CN103088940B - A kind of compound shear wall and construction method thereof - Google Patents

A kind of compound shear wall and construction method thereof Download PDF

Info

Publication number
CN103088940B
CN103088940B CN201310033632.3A CN201310033632A CN103088940B CN 103088940 B CN103088940 B CN 103088940B CN 201310033632 A CN201310033632 A CN 201310033632A CN 103088940 B CN103088940 B CN 103088940B
Authority
CN
China
Prior art keywords
shear wall
pipe
reinforced concrete
prefibers
compound shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310033632.3A
Other languages
Chinese (zh)
Other versions
CN103088940A (en
Inventor
黄靓
孙晓逊
黄凯
谭浩智
戴光校
尹鹏
黄梅梅
何东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201310033632.3A priority Critical patent/CN103088940B/en
Publication of CN103088940A publication Critical patent/CN103088940A/en
Application granted granted Critical
Publication of CN103088940B publication Critical patent/CN103088940B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to technical field of building construction, particularly relate to a kind of compound shear wall and construction method thereof, compound shear wall retrains reinforced concrete post by the fibre pipe being positioned at compound shear wall two ends and the assembled integral reinforced concrete shear wall be positioned in the middle of compound shear wall combines, fibre pipe constraint reinforced concrete post after mutual bonding and assembled integral reinforced concrete shear wall are combined into can cooperative compound shear wall, fibre pipe constraint reinforced concrete post is used as the edge member of shear wall, compound shear wall is made to have good ductility and energy dissipation capacity under seismic loading, the ability of the anti-shearing destruction of shear wall is improve by the cloth in arranged crosswise fibre pipe, and then improve the bearing capacity of shear wall, be conducive to flexible arrangement and the space utilization of structure, its assembling overall structure is convenient processing and production not only, the more important thing is and can save template, improve speed of application and reduce construction costs.

Description

A kind of compound shear wall and construction method thereof
Technical field
The present invention relates to technical field of building construction, particularly relate to a kind of compound shear wall and construction method thereof.
Background technology
The similar semi girder of the stress of shear wall under geological process, namely its two ends are born and larger to be drawn, press load, shear wall by criterion settings confined boundary member or must construct edge member to improve its two ends load-bearing ability, there is arrangement of reinforcement problem bigger than normal in the edge member of traditional shear wall, under seismic loading, the ductility of shear wall is not enough, energy dissipation capacity is poor, and it designs, construction is all more complicated, and not easily design becomes " high thin " shear wall.
A kind of compound shear wall of the present invention has good ductility and energy dissipation capacity under seismic loading, fibre pipe constraint reinforced concrete post is used as the edge member of shear wall, solve the problem that shear wall edge member arrangement of reinforcement is bigger than normal, the ability of the anti-shearing destruction of shear wall is improve by the cloth in arranged crosswise fibre pipe, and then improve the bearing capacity of shear wall, reduce deadweight and the volume of shear wall to a certain extent, be conducive to flexible arrangement and the space utilization of structure, its assembling overall structure is convenient processing and production not only, the more important thing is and can save template, improve speed of application and reduce construction costs, be adapted at promoting the use of in China's construction work.
Summary of the invention
The object of the present invention is to provide a kind of compound shear wall and construction method thereof, improve the supporting capacity of shear wall, optimize architectural design.
The object of the invention is to be achieved through the following technical solutions:
The present invention proposes a kind of compound shear wall, specific embodiments is: compound shear wall retrains reinforced concrete post by the fibre pipe being positioned at compound shear wall two ends and the assembled integral reinforced concrete shear wall be positioned in the middle of compound shear wall combines, fibre pipe constraint reinforced concrete post is made up of the cast-in-situ steel reinforced concrete in U-shaped prefibers pipe and U-shaped prefibers pipe, assembled integral reinforced concrete shear wall is made up of the cast-in-situ steel reinforced concrete in precast concrete pipe and precast concrete pipe, two sections of U-shaped prefibers pipes are projected with a section fibre cloth to assembled integral reinforced concrete shear wall, overhanging section fibre cloth and assembled integral reinforced concrete shear wall bond mutually, fibre pipe constraint reinforced concrete post after mutual bonding and assembled integral reinforced concrete shear wall are combined into can cooperative compound shear wall.
Further, the short transverse angle arranged crosswise at 45 ° of the cloth in U-shaped prefibers pipe and compound shear wall.
Further, assembled integral reinforced concrete shear wall is all cuboid with the shape of the reinforced concrete post having fibre pipe to retrain.
Further, the bonding mode of U-shaped prefibers pipe and precast concrete pipe is: the overhanging section fibre cloth of U-shaped prefibers pipe is pasted onto by epoxy resin adhesive on the precast concrete pipe that is in contact with it.
The construction method of this compound shear wall, comprises the steps: successively
(a) preparation: the preparation comprising U-shaped prefibers pipe, reinforcing cage, precast concrete pipe, cementing agent, the concrete of design designated with numeral, concrete pump, concrete vibrating equipment, template and lifting machine; Installing of lifting hoop; Snap the line bit combination shear wall;
B the bonding of () prefabricated units: docked with precast concrete pipe by two sections of U-shaped prefibers pipes, by precast concrete pipe and overhanging cloth, precast concrete pipe with bond with the cloth epoxy resin adhesive of precast concrete pipe end contact;
The colligation of (c) reinforcing cage: specify reinforcing cage colligation scheme assembling reinforcement cage by design, and link with lower one deck compound shear wall protruding bar or compound shear wall vertical reinforcement is stretched into basic engineering designated length;
D the lifting of () prefabricated units: after the adhesion strength between prefabricated units meets lifting requirements, is made prefabricated pipe wear corresponding reinforcing cage by lifting and the U-shaped prefibers pipe mutually bondd and precast concrete pipe is placed in snap the line position location;
The check of (e) prefabricated units position and adjustment: the calibration comprising the verticality of the U-shaped prefibers pipe of mutually bonding and precast concrete pipe, position and distortion;
F () compound shear wall is constructed: concreting in the U-shaped prefibers pipe and precast concrete pipe of compound shear wall, and the steel concrete reaching design strength and the U-shaped prefibers pipe mutually bondd, precast concrete pipe bond, and become can cooperative compound shear wall.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is top view of the present invention;
Fig. 3 is component schematic diagram used in the present invention.
Description of reference numerals is as follows:
1-U type prefibers pipe, the overhanging cloth of 2-, 3-cast-in-situ steel reinforced concrete, 4-precast concrete pipe, 5-assembled integral reinforced concrete shear wall, 6-fibre pipe constraint reinforced concrete post, 7-lifts hoop.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in detail.
See Fig. 1-Fig. 3:
Compound shear wall retrains reinforced concrete post by the fibre pipe being positioned at compound shear wall two ends and the assembled integral reinforced concrete shear wall be positioned in the middle of compound shear wall combines, fibre pipe constraint reinforced concrete post is made up of the cast-in-situ steel reinforced concrete in U-shaped prefibers pipe and U-shaped prefibers pipe, assembled integral reinforced concrete shear wall is made up of the cast-in-situ steel reinforced concrete in precast concrete pipe and precast concrete pipe, two sections of U-shaped prefibers pipes are projected with a section fibre cloth to assembled integral reinforced concrete shear wall, overhanging section fibre cloth and assembled integral reinforced concrete shear wall bond mutually, fibre pipe constraint reinforced concrete post after mutual bonding and assembled integral reinforced concrete shear wall are combined into can cooperative compound shear wall.
The construction method of this compound shear wall, comprises the following steps successively:
(a) preparation: the preparation comprising U-shaped prefibers pipe, reinforcing cage, precast concrete pipe, cementing agent, the concrete of design designated with numeral, concrete pump, concrete vibrating equipment, template and lifting machine; Installing of lifting hoop; Snap the line bit combination shear wall.
B the bonding of () prefabricated units: docked with precast concrete pipe by two sections of U-shaped prefibers pipes, by precast concrete pipe and overhanging cloth, precast concrete pipe with bond with the cloth epoxy resin adhesive of precast concrete pipe end contact.
The colligation of (c) reinforcing cage: specify reinforcing cage colligation scheme assembling reinforcement cage by design, and link with lower one deck compound shear wall protruding bar or compound shear wall vertical reinforcement is stretched into basic engineering designated length.
D the lifting of () prefabricated units: after the adhesion strength between prefabricated units meets lifting requirements, is made prefabricated pipe wear corresponding reinforcing cage by lifting and the U-shaped prefibers pipe mutually bondd and precast concrete pipe is placed in snap the line position location.
The check of (e) prefabricated units position and adjustment: the calibration comprising the verticality of the U-shaped prefibers pipe of mutually bonding and precast concrete pipe, position and distortion.
F () compound shear wall is constructed: concreting in the U-shaped prefibers pipe and precast concrete pipe of compound shear wall, and the steel concrete reaching design strength and the U-shaped prefibers pipe mutually bondd, precast concrete pipe bond, and become can cooperative compound shear wall.

Claims (5)

1. a compound shear wall, it is characterized in that: compound shear wall retrains reinforced concrete post by the fibre pipe being positioned at compound shear wall two ends and the assembled integral reinforced concrete shear wall be positioned in the middle of compound shear wall combines, fibre pipe constraint reinforced concrete post is made up of the cast-in-situ steel reinforced concrete in U-shaped prefibers pipe and U-shaped prefibers pipe, assembled integral reinforced concrete shear wall is made up of the cast-in-situ steel reinforced concrete in precast concrete pipe and precast concrete pipe, two sections of U-shaped prefibers pipes are projected with a section fibre cloth to assembled integral reinforced concrete shear wall, overhanging section fibre cloth and assembled integral reinforced concrete shear wall bond mutually, fibre pipe constraint reinforced concrete post after mutual bonding and assembled integral reinforced concrete shear wall are combined into can cooperative compound shear wall.
2. a kind of compound shear wall according to claim 1, is characterized in that: the cloth in U-shaped prefibers pipe and the short transverse of compound shear wall angle arranged crosswise at 45 °.
3. a kind of compound shear wall according to claim 1, is characterized in that: the shape of assembled integral reinforced concrete shear wall and fibre pipe constraint reinforced concrete post is all cuboid.
4. a kind of compound shear wall according to claim 1, is characterized in that: the bonding mode of U-shaped prefibers pipe and precast concrete pipe is: the overhanging section fibre cloth of U-shaped prefibers pipe is pasted onto by epoxy resin adhesive on the precast concrete pipe that is in contact with it.
5. a construction method for compound shear wall, is characterized in that: comprise following steps successively:
(a) preparation: the preparation comprising U-shaped prefibers pipe, reinforcing cage, precast concrete pipe, cementing agent, the concrete of design designated with numeral, concrete pump, concrete vibrating equipment, template and lifting machine; Installing of lifting hoop; Snap the line bit combination shear wall;
B the bonding of () prefabricated units: docked with precast concrete pipe by two sections of U-shaped prefibers pipes, by precast concrete pipe and overhanging cloth, precast concrete pipe with bond with the cloth epoxy resin adhesive of precast concrete pipe end contact;
The colligation of (c) reinforcing cage: specify reinforcing cage colligation scheme assembling reinforcement cage by design, and link with lower one deck compound shear wall protruding bar or compound shear wall vertical reinforcement is stretched into basic engineering designated length;
D the lifting of () prefabricated units: after the adhesion strength between prefabricated units meets lifting requirements, is made prefabricated pipe wear corresponding reinforcing cage by lifting and the U-shaped prefibers pipe mutually bondd and precast concrete pipe is placed in snap the line position location;
The check of (e) prefabricated units position and adjustment: the calibration comprising the verticality of the U-shaped prefibers pipe of mutually bonding and precast concrete pipe, position and distortion;
F () compound shear wall is constructed: concreting in the U-shaped prefibers pipe and precast concrete pipe of compound shear wall, and the steel concrete reaching design strength and the U-shaped prefibers pipe mutually bondd, precast concrete pipe bond, and become can cooperative compound shear wall.
CN201310033632.3A 2013-01-29 2013-01-29 A kind of compound shear wall and construction method thereof Active CN103088940B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310033632.3A CN103088940B (en) 2013-01-29 2013-01-29 A kind of compound shear wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310033632.3A CN103088940B (en) 2013-01-29 2013-01-29 A kind of compound shear wall and construction method thereof

Publications (2)

Publication Number Publication Date
CN103088940A CN103088940A (en) 2013-05-08
CN103088940B true CN103088940B (en) 2015-08-12

Family

ID=48202029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310033632.3A Active CN103088940B (en) 2013-01-29 2013-01-29 A kind of compound shear wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN103088940B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836554B (en) * 2017-01-24 2019-02-15 广东省建筑设计研究院 The separate type biplate steel plate shear force wall of strap bolt connection
CN106988455B (en) * 2017-04-12 2018-12-04 山东科技大学 Splice node and its construction method in steel plate concrete shear wall scene
CN114704095B (en) * 2022-04-15 2023-04-07 濮阳市宏超建筑安装有限公司 Continuous casting equipment and method for reinforcement cage concrete pipe in building

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020023401A1 (en) * 2000-08-23 2002-02-28 Budge Paul W. Structural thermal framing and panel system for assembling finished or unfinished walls with multiple panel combinations for poured and nonpoured walls
CN201539030U (en) * 2009-05-27 2010-08-04 清华大学 Self-adapting stitch-separating shear wall
CN201459963U (en) * 2009-05-27 2010-05-12 清华大学 Automatic reset concrete shear wall equipped with high-intensity ribs
FR2950638B1 (en) * 2009-09-30 2012-01-13 Alain Vidaillac CONSTRUCTION SYSTEM FOR BUILDINGS
CN101979798A (en) * 2010-01-28 2011-02-23 汪超 Novel ecological building structure system suitable for building industrialization
CN101831970A (en) * 2010-02-10 2010-09-15 黄靓 Integrally assembled wallboard wall and construction method thereof
JP5574328B2 (en) * 2010-04-05 2014-08-20 清水建設株式会社 Tokai seismic wall and its construction method
CN102433955B (en) * 2012-02-02 2013-11-13 孙有芳 Assembling prefabricated light steel composite load-bearing wall panel
CN102704593B (en) * 2012-05-25 2014-07-23 北京工业大学 Steel tube reinforced concrete composite column-steel beam-lattice steel support shear wall and manufacturing method
CN102808465B (en) * 2012-08-08 2014-07-09 沈阳建筑大学 Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination
CN203174812U (en) * 2013-01-29 2013-09-04 湖南大学 Combination shear wall

Also Published As

Publication number Publication date
CN103088940A (en) 2013-05-08

Similar Documents

Publication Publication Date Title
CN202248390U (en) Enclosed end column embedded steel plate concrete composite shear wall
CN104032840A (en) Prestress assembly type frame joint connecting structure with additionally-arranged steel angles and construction method of prestress assembly type frame joint connecting structure
CN204163196U (en) A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint
CN101177966A (en) Hollow double-layer FRP pipe concrete combination structure
CN105442864A (en) Local reinforcing method of circular reinforced concrete column
CN105201143A (en) Carbon fiber thin-wall steel tube concrete composite column with internal FRP sectional material and method
CN103510639A (en) Overlapped plate type shear wall with restorability and constructing method thereof
CN103088940B (en) A kind of compound shear wall and construction method thereof
CN104251038A (en) Encased steel plate-concrete composite coupling beam and construction method thereof
CN203640084U (en) Superimposed slab shear wall with restorable function
CN203113782U (en) Reversed beam erecting formwork stationary fixture
CN103422603A (en) Spiral stirrup shearing force connecting piece and manufacturing and installation methods
CN205153145U (en) Adopt precast concrete coincide floor of bolt and connection structure of H shaped steel roof beam
CN205444969U (en) Local reinforcing apparatus of rectangle reinforced concrete column
CN203174812U (en) Combination shear wall
CN203080799U (en) Coupling beam combining steel plates and high-strength concrete
CN204282578U (en) A kind of lift-on/lift-off type refractoriness shear wall
CN203742077U (en) Concrete-filled thin-wall steel tube column with built-in steel bar trusses
CN202945816U (en) Brickwork wall between windows and reinforced by high-ductility fiber concrete
CN213741879U (en) FRP (fiber reinforced plastic) -self-compacting UHPC (ultra high performance polycarbonate) combined member with T-shaped ribs
CN103388366A (en) Precast steel bar truss shear wall
CN201121778Y (en) Hollow double-layer FRP pipe concrete composite structure
CN201666004U (en) Reinforcing body connected by using anchor bolts
CN202321919U (en) Metallic framework structure of escalator
CN201121780Y (en) Steel pipe-FRP pipe internally filled concrete composite structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant