

Info

Publication number
CN103104909A
CN103104909A CN2012105399589A CN201210539958A CN103104909A CN 103104909 A CN103104909 A CN 103104909A CN 2012105399589 A CN2012105399589 A CN 2012105399589A CN 201210539958 A CN201210539958 A CN 201210539958A CN 103104909 A CN103104909 A CN 103104909A
Authority
CN
China
Prior art keywords
boiler
throttling
high pressure
water
feeding pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105399589A
Other languages
Chinese (zh)
Inventor
周军龙
刘海涛
王学军
张金霞
卢元庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Meili Paper Industry Co Ltd
Original Assignee
MCC Meili Paper Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Meili Paper Industry Co Ltd filed Critical MCC Meili Paper Industry Co Ltd
Priority to CN2012105399589A priority Critical patent/CN103104909A/en
Publication of CN103104909A publication Critical patent/CN103104909A/en
Pending legal-status Critical Current

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention relates to a throttling device for a high pressure water-feeding pump of an industrial boiler. The throttling device for the high pressure water-feeding pump of the industrial boiler is characterized by comprising a throttling straight pipe, a throttling nozzle installed on an end face of the throttling straight pipe, and a plurality of throttling orifice plates installed in the throttling straight pipe with a 45-degree angle or a 90-degree angle in a staggered mode. The throttling device for the high pressure water-feeding pump of the industrial boiler is installed in front of a first recycling door of a boiler water-feeding pump outlet pipeline, so that output force of a boiler water-feeding pump can be effectively improved, the water amount can be well throttled, water-feeding pressure needed by the boiler is met, and stability of water feeding of the boiler is guaranteed. The operation number of the first recycling door and a second recycling door when the boiler is normally adjusted is reduced, and safe and economical operation of a boiler unit is improved.

Description

Industrial Boiler high pressure water pump throttling arrangement
Technical field
The present invention relates to a kind of Industrial Boiler high pressure water pump throttling arrangement, be particularly suitable for frequent adjustment of self-contained thermoelectric plant steam boiler and cause feed pump capacity to change comparatively significantly field.
Background technology
Boiler plant is in operation, and because the boiler circuit reciprocation cycle is carried out constantly, keeping boiler carbonated drink balance is the prerequisite that guarantees the boiler plant safe operation, therefore will guarantee the stability of boiler feedwater.High pressure water pump is that the capital equipment at water source is provided to boiler, the vapour electric load of supplying with to outer net due to steam power plant changes comparatively frequent, cause boiler load also in continuous variation, make the boiler adjustment more frequent, guarantee in the boiler adjustment that wherein stablizing of feed pressure, flow is most important.Being adjusted at of boiler feedwater relies on the feedwater throttling arrangement of feedwater outlet conduit installing to carry out when originally designing, because this device design is not too reasonable, lost the effect of throttling feedwater flow.the method of adjustment of now using is with the recirculation of feedwater outlet conduit installing once, the secondary valve is completed, but because of power plant for self-supply's vapour electric load unstable, the frequent adjustment of boiler causes the spool of recirculation (egr) valve at high temperature, appearance wearing and tearing under the washing away of high-pressure feed water pressure, interior leakage increases, the adjustment effect is relatively poor, in order to guarantee the normal operation of boiler feed pump, the frequent recirculation one secondary valve of changing, when adjusting, boiler changes greatly because of feed pressure after changing, pump housing impeller to feed pump causes serious impact, thereby seriously restricting exerting oneself of feed pump, when boiler at low load moves, the feedwater flow that needs is less, can't adjust because of valves leakage causes feed pressure larger, cause safety factor scarcely to boiler plant and pipeline, increase simultaneously plant consumption.When the boiler heavy-duty service, the feedwater flow that needs is larger, but larger owing to leaking in recirculation (egr) valve, adjust to the limit and still can not satisfy feed pump capacity, causing the required feed pressure of boiler to descend affects the safe operation of boiler, in order to guarantee the safe operation of boiler plant, just need to restart a feed pump in such cases, so just increased the consumption of station service, cost payout increases.
Summary of the invention
The object of the invention is to overcome the defective of above-mentioned prior art, a kind of safe, stable, economical operation of effective raising feed pump are provided, thereby guarantee the stability of boiler feedwater, improve the Industrial Boiler high pressure water pump throttling arrangement of the safety and economic operation of unit.
The technical scheme of taking for achieving the above object is:
A kind of Industrial Boiler high pressure water pump throttling arrangement is characterized in that: comprise the throttling straight tube, the end face of described throttling straight tube is equipped with throttle nozzle, and inner stagger arrangement is installed several restricting orifices with 45 ° or 90 ° of angles.
Industrial Boiler high pressure water pump throttling arrangement of the present invention is arranged on the recirculation of boiler feed pump outlet conduit and once locates in front of the door, can effectively improve exerting oneself of boiler feed pump, preferably feedwater flow is played throttling action, satisfy the required feed pressure of boiler, guarantee the stability of boiler feedwater, reduce the number of operations that recycles first and second valve when boiler is normally adjusted, thereby improve the safety and economic operation of unit.
Description of drawings
Fig. 1 is the structural representation sketch of Industrial Boiler high pressure water pump throttling arrangement of the present invention.
The specific embodiment
As shown in Figure 1, Industrial Boiler high pressure water pump throttling arrangement of the present invention comprises throttling straight tube 1, and the end face of described throttling straight tube 1 is equipped with throttle nozzle 3, and inner stagger arrangement is installed several restricting orifices 2 with 45 ° or 90 ° of angles.
During making, first throttle nozzle 3 is welded on the end face of throttling straight tube 1, then successively the restricting orifice stagger arrangement is arranged on throttling straight tube 1 inside with 45 ° or 90 ° of angles, the throttling arrangement that completes is welded on the recirculation of boiler feed pump outlet conduit once locates in front of the door.

Claims (1)

1. Industrial Boiler high pressure water pump throttling arrangement, it is characterized in that: comprise throttling straight tube (1), the end face of described throttling straight tube (1) is equipped with throttle nozzle (3), and inner stagger arrangement is installed several restricting orifices (2) with 45 ° or 90 ° of angles.
CN2012105399589A 2012-12-14 2012-12-14 Throttling device for high pressure water-feeding pump of industrial boiler Pending CN103104909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105399589A CN103104909A (en) 2012-12-14 2012-12-14 Throttling device for high pressure water-feeding pump of industrial boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105399589A CN103104909A (en) 2012-12-14 2012-12-14 Throttling device for high pressure water-feeding pump of industrial boiler

Publications (1)

Publication Number Publication Date
CN103104909A true CN103104909A (en) 2013-05-15

Family

ID=48312979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105399589A Pending CN103104909A (en) 2012-12-14 2012-12-14 Throttling device for high pressure water-feeding pump of industrial boiler

Country Status (1)

Country Link
CN (1) CN103104909A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05272707A (en) * 1992-03-25 1993-10-19 Mitsubishi Heavy Ind Ltd Boiler water feeding control device
CN2227240Y (en) * 1995-02-27 1996-05-15 上海平安高压调节阀门厂 Minimum discharge controlled valve for boiler water supply pump
CN201505675U (en) * 2009-09-19 2010-06-16 山西太钢不锈钢股份有限公司 High-pressure water throttling device
CN202991442U (en) * 2012-12-14 2013-06-12 中冶美利纸业股份有限公司 Throttling gear for boiler feed pump

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05272707A (en) * 1992-03-25 1993-10-19 Mitsubishi Heavy Ind Ltd Boiler water feeding control device
CN2227240Y (en) * 1995-02-27 1996-05-15 上海平安高压调节阀门厂 Minimum discharge controlled valve for boiler water supply pump
CN201505675U (en) * 2009-09-19 2010-06-16 山西太钢不锈钢股份有限公司 High-pressure water throttling device
CN202991442U (en) * 2012-12-14 2013-06-12 中冶美利纸业股份有限公司 Throttling gear for boiler feed pump

Similar Documents

Publication Publication Date Title
CN204648636U (en) The gas heater of built-in buffer tank
CN202991442U (en) Throttling gear for boiler feed pump
CN204510354U (en) A kind of adjustable type water tank flow diverter
CN203603214U (en) Water supply quick response device with adjusting function
CN202831091U (en) Ejector device for high-rise water supply secondary pressurization
CN103104909A (en) Throttling device for high pressure water-feeding pump of industrial boiler
CN204648637U (en) The gas heater of built-in buffer tank
CN206072643U (en) Welding type high pressure reducing pressure by regulating flow pipe
CN103727306A (en) Pressure reducer
CN205532985U (en) Hydraulic turbine water installations
CN203393174U (en) Device for maintaining and judging tuyere cooler of blast furnace
CN204494076U (en) Pressurized air self-draining arrangement
CN204326170U (en) A kind of bidirectional compensating formula totally-enclosed non-negative pressure water-supply installation
CN208779142U (en) A kind of device for gas pipeline water seal
CN203488361U (en) Water-feeding pump warming-up water control device in conventional island
CN203645963U (en) Water-cooling system for frequency-conversion control cabinet for crane
CN202381396U (en) Deflation type adjustable nozzle for electrical submersible pump
CN206174048U (en) Water supply equipment with anti -water hammer
CN103363513A (en) Water feeding system for sintering waste heat electric generating boiler
CN203319767U (en) Organic wastewater treating device internally provided with balance pressure-splitting and flow-splitting control system
CN203913215U (en) A kind of soy milk production equipment
CN204959376U (en) Device of liquid washing assistant of built -in injection
CN202787386U (en) Non-negative pressure pump station with water hammer protection function
CN205193008U (en) Novel serial test block is markd to cinder
CN203730277U (en) Hydraulic self-balancing power device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130515