CN103103899A - Track maintenance base point plane measurement method - Google Patents

Track maintenance base point plane measurement method Download PDF

Info

Publication number
CN103103899A
CN103103899A CN2013100495387A CN201310049538A CN103103899A CN 103103899 A CN103103899 A CN 103103899A CN 2013100495387 A CN2013100495387 A CN 2013100495387A CN 201310049538 A CN201310049538 A CN 201310049538A CN 103103899 A CN103103899 A CN 103103899A
Authority
CN
China
Prior art keywords
railway maintenance
point
website
track
basic point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100495387A
Other languages
Chinese (zh)
Other versions
CN103103899B (en
Inventor
王文庆
陈军
金亚雷
雷军
帅明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanghai Design Institute Group Co Ltd
Original Assignee
China Railway Shanghai Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Shanghai Design Institute Group Co Ltd filed Critical China Railway Shanghai Design Institute Group Co Ltd
Priority to CN201310049538.7A priority Critical patent/CN103103899B/en
Publication of CN103103899A publication Critical patent/CN103103899A/en
Application granted granted Critical
Publication of CN103103899B publication Critical patent/CN103103899B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to the field of surveying and mapping, in particular to a track maintenance base point plane measurement method. The method is characterized by including the following steps: an observing device is arranged at any one track maintenance base point which serves as a first station; at least three pairs of CP III points in the front and at least three pairs of CP III points in the rear of the first station along the track direction are observed; the first station, one track maintenance base point in the front and one track maintenance base point in the rear of the opposite side track along the track direction, and the prior track maintenance base point of apart track maintenance base points of the same side track are observed; and after observation is completed, the observing device moves to a second station to conduct observation, the second station is placed in the front of the side track opposite to the first station, and the first station and the second station are at a distance of two pairs of CP III points. The method has the advantages that all the track maintenance base points can be observed during track control (CP III).

