CN103090139A - Method for rapidly completing hoop assembly through installation marks - Google Patents
Method for rapidly completing hoop assembly through installation marks Download PDFInfo
- Publication number
- CN103090139A CN103090139A CN2013100220420A CN201310022042A CN103090139A CN 103090139 A CN103090139 A CN 103090139A CN 2013100220420 A CN2013100220420 A CN 2013100220420A CN 201310022042 A CN201310022042 A CN 201310022042A CN 103090139 A CN103090139 A CN 103090139A
- Authority
- CN
- China
- Prior art keywords
- clip
- hoop
- assembly
- assembling
- rubber tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Clamps And Clips (AREA)
Abstract
The invention relates to a method for rapidly completing hoop assembly through installation marks. A positioning mark (2) for hoop installation is arranged on a rubber tube (1), a hoop (3) is firstly sleeved on the rubber tube (1) when the method is used for assembling, and then the hoop (3) is moved to a scope of the installation marks (2) to complete assembly after assembly of the rubber tube (1) and a joint (4) is completed. When the hoop of a traditional assembly product is assembled, the hoop, the rubber tube and a joint are assembled in advance, then a distance from the hoop to a rubber tube port or a joint limiting retaining plate is adjusted through assembly tools, and assembly assembling is completed. The hoop installation marks are arranged on the rubber tube in advance, the hoop is assembled on the installation marks during assembling, and accordingly rapid and accurate assembly can be achieved. The position of the hoop is accurate, and work efficiency can be improved.
Description
Technical field
The present invention relates to clip and sebific duct and assemble the field, particularly a kind of sebific duct and joint pass through quick and precisely a kind of method of fastening clamp of clip adjustment notch after completing assembling.
Background technique
Fast development along with Chinese Auto Industry, assembly, module supply (ModularSupply) become the development trend of auto parts machinery industry gradually, and car load enterprise will be progressively purchases by transferring to minority system module supplier to the buying of a plurality of auto parts machinery manufacturer.Turn to a small amount of assembly and assembling module same period by assembling under a large amount of part production lines, along with the segmentation of supply responsibility, a large amount of components supplying business becomes secondary, three grades of suppliers, and a large amount of assemblies, integrated technology are applied in the Tier One supplier.Automotive hose pipeline assembly generally is comprised of the valve body of rubber hose, hard tube, joint, clip securing means and special role, electronic component etc.The assembly technology of generally having used at present is that sebific duct is connected with joint, and the assembly product is applied directly in the automobile assembling of automobile factory, the time of rolling off the production line to reduce automobile.
Assembled clip is according to assembly tool of production in the past, with clip pre-assembled to the sebific duct after, assembling sebific duct and joint, again hose assembly is put in assembly tool and to be adjusted clip apart from the sebific duct port or apart from the position of joint postive stop baffle, guarantee the correctness of clip position, this mode not only need to be made separately a frock for the different of product, and workman's operation will pass through a plurality of steps, and working efficiency is low.Meet status requirement after can not using assembly tool and can be assembled to clip on assembly by the present invention now.
Summary of the invention
The object of the present invention is to provide a kind of can be quick, a kind of method of clip accurately is installed, the workman can omit the loaded down with trivial details step of using frock to adjust, can increase work efficiency, and reduces costs, and accurately clip is assembled on assembly.
The present invention is achieved by the following technical solutions:
A kind of method of quick and precisely completing the clip installation by the clip adjustment notch is provided with the positioning mark 2 that clip is installed on sebific duct 1; During assembling, clip 3 first is enclosed within on sebific duct 1, after sebific duct 1 and joint 4 assemblings are completed, then clip 3 is moved on in adjustment notch 2 scopes completes assembling.
Clip adjustment notch (2) usage flag pad printing machine, bat printing plate are realized.
The present invention is applicable to install the assembly product of all kinds of gripping mechanisms.
Effect of the present invention: the assembly product of traditional assembly ring when assembling procedure is assembled, needs comparison assembly clip position, in advance clip is assembled on assembly, then pre-assembled good assembly is put in special tooling, adjusted the position, complete general assembly.The present invention by the method for clip adjustment notch is set on sebific duct, in the time of assembling, only needs clip is installed in the adjustment notch scope, namely can realize accurately, efficiently assembling.Need not to adjust.Not only rigging position is accurate, can also increase work efficiency.
Description of drawings
Fig. 1: clip of the present invention is installed to general assembly figure;
Fig. 2: adjustment notch schematic diagram of the present invention.
Embodiment
Below in conjunction with marginal data the specific embodiment of the present invention.
The present invention is a kind of design method of completing fast the clip assembling by adjustment notch.
As shown in Figure 2, design clip adjustment notch 2 according to the width that uses clip and customer requirement clip apart from the distance of sebific duct port on sebific duct 1, realize with pad printing machine, bat printing plate.The shape of clip adjustment notch, color can be controlled clip apart from the distance of sebific duct port without specific (special) requirements, can either satisfy required distance, can realize again once completing the clip assembling and get final product.As Fig. 1, a clip adjustment notch 2 is set on sebific duct 1, clip 3 first is enclosed within on sebific duct 1, after sebific duct 1 port is inserted into the baffle position of joint 4, clip 3 is moved on in the scope of the clip adjustment notch 2 on sebific duct 1, complete general assembly.
In the past in the operation of assembling clip, the workman is assembled into clip on assembly in advance, then put into special tooling and adjust the clip position, this method is passed through in 10 ~ 15 of the about assemblings per minute of completed knocked down products, the workman can be according to the method that clip is assembled in the adjustment notch scope, need not pre-installation and adjustment, can complete fast, accurately assembly working, use 30 ~ 45 of the about assemblings per minute of this method assembling clip, can improve the manufacturing efficiency of three to four-fold.
Structure of the present invention is without any pro forma restriction, allly does any simple modification and modification according to example of the present invention, within all belonging to technological scheme scope of the present invention.
Claims (2)
1. quick and precisely complete by the clip adjustment notch method that clip is installed for one kind, it is characterized in that in the upper setting of sebific duct (1)
The positioning mark (2) that has clip to install; During assembling, clip (3) first is enclosed within on sebific duct (1), when with sebific duct
(1) complete with joint (4) assembling after, then clip (3) moved on in adjustment notch (2) scope complete assembling.
2. as the method under claim 1, it is characterized in that clip adjustment notch (2) usage flag pad printing machine, bat printing plate come
Realize.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100220420A CN103090139A (en) | 2013-01-22 | 2013-01-22 | Method for rapidly completing hoop assembly through installation marks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100220420A CN103090139A (en) | 2013-01-22 | 2013-01-22 | Method for rapidly completing hoop assembly through installation marks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103090139A true CN103090139A (en) | 2013-05-08 |
Family
ID=48203071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100220420A Pending CN103090139A (en) | 2013-01-22 | 2013-01-22 | Method for rapidly completing hoop assembly through installation marks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103090139A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103410617A (en) * | 2013-08-20 | 2013-11-27 | 中国航空工业集团公司沈阳发动机设计研究所 | Method for determining position of hoops on engine pipelines |
CN108674927A (en) * | 2018-05-22 | 2018-10-19 | 江苏赛麟汽车科技有限公司 | A kind of pipeline parts divide packing method |
CN115405763A (en) * | 2022-11-03 | 2022-11-29 | 中国航发四川燃气涡轮研究院 | Cold extrusion connection clamp assembly and pipeline using same |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10121966A (en) * | 1996-10-18 | 1998-05-12 | Suzuki Motor Corp | Structure of assembly of water hose in water-cooled engine |
CN101363218A (en) * | 2007-08-06 | 2009-02-11 | 中国海洋石油总公司 | Installation method of riser clip on offshore jacket |
GB2474241A (en) * | 2009-10-06 | 2011-04-13 | Clancy Plant Hire Ltd | Electro-fushion Welding |
KR20110048095A (en) * | 2009-11-02 | 2011-05-11 | 신경식 | clamp for easy to assembling |
CN202181937U (en) * | 2011-09-01 | 2012-04-04 | 浙江峻和橡胶科技有限公司 | Forced ventilation pipe assembly for crankcase |
-
2013
- 2013-01-22 CN CN2013100220420A patent/CN103090139A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10121966A (en) * | 1996-10-18 | 1998-05-12 | Suzuki Motor Corp | Structure of assembly of water hose in water-cooled engine |
CN101363218A (en) * | 2007-08-06 | 2009-02-11 | 中国海洋石油总公司 | Installation method of riser clip on offshore jacket |
GB2474241A (en) * | 2009-10-06 | 2011-04-13 | Clancy Plant Hire Ltd | Electro-fushion Welding |
KR20110048095A (en) * | 2009-11-02 | 2011-05-11 | 신경식 | clamp for easy to assembling |
CN202181937U (en) * | 2011-09-01 | 2012-04-04 | 浙江峻和橡胶科技有限公司 | Forced ventilation pipe assembly for crankcase |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103410617A (en) * | 2013-08-20 | 2013-11-27 | 中国航空工业集团公司沈阳发动机设计研究所 | Method for determining position of hoops on engine pipelines |
CN108674927A (en) * | 2018-05-22 | 2018-10-19 | 江苏赛麟汽车科技有限公司 | A kind of pipeline parts divide packing method |
CN115405763A (en) * | 2022-11-03 | 2022-11-29 | 中国航发四川燃气涡轮研究院 | Cold extrusion connection clamp assembly and pipeline using same |
CN115405763B (en) * | 2022-11-03 | 2023-03-10 | 中国航发四川燃气涡轮研究院 | Pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103090139A (en) | Method for rapidly completing hoop assembly through installation marks | |
CN103313908A (en) | Vehicle body assembly apparatus | |
CN202861694U (en) | Shell plate tool of vehicle body side | |
CN103032429A (en) | Fast connecting method of rubber pipe and joint | |
CN103016885A (en) | Fast connecting device of rubber tube and joint | |
CN103161370A (en) | Car door hinge locating pin component | |
CN105479157A (en) | Condenser fan assembly fixture | |
CN105563384A (en) | Condenser fan assembling clamp | |
CN102514388B (en) | Rubber hose positioning, marking and processing tooling | |
CN104626764B (en) | Component marking positioning clamping mechanism and corresponding marking device | |
CN203957852U (en) | A kind of filler cap harness | |
CN202878160U (en) | Positioning tool of automobile windshield glass | |
CN202910500U (en) | Oil tank positioning welding device of skid loader | |
CN203641532U (en) | Installation structure of radial seal valve parts | |
CN204603897U (en) | Saddle boring bearing hole frock | |
CN204977730U (en) | Multi -functional tool and backlight sticking film machine | |
CN204397296U (en) | A kind of Carrier for cycle assembled fixture | |
CN204545859U (en) | Rubber sleeve press-in device | |
CN202992115U (en) | Car speed reducer shell provided with anti-misloading holes | |
CN214292829U (en) | Tool for installing skin bracket in center relative to fender before final assembly | |
CN201505732U (en) | Tailstock sleeve structure for a numerically controlled machine tool | |
CN204546043U (en) | More than one piece milling side positioning tool | |
CN206536707U (en) | A kind of grinding tool processed for auto parts machinery | |
CN203109520U (en) | Fixture for welding tail light plate and side frame outer plate of automobile | |
CN204383124U (en) | A kind of air conditioning for automobiles HVAC interlinked mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130508 |