CN102704965A - 一种防止剧烈采动影响巷道顶板垮冒方法 - Google Patents

一种防止剧烈采动影响巷道顶板垮冒方法 Download PDF

Info

Publication number
CN102704965A
CN102704965A CN2012101569218A CN201210156921A CN102704965A CN 102704965 A CN102704965 A CN 102704965A CN 2012101569218 A CN2012101569218 A CN 2012101569218A CN 201210156921 A CN201210156921 A CN 201210156921A CN 102704965 A CN102704965 A CN 102704965A
Authority
CN
China
Prior art keywords
anchor cable
short
top board
long
circular hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101569218A
Other languages
English (en)
Other versions
CN102704965B (zh
Inventor
严红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
严红
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 严红 filed Critical 严红
Priority to CN201210156921.8A priority Critical patent/CN102704965B/zh
Publication of CN102704965A publication Critical patent/CN102704965A/zh
Application granted granted Critical
Publication of CN102704965B publication Critical patent/CN102704965B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种防止剧烈采动影响巷道顶板垮冒方法,适用于煤矿开采地下巷道支护工程。主要由倒梯形筒式联接器、锁具、长锚索、短锚索、钢筋网和厚层钢带构成,有效控制顶板大变形和垮冒,保障顶板的支护安全,并且能够解决现有工字钢支架作用下低工作阻力、无法及时施加预紧力、以及支护强度大、支护效率低等问题,进而有效保证巷道顶板结构稳定性;同时避免了现有锚杆索支护过程中锚杆、锚索刚强度不匹配、锚杆延伸率低、长度小、刚强度低等缺陷,进而难以保持顶板多次高应力扰动下稳定而出现突发性垮冒问题。

Description

一种防止剧烈采动影响巷道顶板垮冒方法
技术领域
本发明涉及一种防止剧烈采动影响巷道顶板垮冒方法,适用于煤矿开采地下巷道支护工程。
背景技术
伴随我国煤矿开采深度的增加,地质条件日趋复杂,生产采掘衔接紧张局面状况日益增多,受剧烈采动作用的回采巷道数量逐年攀升;同时,由于部分矿井瓦斯涌出量特别大,为确保回采工作的安全和正常进行,还需掘出瓦斯抽排巷道,由于巷道断面大,受多次剧烈动压影响以及不合理的支护结构,其主要支护表现为:巷道出现大变形,顶板下沉量普遍达1.5m左右,顶锚杆、托盘及少量锚索被拉断破坏,W钢带出现折断、撕裂、褶曲等强烈破坏现象,部分顶板出现整体切顶和大面积垮冒,给巷道支护安全带来许多不确定因素,极大影响作业生产的正常进行。现有技术中防止煤巷顶板垮冒的方法主要分为两种:工字钢支架支护和锚杆索支护。工字钢支架支护在一定程度上能直观显示顶板变形情况,防止顶板突然垮冒事故发生,然而工字钢支架在防止顶板垮冒方面的主要缺陷是:①工字钢支架属于被动支护,不能及时给围岩施加预应力,且支架的初撑力低,增阻速度慢且工作阻力小,易造成顶棚中部出现应力集中而导致顶板离层,从而加大了顶板大变形发展,承受剧烈采动影响作用工字钢支架容易出现大扭曲变形,导致顶板稳定岩层结构出现破坏,造成顶板逐层垮冒;②工字钢支架支护工作强度大、支护效率低,难以保障高效高安全矿井的采掘平衡;锚杆索支护凭借运输方便,支护强度低且效率高等优点而在煤矿巷道中广泛应用,然而对于承受剧烈采动影响巷道而言,普通锚杆索混合支护的支护参数要求较高,锚杆、锚索刚强度差异大,难以协同控制顶板高应力作用,且普通锚杆延伸率和刚度低、长度小,难以阻止剧烈采动作用下的浅部围岩大变形,在多次高应力扰动作用下容易导致顶板发生突发性垮冒。因此,亟需研究一套能控制剧烈采动巷道顶板垮冒方法,为现场安全支护和正常作业生产提供技术保障。
发明内容
一.发明目的
本发明目的是提供一种防止剧烈采动影响巷道顶板垮冒方法,有效控制顶板大变形和垮冒,保障顶板的支护安全,并且能够解决现有工字钢支架作用下低工作阻力、无法及时施加预紧力、以及支护强度大、支护效率低等问题,进而有效保证巷道顶板结构稳定性;同时避免了现有锚杆索支护过程中锚杆、锚索刚强度不匹配、锚杆延伸率低、长度小、刚强度低等缺陷,进而难以保持顶板多次高应力扰动下稳定而出现突发性垮冒问题。
二.技术方案
本申请的防止剧烈采动影响巷道顶板垮冒方法采用倒梯形筒式联接器1,锁具2,长锚索3、短锚索4,钢筋网5和厚层钢带6,倒梯形筒式联接器为左右侧面各含两圆孔包括第一圆孔7、第二圆孔10和第三圆孔8、第四圆孔9,且呈倒梯形状的铸钢联接器;具体步骤为:巷道开掘后,先根据一排短锚索4设置的间距利用锚索钻机钻孔,利用扫孔器清孔后加入一定数量的树脂锚固剂,在开掘的顶板表面依次安装钢筋网5和厚层钢带6,其中钢筋网5位于顶板与厚层钢带6之间,然后在厚层钢带6上安装一排短锚索4,短锚索4穿过顶板厚层钢带6中各眼孔,并伸入顶板钻孔内,利用锚索钻机搅拌树脂锚固剂,使得短锚索4的一端锚固于顶板围岩中,短锚索4另一端加装钢托盘,并对短锚索4施加预紧力,最后用锁具2锁紧,对于一排短锚索4安装顺序而言,先安装中间部位短锚索4,从中间向两侧逐级安装支护,同时靠近煤壁的顶帮角部短锚索4倾斜地锚固在顶板中,其它短锚索4与顶板围岩夹角为90°;长锚索桁架与顶板短锚索4保持一定距离进行安装,每一个长锚索桁架由倒梯形筒式联接器1,锁具2和两根长锚索3构成,长锚索3倾斜地锚固在顶板中,长锚索桁架中的一根长锚索3的一端利用树脂锚固剂锚固于上部围岩顶帮交界稳定区域,另一端穿过倒梯形筒式联接器1中的第一圆孔7和第三圆孔8,通过千斤顶张拉预紧后利用锁具2锁紧,采用同样的安装方法将长锚索桁架中的另一根长锚索3的一端由树脂锚固剂锚固,另一端穿过倒梯形筒式联接器1中的第四圆孔9和第二圆孔10,通过千斤顶张拉预紧后利用锁具2锁紧,顶板一排短锚索与一排长锚索桁架间隔排列。短锚索4间排距及长锚索桁架排距根据巷道受采动影响剧烈程度、顶板围岩条件和巷道跨度因素确定。短锚索4直径为16-22mm,短锚索4长度为4-6m,短锚索4间距为0.8-1.2m,排距为0.8-2.4m,靠顶帮处的短锚索4与顶板垂直方向夹角为10-60°,对短锚索4施加预紧力为80-200KN。长锚索3直径为16-22mm,长锚索3长度为7-12m,所述长锚索桁架排距为0.8-2.4m,长锚索桁架中两根长锚索3的间距为1.2-4.5m,长锚索3与顶板垂直方向夹角为10-60°,对长锚索3施加预紧力为120-250KN。厚层钢带5的厚度为8-10mm,形状为W形或M形。
三.技术效果
本发明一种防止剧烈采动影响巷道顶板垮冒方法,适用于煤矿开采地下巷道支护工程,该方法对顶板支护强度高,支护效果显著,防止了顶板大变形和垮冒,保障了顶板的支护安全。顶板围岩受到剧烈动压影响时,由于短锚索较传统的锚杆而言自身延伸率以及可施加得预紧力更大,能有效控制顶板浅部围岩的离层和变形,保证了顶板浅部围岩支护结构的稳定性;而锚索桁架中的长锚索锚固于深部岩层顶帮角部稳定区域,且可施加预紧力大,避免了顶板深部岩层的离层和变形,且锚索桁架与其中的煤岩体组成倒楔体状支护结构,顶板围岩受动压荷载越大,则卡紧力亦愈大,保证了顶板深部岩层支护期间的稳定性;从整体来看,长锚索桁架与短锚索形成上压下拉的“拱一桥”结构,有效避免了顶板浅部围岩出现裂隙扩张贯通、岩层松动破碎增多以及岩层间离层等现象,使顶板在剧烈采动影响下能保持支护安全、稳定的状态。
附图说明
图1是本发明平面示意图。
图2是本发明空间俯视图
图3是倒梯形筒式联接器结构示意图。
具体实施方式
下面将结合附图中的一个实施例对本发明作进一步的描述:
本发明为一种防止剧烈采动影响巷道顶板垮冒方法,采用倒梯形筒式联接器1,锁具2,长锚索3、短锚索4,钢筋网5和厚层钢带6。所述倒梯形筒式联接器1具体构造为:左右侧面各含两圆孔包括第一圆孔7、第二圆孔10和第三圆孔8、第四圆孔9,且呈倒梯形状的铸钢联接器。具体方法为:巷道开掘后,先根据一排短锚索4设置的间距利用锚索钻机钻孔,利用扫孔器清孔后加入一定数量的树脂锚固剂,在开掘的顶板表面依次安装钢筋网5和厚层钢带6,其中钢筋网5位于顶板与厚层钢带6之间,然后在厚层钢带6上安装一排短锚索4,短锚索4穿过顶板厚层钢带6中各眼孔,并伸入顶板钻孔内,利用锚索钻机搅拌树脂锚固剂,使得短锚索4的一端锚固于顶板围岩中,短锚索4另一端加装钢托盘,并对短锚索4施加预紧力,最后用锁具2锁紧,对于一排短锚索4安装顺序而言,先安装中间部位短锚索4,从中间向两侧逐级安装支护,同时靠近煤壁的顶帮角部短锚索4倾斜地锚固在顶板中,其它短锚索4与顶板围岩夹角为90°;长锚索桁架与顶板短锚索4保持一定距离进行安装,每一个长锚索桁架由倒梯形筒式联接器1,锁具2和两根长锚索3构成,长锚索3倾斜地锚固在顶板中,长锚索桁架中的一根长锚索3的一端利用树脂锚固剂锚固于上部围岩顶帮交界稳定区域,另一端穿过倒梯形筒式联接器1中的第一圆孔7和第三圆孔8,通过千斤顶张拉预紧后利用锁具2锁紧,采用同样的安装方法将长锚索桁架中的另一根长锚索3的一端由树脂锚固剂锚固,另一端穿过倒梯形筒式联接器1中的第四圆孔9和第二圆孔10,通过千斤顶张拉预紧后利用锁具2锁紧。顶板一排短锚索与一排长锚索桁架间隔排列。短锚索4间排距及长锚索桁架排距根据巷道受采动影响剧烈程度、顶板围岩条件和巷道跨度因素确定。短锚索4直径为16-22mm,短锚索4长度为4-6m,短锚索4间距为0.8-1.2m,排距为0.8-2.4m,靠顶帮处的短锚索4与顶板垂直方向夹角为10-60°,对短锚索4施加预紧力为80-200KN,长锚索直径为16-22mm,长锚索长度为7-12m,长锚索桁架排距为0.8-2.4m,长锚索桁架中两根长锚索3的间距为1.2-4.5m,长锚索3与顶板垂直方向夹角为10-60°,对长锚索3施加预紧力为120-250KN,厚层钢带5的厚度为8-10mm,形状为W型或M型。

Claims (4)

1.一种防止剧烈采动影响巷道顶板垮冒方法,其特征在于:采用倒梯形筒式联接器(1),锁具(2),长锚索(3)、短锚索(4),钢筋网(5)和厚层钢带(6),所述倒梯形筒式联接器为左右侧面各含两圆孔包括第一圆孔(7)、第二圆孔(10)和第三圆孔(8)、第四圆孔(9),且呈倒梯形状的铸钢联接器;具体步骤为:
巷道开掘后,先根据一排短锚索(4)设置的间距利用锚索钻机钻孔,利用扫孔器清孔后加入一定数量的树脂锚固剂,在开掘的顶板表面依次安装钢筋网(5)和厚层钢带(6),其中钢筋网(5)位于顶板与厚层钢带(6)之间,然后在厚层钢带(6)上安装一排短锚索(4),短锚索(4)穿过顶板厚层钢带(6)中各眼孔,并伸入顶板钻孔内,利用锚索钻机搅拌树脂锚固剂,使得短锚索(4)的一端锚固于顶板围岩中,短锚索(4)另一端加装钢托盘,并对短锚索(4)施加预紧力,最后用锁具(2)锁紧,对于一排短锚索(4)安装顺序而言,先安装中间部位短锚索(4),从中间向两侧逐级安装支护,同时靠近煤壁的顶帮角部短锚索(4)倾斜地锚固在顶板中,其它短锚索(4)与顶板围岩夹角为90°;长锚索桁架与顶板短锚索(4)保持一定距离进行安装,每一个长锚索桁架由倒梯形筒式联接器(1),锁具(2)和两根长锚索(3)构成,长锚索(3)倾斜地锚固在顶板中,长锚索桁架中的一根长锚索(3)的一端利用树脂锚固剂锚固于上部围岩顶帮交界稳定区域,另一端穿过倒梯形筒式联接器(1)中的第一圆孔(7)和第三圆孔(8),通过千斤顶张拉预紧后利用锁具(2)锁紧,采用同样的安装方法可以将长锚索桁架中的另一根长锚索(3)的一端由树脂锚固剂锚固,另一端穿过倒梯形筒式联接器(1)中的第四圆孔(9)和第二圆孔(10),通过千斤顶张拉预紧后利用锁具(2)锁紧,顶板一排短锚索与一排长锚索桁架间隔排列,短锚索(4)间排距及长锚索桁架排距根据巷道受采动影响剧烈程度、顶板围岩条件和巷道跨度因素确定。
2.根据权利要求1所述的一种防止剧烈采动影响巷道顶板垮冒方法,其特征在于:所述短锚索(4)直径为16-22mm,短锚索(4)长度为4-6m,短锚索(4)间距为0.8-1.2m,排距为0.8-2.4m,靠顶帮处的短锚索(4)与顶板垂直方向夹角为10-60°,对短锚索(4)施加预紧力约为80-200KN。
3.根据权利要求1所述的一种防止剧烈采动影响巷道顶板垮冒方法,其特征在于:所述长锚索(3)直径为16-22mm,长锚索(3)长度为7-12m,所述长锚索桁架排距为0.8-2.4m,长锚索桁架中两根长锚索(3)的间距为1.2-4.5m,长锚索(3)与顶板垂直方向夹角为10-60°,对长锚索(3)施加预紧力约为120-250KN。
4.根据权利要求1所述的一种防止剧烈采动影响巷道顶板垮冒方法,其特征在于:厚层钢带(5)的厚度为8-10mm,形状为W形或M形。
CN201210156921.8A 2012-05-21 2012-05-21 一种防止剧烈采动影响巷道顶板垮冒方法 Expired - Fee Related CN102704965B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210156921.8A CN102704965B (zh) 2012-05-21 2012-05-21 一种防止剧烈采动影响巷道顶板垮冒方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210156921.8A CN102704965B (zh) 2012-05-21 2012-05-21 一种防止剧烈采动影响巷道顶板垮冒方法

Publications (2)

Publication Number Publication Date
CN102704965A true CN102704965A (zh) 2012-10-03
CN102704965B CN102704965B (zh) 2015-09-09

Family

ID=46897990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210156921.8A Expired - Fee Related CN102704965B (zh) 2012-05-21 2012-05-21 一种防止剧烈采动影响巷道顶板垮冒方法

Country Status (1)

Country Link
CN (1) CN102704965B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352707A (zh) * 2013-07-19 2013-10-16 山西潞安环保能源开发股份有限公司常村煤矿 一种多维多级支护方法
CN103628897A (zh) * 2013-12-06 2014-03-12 中国矿业大学 一种通过巷道高冒区方法
CN103953373A (zh) * 2014-05-08 2014-07-30 张新怀 巷道顶板高冒区临时支护装置
CN106523003A (zh) * 2016-09-27 2017-03-22 北京科技大学 一种适于深部开采巷道的刚柔耦合吸能支护技术
CN107461215A (zh) * 2017-08-29 2017-12-12 河南理工大学 一种顶梁式锚索恒阻结构及其安装方法
CN109441502A (zh) * 2018-10-25 2019-03-08 太原理工大学 基于拱-梁耦合结构的深井含煤复合顶板支护方法
CN111485927A (zh) * 2020-04-15 2020-08-04 泰安泰烁岩层控制科技有限公司 一种复合软岩顶板阶梯支护系统及施工方法
CN113586081A (zh) * 2021-09-03 2021-11-02 淮北市平远软岩支护工程技术有限公司 一种应用于高冲击地压的双桁架巷道主动动态修护方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1789718C (ru) * 1990-05-11 1993-01-23 Институт горного дела Севера СО АН СССР Гибкое раздел ющее перекрытие
CN102121389A (zh) * 2010-06-02 2011-07-13 中国矿业大学(北京) 一种煤巷围岩冒顶垮帮的锚索桁架防治方法
CN102182483A (zh) * 2011-04-26 2011-09-14 山东大学 半刚性异型梁锚索桁架巷道支护系统
CN102200020A (zh) * 2011-04-26 2011-09-28 山东大学 让压型异型梁锚索桁架巷道支护系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1789718C (ru) * 1990-05-11 1993-01-23 Институт горного дела Севера СО АН СССР Гибкое раздел ющее перекрытие
CN102121389A (zh) * 2010-06-02 2011-07-13 中国矿业大学(北京) 一种煤巷围岩冒顶垮帮的锚索桁架防治方法
CN102182483A (zh) * 2011-04-26 2011-09-14 山东大学 半刚性异型梁锚索桁架巷道支护系统
CN102200020A (zh) * 2011-04-26 2011-09-28 山东大学 让压型异型梁锚索桁架巷道支护系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何富连等: "采动垮冒型顶板煤巷强力锚索桁架支护系统试验", 《煤炭科学技术》, vol. 39, no. 2, 28 February 2011 (2011-02-28), pages 1 - 5 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352707A (zh) * 2013-07-19 2013-10-16 山西潞安环保能源开发股份有限公司常村煤矿 一种多维多级支护方法
CN103352707B (zh) * 2013-07-19 2015-12-02 山西潞安环保能源开发股份有限公司常村煤矿 一种多维多级支护方法
CN103628897A (zh) * 2013-12-06 2014-03-12 中国矿业大学 一种通过巷道高冒区方法
CN103953373A (zh) * 2014-05-08 2014-07-30 张新怀 巷道顶板高冒区临时支护装置
CN106523003A (zh) * 2016-09-27 2017-03-22 北京科技大学 一种适于深部开采巷道的刚柔耦合吸能支护技术
CN107461215A (zh) * 2017-08-29 2017-12-12 河南理工大学 一种顶梁式锚索恒阻结构及其安装方法
CN109441502A (zh) * 2018-10-25 2019-03-08 太原理工大学 基于拱-梁耦合结构的深井含煤复合顶板支护方法
CN111485927A (zh) * 2020-04-15 2020-08-04 泰安泰烁岩层控制科技有限公司 一种复合软岩顶板阶梯支护系统及施工方法
CN113586081A (zh) * 2021-09-03 2021-11-02 淮北市平远软岩支护工程技术有限公司 一种应用于高冲击地压的双桁架巷道主动动态修护方法

Also Published As

Publication number Publication date
CN102704965B (zh) 2015-09-09

Similar Documents

Publication Publication Date Title
EP3489459B1 (en) Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method
CN102704965A (zh) 一种防止剧烈采动影响巷道顶板垮冒方法
CN105134269B (zh) 一种锚索穿棚协同承载的巷道围岩控制方法
CN109681248B (zh) 一种注浆锚索超前支护方法
CN107143338B (zh) 一种煤矿巷道掘进及支护方法
CN104895072B (zh) 一种预应力锚索以及预应力锚索一次成型施工方法
CN103233751A (zh) 极软弱顶板煤巷双层锚固平衡拱支护系统
CN102900449B (zh) 一种煤矿井下采空区顶板的支护方法
CN109973126A (zh) 小煤柱沿空掘巷双卸压恒阻支护围岩稳定性控制方法
CN101509383A (zh) 巷道底脚锚注加固抗底臌的方法及施工工艺
CN105971640A (zh) 一种沿空掘巷窄煤柱的加固方法
CN101899837A (zh) 加固岩质边坡深部滑裂面的混凝土抗剪主动支护结构
CN103758529A (zh) 一种煤矿沿空留巷巷旁支护方法
CN103089279B (zh) 一种多巷顺槽巷间薄煤柱加固的方法
CN110529144A (zh) 一种小断面回采巷道混合式超前支护方法
CN108049899A (zh) 一种沿空掘巷窄煤柱破碎围岩加固方法
CN112610258A (zh) 一种应用于智慧矿山的冲击矿井回采巷道超前支护方法
CN104612729A (zh) 一种用于沿空巷道顶板的非对称锚梁结构及其支护方法
CN110541710B (zh) 一种v级高危地质围岩隧道机械化施工方法
CN110566238A (zh) 一种泥岩类顶板小煤柱沿空巷道支护结构及其方法
CN109958454A (zh) 回采巷道底鼓控制系统及其控制方法
CN102425428A (zh) 巷道迎头极破碎顶板控制方法
CN109578032A (zh) 一种高应力破碎围岩硐室加固方法
CN102296974B (zh) 采场破碎顶板快速维护方法
CN104790991A (zh) 一种回采巷道围岩强长顶锚固技术

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Yan Hong

Document name: Notification of Patent Invention Entering into Substantive Examination Stage

DD01 Delivery of document by public notice

Addressee: Yan Hong

Document name: the First Notification of an Office Action

DD01 Delivery of document by public notice

Addressee: Yan Hong

Document name: Notification to Go Through Formalities of Registration

ASS Succession or assignment of patent right

Owner name: CHINA UNIVERSITY OF MINING + TECHNOLOGY

Free format text: FORMER OWNER: YAN HONG

Effective date: 20150716

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150716

Address after: 221116 Xuzhou Province,, China University of Mining and Technology, the southern loop of science and Technology Department of the three

Applicant after: China University of Mining & Technology

Address before: 100083 Beijing City, Haidian District Institute of Rutosids China University of Mining and Technology No. 11 (Beijing) Baoyuan apartment A1-17032

Applicant before: Yan Hong

C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Yan Hong

Document name: Notification of Passing Examination on Formalities

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20180521