CN103062754B - Power station machine furnace integrated cold end comprehensive optimization system - Google Patents
Power station machine furnace integrated cold end comprehensive optimization system Download PDFInfo
- Publication number
- CN103062754B CN103062754B CN201210586768.2A CN201210586768A CN103062754B CN 103062754 B CN103062754 B CN 103062754B CN 201210586768 A CN201210586768 A CN 201210586768A CN 103062754 B CN103062754 B CN 103062754B
- Authority
- CN
- China
- Prior art keywords
- flue
- stage
- low
- heat exchanger
- smoke
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Air Supply (AREA)
Abstract
本发明公开了属于电站节能领域的一种电站机炉一体化冷端综合优化系统,该系统主要包括汽轮机、主省煤器,主烟道,旁路烟道,汇合烟道,主空气预热器,烟水换热器,高、低压加热器,除氧器,烟气-空气加热器以及抽汽冷凝式空气预热器。采用抽汽冷凝式空气预热器多级串联布置,依次抽取部分汽轮机排汽及相应低压级抽汽,逐级预热冷空气;设置第一、二、三级烟水换热器用于加热给水和凝结水,替代汽轮机的较高压力的抽汽。由此,机炉一体化冷端综合优化系统通过高效余热利用,以及利用低压抽汽加热空气节省用于回热的高压抽汽,从而显著增加机组出功、实现燃煤发电机组的深度节能降耗;并减轻余热利用受热面低温腐蚀问题,经济效益显著。
The invention discloses an integrated cold-end comprehensive optimization system for a power station machine and furnace, which belongs to the field of power station energy saving. The system mainly includes a steam turbine, a main economizer, a main flue, a bypass flue, a combined flue, and main air preheating device, smoke-water heat exchanger, high and low pressure heater, deaerator, flue gas-air heater and extraction condensing air preheater. The extraction and condensing air preheater is arranged in series in multiple stages, and part of the exhaust steam of the steam turbine and the corresponding low-pressure stage extraction are sequentially extracted to preheat the cold air step by step; the first, second and third stage smoke-water heat exchangers are set up to heat the feed water and condensate, replacing the higher pressure extraction of the steam turbine. As a result, the cold end comprehensive optimization system of machine-furnace integration uses high-efficiency waste heat and uses low-pressure extraction steam to heat air to save high-pressure extraction steam for heat recovery, thereby significantly increasing unit output and realizing deep energy saving and reduction of coal-fired generating units. consumption; and reduce the problem of low-temperature corrosion of the heating surface by waste heat utilization, and the economic benefits are remarkable.
Description
技术领域 technical field
本发明属于节能减排领域,特别涉及一种电站机炉一体化冷端综合优化系统,具体说是:(1)空气侧,采用汽轮机排汽以及低压抽汽逐级对冷空气进行预热,预热后的空气再进入主空气预热器进一步加热至所需温度;(2)锅炉省煤器出口的烟气同时进入主空气预热器和旁路烟道的第一、第二级烟水换热器,出口烟气经锅炉尾部汇合后进入第三级烟水换热器,其后再进入除尘和脱硫装置;(3)第一级烟水换热器可用于加热汽轮机给水、替代部分高压抽汽,第二、三级烟水换热器也可用于加热较高温度的凝结水、替代较高压力的抽汽;(4)可根据机组烟气温度水平、各级抽汽参数等,灵活设计不同的烟气余热利用方式以及各级烟水换热器与汽轮机汽水系统的连接方式。The invention belongs to the field of energy saving and emission reduction, and particularly relates to a comprehensive optimization system for the integrated cold end of a power station machine and furnace, specifically: (1) on the air side, steam turbine exhaust and low-pressure steam extraction are used to preheat the cold air step by step, The preheated air enters the main air preheater and is further heated to the required temperature; (2) The flue gas at the outlet of the boiler economizer enters the main air preheater and the first and second stage flue gas of the bypass flue at the same time. Water heat exchanger, the outlet flue gas enters the third-stage flue-water heat exchanger after being merged at the boiler tail, and then enters the dust removal and desulfurization device; (3) The first-stage flue-water heat exchanger can be used to heat the turbine feed water, replace Partial high-pressure steam extraction, the second and third-stage smoke-water heat exchangers can also be used to heat higher-temperature condensed water and replace higher-pressure steam extraction; etc., flexibly design different flue gas waste heat utilization methods and connection methods between the flue gas heat exchangers at all levels and the steam turbine steam water system.
背景技术 Background technique
大型火电机组的节能减排是中国的重要能源战略。在中国,燃煤电厂消耗了全国近一半的煤炭产量,一般燃煤机组的锅炉排烟温度在120-140℃左右,导致大量低品位能量直接排向环境,带来巨大的余热资源浪费。随着近年来煤炭能源价格的不断上涨,以煤炭为基础的发电成本日益提高,各火力发电厂面临着巨大的节能压力,不断寻求降低煤耗 、节约能源方面新的应用技术,并加大相关的资金投入。Energy conservation and emission reduction of large thermal power units is an important energy strategy in China. In China, coal-fired power plants consume nearly half of the country's coal production, and the boiler exhaust temperature of general coal-fired units is around 120-140°C, resulting in a large amount of low-grade energy being directly discharged to the environment, resulting in a huge waste of waste heat resources. With the continuous rise of coal energy prices in recent years and the increasing cost of coal-based power generation, thermal power plants are facing huge energy-saving pressures, constantly seeking new application technologies for reducing coal consumption and saving energy, and increasing related Capital investment.
