CN103075740A - Chimney white mist removal system and method - Google Patents

Chimney white mist removal system and method Download PDF

Info

Publication number
CN103075740A
CN103075740A CN2013100512490A CN201310051249A CN103075740A CN 103075740 A CN103075740 A CN 103075740A CN 2013100512490 A CN2013100512490 A CN 2013100512490A CN 201310051249 A CN201310051249 A CN 201310051249A CN 103075740 A CN103075740 A CN 103075740A
Authority
CN
China
Prior art keywords
flue
hot
chimney
air
links
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100512490A
Other languages
Chinese (zh)
Inventor
苗长江
范兰
曹宗富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Lanfeng Environmental Engineering Technology Co Ltd
Original Assignee
Yancheng Lanfeng Environmental Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Lanfeng Environmental Engineering Technology Co Ltd filed Critical Yancheng Lanfeng Environmental Engineering Technology Co Ltd
Priority to CN2013100512490A priority Critical patent/CN103075740A/en
Publication of CN103075740A publication Critical patent/CN103075740A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electrostatic Separation (AREA)
  • Chimneys And Flues (AREA)

Abstract

The invention discloses a chimney white mist removal system and a chimney white mist removal method. The system comprises a desulfurizing tower, a fan, a chimney, a coal fired boiler heat secondary air main pipe, a dust collector and a high-temperature electric dust collector, wherein the coal fired boiler heat secondary air main pipe is connected with an inlet of the high-temperature electric dust collector through a flue I; the flue I is provided with an air valve I; an outlet of the high-temperature electric dust collector is connected with one end of a flue II; the other end of the flue II is communicated with an air passage; and the flue II is provided with an air valve II. The method comprises the following steps of: (1) feeding a part of dust-containing hot air in the coal fired boiler heat secondary air main pipe into the flue I, wherein the temperature of the dust-containing hot air is 300-350 DEG C; (2) feeding the dust-containing hot air in the step (1) into the high-temperature electric dust collector from the flue I to perform heating and dust collection on the dust-containing hot air; (3) feeding hot air which is subjected to heating and dust collection in the step (2) into the flue II from the outlet of the high-temperature electric dust collector, next feeding into the air passage between the desulfurizing tower and the fan, and mixing with desulfurized low-temperature gas to realize that the temperature of the hot air discharged by the fan reaches 100-110 DEG C; and (4) feeding the mixed hot air into the chimney to be discharged into atmosphere through the fan.

Description

A kind of system and method except the white mist of chimney
Technical field
The present invention relates to a kind of system and method except the white mist of chimney, particularly a kind of system and method except the white mist of coal-burning power plant's chimney.
Background technology
At present, along with the day by day raising of China's Emission standards of air pollutants for coal-fired, the coal-burning power plant of China majority has adopted efficient dedusting, desulphurization and denitration process system, and the discharge capacity of pollutant reduces year by year, has effectively protected atmospheric environment.But because the flue gas after the dedusting is after the desulfurizing tower desulfurization, temperature is reduced to rapidly about 40~50 ℃, lower and a large amount of steam that mixed of temperature, and the coal fired power plant flue gas desulfurization system is when design, in view of taking up an area the reasons such as space and cost of investment, often be not Gas-Gas Heater with GGH(English) heater, the reasonability that designs from coal-burning power plant's chimney height simultaneously, its chimney height is generally all about 200 meters, flue gas is when chimney enters atmosphere like this, the low-temperature flue gas of a large amount of steam of having mixed is met cold condense rapidly afterwards, produced round and round " a white mist " around the chimney breast, it is not up to standard that people usually misread this power-plant flue gas discharging, and this phenomenon is called " Mao Baiyan ", thereby bring harmful effect to power plant.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of system and method except the white mist of chimney that is applicable to the coal-burning power plant.
For solving the problems of the technologies described above, a kind of system except the white mist of chimney of the present invention, contain desulfurizing tower, blower fan, chimney, the female pipe of coal-fired boiler hot Secondary Air and deduster, one end of desulfurizing tower links to each other with the deduster output channel, the other end of desulfurizing tower links to each other with an end in air channel, the other end in air channel links to each other with the import of blower fan, the outlet of blower fan links to each other with an end of exhausting duct, the other end of exhausting duct links to each other with chimney, also contain hot electrostatic precipitator, the female pipe of described coal-fired boiler hot Secondary Air links to each other with the import of hot electrostatic precipitator by the flue I, described flue I is provided with the air-valve I, the outlet of hot electrostatic precipitator links to each other with an end of flue II, and the other end of flue II is connected with described air channel, and the flue II is provided with the air-valve II.
A kind of method except the white mist of chimney of the present invention may further comprise the steps:
(1) the dust-laden hot blast of the part in the female pipe of coal-fired boiler hot Secondary Air enters the flue I, and this dust-laden hot blast temperature is 300~350 ℃;
(2) the dust-laden hot blast in the step (1) enters the hot electrostatic precipitator from the flue I, and hot electrostatic precipitator heats and dedusting the dust-laden hot blast of this part;
(3) outlet from hot electrostatic precipitator enters the flue II through the hot blast after heating and the dedusting in (2) step, then the hot blast in the flue II enters in the air channel between desulfurizing tower and the blower fan, and mix with low-temperature flue gas after the desulfurization, make the temperature of blower fan discharging hot blast reach 100~110 ℃;
(4) mixed hot blast enters chimney through blower fan and enters atmosphere.
The present invention is by utilizing the high-temperature hot-air in the female pipe of coal-fired boiler hot Secondary Air, after hot electrostatic precipitator heating and dedusting, mix with the low temperature hot blast after the desulfurizing tower desulfurization, make the final gas of discharging of chimney can Yin Wendu not cross low and form " white mist ", thereby it be up to standard and bring dysgenic deficiency to power plant to avoid people to misread the power-plant flue gas discharging.
Description of drawings
Fig. 1 is a kind of structural representation that removes the system of the white mist of chimney of the present invention.
The specific embodiment
Among Fig. 1, a kind of system except the white mist of chimney of the present invention contains desulfurizing tower 5, blower fan 10, chimney 11, the female pipe 1 of coal-fired boiler hot Secondary Air and deduster.One end of desulfurizing tower 5 links to each other with deduster output channel 4, and the other end of desulfurizing tower 5 links to each other with an end in air channel 7, and the other end in air channel 7 links to each other with the import of blower fan 10, and the outlet of blower fan 10 links to each other with an end of exhausting duct, and the other end of exhausting duct links to each other with chimney 11.Above-mentioned system except the white mist of chimney also contains hot electrostatic precipitator 6.The female pipe 1 of described coal-fired boiler hot Secondary Air links to each other with the import of hot electrostatic precipitator 6 by flue I 3, and described flue I 3 is provided with air-valve I 2.The outlet of hot electrostatic precipitator 6 links to each other with an end of flue II 8, and the other end of flue II 8 is connected with described air channel 7.Flue II 8 is provided with air-valve II 9.A kind of method except the white mist of chimney of the present invention may further comprise the steps: the dust-laden hot blast of the part in the female pipe 1 of (1) coal-fired boiler hot Secondary Air enters flue I 3, and this dust-laden hot blast temperature is 300~350 ℃; (2) the dust-laden hot blast in the step (1) enters the hot electrostatic precipitator 6 from flue I 3, and the dust-laden hot blast of 6 pairs of these parts of hot electrostatic precipitator heats and dedusting; (3) outlet from hot electrostatic precipitator 6 enters the flue II 8 through the hot blast after heating and the dedusting in (2) step, then the hot blast in the flue II 8 enters in the air channel 7 between desulfurizing tower 5 and the blower fan 10, and mix with low-temperature flue gas after the desulfurization, make the temperature of blower fan 10 discharging hot blasts reach 100~110 ℃; (4) mixed hot blast enters chimney 11 through blower fan 10 and enters atmosphere.The present invention is by utilizing the high-temperature hot-air in the female pipe 1 of coal-fired boiler hot Secondary Air, after hot electrostatic precipitator 6 heating and dedusting, mix with the low temperature hot blast after desulfurizing tower 5 desulfurization, make the final gases of discharging of chimney 11 can Yin Wendu not cross low and form " white mist ", thereby it be up to standard and bring dysgenic deficiency to power plant to avoid people to misread the power-plant flue gas discharging.When being in summer, temperature is higher, and day and night temperature is little, and the flue gas after the desulfurization is not prone to " white mist " phenomenon when entering atmosphere from chimney.At this moment, air-valve I 2 and air-valve II 9 can be closed, the hot electrostatic precipitator 6 of stopping transport simultaneously is to realize saving consumption reduction.

Claims (2)

1. system except the white mist of chimney, contain desulfurizing tower, blower fan, chimney, the female pipe of coal-fired boiler hot Secondary Air and deduster, one end of desulfurizing tower links to each other with the deduster output channel, the other end of desulfurizing tower links to each other with an end in air channel, the other end in air channel links to each other with the import of blower fan, the outlet of blower fan links to each other with an end of exhausting duct, the other end of exhausting duct links to each other with chimney, it is characterized in that: also contain hot electrostatic precipitator, the female pipe of described coal-fired boiler hot Secondary Air links to each other with the import of hot electrostatic precipitator by the flue I, described flue I is provided with the air-valve I, the outlet of hot electrostatic precipitator links to each other with an end of flue II, the other end of flue II is connected with described air channel, and the flue II is provided with the air-valve II.
2. method except the white mist of chimney may further comprise the steps:
(1) the dust-laden hot blast of the part in the female pipe of coal-fired boiler hot Secondary Air enters the flue I, and this dust-laden hot blast temperature is 300~350 ℃;
(2) the dust-laden hot blast in the step (1) enters the hot electrostatic precipitator from the flue I, and hot electrostatic precipitator heats and dedusting the dust-laden hot blast of this part;
(3) outlet from hot electrostatic precipitator enters the flue II through the hot blast after heating and the dedusting in (2) step, then the hot blast in the flue II enters in the air channel between desulfurizing tower and the blower fan, and mix with low-temperature flue gas after the desulfurization, make the temperature of blower fan discharging hot blast reach 100~110 ℃;
(4) mixed hot blast enters chimney through blower fan and enters atmosphere.
CN2013100512490A 2013-02-16 2013-02-16 Chimney white mist removal system and method Pending CN103075740A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100512490A CN103075740A (en) 2013-02-16 2013-02-16 Chimney white mist removal system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100512490A CN103075740A (en) 2013-02-16 2013-02-16 Chimney white mist removal system and method

Publications (1)

Publication Number Publication Date
CN103075740A true CN103075740A (en) 2013-05-01

Family

ID=48152367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100512490A Pending CN103075740A (en) 2013-02-16 2013-02-16 Chimney white mist removal system and method

Country Status (1)

Country Link
CN (1) CN103075740A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994456A (en) * 2014-05-06 2014-08-20 浙江天地环保工程有限公司 Integrated system for efficiently and synergistically removing multiple pollutants
CN109028922A (en) * 2018-06-11 2018-12-18 济南阜丰宏发机械有限公司 Exhaust gas white cigarette cleaning equipment and its technique during a kind of Starch Production dry materials
CN110790335A (en) * 2018-12-13 2020-02-14 北京国电龙源环保工程有限公司 Wastewater zero discharge and desulfurization flue gas white elimination integrated treatment device and treatment method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102294171A (en) * 2011-06-30 2011-12-28 光大环保能源(苏州)有限公司 Flue gas purifying system
CN202221098U (en) * 2011-08-24 2012-05-16 中电投东北节能技术有限公司 Mixed type GGH system
JP2012242029A (en) * 2011-05-23 2012-12-10 Metawater Co Ltd Heat recovery system from exhaust gas of incinerator
CN203082907U (en) * 2013-02-16 2013-07-24 盐城市兰丰环境工程科技有限公司 System for removing white mist of chimney

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012242029A (en) * 2011-05-23 2012-12-10 Metawater Co Ltd Heat recovery system from exhaust gas of incinerator
CN102294171A (en) * 2011-06-30 2011-12-28 光大环保能源(苏州)有限公司 Flue gas purifying system
CN202221098U (en) * 2011-08-24 2012-05-16 中电投东北节能技术有限公司 Mixed type GGH system
CN203082907U (en) * 2013-02-16 2013-07-24 盐城市兰丰环境工程科技有限公司 System for removing white mist of chimney

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994456A (en) * 2014-05-06 2014-08-20 浙江天地环保工程有限公司 Integrated system for efficiently and synergistically removing multiple pollutants
CN103994456B (en) * 2014-05-06 2015-09-09 浙江天地环保工程有限公司 The efficient cooperation-removal integrated system of multiple pollutant
CN109028922A (en) * 2018-06-11 2018-12-18 济南阜丰宏发机械有限公司 Exhaust gas white cigarette cleaning equipment and its technique during a kind of Starch Production dry materials
CN110790335A (en) * 2018-12-13 2020-02-14 北京国电龙源环保工程有限公司 Wastewater zero discharge and desulfurization flue gas white elimination integrated treatment device and treatment method

Similar Documents

Publication Publication Date Title
CN103968401B (en) Dedusting-desulfurization-UTILIZATION OF VESIDUAL HEAT IN integral system of low PM2.5 discharge
CN204254649U (en) A kind of zero-emission no chimney coal-burning boiler system
CN205191616U (en) Novel clean flue gas heating device
CN204438718U (en) Residual heat from boiler fume drying brown coal system and boiler smoke system
CN202021013U (en) Dedusting and denitration system of coal-fired flue gas of thermal power plant
CN209131426U (en) A kind of concurrent heating system of sintering device flue gas purification device
CN203116052U (en) Device for eliminating desulfurized gypsum rain of coal-fired power plant
CN103075740A (en) Chimney white mist removal system and method
CN107702107A (en) A kind of waste incinerator and Large-scale fire-electricity unit fume side coupled system
CN204534555U (en) A kind of flue gas recirculation device for reducing NO_x formation
CN102072499B (en) Flue gas low temperature denitriding and coal slime drying combined circulating system
CN203082907U (en) System for removing white mist of chimney
CN201930707U (en) Flue gas desulphurization device
CN205208601U (en) A closed cigarette water heat exchange system for low temperature flue gas
CN207763512U (en) A kind of wet process of FGD white cigarette controlling device
CN103234206A (en) Recycling method and recycling device of fire coal high temperature flue gas
CN103939934A (en) Drying system for boiler pulverizing system
CN202648451U (en) Outlet smoke temperature regulating system of kiln head waste heat boiler
CN207137666U (en) A kind of cigarette cooler for being applied to flue gas after burning combines mercury removal device with ultraviolet
CN101655306A (en) Coal bar drying device utilizing fume of boiler
CN207351232U (en) A kind of coking flue gas purification system
CN206027935U (en) Wet -type is hot air blowing system for electrostatic precipitator
CN205155926U (en) Novel coal fired boiler residual heat from flue gas system
CN105889963A (en) Heat exchange device for wet desulphurization system
CN202254878U (en) Waste heat utilization system of lime kiln

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130501