CN103089053B - The anticorrosion lining brick construction method of concentrator in tropical rain forest area - Google Patents
The anticorrosion lining brick construction method of concentrator in tropical rain forest area Download PDFInfo
- Publication number
- CN103089053B CN103089053B CN201110335829.3A CN201110335829A CN103089053B CN 103089053 B CN103089053 B CN 103089053B CN 201110335829 A CN201110335829 A CN 201110335829A CN 103089053 B CN103089053 B CN 103089053B
- Authority
- CN
- China
- Prior art keywords
- concentrator
- lining brick
- brick
- anticorrosion
- anticorrosion lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The present invention relates to the anticorrosion lining brick construction method of concentrator.The anticorrosion lining brick construction method of concentrator in tropical rain forest area, it comprises: step one, DECOMPOSED OPTIMIZATION drawing: according to concentrator liner acid resisting brick basic unit, setting course, operational layer material, by lining brick figure and brick shape figure Synchronization Design, Synchronous fluorimetry; Step 2, construction environment controls: take cable-stayed type three rain-proof shelter to carry out integrally closed by uncovered for ultra-large volume concentrator, and utilizes blower fan, dehumidifier, air-conditioning to carry out dehumidifying and cooling to the inside that it is closed; Step 3, according to the lining brick technique preset, check with on-the-spot full size, brick ring and dilatation joint control line is discharged after errorless, anticorrosion for entirety lining brick Region Decomposition become some regions according to the order of the end, wall, wedged bottom and barricade, progressively lining brick continuous productive process is organized in segmentation from bottom to top, from inside to outside.The present invention can carry out the anticorrosion lining brick construction of concentrator at any time, fast in tropical rain forest area, ensure construction quality, shorten construction period.
Description
Technical field
The present invention relates to concentrator construction, particularly relate to the anticorrosion lining brick construction method of concentrator.
Background technology
In recent years, China has undertaken the construction of a large amount of concentrators in the world.Concentrator is usually all along with orefield is arranged, and many metallurgical ore places of production are all positioned at tropical rain forest area.As everyone knows, the weather in tropical rain forest area is sultry rainy, high humidity, and this is very unfavorable for lining brick construction: not only huge for the impact of lining brick material, and is also a huge challenge for the muscle power of constructor, easily the phenomenons such as heatstroke occurs.Therefore common lining brick construction all avoids summer.But the time being applicable to lining brick construction due to tropical rain forest area is not a lot, if select suitable weather just to construct, this can not put up with, and with regard to requiring us to emit, sultry hot and humid weather is constructed for this.
In addition, weight hundreds of ton easily of concentrator, its diameter also can reach tens of rice usually, and common lining brick technology is difficult to meet owner to the requirement of construction period.
Summary of the invention
The present invention is intended to solve the problems of the technologies described above, and provides a kind of concentrator of tropical rain forest area anticorrosion lining brick construction method.The present invention can carry out the anticorrosion lining brick construction of concentrator at any time, fast in tropical rain forest area, ensure construction quality, shorten construction period.
For solving the problem, a kind of anticorrosion lining brick construction method of concentrator of tropical rain forest area, it comprises:
Step one, DECOMPOSED OPTIMIZATION drawing: according to the anticorrosion lining brick basic unit of concentrator, setting course, operational layer material, by anticorrosion lining brick figure and brick shape figure Synchronization Design, Synchronous fluorimetry: according to concentrator internal diameter size and wall, bottom structure, preset brick-building art, by anticorrosion lining brick number of rings, build modulus by laying bricks or stones, utilize 3-D technology to simulate to decompose, optimize brick kind, complicated key position carries out special form brick design and production and processing;
Step 2, construction environment controls: according to on-the-spot tropical rain forest climate, the climatic characteristic of the rainy sultry humidity of environment, cable-stayed type three rain-proof shelter is taked to carry out integrally closed by uncovered for ultra-large volume concentrator, and utilize blower fan, dehumidifier, air-conditioning to carry out dehumidifying and cooling to the inside that it is closed, guarantee that line with rubber lining brick environment meets the requirements;
Step 3, according to the lining brick technique preset, check with on-the-spot full size, anticorrosion lining brick ring and dilatation joint control line is discharged after errorless, anticorrosion for entirety lining brick Region Decomposition is become some regions: the end, wall, wedged bottom and barricade, by the order of the end, wall, wedged bottom and barricade, progressively lining brick continuous productive process is organized in segmentation from bottom to top, from inside to outside.
The anticorrosion lining brick construction method of concentrator in described tropical rain forest area, described step 2 comprises:
One of, in the gantry top of concentrator, supporting traverse is set;
Two, the top circle along concentrator barrel wall arranges one group of strong point;
Three, centered by supporting traverse, connect supporting traverse and the strong point radially with cable wire, composition cable-stayed type cable wire is as the skeleton of cable-stayed type three rain-proof shelter;
Four, the skeleton of cable-stayed type three rain-proof shelter covers tarpaulin, and tarpaulin and skeleton is fixed, form the inner space of a relative closure, this interior volume arranges air-conditioning, blower fan;
Five, dehumidifier is connected with the storage tank technique mouth of pipe below concentrator wedged bottom central authorities or manhole by air channel; Dehumidifier is blown in concentrator, makes oblique pull awning inside remain positive draft.
The anticorrosion lining brick construction method of concentrator in described tropical rain forest area, four of described step 2 also comprises, and is connected by cable-stayed type three rain-proof shelter skeleton with metal flat steel band with the stake of concentrator lightning protection; Ground resistance is for being less than 50 ohm.
The anticorrosion lining brick construction method of concentrator in described tropical rain forest area, described step 3 comprises, and described wedged bottom region is divided into four right angle sector regions; Simultaneously four regions carry out anticorrosion lining brick construction.
The particular surroundings control measure such as the present invention takes Rainproof moisture-proof windproof at the scene, will separate with natural environment in equipment, form a closed construction space, ensure that carrying out smoothly of construction; Decrease the adverse effect to construction of natural environment and weather diversity complexity, lining brick is constructed from the restriction of tropical rainy climate, allowing anticorrosion lining brick construct becomes " round-the-clock " construction, contributes to shortening the on-the-spot duration; Control construction external environment condition simultaneously, effectively decrease the pollution that may cause surrounding environment in work progress in equipment.Further the present invention adopts scientific and reasonable division ultra-large volume concentrator wall, bottom structure region, organizes piecemeal construction flow process piecemeal, ensure that each professional construction quality in equipment; Anticorrosion lining brick operation is specialized, batch production, ensure that masonry quality.
Detailed description of the invention
The anticorrosion lining brick construction method of concentrator in tropical rain forest area, it comprises:
Step one, DECOMPOSED OPTIMIZATION drawing: according to the anticorrosion lining brick basic unit of concentrator, setting course, operational layer material, by anticorrosion lining brick figure and brick shape figure Synchronization Design, Synchronous fluorimetry: according to concentrator internal diameter size and wall, bottom structure, preset brick-building art, by lining brick number of rings, build modulus by laying bricks or stones, utilize 3-D technology to simulate to decompose, optimize anticorrosion lining brick brick kind, complicated key position carries out special form brick design and production and processing;
Step 2, construction environment controls: according to on-the-spot tropical rain forest climate, the climatic characteristic of the rainy sultry humidity of environment, cable-stayed type three rain-proof shelter is taked to carry out integrally closed by uncovered for ultra-large volume concentrator, and utilize blower fan, dehumidifier, air-conditioning to carry out dehumidifying and cooling to the inside that it is closed, guarantee that line with rubber lining brick environment meets the requirements;
Step 3, according to the lining brick technique preset, check with on-the-spot full size, anticorrosion lining brick brick ring and dilatation joint control line is discharged after errorless, anticorrosion for entirety lining brick Region Decomposition is become some regions: the end, wall, wedged bottom and barricade, by the order of the end, wall, wedged bottom and barricade, progressively lining brick continuous productive process is organized in segmentation from bottom to top, from inside to outside.Described wedged bottom region is divided into four right angle sector regions; Simultaneously four regions carry out anticorrosion lining brick construction.
The anticorrosion lining brick construction method of concentrator in described tropical rain forest area, described step 2 comprises:
One of, in the gantry top of concentrator, supporting traverse is set;
Two, the top circle along concentrator barrel wall arranges one group of strong point;
Three, centered by supporting traverse, connect supporting traverse and the strong point radially with cable wire, composition cable-stayed type cable wire is as the skeleton of cable-stayed type three rain-proof shelter;
Four, the skeleton of cable-stayed type three rain-proof shelter covers tarpaulin, and tarpaulin and skeleton is fixed, form the inner space of a relative closure, this interior volume arranges air-conditioning, blower fan;
Five, dehumidifier is connected with the storage tank technique mouth of pipe below concentrator wedged bottom central authorities or manhole by air channel; Dehumidifier is blown in concentrator, makes cable-stayed type three rain-proof shelter inside remain positive draft.
The anticorrosion lining brick construction method of concentrator in described tropical rain forest area, four of described step 2 also comprises, and is connected by cable-stayed type three rain-proof shelter skeleton with metal flat steel band with the stake of concentrator lightning protection; Ground resistance is for being less than 50 ohm.
Claims (4)
1. the anticorrosion lining brick construction method of the concentrator in tropical rain forest area, it is characterized in that, it comprises:
Step one, DECOMPOSED OPTIMIZATION drawing: according to the anticorrosion lining brick basic unit of concentrator, setting course, operational layer material, by anticorrosion lining brick figure and brick shape figure Synchronization Design, Synchronous fluorimetry: according to concentrator internal diameter size and wall, bottom structure, preset brick-building art, by anticorrosion lining brick number of rings, build modulus by laying bricks or stones, utilize 3-D technology to simulate to decompose, optimize anticorrosion lining brick brick kind, complicated key position carries out special form brick design and production and processing;
Step 2, construction environment controls: take cable-stayed type three rain-proof shelter to carry out integrally closed by uncovered for ultra-large volume concentrator, and dehumidifying and cooling is carried out in the inside utilizing blower fan, dehumidifier, air-conditioning closed to it, guarantees line with rubber, the environment of anticorrosion lining brick meets the requirements;
Step 3, according to the lining brick technique preset, with on-the-spot full size carry out checking errorless after discharge anticorrosion lining brick brick ring and dilatation joint control line, anticorrosion for entirety lining brick Region Decomposition is become some regions: the end, wall, wedged bottom and barricade, by the order of the end, wall, wedged bottom and barricade, progressively anticorrosion lining brick continuous productive process is organized in segmentation from bottom to top, from inside to outside.
2. the anticorrosion lining brick construction method of the concentrator in tropical rain forest area according to claim 1, it is characterized in that, described step 2 comprises:
One of, in the gantry top of concentrator, supporting traverse is set;
Two, the top circle along concentrator barrel wall arranges one group of strong point;
Three, centered by supporting traverse, connect supporting traverse and the strong point radially with cable wire, composition cable-stayed type cable wire is as the skeleton of cable-stayed type three rain-proof shelter;
Four, the skeleton of cable-stayed type three rain-proof shelter covers tarpaulin, and tarpaulin and skeleton is fixed, form the inner space of a relative closure, this interior volume arranges air-conditioning, blower fan;
Five, dehumidifier is connected with the storage tank technique mouth of pipe below concentrator wedged bottom central authorities or manhole by air channel; Dehumidifier is blown in concentrator, makes cable-stayed type three rain-proof shelter inside remain positive draft.
3. the anticorrosion lining brick construction method of the concentrator in tropical rain forest area according to claim 2, it is characterized in that, four of described step 2 also comprises, and is connected by anti-for cable-stayed type three rain-proof shelter skeleton with metal flat steel band with the stake of concentrator lightning protection; Ground resistance is for being less than 50 ohm.
4. the anticorrosion lining brick construction method of the concentrator in tropical rain forest area according to claim 1, is characterized in that, in described step 3, described wedged bottom region is divided into four right angle sector regions; Simultaneously four regions carry out anticorrosion lining brick construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110335829.3A CN103089053B (en) | 2011-10-31 | 2011-10-31 | The anticorrosion lining brick construction method of concentrator in tropical rain forest area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110335829.3A CN103089053B (en) | 2011-10-31 | 2011-10-31 | The anticorrosion lining brick construction method of concentrator in tropical rain forest area |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103089053A CN103089053A (en) | 2013-05-08 |
CN103089053B true CN103089053B (en) | 2015-08-12 |
Family
ID=48202139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110335829.3A Active CN103089053B (en) | 2011-10-31 | 2011-10-31 | The anticorrosion lining brick construction method of concentrator in tropical rain forest area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103089053B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1147423A1 (en) * | 1983-02-11 | 1985-03-30 | Всесоюзный Научно-Исследовательский И Проектно-Изыскательский Институт По Проблемам Добычи,Транспорта И Переработки Минерального Сырья В Промышленности Строительных Материалов | Pulp thickener |
CN101837203A (en) * | 2009-11-05 | 2010-09-22 | 中国恩菲工程技术有限公司 | Thickener shell |
CN101837202A (en) * | 2009-11-05 | 2010-09-22 | 中国恩菲工程技术有限公司 | Thickener |
CN201815155U (en) * | 2010-10-27 | 2011-05-04 | 烟台宜陶矿业有限公司 | Novel slow-flow high-efficiency thickening machine |
-
2011
- 2011-10-31 CN CN201110335829.3A patent/CN103089053B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1147423A1 (en) * | 1983-02-11 | 1985-03-30 | Всесоюзный Научно-Исследовательский И Проектно-Изыскательский Институт По Проблемам Добычи,Транспорта И Переработки Минерального Сырья В Промышленности Строительных Материалов | Pulp thickener |
CN101837203A (en) * | 2009-11-05 | 2010-09-22 | 中国恩菲工程技术有限公司 | Thickener shell |
CN101837202A (en) * | 2009-11-05 | 2010-09-22 | 中国恩菲工程技术有限公司 | Thickener |
CN201815155U (en) * | 2010-10-27 | 2011-05-04 | 烟台宜陶矿业有限公司 | Novel slow-flow high-efficiency thickening machine |
Also Published As
Publication number | Publication date |
---|---|
CN103089053A (en) | 2013-05-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105009836B (en) | A kind of constant temperature protection against the tide silo | |
CN105594390B (en) | Ground type citrus ventilated storage house | |
CN107178226A (en) | The whole self-propelled totally-enclosed green construction enclosing of formula and its construction method | |
CN103089053B (en) | The anticorrosion lining brick construction method of concentrator in tropical rain forest area | |
CN104533001B (en) | A kind of electronic rotation temporary roof cover for nuclear power plant reactor factory building | |
CN206917351U (en) | The whole self-propelled totally-enclosed green construction enclosing of formula | |
CN105830814A (en) | Novel multifunctional greenhouse | |
CN103884200B (en) | The indirect air cooling light-weight steel cage structure tower of anti-freezing economical can be realized | |
CN202731321U (en) | Multifunctional movable shack at construction site | |
CN203514952U (en) | Wind-break wall used for coal yard | |
CN201652695U (en) | Stream guidance structure of natural ventilation device on roof | |
CN205531409U (en) | A lew for explosion welding place | |
CN207974616U (en) | A kind of detachable protective net | |
CN201652694U (en) | Roof natural ventilation device with lifting structure | |
CN201878339U (en) | Integrated communication base station | |
CN206635939U (en) | Rack | |
CN205857828U (en) | A kind of haze science and technology Peng Guan | |
CN201981681U (en) | An insulation structure of a metal grid plate | |
CN205623525U (en) | Novel multifunctional greenhouse | |
CN203973729U (en) | A kind of new concrete Construction of Continuous Box Beam ventilating system | |
CN206078313U (en) | Plant room | |
CN204371061U (en) | A kind of OLED is except haze clearing window | |
CN110158493A (en) | The Combined anti-wind canopy of the heavens and method | |
CN103558365A (en) | Testing device for simulating cement clinker calcination cooling | |
CN103883139A (en) | Novel cable net film cooling tower structural system with chimney utilized as inner mast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |