CN103075165B - 煤巷纵向梁复合式支护方法 - Google Patents
煤巷纵向梁复合式支护方法 Download PDFInfo
- Publication number
- CN103075165B CN103075165B CN201310008421.4A CN201310008421A CN103075165B CN 103075165 B CN103075165 B CN 103075165B CN 201310008421 A CN201310008421 A CN 201310008421A CN 103075165 B CN103075165 B CN 103075165B
- Authority
- CN
- China
- Prior art keywords
- longitudinal beam
- iron
- steel band
- steel
- mesh reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003245 coal Substances 0.000 title claims abstract description 50
- 230000008093 supporting effect Effects 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 94
- 239000010959 steel Substances 0.000 claims abstract description 94
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 72
- 229910052742 iron Inorganic materials 0.000 claims abstract description 36
- 230000002787 reinforcement Effects 0.000 claims abstract description 23
- 239000011435 rock Substances 0.000 claims abstract description 17
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 239000003795 chemical substances by application Substances 0.000 description 12
- 238000004873 anchoring Methods 0.000 description 9
- 239000011347 resin Substances 0.000 description 9
- 229920005989 resin Polymers 0.000 description 9
- 230000000694 effects Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000002131 composite material Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
本发明公开了一种煤巷纵向梁复合式支护方法。利用工字钢纵向梁将锚杆、锚索、横向钢带和钢筋网连接成整体,将锚杆、锚索的支护力合理地分配到工字钢纵向梁和横向钢带,再通过钢筋网均匀地分配到煤巷围岩的表面,提高煤巷整体稳定性。工字钢纵向梁是将两根工字钢通过数根钢条焊接在一起,两端焊接带4个螺栓孔的优质钢板;前后相邻的工字钢纵向梁通过端部钢板用高强度螺栓连接。本发明通过改善围岩应力状态,减小煤巷变形量与极限平衡区,提高整体稳定性与支护效果,保证煤巷在服务期内的安全性。
Description
技术领域
本发明涉及采用纵向梁的煤巷支护方法,尤其适用于高矿压、煤岩体破碎的煤巷支护。
背景技术
煤层面积占巷道断面4/5或4/5以上的巷道,称为煤巷。煤巷是回采工作面的主要通道,维护其在服务期内的整体稳定性及安全性具有重要意义。我国煤巷现场条件复杂多变,围岩物理力学参数普遍较低;同时,由于煤层开采深度不断增加,使巷道围岩应力日益增大且分布复杂,导致煤巷支护难度越来越大。
如图1所示,常规煤巷支护方法主要在巷道顶板与帮部,一排一排地打设多根锚杆、锚索进行支护,使得巷道锚杆、锚索支护力只能一排一排单独发挥作用,未能发挥整体支护效果。此外,煤巷围岩一般松散破碎,强度和弹性模量低,在较大矿压作用下,巷道冒顶、片帮等事故时有发生。
发明内容
本发明的目的是提出一种煤巷纵向梁复合式支护方法,该方法能提供一种整体复合式支护方式,提高煤巷支护强度,从而达到改善煤巷围岩受力状态,增加煤巷整体稳定性的效果。
本发明通过以下技术方案实现:
煤巷纵向梁复合式支护方法利用纵向梁(工字钢纵向梁或W型钢带纵向梁)将锚杆、锚索、横向钢带和钢筋网连接成整体,使得锚杆、锚索的支护力被合理地分配到纵向梁和横向钢带,进一步通过钢筋网均匀地分配到煤巷围岩的表面,提高煤巷的整体稳定性。首先,铺设φ6.5mm钢筋网;然后,用φ18~22mm,长度2.0~2.4m的左旋螺纹钢锚杆与横向钢带(W型钢带或钢筋钢带等)进行横向支护;最后,用纵向梁(工字钢纵向梁或W型钢带纵向梁)和φ21.6mm,长度6~10m的锚索进行纵向支护,形成整体支护结构,提高巷道稳定性。
利用工字钢纵向梁实现时,将两根工字钢通过数根厚度为10mm、宽度为20mm的钢条焊接在一起,两端焊接带4个螺栓孔的优质钢板。钢板厚度为16mm,高度为工字钢高度与两个钢条厚度之和。前后相邻的两个工字钢纵向梁通过端部的钢板用4个高强度螺栓进行连接。
利用W型钢带纵向梁实现时,采用厚度为3~5mm,宽度为280mm的W型钢带纵向梁。将前后相邻的两个W型钢带纵向梁端部的孔重合,用一根锚索连接,并锚固在煤巷围岩上。
由本发明的技术方案可见,纵向梁煤巷支护方法能形成一种整体复合式支护方式,将锚杆、锚索的支护力较均匀的施加到煤巷围岩表面,提供很强的整体支护力,从而提高煤巷整体稳定性,保证煤巷的安全性。
附图说明
图1为煤巷常规顶板支护示意图;
图2为煤巷单根纵向梁复合式支护示意图;
图3为煤巷两根纵向梁复合式支护示意图;
图4为单根工字钢纵向梁结构示意图;
图5为工字钢纵向梁连接处斜俯视图;
图6为工字钢纵向梁连接处斜仰视图;
图7为W型钢带纵向梁连接处斜俯视图;
图8为W型钢带纵向梁连接处斜仰视图。
图中:1-锚杆,2-横向钢带(W型钢带或钢筋钢带等),3-锚索,4-铁丝网,5-纵向梁(工字钢纵向梁或W型钢带纵向梁),6-钢筋网,7-钢条,8-工字钢,9-钢板,10-螺栓孔,11-螺栓,12-锚索托盘,13-W型钢带,14-W型钢带孔。
具体实施方式
本发明提出的煤巷纵向梁复合式支护方法较佳的具体实施方式如下:
煤巷开掘后,第一步进行横向支护,第二步进行纵向支护。
(1)进行横向支护。(参照图2、3)
钻锚杆孔后,在煤巷围岩铺设钢筋网6,用14#铁丝将钢筋网6与先前铺设的钢筋网相连接。安装横向钢带2,横向钢带2采用W型钢带或钢筋钢带等。然后安装锚杆1,对锚杆1施加预紧力,通过锚杆托盘将横向钢带2与钢筋网6贴紧煤巷围岩,从而提供横向支护力。
锚杆1为φ18~22mm,长度2.0~2.4m的左旋螺纹钢锚杆。每根锚杆用两卷锚固剂(一卷MSK2355树脂锚固剂与一卷MSCK2355树脂锚固剂,MSCK2355树脂锚固剂在孔底)。横向钢带2可选用厚度为3~5mm,宽度为280mm的W型钢带或φ14mm钢筋制作的钢筋钢带。钢筋网6选用φ6.5mm钢筋加工制作。
(2)进行纵向支护。
利用纵向梁将锚杆、锚索、横向钢带和钢筋网连接成整体。一条煤巷设一道或多道纵向梁,纵向梁有工字钢纵向梁和W型钢带纵向梁两种形式。
①工字钢纵向梁。(参照图2~6)
钻锚索孔后,安装工字钢纵向梁5,通过高强度螺栓11连接纵向梁端部的钢板9,从而将这根工字钢纵向梁5与相邻的工字钢纵向梁连接在一起。安设一根或数根锚索3,然后对锚索3施加预应力,使工字钢纵向梁5和横向钢带2紧密结合,从而提供纵向支护力,同时把锚杆1、横向钢带2、钢筋网6等连接成一个支护整体。
锚索3为φ21.6mm,长度6~10m。每根锚索用三卷锚固剂(两卷MSK2355树脂锚固剂与一卷MSCK2355树脂锚固剂,MSCK2355树脂锚固剂在孔底)。工字钢纵向梁由两根工字钢8通过数根厚度为10mm、宽度为20mm钢条7焊接在一起,两端焊接带四个螺栓孔10的优质钢板9。钢板9厚度为16mm,高度为工字钢高度与两个钢条厚度之和。
②W型钢带纵向梁。(参照图2、3、7、8)
钻锚索孔后,安装W型钢带纵向梁13,使W型钢带纵向梁13的端部孔14与前后相邻W型钢带纵向梁端部孔重合,用一根锚索3穿入此孔14,并锚固在煤巷围岩上。对锚索3施加预应力,使W型钢带纵向梁13和横向钢带2紧密结合,从而提供纵向支护力,同时把锚杆1、横向钢带2、钢筋网6等连接成一个支护整体。
锚索3为φ21.6mm,长度6~10m。每根锚索用三卷锚固剂(两卷MSK2355树脂锚固剂与一卷MSCK2355树脂锚固剂,MSCK2355树脂锚固剂在孔底)。W型钢带13的厚度为3~5mm,宽度为280mm。
本发明在煤巷顶板支护与帮部支护中均具有适用性。煤巷纵向梁复合式支护方法通过与FLAC3D软件相结合,针对具体的工程概况优化煤巷支护参数,如锚杆具体长度和间排距、锚索具体长度和间排距、横向钢带和纵向梁具体长度等,从而得出科学的煤巷支护方案,提高煤巷稳定性。
煤巷纵向梁复合式支护方法,能改善围岩应力状态,减小巷道变形量与极限平衡区,提高巷道整体稳定性,从而使煤巷支护效果得到大幅提高与改善,保证巷道在服务期内的安全性。
以上所述,仅为较佳的具体实施方式。本发明的保护范围不局限于此,任何熟悉本领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围内。
Claims (3)
1.一种煤巷纵向梁复合式支护方法,其特征在于:利用一道或多道工字钢纵向梁将锚杆、锚索、横向钢带和钢筋网连接成整体,将锚杆、锚索的支护力合理地分配到工字钢纵向梁和横向钢带,再通过钢筋网均匀地分配到煤巷围岩的表面,提高煤巷的整体稳定性;包括以下步骤:首先,铺设钢筋网,然后,用锚杆与横向钢带进行横向支护,最后,用工字钢纵向梁和锚索进行纵向支护,形成整体支护结构。
2.根据权利要求1所述的煤巷纵向梁复合式支护方法,其特征在于:钻锚杆孔后,在煤巷围岩铺设钢筋网,用铁丝将钢筋网与先前铺设的钢筋网相连接,安装横向钢带,横向钢带采用W型钢带或钢筋钢带,然后安装锚杆,对锚杆施加预紧力,通过锚杆托盘将横向钢带与钢筋网贴紧煤巷围岩,从而提供横向支护力。
3.根据权利要求1所述的煤巷纵向梁复合式支护方法,其特征在于:钻锚索孔后,安装工字钢纵向梁,通过高强度螺栓连接纵向梁端部的钢板,从而将这根工字钢纵向梁与相邻的工字钢纵向梁连接在一起,安设一根或数根锚索,然后对锚索施加预应力,使工字钢纵向梁和横向钢带紧密结合,从而提供纵向支护力,同时把锚杆、横向钢带、钢筋网连接成一个支护整体;其中工字钢纵向梁由两根工字钢通过数根钢条焊接在一起,两端焊接带四个螺栓孔的优质钢板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310008421.4A CN103075165B (zh) | 2013-01-10 | 2013-01-10 | 煤巷纵向梁复合式支护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310008421.4A CN103075165B (zh) | 2013-01-10 | 2013-01-10 | 煤巷纵向梁复合式支护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103075165A CN103075165A (zh) | 2013-05-01 |
CN103075165B true CN103075165B (zh) | 2015-09-02 |
Family
ID=48151846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310008421.4A Expired - Fee Related CN103075165B (zh) | 2013-01-10 | 2013-01-10 | 煤巷纵向梁复合式支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103075165B (zh) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103244150A (zh) * | 2013-05-24 | 2013-08-14 | 湖南科技大学 | 底拱连锁梁及其施工方法 |
CN103883340B (zh) * | 2014-02-26 | 2016-08-24 | 山东科技大学 | 矿用锚固钢带和巷道顶板锚杆支护方法 |
CN103850693A (zh) * | 2014-03-24 | 2014-06-11 | 河南理工大学 | 一种控制高应力巷道底鼓的方法 |
CN103939110A (zh) * | 2014-05-07 | 2014-07-23 | 中铁第一勘察设计院集团有限公司 | 既有隧道拱部衬砌轻微开裂加固体系 |
CN104005774B (zh) * | 2014-06-08 | 2016-02-10 | 衢州市优德工业设计有限公司 | 一种调节支护压力进行巷道围岩支护方法 |
CN104061003A (zh) * | 2014-06-18 | 2014-09-24 | 中铁隧道集团二处有限公司 | 一种支撑钢架之间的连接结构 |
CN104329106B (zh) * | 2014-11-26 | 2016-06-08 | 湖南科技大学 | 一种用于半煤岩巷不均匀大变形巷道围岩的锚杆垫板 |
CN104763425B (zh) * | 2015-02-03 | 2017-01-25 | 杨洪兴 | 一种卸压预裂爆破沿空留巷无煤柱开采方法 |
CN105275486B (zh) * | 2015-11-09 | 2017-12-22 | 中国矿业大学(北京) | 一种锚杆锚索组合支护结构及其施工方法 |
CN105569700A (zh) * | 2016-03-21 | 2016-05-11 | 成都理工大学 | 锚钢索支护结构 |
CN105909289B (zh) * | 2016-04-18 | 2017-12-29 | 中国矿业大学 | 一种深部三软煤层非对称巷道支护结构 |
CN106437780B (zh) * | 2016-10-13 | 2018-05-08 | 安徽理工大学 | 用于治理巷道底臌的钢混反拱与锚杆的组合结构及该组合结构的施工方法 |
CN106769589A (zh) * | 2017-03-06 | 2017-05-31 | 山东科技大学 | 模拟岩层水对煤巷围岩强度、破坏特征影响的试验辅助装置及试验方法 |
CN108561159A (zh) * | 2018-04-10 | 2018-09-21 | 淮南矿业(集团)有限责任公司 | 一种煤层的高帮防片帮支护装置及支护方法 |
CN109339835B (zh) * | 2018-11-08 | 2024-10-11 | 杭州图强工程材料有限公司 | 一种锚固体系及地下工程施工方法 |
CN110284913B (zh) * | 2019-07-19 | 2021-09-10 | 山东科技大学 | 一种大跨度切顶成巷顶板的内拉锚索结构 |
CN110284911B (zh) * | 2019-07-25 | 2024-02-13 | 辽宁工程技术大学 | 一种掘支锚联合机组用循环二段钢带自动铺设装置及方法 |
CN110566242A (zh) * | 2019-08-21 | 2019-12-13 | 义煤集团宜阳义络煤业有限责任公司 | 大倾角松软厚煤层托顶煤巷道围岩的控制方法 |
CN110700861A (zh) * | 2019-11-29 | 2020-01-17 | 西南交通大学 | 一种用于隧道分部开挖转换过程的连接装置与方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182483A (zh) * | 2011-04-26 | 2011-09-14 | 山东大学 | 半刚性异型梁锚索桁架巷道支护系统 |
JP2011214390A (ja) * | 2010-03-18 | 2011-10-27 | Hiro Corporation:Kk | トンネル壁面へのプレート部材の取付構造 |
CN202064981U (zh) * | 2011-05-07 | 2011-12-07 | 山西晋城无烟煤矿业集团有限责任公司 | 软煤层巷道支护结构 |
-
2013
- 2013-01-10 CN CN201310008421.4A patent/CN103075165B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011214390A (ja) * | 2010-03-18 | 2011-10-27 | Hiro Corporation:Kk | トンネル壁面へのプレート部材の取付構造 |
CN102182483A (zh) * | 2011-04-26 | 2011-09-14 | 山东大学 | 半刚性异型梁锚索桁架巷道支护系统 |
CN202064981U (zh) * | 2011-05-07 | 2011-12-07 | 山西晋城无烟煤矿业集团有限责任公司 | 软煤层巷道支护结构 |
Non-Patent Citations (1)
Title |
---|
三软煤层综采大断面切眼锚网索支护技术;任玉朋;《中州煤炭》;20110825(第8期);第69-70、74页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103075165A (zh) | 2013-05-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103075165B (zh) | 煤巷纵向梁复合式支护方法 | |
CN103410528B (zh) | 一种隧道衬砌结构及施工方法 | |
CN103174435B (zh) | 一种采用u型棚架支护结构体的巷道支护方法 | |
CN104074529B (zh) | 一种深部巷硐连续双壳加固方法 | |
CN205117366U (zh) | 一种大断面松软破碎煤巷双承压拱支护装置 | |
CN202882943U (zh) | 让压型约束砼拱架高强立体支护体系 | |
CN103075170A (zh) | 一种中空注浆锚索控制多次跨采巷道围岩变形的方法 | |
CN105909289B (zh) | 一种深部三软煤层非对称巷道支护结构 | |
CN103233751A (zh) | 极软弱顶板煤巷双层锚固平衡拱支护系统 | |
CN103758529A (zh) | 一种煤矿沿空留巷巷旁支护方法 | |
CN110242335A (zh) | 大变形回采巷道主被动耦合支护系统及施工方法 | |
CN110821537A (zh) | 一种综采工作面预掘单回撤通道支护方法 | |
CN102704965A (zh) | 一种防止剧烈采动影响巷道顶板垮冒方法 | |
CN206000543U (zh) | 一种用于沿空留巷护巷的支护结构 | |
CN203614107U (zh) | 马头门复合支护结构 | |
CN202266277U (zh) | 一种u型棚支护用可缩支柱 | |
CN206280090U (zh) | 急倾斜回采巷道围岩稳定支护设施 | |
CN109057818B (zh) | 一种矿山高应力软岩巷道的锚杆联合支护方法 | |
CN204703936U (zh) | 封闭式全长锚固高预应力煤壁及顶板锚杆加固结构 | |
CN106761867A (zh) | 急倾斜回采巷道围岩稳定支护设施及支护工艺 | |
CN212801573U (zh) | 一种隧道洞口边仰坡预加固钢管桩 | |
CN210948737U (zh) | 薄煤层倾斜小断面半煤岩巷的高效快速掘进巷道支护设施 | |
CN101570968A (zh) | 组合加劲灌注桩 | |
CN110513129B (zh) | 一种松软厚煤层工作面巷道超前护顶支护结构及支护方法 | |
CN203066986U (zh) | 一种用于煤岩巷顶板支护的复合型桁架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150902 Termination date: 20210110 |