Description

Railway maintenance basic point plane survey method
Technical field
The present invention relates to survey field, be specifically related to railway maintenance basic point plane survey method.
Background technology
The railway maintenance basic point is embedded in circuit two centers, track plates joint portion, adjacent 2 pairs of CP III middle part, lays one by every about 60 meters.Burial place near central lines of track, departs from wire center and should be not more than 3cm as far as possible.Uplink, downlink are buried underground respectively.
Traditional railway maintenance basic point observation procedure is very similar to the observation procedure of rail control network point (also claiming CP III point), namely adopts the mode of Free Station, and each 3 pairs of CP III points before and after establishing website are observed, and carries out whole net adjustment according to a section at last.This conventional planar observation procedure of railway maintenance basic point needs to arrange separately a group of people (approximately 5 people) to observe.Need like this two groups of personnel respectively to safeguarding that basic point and CP III point observe (approximately 10 people), caused like this waste of manpower, and reduced operating efficiency, increased the working time.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, railway maintenance basic point plane survey method is provided, railway maintenance basic point and CP III are put these two observation process to be observed together with combining, the a group of people completes the work that two groups of people complete, can greatly save manpower like this, and significantly improve observed efficiency.
The object of the invention realizes being completed by following technical scheme:
Railway maintenance basic point plane survey method, be provided with railway maintenance basic point and rail control network point along its bearing of trend array on described track, described rail control network point is centered in the plate seam of described track, described railway maintenance basic point is the forced centering control point that is laid in described plate seam, described rail control network point lays respectively at outside described two tracks, and it is characterized in that: described method comprises the following steps at least:
(a) observation instrument is erected on arbitrary described railway maintenance basic point, this railway maintenance basic point is established website as first;
(b) each three pairs of rail control network points are at least established before and after the website direction along ng a path in observation described first; Observe described first establish website itself, its to railway maintenance basic point of each before and after direction along ng a path on siding track with and the homonymy track on the be separated by last railway maintenance basic point of a railway maintenance basic point;
(c) observation complete after, described observation instrument is moved to second to be established website and observes by step (b), described second establish website be positioned at described first establish website on siding track the place ahead, and described first establish website and described second and establish the two pairs of described rail control network points of being separated by between website.
Described first establishes first railway maintenance basic point that website is direction along ng a path.
Described method advances described observation instrument direction along ng a path and cycling step (b) and step (c), until complete the observation of all railway maintenance basic points and rail control network point.
Advantage of the present invention is: all railway maintenance points can be observed in the lump the problem that does not have repeated measures or omit certain railway maintenance basic point of observation; Can save manpower, improve observed efficiency, shorten observation time.
Description of drawings
Fig. 1 is that middle orbit of the present invention is safeguarded basic point observation procedure schematic diagram;
Fig. 2 first establishes website rail control network point observation method schematic diagram in the present invention;
Fig. 3 second establishes website rail control network point observation method schematic diagram in the present invention.
The specific embodiment
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
As Figure 1-3, in figure, mark 1-13 is respectively: first establishes website 1, railway maintenance basic point 2, railway maintenance basic point 3, railway maintenance basic point 4, second establishes website 5, CP III point 6, CP III point 7, CP III point 8, CP III point 9, CP III point 10, CP III point 11, track 12, track 13.
Embodiment: the observation procedure of the present embodiment is used for providing a kind of observational network type, can be in satisfying CP III point (being the rail control network point) needs and repeatedly repeating the process of plane observation, the railway maintenance basic point is observed saving manpower in the lump, and improve observed efficiency.
As shown in Figure 1, direction shown in arrow is the observation direction of advance along track, namely successively railway maintenance basic point and CP III point is observed along the observation direction of advance of this track.First establishes website 1, railway maintenance basic point 2, railway maintenance basic point 3, railway maintenance basic point 4, second establishes website 5 and is in respectively on track 12 or track 13; As shown in Figure 1, 2, CP III point 6, CP III point 7, CP III point 8, CP III point 9, CP III point 10, CP III point 11 are all the rail control network point, and refer at track 12, track 13 both sides but the identical a pair of CP III point of mileage.
Observation procedure in this enforcement comprises the following steps:
1) basic point is established the station: observation instrument is erected at is in first in track 13 and establishes on website 1, namely this first establishes the website of establishing that website 1 itself is railway maintenance basic point and observation instrument.
2) net type observation: as shown in Figure 2, observe first to establish website 1 front and back respectively three pairs of CP III points, i.e. CP III point 6, CP III point 7, CP III point 8, CP III point 9, CP III point 10, CP III point 11 by observation instrument; As shown in Figure 1, observation first is established website 1 along observation direction of propulsion each railway maintenance basic point to front and back on siding track 12, be railway maintenance basic point 3, railway maintenance basic point 4, and with the last railway maintenance basic point 2 of the railway maintenance basic point of being separated by on siding track 13, add that first establishes website 1 itself, amount to four railway maintenance basic points of observation, six pairs of CP III points.What additionally need to illustrate is herein: net type observation refers to take the above-mentioned relative position relation of establishing between website (this establishes website itself also as the railway maintenance basic point) and railway maintenance observation base point or CP III point and observes as observation procedure.
3) instrument displacement: when step 2) complete after, observation instrument is established website 1 from first moves to second and establish website 5, the second to establish website itself be also a railway maintenance basic point.Second establishes website 5 and first establishes the CP III point 9 of being separated by between website 1, CP III point 10 these two pairs of CP III points, and second establish website 5 be in first establish website 1 on siding track 12.
4) along observing direction of propulsion and observing with step 1) to the observation operating procedure of step 3), when carrying out the plane observation of CP III point, railway maintenance basic points all on track 12 and track 13 can be observed in the lump, and do not had repeated measures.
The present embodiment is in the specific implementation: because observation is to carry out successively along direction along ng a path (observation direction of advance), so general employing begins observation with first railway maintenance basic point of any side as the first way of establishing website, make like this each railway maintenance basic point to observe successively along with the observation direction of advance, and without repeated measures; By the method for the present embodiment, in observation railway maintenance basic point, CP III point also can satisfy the technical requirements of twice observation in addition.

Claims (3)

1. railway maintenance basic point plane survey method, be provided with railway maintenance basic point and rail control network point along its bearing of trend array on described track, described rail control network point is centered in the plate seam of described track, described railway maintenance basic point is the forced centering control point that is laid in described plate seam, described rail control network point lays respectively at outside described two tracks, and it is characterized in that: described method comprises the following steps at least:
(a) observation instrument is erected on arbitrary described railway maintenance basic point, this railway maintenance basic point is established website as first;
(b) each three pairs of rail control network points are at least established before and after the website direction along ng a path in observation described first; Observe described first establish website itself, its to railway maintenance basic point of each before and after direction along ng a path on siding track with and the homonymy track on the be separated by last railway maintenance basic point of a railway maintenance basic point;
(c) observation complete after, described observation instrument is moved to second to be established website and observes by step (b), described second establish website be positioned at described first establish website on siding track the place ahead, and described first establish website and described second and establish the two pairs of described rail control network points of being separated by between website.
2. railway maintenance basic point plane survey method according to claim 1, it is characterized in that: described first establishes first railway maintenance basic point that website is direction along ng a path.
3. railway maintenance basic point plane survey method according to claim 1, it is characterized in that: described method advances described observation instrument direction along ng a path and cycling step (b) and step (c), until complete the observation of all railway maintenance basic points and rail control network point.
CN201310049538.7A 2013-02-07 2013-02-07 Track maintenance base point plane measurement method Active CN103103899B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310049538.7A CN103103899B (en) 2013-02-07 2013-02-07 Track maintenance base point plane measurement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310049538.7A CN103103899B (en) 2013-02-07 2013-02-07 Track maintenance base point plane measurement method

Publications (2)

Publication Number Publication Date
CN103103899A true CN103103899A (en) 2013-05-15
CN103103899B CN103103899B (en) 2015-03-25

Family

ID=48312074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310049538.7A Active CN103103899B (en) 2013-02-07 2013-02-07 Track maintenance base point plane measurement method

Country Status (1)

Country Link
CN (1) CN103103899B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306172A (en) * 2013-06-07 2013-09-18 西南交通大学 Method for building track control CP III network in simple point form
CN105672070A (en) * 2016-01-19 2016-06-15 长沙铁信交通科技有限公司 Control network establishing method for single-row track in existing line railway station
CN105821727A (en) * 2016-04-29 2016-08-03 中铁第四勘察设计院集团有限公司 CP III plane network measurement method
CN105821728A (en) * 2016-04-29 2016-08-03 中铁第四勘察设计院集团有限公司 CP III plane network measuring system
WO2017185918A1 (en) * 2016-04-29 2017-11-02 中铁第四勘察设计院集团有限公司 Cpiii planar network measurement method
CN112113550A (en) * 2020-10-16 2020-12-22 中铁上海设计院集团有限公司 Intelligent magnetic suspension power multi-state measuring prism and application method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989007688A1 (en) * 1988-02-22 1989-08-24 Matti Henttinen A method of and an equipment for determining the position of a track
US5598782A (en) * 1992-06-05 1997-02-04 British Railways Board Methods of railway track maintenance
CN101914881A (en) * 2010-07-27 2010-12-15 唐粮 Method for rapidly measuring foundation pile control net (CPIII) of rapid transit railway
CN102359042A (en) * 2011-07-22 2012-02-22 中南大学 Railway track accurate measurement control network establishing method
CN102425085A (en) * 2011-10-20 2012-04-25 中铁第一勘察设计院集团有限公司 CPIII plane network retest method in high-speed railway operation maintenance stage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989007688A1 (en) * 1988-02-22 1989-08-24 Matti Henttinen A method of and an equipment for determining the position of a track
US5598782A (en) * 1992-06-05 1997-02-04 British Railways Board Methods of railway track maintenance
CN101914881A (en) * 2010-07-27 2010-12-15 唐粮 Method for rapidly measuring foundation pile control net (CPIII) of rapid transit railway
CN102359042A (en) * 2011-07-22 2012-02-22 中南大学 Railway track accurate measurement control network establishing method
CN102425085A (en) * 2011-10-20 2012-04-25 中铁第一勘察设计院集团有限公司 CPIII plane network retest method in high-speed railway operation maintenance stage

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐俊洪: "高速铁路轨道控制网测量关键环节的质量控制", 《测绘通报》 *
杨永林: "既有提速线路绝对坐标精密控制网建网精度研究", 《企业技术发展》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306172A (en) * 2013-06-07 2013-09-18 西南交通大学 Method for building track control CP III network in simple point form
CN105672070A (en) * 2016-01-19 2016-06-15 长沙铁信交通科技有限公司 Control network establishing method for single-row track in existing line railway station
CN105821727A (en) * 2016-04-29 2016-08-03 中铁第四勘察设计院集团有限公司 CP III plane network measurement method
CN105821728A (en) * 2016-04-29 2016-08-03 中铁第四勘察设计院集团有限公司 CP III plane network measuring system
WO2017185918A1 (en) * 2016-04-29 2017-11-02 中铁第四勘察设计院集团有限公司 Cpiii planar network measurement method
CN105821728B (en) * 2016-04-29 2018-01-09 中铁第四勘察设计院集团有限公司 A kind of plane net measuring systems of CP III
CN112113550A (en) * 2020-10-16 2020-12-22 中铁上海设计院集团有限公司 Intelligent magnetic suspension power multi-state measuring prism and application method thereof
CN112113550B (en) * 2020-10-16 2023-08-15 中铁上海设计院集团有限公司 Intelligent magnetic floating force polymorphism measuring prism and application method thereof

Also Published As

Publication number Publication date
CN103103899B (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN103103899A (en) Track maintenance base point plane measurement method
CN105547151A (en) Three-dimensional laser scanning spot cloud data acquisition and processing method and system thereof
CN103706989B (en) A kind of online H profile steel corrugated web quick centering group erects standby
CN103306172B (en) Method for building track control CP III network in simple point form
CN102359042A (en) Railway track accurate measurement control network establishing method
CN106443354B (en) A kind of high-speed rail circuit fault distance measurement and fault localization system
CN106001242A (en) Full-automatic hydraulic punching machine
CN103661449B (en) Overhead contact line condition monitoring system
CN103132412B (en) Track maintenance base point lateral deviation measuring method based on Helen formula
CN104977474B (en) For the system for the loss for measuring high voltage direct current
CN103752920B (en) tower crane standard knot processing device and processing method
CN102825389A (en) Laser lineation positioning technique capable of enhancing solar cell conversion efficiency
CN105738955B (en) A kind of quick cloth electrode systems of tunnel water damage forward probe and its detection method based on DC electrical method
CN106976720A (en) Clamping jaw transport mechanism
CN205218403U (en) Supplementary welding frock of light -duty frame of elevator
CN103821537A (en) Splicing machining method of rectangular shield duct piece and anti-shear structure of rectangular shield duct piece
CN203918854U (en) A kind of mobile phone backlight source module General purpose jig
CN106584161A (en) Multi-station processing fixture
CN104401767B (en) PCB corners transmitting device and method
CN204116250U (en) A kind of X ray flat panel imaging monitor station system and device
CN203649746U (en) Rapid on-line aligning and assembly device for corrugated webs of H-shaped section steel
CN204237244U (en) PCBA board carrying mechanism in a kind of PCBA test cabinet
CN103934712B (en) For the drilling-hole positioning device of exhaust manifold inlet flange intercommunicating pore
CN203887277U (en) Multi-hole-diameter hole drilling clamp
CN105425102A (en) High speed railway fault distance measuring system based on power supply arms

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant