CN103074906A - Construction method of protecting pad of methane tank - Google Patents
Construction method of protecting pad of methane tank Download PDFInfo
- Publication number
- CN103074906A CN103074906A CN2011103267792A CN201110326779A CN103074906A CN 103074906 A CN103074906 A CN 103074906A CN 2011103267792 A CN2011103267792 A CN 2011103267792A CN 201110326779 A CN201110326779 A CN 201110326779A CN 103074906 A CN103074906 A CN 103074906A
- Authority
- CN
- China
- Prior art keywords
- biomass pool
- geotextiles
- sand
- methane tank
- job practices
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention belongs to the technical field of building construction and relates to a construction method of a protecting pad of a methane tank. The construction method comprises the following steps of: firstly, placing geotechnical cloth into a pit of the methane tank, and unfolding according to the shape of the pit; laying sand on the unfolded geotechnical cloth at the center of the pit of the methane tank; placing the engineering plastic methane tank into the pit; holding the geotechnical cloth along the bottom of the methane tank, uniformly coating a sphere of the methane tank, and fixing the top side of the geotechnical cloth on a shell of the methane tank through an adhesive tape; filling and ramming from the bottom of the methane tank; pulling down the top side of the geotechnical cloth, horizontally pulling the geotechnical cloth, and uniformly adding sand between the geotechnical cloth and the sphere shell; holding the geotechnical cloth to coat the sphere of the methane tank, fixing on the shell of the methane tank, filling, ramming and burying the whole methane tank. By adoption of the method of the protecting pad through adding the sand into the geotechnical cloth, the bottom structure of the methane tank is reinforced, so that the shell of the methane tank is uniformly stressed, thus a good integral reinforcement action is provided and the protecting pad has a thermal insulation effect on the engineering plastic methane tank.
Description
Technical field
The invention belongs to technical field of building construction, relate to a kind of job practices of biomass pool protective pad.
Background technology
Engineering plastic methane tank is a kind of marsh gas generator that the family, rural area is built with (family) biomass pool that is widely used in, and is to be formed by the compacting of the engineering plastics such as ABS, MODIFIED PP.Engineering plastic methane tank has light weight, carrying, the simple and easy and good advantages such as comprehensive mechanical property of installation.Compare with the biomass pool that cement is built, when mounted between, all have greatly improved on the maintenance cost, tightness.
If but the engineering plastic methane tank of rounded bottom directly contacts with earth, owing to when circular arc-shaped bottom portion bankets, be not easy compacting, loose and gap can appear in the earth of engineering plastic methane tank bottom periphery, therefore the part causes stress to concentrate at the bottom of the engineering plastic methane tank, can produce the danger of breaking in stressed concentrated situation.
Summary of the invention
The object of the invention is to provides a kind of biomass pool protective pad job practices for the defective of prior art.The biomass pool protective pad is between engineering plastic methane tank and bear between the earth of weight; form compound buffer layer by geotextiles, sand; the biomass pool protective pad is applied on the biomass pool; simple and convenient is installed; good effect and effect have been played improving the whole distribution of force of biomass pool, for the installation of biomass pool, use a kind of engineering plastic methane tank housing safeguard measure is provided.
A kind of biomass pool protective pad job practices comprises following steps:
(1) geotextiles is put into the hole of biomass pool, launched by the shape in hole;
(2) lay sand in the geotextiles of biomass pool hole center deployment;
(3) biomass pool is put into the hole, its bottom contacts with the sand of laying;
(4) geotextiles has been held together along the biomass pool bottom, wrapped equably the biomass pool spheroid, with adhesive tape the geotextiles top margin has been fixed on the biomass pool housing;
(5) begin to banket from biomass pool bottom, compacting;
(6) the geotextiles top margin is left behind, level is torn geotextiles, owing to be not easy compacting when circular arc-shaped bottom portion bankets, has certain space in geotextiles and between banketing, can make between geotextiles and the global shell and reserve the space, and in this space, add equably sand;
(7) geotextiles has been held together to wrap the biomass pool spheroid, has been fixed on the biomass pool housing with adhesive tape, again to its banket, compacting work, the most whole biomass pool buries, finishes the installation of biomass pool.
Described biomass pool is engineering plastic methane tank, preferred modified polypropene biomass pool or ABS (acrylonitrile-butadiene-styrene (ABS) plastics) biomass pool.
The material of described geotextiles is shaped as circle for spinning geotextiles or non-woven geotextile.
The diameter of described geotextiles is that biomass pool lower semisphere bottom arc length adds 70~100cm again.
In the described step (1), the number of plies of geotextiles is 1~3 layer.
In the described step (2), the thickness of sand is 5~7cm, and the tiling diameter of sand is 0.8~1.5m.
In the described step (6), the adding of sand highly is whole biomass pool height
The place is consistent with the height that has banketed in the step (5).
Space in the described step (6) is 3~7mm.
Described sand is the building yellow sand, and water content is 0.1~0.5%, and mud content is 0.1~0.2%, and the sand particle diameter is 0.5~2mm.
Beneficial effect of the present invention:
The present invention relates to a kind of biomass pool protective pad job practices, the mode of taking this protective pad to add sand has been reinforced the biomass pool polycrystalline substance, make biomass pool housing uniform stressed, played good integral reinforcing effect, owing to use the geotextiles thicker than material, can also play to engineering plastic methane tank the effect of insulation simultaneously.
Description of drawings
Fig. 1 is engineering plastic methane tank protective pad job practices schematic diagram.
Symbol description:
1 engineering plastic methane tank,
The sand part of 2 protective pads,
The geotextiles part of 3 protective pads,
The heatable adobe sleeping platform of 4 installing engineering plastic methane tanks.
The specific embodiment
The hydraulic biomass pool of the below's 8 cubic metres of polypropylene materials commonly used take the rural area is example, uses grammes per square metre 450g/m
2Non-woven geotextile, the present invention is described further in conjunction with Fig. 1.
Step 4 has been held together geotextiles along the biomass pool bottom, wrap equably the biomass pool spheroid, with adhesive tape the geotextiles top margin is fixed on the biomass pool housing;
Step 5 begins to banket from biomass pool bottom, compacting, bankets to whole biomass pool height
The time, stop to banket;
Step 6 is left behind the geotextiles top margin, and level is torn geotextiles, and making and reserving the space between geotextiles and the global shell is 5mm, and adds equably sand to whole biomass pool height
Locate, and be consistent 2 sand part among shape such as the figure with the height that has banketed;
Step 7 has held together to wrap the biomass pool spheroid with geotextiles, be fixed on the biomass pool housing with adhesive tape, again to its banket, compacting work, the most whole biomass pool buries, finishes the installation of biomass pool.
The hydraulic biomass pool of the below's 6 cubic metres of ABS materials commonly used take the rural area is example, uses grammes per square metre 300g/m
2Non-woven geotextile, the present invention is described further in conjunction with Fig. 1.
Step 4 has been held together geotextiles along the biomass pool bottom, wrap equably the biomass pool spheroid, with adhesive tape the geotextiles top margin is fixed on the biomass pool housing;
Step 5 begins to banket from biomass pool bottom, compacting, bankets to whole biomass pool height
The time, stop to banket;
Step 6 is left behind the geotextiles top margin, and level is torn geotextiles, and making and reserving the space between geotextiles and the global shell is 7mm; And add equably sand to whole biomass pool height
Locate, and be consistent 2 sand part among shape such as the figure with the height that has banketed;
Step 7 has held together to wrap the biomass pool spheroid with geotextiles, be fixed on the biomass pool housing with adhesive tape, again to its banket, compacting work, the most whole biomass pool buries, finishes the installation of biomass pool.
The hydraulic biomass pool of the below's 10 cubic metres of polypropylene materials commonly used take the rural area is example, uses grammes per square metre 450g/m
2Non-woven geotextile, the present invention is described further in conjunction with Fig. 1.
Step 4 has been held together geotextiles along the biomass pool bottom, wrap equably the biomass pool spheroid, with adhesive tape the geotextiles top margin is fixed on the biomass pool housing;
Step 5 begins to banket from biomass pool bottom, compacting, when banketing to whole biomass pool height 1/2, stops to banket;
Step 6 is left behind the geotextiles top margin, and level is torn geotextiles, and making and reserving the space between geotextiles and the global shell is 3mm; And add equably sand to whole biomass pool height 1/2 place, and be consistent 2 sand part among shape such as the figure with the height that has banketed;
Step 7 has held together to wrap the biomass pool spheroid with geotextiles, be fixed on the biomass pool housing with adhesive tape, again to its banket, compacting work, the most whole biomass pool buries, finishes the installation of biomass pool.
The above-mentioned description to embodiment is can understand and apply the invention for ease of those skilled in the art.The person skilled in the art obviously can easily make various modifications to these embodiment, and needn't pass through performing creative labour being applied in the General Principle of this explanation among other embodiment.Therefore, the invention is not restricted to the embodiment here, those skilled in the art are according to announcement of the present invention, and not breaking away from the improvement that category of the present invention makes and revise all should be within protection scope of the present invention.
Claims (10)
1. the job practices of a biomass pool protective pad is characterized in that: comprise following steps:
(1) geotextiles is put into the hole of biomass pool, by the shape drawout in hole;
(2) lay sand in the geotextiles of biomass pool hole center deployment;
(3) biomass pool is put into the hole, its bottom contacts with the sand of laying;
(4) geotextiles has been held together along the biomass pool bottom, wrapped equably the biomass pool spheroid, with adhesive tape the geotextiles top margin has been fixed on the biomass pool housing;
(5) begin to banket from biomass pool bottom, compacting;
(6) the geotextiles top margin is left behind, level is torn geotextiles, makes between geotextiles and the global shell and reserves the space, and add equably sand in this space;
(7) geotextiles has been held together to wrap the biomass pool spheroid, has been fixed on the biomass pool housing with adhesive tape, again to its banket, compacting work, the most whole biomass pool buries, finishes the installation of biomass pool.
2. job practices according to claim 1, it is characterized in that: the material of described geotextiles is shaped as circle for spinning geotextiles or non-woven geotextile.
3. job practices according to claim 1 is characterized in that: the diameter of described geotextiles is that biomass pool lower semisphere bottom arc length adds 70~100cm again.
4. job practices according to claim 1, it is characterized in that: in the described step (1), the number of plies of geotextiles is 1~3 layer.
5. job practices according to claim 1, it is characterized in that: in the described step (2), the thickness of sand is 5~7cm, and the tiling diameter of sand is 0.8~1.5m.
6. job practices according to claim 1, it is characterized in that: described biomass pool is engineering plastic methane tank.
7. job practices according to claim 6, it is characterized in that: described engineering plastics are modified polypropene or acrylonitrile-butadiene-styrene (ABS) plastics.
8. job practices according to claim 1, it is characterized in that: in the described step (5), the height that bankets is whole biomass pool height
10. job practices according to claim 1 is characterized in that: described sand is the building yellow sand, and water content is 0.1~0.5%, and mud content is 0.1~0.2%, and the sand particle diameter is 0.5~2mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110326779.2A CN103074906B (en) | 2011-10-25 | 2011-10-25 | Construction method of protecting pad of methane tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110326779.2A CN103074906B (en) | 2011-10-25 | 2011-10-25 | Construction method of protecting pad of methane tank |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103074906A true CN103074906A (en) | 2013-05-01 |
CN103074906B CN103074906B (en) | 2015-05-20 |
Family
ID=48151595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110326779.2A Active CN103074906B (en) | 2011-10-25 | 2011-10-25 | Construction method of protecting pad of methane tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103074906B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1661003A (en) * | 2005-01-04 | 2005-08-31 | 张金兰 | Combination of triad materials in use for biomass pool for water and gas leak protection in pool body |
CN101591613A (en) * | 2009-07-13 | 2009-12-02 | 白建国 | A kind of methane fermentor and production method of being furnished with spherical gas-holder |
EP1908619B1 (en) * | 2006-10-06 | 2009-12-09 | FIAT AUTO S.p.A. | Restraining unit for fitting a combustible gas cylinder into a motor vehicle |
-
2011
- 2011-10-25 CN CN201110326779.2A patent/CN103074906B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1661003A (en) * | 2005-01-04 | 2005-08-31 | 张金兰 | Combination of triad materials in use for biomass pool for water and gas leak protection in pool body |
EP1908619B1 (en) * | 2006-10-06 | 2009-12-09 | FIAT AUTO S.p.A. | Restraining unit for fitting a combustible gas cylinder into a motor vehicle |
CN101591613A (en) * | 2009-07-13 | 2009-12-02 | 白建国 | A kind of methane fermentor and production method of being furnished with spherical gas-holder |
Non-Patent Citations (2)
Title |
---|
林斌: "6m³有机玻璃钢沼气池的安装及问题探讨", 《能源与环境》 * |
穆晓路: "玻璃钢沼气池的安装与使用", 《农村新能源》 * |
Also Published As
Publication number | Publication date |
---|---|
CN103074906B (en) | 2015-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102808628B (en) | Construction method of passage of large-section tunnel by water diversion fault | |
CN203939034U (en) | The slope treatment structure that a kind of antislide pile is combined with anchor cable, anchor caverns | |
CN103604321A (en) | Soft recovery method of storage testing device embedded in high-speed flying body | |
CN110439082A (en) | A kind of backfill structure and construction method suitable for underground piping vibration isolation | |
Wang et al. | Laboratory model tests on water inrush in foundation pit bottom | |
CN103074906B (en) | Construction method of protecting pad of methane tank | |
Guo et al. | Design of the supporting structures for large and unusually shaped foundation pit near the Yangtze river | |
CN101446090A (en) | Method for fixation of underground storage (stock) gas well unit conjunction | |
Zhu et al. | An integrated treatment technology for ground fissures of shallow coal seam mining in the mountainous area of southwestern China: a typical case study | |
Zhu et al. | Field test on the mechanism of composite bucket foundation penetrating sandy silt overlying clay | |
RU2010132456A (en) | METHOD FOR CREATING AN ANTI-FILTRATION COVERING | |
Zhang et al. | Pullout behavior of GFRP anti-floating anchor based on the FBG sensor technology | |
CN207437104U (en) | Tunnel inverted arch repairs secondary lining ruggedized construction | |
CN207905819U (en) | A kind of suspension device to empty lane | |
Chen et al. | Red sandstone slope stability under different rainfall intensities and reinforcement calculation | |
Zhu et al. | A method of calculating water and soil loading on top of shallow shield tunnels near water areas | |
Jun-ying et al. | Model test study on in-service karst highway tunnel | |
Zhao et al. | Analysis on intelligent deformation prediction of deep foundation pits with internal support based on optical fiber monitoring and the HSS model | |
Liu et al. | Field Pullout Tests of Steel Strips in Lightweight Cellular Concrete Backfill | |
CN109538251A (en) | A kind of husky combined bearing structure of net and gob-side entry retaining support method | |
CN214940235U (en) | Waterproof construction suitable for green assembled soil nail wall | |
Hur et al. | A study on the performance-based design methodology for tunnels through case study on the tunnel built by the prescribed design | |
CN203066096U (en) | Caisson bottom tire structure | |
Jia et al. | Analyses of Reinforcement Technology and Stability of One Deep Foundation Fit Engineering | |
Shengbin et al. | The main slope bottom water warehouse floor reinforcement methods research of Malan coal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |