CN103074939B - Bamboo structure emergency house with foldable portal frame - Google Patents

Bamboo structure emergency house with foldable portal frame Download PDF

Info

Publication number
CN103074939B
CN103074939B CN201310028823.0A CN201310028823A CN103074939B CN 103074939 B CN103074939 B CN 103074939B CN 201310028823 A CN201310028823 A CN 201310028823A CN 103074939 B CN103074939 B CN 103074939B
Authority
CN
China
Prior art keywords
urgent need
bamboo structure
framework
room
list pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310028823.0A
Other languages
Chinese (zh)
Other versions
CN103074939A (en
Inventor
黄东升
卞玉玲
李健男
高永辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN201310028823.0A priority Critical patent/CN103074939B/en
Publication of CN103074939A publication Critical patent/CN103074939A/en
Application granted granted Critical
Publication of CN103074939B publication Critical patent/CN103074939B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a bamboo structure emergency house with a foldable portal frame. The bamboo structure emergency house is characterized by comprising a bamboo structure portal emergency house frame, wherein a roof plate is laid on the roof of the bamboo structure portal emergency house frame, and a plate is inserted between two inclined rods for fixing the side surface of the frame, a fabric is enclosed outside the emergency house, a solar panel is erected on a roof, and the size of an example house is 4500*1700*2100mm. The bamboo structure emergency house has the advantages of simple structure, convenience and rapidness in assembly and disassembly, flexible and adjustable space layout because a safe and reliable structure system is adopted in the movable house, material saving, light weight, and convenience for carrying and recovering; and the bamboo structure emergency house can be repeatedly used.

Description

The bamboo structure of collapsible portal frame is met an urgent need house
Technical field
The bamboo structure that the present invention relates to a kind of collapsible portal frame is met an urgent need house, belongs to building structure technology field.
Background technology
At present, the advantage such as known emergent house, Portable belt detachable with it is widely used in disaster relief and rescue, army's actual combat, engineering construction, field work etc.But there are three large defects in existing emergent house: one, existing emergent room assembling and disassembling is more difficult, is difficult to realize rapid and convenient; Two, existing emergent room structural system is single, and material is thin, is difficult in use to ensure safe and reliable, realizes recycling; Three, the folding rear relative volume in existing emergent room is still huge, inconvenience transport.In addition, the constituent material in existing emergent house all belongs to non-degradable material, easily to environment in the process of manufacture of materials, processing and use.
Summary of the invention
A kind of bamboo structure of collapsible portal frame that what the present invention proposed is is met an urgent need house, and its object is intended to the above-mentioned defect overcome existing for prior art, realize dismounting fast, carrying portable, structural safety, the feature such as easily assembled, environmental protection low-carbon (LC).
Technical solution of the present invention: its structure comprises bamboo structure gate-type to meet an urgent need room framework, and mat formation at the meet an urgent need roof roof board material of room framework of bamboo structure gate-type, sheet material inserts between two braces and is fixed by side, and outside, emergent room adopts cloth to go along with sb. to guard him; At roofing erection solar panels.House size can be 4500 × 1700 × 2100mm.
Advantage of the present invention: emergent room adopts bamboo structure portal frame as agent structure, side is with the brace of adjustable-angle, and connect between rod member and take finger mode, structural safety is reliable, and retractility is large, and overall space is adjustable flexibly; There is the features such as span is large, conduct oneself with dignity little, structure is simple, easy installation and removal is quick, stability under loading, so make whole framework safe and simple due to portal frame.Diagonal brace place arranges position, multiple hole, can flexible modulation horizontal spacing, facilitates space layout.Mat formation in structural system outside sheet material and cloth forms inner space.Roofing arranges solar panels and electric wire, can be used for gathering and transmission of electric energy extremely within doors.Emergent room province material is brisk, is easy to carry, can repeatedly recycles, and reduces cost.Building structure is stable, size adjustable, safe and convenient.Rod member bolt can be connected into gate-type list Pin framework during use, more each Pin portal frame diagonal brace is connected.
Accompanying drawing explanation
Accompanying drawing 1 be between two rod members angle be zero A bamboo structure to meet an urgent need room monolateral framework 1 schematic diagram.
Accompanying drawing 2 is that B bamboo structure that between two rod members, angle is less than 90 degree is met an urgent need room monolateral framework 2 schematic diagram.
Accompanying drawing 3 is that C bamboo structure that between two rod members, angle is greater than 90 degree is met an urgent need room monolateral framework 3 schematic diagram.
Accompanying drawing 4 is that A bamboo structure is met an urgent need the elevation of room list Pin framework 5.
Accompanying drawing 4-1 is the lateral view of Fig. 4.
Accompanying drawing 5 is that bamboo structure gate-type is met an urgent need house two Pin frame side view.
Accompanying drawing 6 is that bamboo structure gate-type is met an urgent need room frame side view.
Accompanying drawing 7 is that bamboo structure gate-type is met an urgent need the schematic perspective view of room framework.
Accompanying drawing 8 is schematic diagrames of B rod member and D rod member connected node.
Accompanying drawing 9 is schematic diagrames of E brace and G brace connected node.
Accompanying drawing 10 is that the bamboo structure of collapsible portal frame is met an urgent need building structure schematic diagram.
In figure 1 is that A bamboo structure is met an urgent need the monolateral framework in room, 2 is that B bamboo structure is met an urgent need the monolateral framework in room, 3 is that C bamboo structure is met an urgent need the monolateral framework in room, 4 is that D bamboo structure is met an urgent need the monolateral framework in room, 5 is that A bamboo structure is met an urgent need room list Pin framework, 6 is that B bamboo structure is met an urgent need room list Pin framework, 7 is that C bamboo structure is met an urgent need room list Pin framework, 8 is that D bamboo structure is met an urgent need room list Pin framework, 101 is A bolts hole, 102 is C rod members, 103 is D rod members, 201 is B bolts hole, 202 is A rod members, 203 is B rod members, 204 is C bolts hole, 205 is D bolts hole, 206 is A bolt hole groups, 207 is E braces, 208 is F braces, 209 is E bolts hole, 210 is B bolt hole groups, 211 is G braces, 212 is H braces, 213 is L braces, 214 is M braces, 215 is F bolts hole, 216 is G bolts hole, 217 is C bolt hole groups, 218 is D bolt hole groups.
Detailed description of the invention
Contrast Fig. 1, A bamboo structure is met an urgent need the monolateral framework in room, its structure has A bolt hole 101 between C rod member 102 and D rod member 103, bolt connects C rod member 102 and D rod member 103 by this hole, form A bamboo structure to meet an urgent need the monolateral framework 1 in room, wherein C rod member 102 shape overlapping with D rod member 103 one-tenth, its angle is zero, establish D bolt hole 205, D rod member 103 bottom to establish A bolt hole group 206 on D rod member 103 top.
Contrast Fig. 2, B bamboo structure is met an urgent need the monolateral framework in room, its structure has A bolt hole 101 between C rod member 102 and D rod member 103, bolt connects C rod member 102 and D rod member 103 by this hole and forms B bamboo structure and to meet an urgent need the monolateral framework 2 in room, angle wherein between C rod member 102 and D rod member 103 is less than 90 degree, establish D bolt hole 205, D rod member 103 bottom to establish A bolt hole group 206 on D rod member 103 top.
Contrast Fig. 3, C bamboo structure is met an urgent need the monolateral framework in room, its structure has A bolt hole 101 between C rod member 102 and D rod member 103, and bolt connects C rod member 102 and D rod member 103 by this hole and forms C bamboo structure and to meet an urgent need the monolateral framework 3 in room, and the angle wherein between C rod member 102 and D rod member 103 is greater than 90 degree.Establish D bolt hole 205, D rod member 103 bottom to establish A bolt hole group 206 on D rod member 103 top.
It is long × wide × thick that described D, C rod member can be 1200 × 60 × 60() unit: mm, bolt is Φ 16mm.(brace size: 1800 × 30 × 30).
Contrast Fig. 4, A bamboo structure is met an urgent need room list Pin framework 5, its structure is an A rod member 202, have a B bolt hole 201 between a B rod member 203, bolt connects an A rod member 202 and a B rod member 203 by this hole, form the angle that a D bamboo structure meets an urgent need between room monolateral framework the 4, one A rod member 202 and a B rod member 203 and be greater than 90 degree.An A bolt hole 101 is had between the one C rod member 102 and a D rod member 103, it is consistent with the angle between a D rod member 103 and the angle between an A rod member 202 and B rod member 203 that one C rod member 102 and a D rod member 103 to be connected to form C room monolateral framework the 3, one C rod member 102 of meeting an urgent need by this hole by bolt.The one D bamboo structure monolateral framework in room 4 and a C bamboo structure monolateral framework 3 in room of meeting an urgent need of meeting an urgent need is symmetrical arranged.A C bolt hole 204 is had between the one D rod member 103 and a B rod member 203, bolt connects a D rod member 103 and a B rod member 203 by this hole, thus a D bamboo structure the met an urgent need monolateral framework in room 4 and a C bamboo structure are met an urgent need, the monolateral framework 3 in room is connected to form A bamboo structure and meets an urgent need room list Pin framework 5.
Form B bamboo structure meet an urgent need room list Pin framework 7 and D bamboo structure of room list Pin framework 6, C bamboo structure of meeting an urgent need with the same manner to meet an urgent need room list Pin framework 8.
Described B bamboo structure is met an urgent need room list Pin framework 6, its structure is the 2nd A rod member, have the 2nd B bolt hole between the 2nd B rod member, bolt connects the 2nd A rod member and the 2nd B rod member by this hole, and formation the 2nd D meets an urgent need the monolateral framework in room, and the angle between the 2nd A rod member and the 2nd B rod member is greater than 90 degree.The 2nd A bolt hole is had between the 2nd C rod member and the 2nd D rod member, 2nd C rod member and the 2nd D rod member to be connected to form the 2nd C bamboo structure by this hole and to meet an urgent need the monolateral framework in room by bolt, the angle between the 2nd C rod member with the 2nd D rod member and the angle between the 2nd A rod member and the 2nd B rod member consistent.The 2nd D monolateral framework in room and the 2nd C monolateral framework in room of meeting an urgent need of meeting an urgent need is symmetrical arranged.The 2nd C bolt hole is had between the 2nd D rod member and the 2nd B rod member, bolt connects the 2nd D rod member and the 2nd B rod member by this hole, thus is answered by the 2nd D the bamboo structure urgency monolateral framework in room and the 2nd C bamboo structure monolateral framework in room of meeting an urgent need to be connected to form B bamboo structure and to meet an urgent need room list Pin framework 6.
Described C meets an urgent need room list Pin framework 7, its structure is the 3rd A rod member, have the 3rd B bolt hole between the 3rd B rod member, bolt connects the 3rd A rod member and the 3rd B rod member by this hole, and formation the 3rd D bamboo structure is met an urgent need the monolateral framework in room, and the angle between the 3rd A rod member and the 3rd B rod member is greater than 90 degree.The 3rd A bolt hole is had between the 3rd C rod member and the 3rd D rod member, 3rd C rod member and the 3rd D rod member to be connected to form the 3rd C bamboo structure by this hole and to meet an urgent need the monolateral framework in room by bolt, the angle between the 3rd C rod member with the 3rd D rod member and the angle between the 3rd A rod member and the 3rd B rod member consistent.The 3rd D bamboo structure monolateral framework in room and the 3rd C bamboo structure monolateral framework in room of meeting an urgent need of meeting an urgent need is symmetrical arranged.The 3rd C bolt hole is had between the 3rd D rod member and the 3rd B rod member, bolt connects the 3rd D rod member and the 3rd B rod member by this hole, thus the 3rd D bamboo structure the met an urgent need monolateral framework in room and the 3rd C bamboo structure are met an urgent need, the monolateral framework in room is connected to form C bamboo structure and meets an urgent need room list Pin framework 7.
Described D bamboo structure is met an urgent need room list Pin framework 8, its structure is the 4th A rod member, have the 4th B bolt hole between the 4th B rod member, bolt connects the 4th A rod member and the 4th B rod member by this hole, and formation the 4th D bamboo structure is met an urgent need the monolateral framework in room, and the angle between the 4th A rod member and the 4th B rod member is greater than 90 degree.The 4th A bolt hole is had between the 4th C bamboo structure rod member and the 4th D rod member, 4th C rod member and the 4th D rod member to be connected to form the 4th C bamboo structure by this hole and to meet an urgent need the monolateral framework in room by bolt, the angle between the 4th C rod member with the 4th D rod member and the angle between the 4th A rod member and the 4th B rod member consistent.The 4th D bamboo structure monolateral framework in room and the 4th C bamboo structure monolateral framework in room of meeting an urgent need of meeting an urgent need is symmetrical arranged.The 4th C bolt hole is had between the 4th D rod member and the 4th B rod member, bolt connects the 4th D rod member and the 4th B rod member by this hole, thus the 4th D bamboo structure the met an urgent need monolateral framework in room and the 4th C bamboo structure are met an urgent need, the monolateral framework in room is connected to form D bamboo structure and meets an urgent need room list Pin framework 8.
Contrast Fig. 5, bamboo structure gate-type is met an urgent need house two Pin framework, and its structure is that meet an urgent need room list Pin framework 5 and B bamboo structure of A bamboo structure is met an urgent need the symmetrical layout of room list Pin framework 6; A bolt connects meet an urgent need room list Pin framework 5 and F brace 208, B bolt of A bamboo structure by the A bamboo structure D bolt hole 205 of meeting an urgent need on room list Pin framework 5 and connects B bamboo structure by the B bamboo structure B bolt hole group 210 met an urgent need on room list Pin framework 6 and to meet an urgent need room list Pin framework 6 and F brace 208; C bolt connects meet an urgent need room list Pin framework 5 and E brace 207, D bolt of A bamboo structure by the A bamboo structure A bolt hole group 206 met an urgent need on room list Pin framework 5 and connects B bamboo structure by the B bamboo structure E bolt hole 209 of meeting an urgent need on room list Pin framework 6 and to meet an urgent need room list Pin framework 6 and E brace 207; By the connection of E rod member 207 and F rod member 208, A bamboo structure room list Pin framework 5 and B bamboo structure room list Pin framework 6 of meeting an urgent need of meeting an urgent need forms single framework, and wherein, E rod member 207 is in the outside of single framework, and F rod member 208 is in the inner side of single framework.
Contrast Fig. 6, bamboo structure gate-type is met an urgent need room framework, and its structure comprises A bamboo structure room list Pin framework 5, B bamboo structure meet an urgent need room list Pin framework 7, D bamboo structure of room list Pin framework 6, C bamboo structure of meeting an urgent need of meeting an urgent need to meet an urgent need room list Pin framework 8;
Wherein A bamboo structure the meet an urgent need connected mode of room list Pin framework 6 of room list Pin framework 5 and B bamboo structure of meeting an urgent need is: A bolt is connected meet an urgent need room list Pin framework 5 and F brace 208, B bolt of A bamboo structure by the A bamboo structure D bolt hole 205 of meeting an urgent need on room list Pin framework 5 and connects B bamboo structure by the B bamboo structure B bolt hole group 210 met an urgent need on room list Pin framework 6 and to meet an urgent need room list Pin framework 6 and F brace 208; C bolt connects meet an urgent need room list Pin framework 5 and E brace 207, D bolt of A bamboo structure by the A bamboo structure A bolt hole group 206 met an urgent need on room list Pin framework 5 and connects B bamboo structure by the B bamboo structure E bolt hole 209 of meeting an urgent need on room list Pin framework 6 and to meet an urgent need room list Pin framework 6 and E brace 207;
B bamboo structure the meet an urgent need connected mode of room list Pin framework 7 of room list Pin framework 6 and C bamboo structure of meeting an urgent need is: E bolt is connected meet an urgent need room list Pin framework 6 and H brace 212, F bolt of B bamboo structure by the B bamboo structure E bolt hole 209 of meeting an urgent need on room list Pin framework 6 and connects C bamboo structure by the C bamboo structure C bolt hole group 217 met an urgent need on room list Pin framework 7 and to meet an urgent need room list Pin framework 7 and H brace 212; G bolt connects meet an urgent need room list Pin framework 6 and G brace 211, H bolt of B bamboo structure by the B bamboo structure B bolt hole group 210 met an urgent need on room list Pin framework 6 and connects C bamboo structure by the C bamboo structure F bolt hole 215 of meeting an urgent need on room list Pin framework 7 and to meet an urgent need room list Pin framework 7 and G brace 211;
C bamboo structure the meet an urgent need connected mode of room list Pin framework 8 of room list Pin framework 7 and D bamboo structure of meeting an urgent need is: L bolt is connected meet an urgent need room list Pin framework 7 and M brace 214, M bolt of C bamboo structure by the C bamboo structure F bolt hole 215 of meeting an urgent need on room list Pin framework 7 and connects D bamboo structure by the D bamboo structure D bolt hole group 218 met an urgent need on room list Pin framework 8 and to meet an urgent need room list Pin framework 8 and M brace 214; N bolt connects meet an urgent need room list Pin framework 7 and L brace 213, P bolt of C bamboo structure by the C bamboo structure C bolt hole group 217 met an urgent need on room list Pin framework 7 and connects D bamboo structure by the D bamboo structure G bolt hole 216 of meeting an urgent need on room list Pin framework 8 and to meet an urgent need room list Pin framework 8 and L brace 213;
Room list Pin framework 5, the B bamboo structure of A bamboo structure being met an urgent need room list Pin framework 6, C bamboo structure room list Pin framework 7 and D bamboo structure room list Pin framework 8 of meeting an urgent need of meeting an urgent need of meeting an urgent need takes aforesaid way to be connected, and forms the general frame in emergent room.
Contrast Fig. 7, its structure is that the D bamboo structure monolateral framework in room 4 and the C bamboo structure monolateral framework 3 in room of meeting an urgent need of meeting an urgent need is connected to form A bamboo structure and meets an urgent need room list Pin framework 5; A bamboo structure room list Pin framework 5, B bamboo structure room list Pin framework 6, C bamboo structure room list Pin framework 7 and D bamboo structure room list Pin framework 8 of meeting an urgent need of meeting an urgent need of meeting an urgent need of meeting an urgent need is connected by brace, forms bamboo structure gate-type and to meet an urgent need room framework.
Contrast Fig. 8, its structure is that C rod member 102 takes the mode of finger to be connected with D rod member 103, re-uses bolt and is fixedly connected with.
Contrast Fig. 9, its structure is that E rod member 207 takes the mode of finger to be connected with G rod member 211, re-uses bolt and is fixedly connected with.
Contrast Figure 10, its structure is that the meet an urgent need roof roof board material of room framework of bamboo structure gate-type is mated formation, and sheet material inserts between two braces and can fix by side, and outside, emergent room adopts cloth to go along with sb. to guard him.At roofing erection solar panels.It is long × wide × high that house is of a size of 4500 × 1700 × 2100() (unit: mm).
Described rod member is bamboo wood, and its manufacture craft comprises slitting, clear Huang, carbonization, oven dry, impregnation and hot pressing.
Described brace adjustable-angle, brace is present in the inner side and outer side of framework simultaneously, forms twice Lateral Resistant System.
Described Pin frame spacing is adjustable.
Described emergent room outer covering material comprises sheet material and cloth.
Described emergent room energy supply facility mainly power supply facility, comprises roofing solar panel and gathers and electric power input equipment and electric wire outside room.
Using bamboo wood as main material, from heavy and light, safety and environmental protection.Structure adopts portal frame, and installing/dismounting is simple and efficient, time saving and energy saving.Frame structure system is simple, clearly stressed, safe and reliable.Finger mode is taked to connect between frame member, easy to connect, safety and stability.Rod member is provided with bolt hole group, can arbitrarily regulate brace angle, facilitates framework to stretch, adjusts the standard width of a room in an old-style house.Go along with sb. to guard him with sheet material and cloth outside framework, arrange simple and easy, can keep out wind and rain.There are solar panels on roof, can gather electric energy for basic living.Can carry with after framework is folding, transport is quick, is particularly suitable for disaster area rescue and field encampment use.

Claims (1)

1. the bamboo structure of collapsible portal frame is met an urgent need house, it is characterized in that comprising bamboo structure gate-type to meet an urgent need room framework, and mat formation at the meet an urgent need roof roof board material of room framework of bamboo structure gate-type, sheet material inserts between two braces and is fixed by side, and outside, emergent room adopts cloth to go along with sb. to guard him; At roofing erection solar panels; Described bamboo structure gate-type room framework of meeting an urgent need is connected in sequence by brace by A bamboo structure room list Pin framework (5), B bamboo structure room list Pin framework (6), C bamboo structure room list Pin framework (7) and D bamboo structure room list Pin framework (8) of meeting an urgent need of meeting an urgent need of meeting an urgent need of meeting an urgent need, and described A bamboo structure room list Pin framework (5), B bamboo structure room list Pin framework (6), C bamboo structure the meet an urgent need structure in room list Pin framework (8) of room list Pin framework (7) and D bamboo structure of meeting an urgent need of meeting an urgent need of meeting an urgent need is identical; Described A bamboo structure room list Pin framework (5), B bamboo structure room list Pin framework (6), C bamboo structure room list Pin framework (7) and D bamboo structure room list Pin framework (8) of meeting an urgent need of meeting an urgent need of meeting an urgent need of meeting an urgent need is connected successively by brace, specifically: wherein A bolt is connected A bamboo structure to be met an urgent need room list Pin framework (5) and F brace (208) by meet an urgent need D bolt hole (205) on room list Pin framework (5) of A bamboo structure, B bolt to be met an urgent need room list Pin framework (6) and F brace (208) by B bolt hole group (210) the connection B bamboo structure that B bamboo structure is met an urgent need on room list Pin framework (6); C bolt is connected A bamboo structure to be met an urgent need room list Pin framework (5) and E brace (207) by meet an urgent need A bolt hole group (206) on room list Pin framework (5) of A bamboo structure, and D bolt to be met an urgent need room list Pin framework (6) and E brace (207) by E bolt hole (209) the connection B bamboo structure that B bamboo structure is met an urgent need on room list Pin framework (6); E bolt is connected B bamboo structure to be met an urgent need room list Pin framework (6) and H brace (212) by meet an urgent need E bolt hole (209) on room list Pin framework (6) of B bamboo structure, and F bolt to be met an urgent need room list Pin framework (7) and H brace (212) by C bolt hole group (217) the connection C bamboo structure that C bamboo structure is met an urgent need on room list Pin framework (7); G bolt is connected B bamboo structure to be met an urgent need room list Pin framework (6) and G brace (211) by meet an urgent need B bolt hole group (210) on room list Pin framework (6) of B bamboo structure, and H bolt to be met an urgent need room list Pin framework (7) and G brace (211) by F bolt hole (215) the connection C bamboo structure that C bamboo structure is met an urgent need on room list Pin framework (7);
L bolt is connected C bamboo structure to be met an urgent need room list Pin framework (7) and M brace (214) by meet an urgent need F bolt hole (215) on room list Pin framework (7) of C bamboo structure, and M bolt to be met an urgent need room list Pin framework (8) and M brace (214) by D bolt hole group (218) the connection D bamboo structure that D bamboo structure is met an urgent need on room list Pin framework (8); N bolt is connected C bamboo structure to be met an urgent need room list Pin framework (7) and L brace (213) by meet an urgent need C bolt hole group (217) on room list Pin framework (7) of C bamboo structure, and P bolt to be met an urgent need room list Pin framework (8) and L brace (213) by G bolt hole (216) the connection D bamboo structure that D bamboo structure is met an urgent need on room list Pin framework (8); The meet an urgent need structure of room list Pin framework of described A bamboo structure is formed by connecting by the D bamboo structure monolateral framework in room (4) and the C bamboo structure monolateral framework in room (3) of meeting an urgent need of meeting an urgent need, wherein the D bamboo structure monolateral framework in room (4) and the C bamboo structure monolateral framework in room (3) of meeting an urgent need of meeting an urgent need is symmetrical arranged, and structure is identical; Described D bamboo structure meets an urgent need that the structure in the monolateral framework in room (4) is A rod member (202), have B bolt hole (201) between B rod member (203), bolt connects A rod member (202) and B rod member (203) by this hole, and the angle between A rod member (202) and B rod member (203) is greater than 90 degree; The meet an urgent need structure in the monolateral framework in room (3) of described C bamboo structure has A bolt hole (101) between C rod member (102) and D rod member (103), C rod member (102) is connected with D rod member (103) by this hole by bolt, and the angle between C rod member (102) and D rod member (103) is greater than 90 degree.
CN201310028823.0A 2013-01-25 2013-01-25 Bamboo structure emergency house with foldable portal frame Expired - Fee Related CN103074939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310028823.0A CN103074939B (en) 2013-01-25 2013-01-25 Bamboo structure emergency house with foldable portal frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310028823.0A CN103074939B (en) 2013-01-25 2013-01-25 Bamboo structure emergency house with foldable portal frame

Publications (2)

Publication Number Publication Date
CN103074939A CN103074939A (en) 2013-05-01
CN103074939B true CN103074939B (en) 2014-12-31

Family

ID=48151627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310028823.0A Expired - Fee Related CN103074939B (en) 2013-01-25 2013-01-25 Bamboo structure emergency house with foldable portal frame

Country Status (1)

Country Link
CN (1) CN103074939B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306373B (en) * 2013-07-02 2015-06-24 郑州红宇专用汽车有限责任公司 Unit modular folding mobile house suitable for combined use
CN105317114A (en) * 2015-10-27 2016-02-10 重庆光煦科技有限公司 board house having corridor structure
CN107740601A (en) * 2017-10-12 2018-02-27 济南普利市政管网工程有限责任公司 Water supply first-aid repair weather proof enclosure device
CN111663650A (en) * 2020-05-31 2020-09-15 湖北易安装配建筑科技有限公司 Foldable light steel house
CN111894139B (en) * 2020-09-05 2021-12-28 义乌市今朝创意设计有限公司 Modularized steel structure board room capable of being rapidly installed and disassembled

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1347475A (en) * 1999-03-02 2002-05-01 克拉斯戈尔德有限公司 House and/or shed construction components
CN2773248Y (en) * 2005-01-11 2006-04-19 王丽珊 Collapsible and movable garage
CN201517291U (en) * 2009-09-28 2010-06-30 黄尚进 Movable gantry type automatic telescopic carport
CN201598876U (en) * 2009-12-25 2010-10-06 南京际华三五二一特种装备有限公司 Large-span folding frame tent rack
CN102852354A (en) * 2012-09-20 2013-01-02 浙江工业大学 Rotating folding type parking garage
CN203066507U (en) * 2013-01-25 2013-07-17 南京林业大学 Bamboo-structure emergency house with foldable portal frame

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1347475A (en) * 1999-03-02 2002-05-01 克拉斯戈尔德有限公司 House and/or shed construction components
CN2773248Y (en) * 2005-01-11 2006-04-19 王丽珊 Collapsible and movable garage
CN201517291U (en) * 2009-09-28 2010-06-30 黄尚进 Movable gantry type automatic telescopic carport
CN201598876U (en) * 2009-12-25 2010-10-06 南京际华三五二一特种装备有限公司 Large-span folding frame tent rack
CN102852354A (en) * 2012-09-20 2013-01-02 浙江工业大学 Rotating folding type parking garage
CN203066507U (en) * 2013-01-25 2013-07-17 南京林业大学 Bamboo-structure emergency house with foldable portal frame

Also Published As

Publication number Publication date
CN103074939A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN103074939B (en) Bamboo structure emergency house with foldable portal frame
CN103306373B (en) Unit modular folding mobile house suitable for combined use
CN107090913B (en) Folding house and disassembly and assembly method thereof
CN202678365U (en) Solar energy frame
CN106894506B (en) Large-span breathable structure system
CN203066507U (en) Bamboo-structure emergency house with foldable portal frame
CN202454720U (en) Thermal-stabilizing framework of thin film antenna
CN105227082A (en) A kind of carrying of the Foldable solar energy cell panel with Stewart mechanism support body
CN109184304B (en) Modularized large-span hangar and construction method thereof
CN203672307U (en) Multifunctional portable quadrat frame
CN105735479A (en) Prefabricated house with folding wallboards
CN202644722U (en) Portable easy-to-assemble module board room
CN201794320U (en) Rotationally-built and quickly-assembled unit movable house
CN203452190U (en) Moving house with foldable roof
CN103938780A (en) Dual-ring scissor type unit unfolding roof
CN202882383U (en) Novel scaffold board
CN114893024A (en) Energy self-sustaining foldable emergency shelter cabin
CN203452448U (en) Tent with quick assembly function
CN209975732U (en) Extension house
CN103883057A (en) Openable house cover with transverse scissor type units
CN103883058B (en) A kind of horizontal dicyclo space scissors unit can retractable roof
CN103899027B (en) A kind of horizontal dicyclo scissors unit can retractable roof
CN204928705U (en) Collapsible solar cell panel bearing frame with si tuerte mechanism
CN205545122U (en) Polylith solar panel folds winding and unwinding devices
CN213573307U (en) Tent storehouse convenient to set up

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20160125

EXPY Termination of patent right or utility model