烟气余热的有效利用是燃煤电站锅炉节能的主要途径,利用锅炉尾部烟气余热加热凝结水,不仅能有效降低锅炉的排烟温度,提高锅炉效率,而且通过余热换热器输入热系统的热量能够排挤部分汽轮机的回热抽汽,在汽机进汽蒸汽量不变的情况下,排挤抽汽返回汽轮机继续膨胀做功,排挤的抽汽级别越高,抽汽做的功就越多。而采用低级别的抽汽预热冷空气,置换出高温烟气加热凝结水,可以排挤高级别的抽汽继续做功。因此,在燃料输入量不变的情况下,可以使汽机输出功率增加,提高机组的热效率与经济性。The effective use of flue gas waste heat is the main way to save energy for coal-fired power plant boilers. Utilizing the waste heat of flue gas at the tail of the boiler to heat condensed water can not only effectively reduce the exhaust gas temperature of the boiler and improve boiler efficiency, but also input heat into the heat system through the waste heat exchanger. The heat can displace part of the regenerative extraction steam of the steam turbine. When the amount of steam entering the turbine remains unchanged, the displacement and extraction steam returns to the steam turbine to continue to expand and do work. The higher the extraction level of displacement, the more work the extraction steam does. However, low-level steam extraction is used to preheat cold air, and high-temperature flue gas is replaced to heat condensed water, which can squeeze out high-level steam extraction and continue to work. Therefore, in the case of constant fuel input, the output power of the steam turbine can be increased, and the thermal efficiency and economy of the unit can be improved.
德国Niederaussem电厂为回收利用高温烟气余热,提高凝结水入口温度,替代更高能级的汽机抽汽,在烟气余热利用系统中集成了旁路烟道技术,从省煤器出口流出的高温烟气一部分进入空气预热器,另一部分进入旁路烟道,加热高温换热器中的高压给水以及低温换热器中的凝结水,在并联烟道之后布置冷风预热器,回收烟气中烟温水平较低的余热。In order to recover and utilize high-temperature flue gas waste heat, increase the inlet temperature of condensed water, and replace steam extraction with a higher energy level turbine in Niederaussem Power Plant in Germany, the bypass flue technology is integrated in the flue gas waste heat utilization system. Part of the gas enters the air preheater, and the other part enters the bypass flue to heat the high-pressure feed water in the high-temperature heat exchanger and the condensed water in the low-temperature heat exchanger. A cold air preheater is arranged after the parallel flue to recover the flue gas. Waste heat with lower smoke temperature levels.
德国Niederaussem电厂的余热回收系统可节约发电标准煤耗约7g/kWh,但由于德国电厂一般采用褐煤作为燃料,排烟温度普遍较高,甚至高达160 ℃,因此德国燃煤电厂的尾部烟气余热量很高。而中国燃煤电厂采用普通无烟煤和烟煤作为燃料,烟气温度水平相对较低,一般在120-140℃左右,和德国电厂的实际情况有较大区别,由于锅炉尾部中低温烟气中常常含有如SO2、SO3、NOx等腐蚀性气体,当壁面温度降到酸露点以下时,低温管壁易发生强烈的低温烟气腐蚀,同时与烟气中的飞灰形成以硫酸钙为主的水泥状物质,使烟气侧通风阻力增大,风机电耗增加,而且加剧了管壁的腐蚀,严重影响锅炉的安全与经济运行。因此德国Niederaussem电厂的余热回收系统并不适用于中国的燃煤电站。The waste heat recovery system of the Niederaussem power plant in Germany can save about 7g/kWh of standard coal consumption for power generation. However, since German power plants generally use lignite as fuel, the exhaust gas temperature is generally high, even as high as 160 °C. Therefore, the tail gas waste heat of German coal-fired power plants very high. However, China's coal-fired power plants use ordinary anthracite and bituminous coal as fuel, and the flue gas temperature is relatively low, generally around 120-140°C, which is quite different from the actual situation in German power plants. Such as SO 2 , SO 3 , NO x and other corrosive gases, when the wall surface temperature drops below the acid dew point, the low-temperature pipe wall is prone to strong low-temperature flue gas corrosion, and at the same time forms with the fly ash in the flue gas, mainly calcium sulfate The cement-like substance increases the ventilation resistance of the flue gas side, increases the power consumption of the fan, and intensifies the corrosion of the tube wall, seriously affecting the safe and economical operation of the boiler. Therefore, the waste heat recovery system of Niederaussem power plant in Germany is not suitable for coal-fired power plants in China.
本发明提出了一种电站机炉一体化冷端综合优化系统,解决了上述技术的不足,能量对口、梯级利用尾部烟气能量,并利用汽轮机低压缸抽汽和锅炉尾部烟气预热空气的系统和方法。这种新的能量利用思路,就是在不改变空气预热器出口烟气温度的前提下,利用旁路烟道和低级别抽汽回收较高品质的烟气热量加热较高级别的凝结水,替代较高级别的抽汽,空气预热器减少的吸热量由汽轮机低压缸抽汽凝结放热和锅炉尾部烟气余热弥补,可综合防止烟气温度过低造成的低温腐蚀,是一种真正适用于中国燃煤电站节能减排的新技术。The present invention proposes a comprehensive optimization system for the integrated cold end of the power station machine and furnace, which solves the shortcomings of the above-mentioned technologies. The energy counterparts and cascades use the tail flue gas energy, and use the low-pressure cylinder of the steam turbine to extract steam and the flue gas at the boiler tail to preheat the air. systems and methods. This new idea of energy utilization is to use the bypass flue and low-level extraction to recover higher-quality flue gas heat and heat higher-level condensate without changing the flue gas temperature at the outlet of the air preheater. Instead of the higher-level steam extraction, the reduced heat absorption of the air preheater is compensated by the condensation heat release of the low-pressure cylinder of the steam turbine and the waste heat of the flue gas at the tail of the boiler, which can comprehensively prevent low-temperature corrosion caused by too low flue gas temperature. It is a new technology that is really suitable for energy saving and emission reduction of coal-fired power plants in China.
发明内容 Contents of the invention
本发明的目的是提出了一种电站机炉一体化冷端综合优化系统,该系统主要包括串联的汽轮机高压缸、汽轮机中压缸和汽轮机低压缸,锅炉主省煤器,主烟道,旁路烟道,汇合烟道,主空气预热器,烟水换热器,高压加热器,除氧器,低压加热器,烟气-空气加热器以及抽汽冷凝式空气预热器;其特征在于:主烟道2和旁路烟道3并联后,上端与主省煤器1连接,下端与汇合烟道22连接,旁路烟道3中依次设置第一级烟水换热器5和第二级烟水换热器6,第三级烟水换热器16设置在汇合烟道22中;主空气预热器4分别连接汇合烟道22、主烟道2以及第四级抽汽冷凝式空气预热器27,其中第四级抽汽冷凝式空气预热器27、第三级抽汽式空气预热器26、第二级抽汽冷凝式空气预热器25和第一级抽汽冷凝式空气预热器24串联;汇合烟道22出口经过除尘器23后连接至脱硫装置,第一级烟水换热器5的进口通过第28阀门、第29阀门连接在三号高压加热器9两边,第一级烟水换热器5的出口通过第30阀门、第31阀门连接在一号高压加热器7两边,二号高压加热器8两边分别与第29阀门和第31阀门连接;一号至三号高压加热器分别与汽轮机高压缸17、汽轮机中压缸18连接; 第二级烟水换热器6出口通过第33阀门连接于五号低压加热器11一侧,第二级烟水换热器6进口通过第33阀门连接于五号低压加热器11另一侧,第三级烟水换热器16的进口、出口通过第34阀门、第35阀门连接于六号低压加热器12两侧,其中第二级烟水换热器6和第三级烟水换热器16之间通过第36阀门直接连接,五号低压加热器11、六号低压加热器12、七号低压加热器13和八号低压加热器14通过凝结水和给水管路形成串联结构;并分别与汽轮机低压缸19排气口连接;汽轮机低压缸19排气口还通过凝汽器20与八号低压加热器14进口连接。The object of the present invention is to propose a comprehensive optimization system for the integrated cold end of the power station machine furnace, which mainly includes the high-pressure cylinder of the steam turbine, the medium-pressure cylinder of the steam turbine and the low-pressure cylinder of the steam turbine in series, the main economizer of the boiler, the main flue, the bypass Road flue, combined flue, main air preheater, smoke-water heat exchanger, high-pressure heater, deaerator, low-pressure heater, flue gas-air heater and extraction condensing air preheater; its characteristics It is: after the main flue 2 and the bypass flue 3 are connected in parallel, the upper end is connected with the main economizer 1, and the lower end is connected with the confluent flue 22, and the first-stage smoke-water heat exchanger 5 and the The second-stage smoke-water heat exchanger 6 and the third-stage smoke-water heat exchanger 16 are arranged in the confluent flue 22; the main air preheater 4 is respectively connected to the confluent flue 22, the main flue 2 and the fourth-stage steam extraction Condensing air preheater 27, wherein the fourth stage extraction condensing air preheater 27, the third stage extraction air preheater 26, the second stage extraction condensing air preheater 25 and the first stage Extraction condensing air preheaters 24 are connected in series; the outlet of confluence flue 22 is connected to the desulfurization device after passing through dust collector 23, and the inlet of first-stage smoke-water heat exchanger 5 is connected to No. 3 high pressure through No. 28 valve and No. 29 valve On both sides of the heater 9, the outlet of the first-stage smoke-water heat exchanger 5 is connected to both sides of the No. 1 high-pressure heater 7 through the 30th and 31st valves, and the two sides of the No. 2 high-pressure heater 8 are respectively connected to the 29th valve and the 31st valve Connection; No. 1 to No. 3 high-pressure heaters are respectively connected to the high-pressure cylinder 17 of the steam turbine and the medium-pressure cylinder 18 of the steam turbine; the outlet 6 of the second-stage smoke-water heat exchanger is connected to the side of the No. 5 low-pressure heater 11 through the 33rd valve, and the No. The inlet of the second-stage smoke-water heat exchanger 6 is connected to the other side of No. 5 low-pressure heater 11 through the 33rd valve, and the inlet and outlet of the third-stage smoke-water heat exchanger 16 are connected to No. 6 through the 34th and 35th valves On both sides of the low-pressure heater 12, the second-stage smoke-water heat exchanger 6 and the third-stage smoke-water heat exchanger 16 are directly connected through the 36th valve, No. 5 low-pressure heater 11, No. 6 low-pressure heater 12, No. 7 low-pressure heater 13 and No. 8 low-pressure heater 14 form a series structure through condensed water and water supply pipelines; and are respectively connected with the exhaust port of steam turbine low-pressure cylinder 19; the exhaust port of steam turbine low-pressure cylinder 19 is also connected with condenser 20 No. 8 low-pressure heater 14 inlet connection.
在汇合烟道22和第四级抽汽冷凝式空气预热器27与主空气预热器4连接的烟道中跨接烟气-空气加热器15,替换第三级烟水换热器16。The flue gas-air heater 15 is bridged in the confluent flue 22 and the flue connecting the fourth-stage extraction condensing air preheater 27 and the main air preheater 4 to replace the third-stage smoke-water heat exchanger 16 .
布置在主烟道2、旁路烟道3和汇合烟道22内的并和五号至八号低压加热器和一号至三号高压加热器连接的第一级、第二级和第三级烟水换热器回收烟气余热,以加热汽轮机凝结水或给水。The first stage, the second stage and the third stage arranged in the main flue 2, the bypass flue 3 and the combined flue 22 and connected with No. 5 to No. 8 low-pressure heaters and No. 1 to No. 3 high-pressure heaters The first-stage flue-water heat exchanger recovers the waste heat of the flue gas to heat the condensate water or feed water of the steam turbine.
在空气预热侧:第一级至第四级抽汽冷凝式空气预热器逐级预热冷空气,各级抽汽在抽汽冷凝式空气预热器中放热后的凝结水分别流入该级抽汽对应的低压加热器的回水管中。On the air preheating side: the first stage to the fourth stage extraction condensing air preheater preheats the cold air step by step, and the condensed water after the extraction steam of each stage releases heat in the extraction condensing air preheater flows into the In the return pipe of the low-pressure heater corresponding to this level of steam extraction.
在烟气余热利用侧:省煤器1出口烟气大部分仍然由主烟道2进入主空气预热器4,另一部分进入旁路烟道3,依次通过第一级烟水换热器5和第二级烟水换热器6之后,两股烟气进入汇合烟道22,通过第三级烟水换热器16及除尘器23,随后进入脱硫单元,最终排放。On the flue gas waste heat utilization side: most of the flue gas at the outlet of the economizer 1 still enters the main air preheater 4 from the main flue 2, and the other part enters the bypass flue 3, and passes through the first-stage flue-water heat exchanger 5 in turn After the second-stage smoke-water heat exchanger 6, the two streams of flue gas enter the combined flue 22, pass through the third-stage smoke-water heat exchanger 16 and dust collector 23, and then enter the desulfurization unit for final discharge.
在凝结水加热侧:从某级高压加热器入口抽取凝结水经第一级烟水换热器5加热后返回至更高级高压加热器出口,从某级低压加热器入口抽取凝结水经第二级烟水换热器6加热后返回至更高级低压加热器出口。On the condensed water heating side: the condensed water is extracted from the inlet of a high-pressure heater of a certain stage, heated by the first-stage smoke-water heat exchanger 5 and then returned to the outlet of a higher-level high-pressure heater, and the condensed water is extracted from the inlet of a certain-stage low-pressure heater through the second After being heated by the first-level smoke-water heat exchanger 6, it returns to the outlet of the higher-level low-pressure heater.
本发明的有益效果是所提供电站机炉一体化冷端综合优化系统具有如下特点:The beneficial effect of the present invention is that the integrated cold end comprehensive optimization system of the power plant machine furnace provided has the following characteristics:
1.采用抽汽冷凝式空气预热器多级串联布置,逐级预热冷空气,换热损失小;抽汽冷凝式空气预热器抽取的是汽轮机的低压蒸汽,温度、压力非常低,其在汽轮机中做功能力低,有利于节能。蒸汽在抽汽凝式空气预热器中换热方式为蒸汽冷凝相变换热的换热方式,释放出大量潜热,且加热对象是无腐蚀性的空气,换热器不存在腐蚀问题,空气可以被预热到100摄氏度以上。1. The steam extraction condensing air preheater is arranged in series in multiple stages to preheat the cold air step by step, and the heat exchange loss is small; the steam extraction condensing air preheater extracts the low-pressure steam of the steam turbine, and the temperature and pressure are very low. It has low working ability in the steam turbine, which is beneficial to energy saving. The heat exchange method of steam in the extraction and condensing air preheater is the heat exchange method of steam condensation phase change heat, which releases a large amount of latent heat, and the heating object is non-corrosive air. There is no corrosion problem in the heat exchanger, and the air Can be preheated to over 100 degrees Celsius.
2.烟气侧主要换热器的布置形成串并联结构,有利于最大程度利用烟气余热。2. The arrangement of the main heat exchangers on the flue gas side forms a series-parallel structure, which is conducive to utilizing the waste heat of the flue gas to the greatest extent.
3. 三级烟水换热器利用方式比较灵活,可以通过阀门灵活调节,烟水换热器与加热器采用并联布置,凝结水因未流经加热器而减少的水侧阻力足以补偿其流经烟水换热器所增加的阻力,故其不需增设水泵,更有利于在原电厂热系统的基础上进行改造。3. The use of the three-stage smoke-water heat exchanger is relatively flexible, and can be flexibly adjusted through the valve. The smoke-water heat exchanger and the heater are arranged in parallel, and the water side resistance reduced by the condensed water not flowing through the heater is sufficient to compensate for its flow. Through the increased resistance of the smoke-water heat exchanger, it does not need to add a water pump, which is more conducive to the transformation on the basis of the thermal system of the original power plant.
4.该系统灵活开放,根据需要,可以去掉抽汽冷凝式空气预热器,用烟气-空气换热器直接向空气释放热量。4. The system is flexible and open. According to the needs, the extraction condensing air preheater can be removed, and the flue gas-air heat exchanger can be used to release heat directly to the air.
5. 设置抽汽冷凝式空气预热器、利用汽轮机排汽废热来预热冷空气,可使冷空气加热到8-20℃,可有效避免冬季冻结问题,同时利用废热可节约大量低温热能、节省循环水;同时,抽汽冷凝式空气预热器也适用于空冷机组,一般空冷机组排汽压力比较高,排汽参数较高,引入抽汽冷凝式空气预热器,可以把空气温度提高到15-40℃。5. Set up a steam extraction condensing air preheater and use the waste heat of the exhaust steam of the steam turbine to preheat the cold air, which can heat the cold air to 8-20°C, which can effectively avoid the problem of freezing in winter, and at the same time use waste heat to save a lot of low-temperature heat energy. Save circulating water; at the same time, the extraction condensing air preheater is also suitable for air-cooled units. Generally, air-cooling units have relatively high exhaust pressure and high exhaust parameters. The introduction of extraction condensing air preheaters can increase the air temperature to 15-40°C.
6. 该系统也可不设置第三级烟水换热器,可减少烟气阻力,进一步降低改造投资,并保持较高排烟温度、基本解决余热利用过程中因锅炉尾部烟气温度过低造成的低温腐蚀问题。据计算本一体化系统可降低发电标准煤耗6-11g/KWh,经济效益显著。6. The system may not be equipped with a third-stage flue-water heat exchanger, which can reduce the flue gas resistance, further reduce the transformation investment, and maintain a high exhaust gas temperature, basically solving the problem caused by the low flue gas temperature at the boiler tail during the waste heat utilization process. low temperature corrosion problems. According to calculations, this integrated system can reduce the standard coal consumption of power generation by 6-11g/KWh, and the economic benefits are remarkable.
附图说明 Description of drawings
图1为电站机炉一体化冷端综合优化系统示意图Figure 1 is a schematic diagram of the comprehensive optimization system of the integrated cold end of the power plant machine and furnace
图2为带烟气-空气预热器的电站机炉一体化冷端综合优化系统示意图Figure 2 is a schematic diagram of the comprehensive optimization system for the integrated cold end of the power station machine and furnace with flue gas-air preheater
实施方式Implementation
本发明提出一种电站机炉一体化冷端综合优化系统。下面结合附图和实例予以说明。The invention proposes a comprehensive optimization system for the integrated cold end of a power station machine and furnace. The following will be described in conjunction with the accompanying drawings and examples.
如图1所示的电站机炉一体化冷端综合优化系统示意图中,电站机炉一体化冷端综合优化系统主要包括串联的汽轮机高压缸、汽轮机中压缸和汽轮机低压缸,锅炉主省煤器,主烟道,旁路烟道,汇合烟道,主空气预热器,烟水换热器,高压加热器,除氧器,低压加热器,烟气-空气加热器以及抽汽冷凝式空气预热器;其中主烟道2和旁路烟道3并联后,上端与主省煤器1连接,下端与汇合烟道22连接,旁路烟道3中依次设置第一级烟水换热器5和第二级烟水换热器6,第三级烟水换热器16设置在汇合烟道22中;主空气预热器4分别连接汇合烟道22、主烟道2以及第四级抽汽冷凝式空气预热器27,其中第四级抽汽冷凝式空气预热器27、第三级抽汽冷凝式空气预热器26、第二级抽汽冷凝式空气预热器25和第一级抽汽冷凝式空气预热器24串联;汇合烟道22出口经过除尘器23后连接至脱硫装置,第一级烟水换热器5的进口通过第28阀门、第29阀门连接在三号高压加热器9两边,第一级烟水换热器5的出口通过第30阀门、第31阀门连接在一号高压加热器7两边,二号高压加热器8两边分别与第29阀门和第31阀门连接;一号至三号高压加热器分别与汽轮机高压缸17、汽轮机中压缸18连接; 第二级烟水换热器6出口通过第33阀门连接于五号低压加热器11一侧,第二级烟水换热器6进口通过第33阀门连接于五号低压加热器11另一侧,第三级烟水换热器16的进口、出口通过第34阀门、第35阀门连接于六号低压加热器12两侧,其中第二级烟水换热器6和第三级烟水换热器16之间通过第36阀门直接连接,五号低压加热器11、六号低压加热器12、七号低压加热器13和八号低压加热器14通过凝结水和给水管路形成串联结构;并分别与的第三汽轮机19排气口连接;第三汽轮机19排气口还通过凝汽器20与八号低压加热器14进口连接。In the schematic diagram of the comprehensive optimization system for the integrated cold end of the power station machine and furnace as shown in Figure 1, the integrated cold end integrated optimization system for the power plant mainly includes the high pressure cylinder of the steam turbine, the medium pressure cylinder of the steam turbine and the low pressure cylinder of the steam turbine in series, and the main coal-saving boiler flue, main flue, bypass flue, combined flue, main air preheater, smoke-water heat exchanger, high-pressure heater, deaerator, low-pressure heater, flue gas-air heater and extraction condensing Air preheater; after the main flue 2 and bypass flue 3 are connected in parallel, the upper end is connected to the main economizer 1, the lower end is connected to the confluent flue 22, and the first-stage smoke-water exchange is arranged in the bypass flue 3 in sequence The heat exchanger 5, the second-stage smoke-water heat exchanger 6, and the third-stage smoke-water heat exchanger 16 are arranged in the confluent flue 22; the main air preheater 4 is respectively connected to the confluent flue 22, the main flue 2 and the second Four-stage steam extraction condensing air preheater 27, of which the fourth stage steam extraction condensing air preheater 27, the third stage steam extraction condensing air preheater 26, the second stage steam extraction condensing air preheater 25 is connected in series with the first-stage steam extraction condensing air preheater 24; the outlet of the confluence flue 22 passes through the dust collector 23 and then is connected to the desulfurization device, and the inlet of the first-stage smoke-water heat exchanger 5 passes through the 28th valve and the 29th valve Connected to both sides of No. 3 high-pressure heater 9, the outlet of first-stage smoke-water heat exchanger 5 is connected to both sides of No. 1 high-pressure heater 7 through No. 30 valve and No. 31 valve, and both sides of No. 2 high-pressure heater 8 are connected to No. 29 The valve is connected to the No. 31 valve; No. 1 to No. 3 high-pressure heaters are respectively connected to the high-pressure cylinder 17 of the steam turbine and the medium-pressure cylinder 18 of the steam turbine; the outlet 6 of the second-stage smoke-water heat exchanger is connected to the No. 5 low-pressure heater through the No. 33 valve On one side of 11, the inlet of the second-stage smoke-water heat exchanger 6 is connected to the other side of No. 5 low-pressure heater 11 through the 33rd valve, and the inlet and outlet of the third-stage smoke-water heat exchanger 16 pass through the 34th valve and the 35th valve. The valves are connected to both sides of the No. 6 low-pressure heater 12. The second-stage smoke-water heat exchanger 6 and the third-stage smoke-water heat exchanger 16 are directly connected through the No. 36 valve. No. 5 low-pressure heater 11 and No. 6 Low-pressure heater 12, No. 7 low-pressure heater 13 and No. 8 low-pressure heater 14 form a series structure through condensed water and water supply pipeline; Connect with No. 8 low-pressure heater 14 inlet through condenser 20.
如图2所示,可在抽汽式空气预热器26出口设置烟气-空气加热器15,用烟气-空气换热器15直接向空气释放热量,回收烟气余热用于进一步预热空气;如图1所示,亦可不设置烟气-空气加热器15,而设置第三级烟水换热器16用于加热凝结水或给水,此时,可抽取较高级抽汽用于进一步预热空气。该系统灵活开放,根据需要,可以去掉第四级抽汽冷凝式空气预热器27,如图2所示,所述的一种电站机炉一体化冷端综合优化系统;可完全不设置第三级烟水换热器16,这样便可减少烟气阻力,减少改造投资。此时,锅炉尾部烟气温度在120-150℃,对尾部受热面没有任何的低温烟气腐蚀,故不需要采用特殊防腐蚀材料,可进一步降低改造投资。As shown in Figure 2, a flue gas-air heater 15 can be installed at the outlet of the extraction air preheater 26, and the flue gas-air heat exchanger 15 can be used to directly release heat to the air, and the waste heat of the flue gas can be recovered for further preheating Air; as shown in Figure 1, the flue gas-air heater 15 may not be provided, but the third-stage flue-water heat exchanger 16 is used to heat the condensed water or feed water. At this time, higher-level extraction steam can be extracted for further Preheat the air. The system is flexible and open, and the fourth-stage steam extraction condensing air preheater 27 can be removed as required, as shown in Figure 2, the comprehensive optimization system for the integrated cold end of the power station machine and furnace; the second stage can be completely omitted The three-stage smoke-water heat exchanger 16 can reduce the smoke resistance and reduce the transformation investment. At this time, the flue gas temperature at the tail of the boiler is 120-150°C, and there is no low-temperature flue gas corrosion on the heating surface of the tail, so no special anti-corrosion materials are needed, which can further reduce the transformation investment.
其原理如下:空气侧,依次抽取部分汽轮机排汽和低级别抽汽,分别通过第一级抽汽冷凝式空气预热器24、第二级抽汽冷凝式空气预热器25、第三级抽汽冷凝式空气预热器26和第四级抽汽冷凝式空气预热器27逐级预热冷空气,抽汽在抽汽冷凝式空气预热器中放热后的凝结水分别流入抽汽对应下的下一级低压加热器的回水管中。The principle is as follows: on the air side, part of the exhaust steam of the steam turbine and the low-level extraction steam are sequentially extracted, and pass through the first-stage extraction condensing air preheater 24, the second-stage extraction condensing air preheater 25, and the third-stage steam extraction respectively. The extraction condensing air preheater 26 and the fourth-stage extraction condensing air preheater 27 preheat the cold air step by step, and the condensate after the extraction steam releases heat in the extraction condensing air preheater flows into the extraction The steam corresponds to the return pipe of the next stage low-pressure heater.
烟气侧,省煤器1出口350-450℃的烟气分为两路:一路接入主空气预热器4,另一路经过旁路烟道3依次通过第一级烟水换热器5和第二级烟水换热器6,视机组参数而定,从某级高压加热器入口抽取凝结水经第一级烟水换热器5加热后返回至更高级高压加热器出口,从某级低压加热器入口抽取凝结水经第二级烟水换热器6加热后返回至更高级低压加热器出口,出口烟气在尾部汇合烟道22混合。On the flue gas side, the flue gas at 350-450°C at the outlet of the economizer 1 is divided into two paths: one path is connected to the main air preheater 4, and the other path passes through the bypass flue 3 and passes through the first-stage flue-water heat exchanger 5 in turn and the second-stage smoke-water heat exchanger 6, depending on the parameters of the unit, the condensed water extracted from the inlet of a certain high-pressure heater is heated by the first-stage smoke-water heat exchanger 5 and then returned to the outlet of a higher-level high-pressure heater. The condensed water extracted from the inlet of the first-stage low-pressure heater is heated by the second-stage smoke-water heat exchanger 6 and then returned to the outlet of the higher-stage low-pressure heater.
本发明基于能量对口、梯级利用原则合理利用锅炉尾部烟气余热,并首次提出利用汽轮机低压缸抽汽和锅炉尾部烟气逐级预热空气这一方法,相应的减少了空气预热器的吸热量,能回收较高品质的烟气余热用于加热较高级加热器的凝结水,排挤较高级的抽汽,同时有效减轻余热利用过程中因锅炉尾部烟气温度低于酸露点后对受热面造成的低温腐蚀问题,据计算该系统可降低发电标准煤耗6-11g/KWh,经济效益显著。The present invention rationally utilizes the residual heat of flue gas at the tail of the boiler based on the principles of energy counterpart and cascade utilization, and proposes for the first time the method of using steam extraction from the low-pressure cylinder of the steam turbine and flue gas at the tail of the boiler to preheat the air step by step, which correspondingly reduces the suction of the air preheater Heat, which can recover high-quality flue gas waste heat to heat the condensed water of higher-level heaters and discharge higher-level extraction steam, and at the same time effectively reduce the heat caused by the temperature of the flue gas at the tail of the boiler being lower than the acid dew point in the process of waste heat utilization. According to calculations, the system can reduce the standard coal consumption of power generation by 6-11g/KWh, and the economic benefits are remarkable.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210586768.2A CN103062754B (en) | 2012-12-28 | 2012-12-28 | Power station machine furnace integrated cold end comprehensive optimization system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210586768.2A CN103062754B (en) | 2012-12-28 | 2012-12-28 | Power station machine furnace integrated cold end comprehensive optimization system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103062754A CN103062754A (en) | 2013-04-24 |
| CN103062754B true CN103062754B (en) | 2014-08-20 |
Family
ID=48105509
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210586768.2A Expired - Fee Related CN103062754B (en) | 2012-12-28 | 2012-12-28 | Power station machine furnace integrated cold end comprehensive optimization system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103062754B (en) |
Families Citing this family (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103244944B (en) * | 2013-05-14 | 2015-01-07 | 华北电力大学 | Air preheating system and method performing steam extraction by utilizing steam turbine |
| CN103486567A (en) * | 2013-07-15 | 2014-01-01 | 华北电力大学 | Boiler-turbine coupled flue gas waste heat utilization system capable of preheating air based on condensed water |
| CN103343706B (en) * | 2013-07-26 | 2015-08-05 | 四川德胜集团钒钛有限公司 | A kind of steam turbine heating system |
| CN103375792A (en) * | 2013-08-05 | 2013-10-30 | 华北电力大学 | Engine-boiler coupled deep waste heat utilization system for air cooling unit |
| EP2851616A1 (en) | 2013-09-19 | 2015-03-25 | Alstom Technology Ltd | Flue gas heat recovery integration |
| EP2942495B1 (en) * | 2014-05-08 | 2018-10-10 | General Electric Technology GmbH | Coal fired oxy plant with heat integration |
| CN105157010A (en) * | 2015-09-02 | 2015-12-16 | 上海理工大学 | Coal-fired power generation system based on bypass flue at tail part of boiler |
| CN105401987A (en) * | 2015-12-08 | 2016-03-16 | 广州粤能电力科技开发有限公司 | Steam-extraction superheat utilization system for double-reheat stream turbine for heating boiler secondary air |
| CN106247314A (en) * | 2016-08-11 | 2016-12-21 | 上海电力学院 | A kind of residual heat from boiler fume recovery system of power station reheating embrittlement |
| CN106871097A (en) * | 2017-01-10 | 2017-06-20 | 上海电力学院 | The residual heat from boiler fume recovery system of power station reheating embrittlement twice |
| CN107366897B (en) * | 2017-07-05 | 2019-03-26 | 国网山东省电力公司电力科学研究院 | A kind of Pollutant in Coal Burning Boiler emission reduction optimization collaboration fume afterheat deep exploitation system |
| CN108534126A (en) * | 2018-03-23 | 2018-09-14 | 中国大唐集团科学技术研究院有限公司火力发电技术研究院 | It is a kind of with pressure matcher machine stove waste heat coupling utilize system |
| CN108412564A (en) * | 2018-05-02 | 2018-08-17 | 华北电力大学 | A kind of double reheat system and method for efficient backheat and optimization steam extraction |
| CN109681898B (en) * | 2019-01-22 | 2024-03-22 | 上海电力学院 | Primary air heating temperature-regulating system of phase-change heat pipe type power plant |
| CN114216116A (en) * | 2021-10-19 | 2022-03-22 | 江苏理文造纸有限公司 | Low-grade waste heat recovery method for steam turbine |
| CN115949963B (en) * | 2023-01-13 | 2025-12-16 | 清华大学 | Grade matching-based thermal power plant flue gas waste heat cascade heat supply system |
| CN116379495B (en) * | 2023-03-30 | 2025-08-19 | 烟台500供热有限公司 | System and method for improving heat supply capacity of heat supply unit |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB841040A (en) * | 1957-08-06 | 1960-07-13 | Babcock & Wilcox Ltd | Improvements in or relating to steam generators provided with air heater means |
| JPH063071A (en) * | 1992-03-06 | 1994-01-11 | Gea Luftkuehler Gmbh | Device for utilizing heat included in exhaust gas of coal fired boiler forming component of electric power plant |
| CN102767822A (en) * | 2012-06-27 | 2012-11-07 | 华北电力大学 | Integrated system for pre-heating air and condensed water of turbine in grading manner by using boiler smoke |
| CN102767820A (en) * | 2012-06-27 | 2012-11-07 | 华北电力大学 | Smoke waste heat utilizing system at tail of power station boiler applicable to operation in variable working condition |
| CN102767821A (en) * | 2012-06-27 | 2012-11-07 | 华北电力大学 | Smoke waste heat deep utilization system of power station boiler for heating supplied water at high pressure |
| CN202973061U (en) * | 2012-12-28 | 2013-06-05 | 华北电力大学 | Power station engine and boiler integrated cold end comprehensive optimization system |
-
2012
- 2012-12-28 CN CN201210586768.2A patent/CN103062754B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB841040A (en) * | 1957-08-06 | 1960-07-13 | Babcock & Wilcox Ltd | Improvements in or relating to steam generators provided with air heater means |
| JPH063071A (en) * | 1992-03-06 | 1994-01-11 | Gea Luftkuehler Gmbh | Device for utilizing heat included in exhaust gas of coal fired boiler forming component of electric power plant |
| CN102767822A (en) * | 2012-06-27 | 2012-11-07 | 华北电力大学 | Integrated system for pre-heating air and condensed water of turbine in grading manner by using boiler smoke |
| CN102767820A (en) * | 2012-06-27 | 2012-11-07 | 华北电力大学 | Smoke waste heat utilizing system at tail of power station boiler applicable to operation in variable working condition |
| CN102767821A (en) * | 2012-06-27 | 2012-11-07 | 华北电力大学 | Smoke waste heat deep utilization system of power station boiler for heating supplied water at high pressure |
| CN202973061U (en) * | 2012-12-28 | 2013-06-05 | 华北电力大学 | Power station engine and boiler integrated cold end comprehensive optimization system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103062754A (en) | 2013-04-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103062754B (en) | Power station machine furnace integrated cold end comprehensive optimization system | |
| CN102767821B (en) | Smoke waste heat deep utilization system of power station boiler for heating supplied water at high pressure | |
| CN202973061U (en) | Power station engine and boiler integrated cold end comprehensive optimization system | |
| CN103486567A (en) | Boiler-turbine coupled flue gas waste heat utilization system capable of preheating air based on condensed water | |
| WO2018014768A1 (en) | Residual heat reuse system for turbine-boiler integrated heat energy circulation | |
| CN106016416B (en) | The high back pressure co-generation unit that boiler smoke is coupled with exhaust steam in steam turbine | |
| CN105180146B (en) | A multi-stage recovery and comprehensive utilization system for flue gas waste heat in cogeneration power plants | |
| CN103104907B (en) | Heating structure and heating method of boiler based on partitioned flue and multistage air preheating | |
| CN203501144U (en) | Waste heat recovery system for gas-fired boiler | |
| CN101737766A (en) | Coal-water boiler exhaust gas residual heat recovery device | |
| CN102230615B (en) | Combined type flue gas residual heat comprehensive utilization system | |
| CN201764527U (en) | Thermal power plant boiler exhaust heat recovery and utilization system | |
| CN102506412A (en) | System and method for recycling heat energy generated by deslagging of fluidized-bed combustion boiler | |
| CN203298285U (en) | Power station machine and furnace integrating type waste heat utilization system based on air preheated by extraction steam | |
| CN102767822B (en) | Integrated system for pre-heating air and condensed water of turbine in grading manner by using boiler smoke | |
| CN203703942U (en) | Boiler-side flue gas heat energy high-efficiency utilizing system for heating steam-turbine-side heat regenerative feed water | |
| CN205535742U (en) | System is utilized to coal -fired power plant energy high efficiency | |
| CN105698161B (en) | Coal fired power plant level-density parameter around First air is thermally integrated system | |
| CN103375792A (en) | Engine-boiler coupled deep waste heat utilization system for air cooling unit | |
| CN204593353U (en) | A kind of integrated system of deep exploitation residual heat from boiler fume | |
| CN203249228U (en) | Air pre-heating system extracting steam through steam turbine | |
| CN112128732B (en) | Waste steam and flue gas waste heat energy quality coupling and improving system | |
| CN201606865U (en) | A water-medium boiler exhaust waste heat recovery device | |
| CN202813417U (en) | Energy-saving system for preheating air by utilizing exhaust steam of small steam turbine in power plant | |
| CN207740056U (en) | A kind of CO2The machine furnace cooling of cycle can recycle and power generation and heat supply integral system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140820 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |