CN103046639A - Checking and catch basin for drainage pipeline and production method thereof - Google Patents

Checking and catch basin for drainage pipeline and production method thereof Download PDF

Info

Publication number
CN103046639A
CN103046639A CN2011103089352A CN201110308935A CN103046639A CN 103046639 A CN103046639 A CN 103046639A CN 2011103089352 A CN2011103089352 A CN 2011103089352A CN 201110308935 A CN201110308935 A CN 201110308935A CN 103046639 A CN103046639 A CN 103046639A
Authority
CN
China
Prior art keywords
basin
cover plate
bearing cover
well body
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103089352A
Other languages
Chinese (zh)
Inventor
肖玉光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011103089352A priority Critical patent/CN103046639A/en
Publication of CN103046639A publication Critical patent/CN103046639A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

A checking and catch basin for a drainage pipeline and a production method thereof relate to the checking and catch basin connected with a large-diameter drainage pipeline and the production method thereof. The checking and catch basin is mainly used for solving the problems in the existing checking and catch basin of being high in construction cost, not capable of conducting injection molding, inconvenient to construct and the like. The checking and catch basin comprises a basin body, a basin bottom, horizontal ports and a pipe material. A cement load-bearing cover plate is arranged above the basin body, a basin shaft is arranged on the cement load-bearing cover plate, an opening is arranged on the cement load-bearing cover plate, and a basin cover is arranged above the basin shaft. The production method is that a steel plastic composite pipe basin body is produced through winding, a polyvinyl chloride (PVC) lamination board or an extrusion board is used as the basin bottom, the basin bottom is pasted on the bottom of the basin body through special glue, the horizontal ports are dug on two sides of basin body, and pipe heads are pasted on the horizontal ports on two sides of the basin body through the special glue; the cement load-bearing cover plate is manufactured, the opening is arranged on the cement load-bearing cover plate, the basin shaft is manufactured through cement pipes or steel plastic composite pipes, and the basin cover is manufactured. The checking and catch basin has the advantages of being low in construction cost and easy to construct.

Description

A kind of drainage pipe inspection, catch-basin and production method thereof
Technical field:
The present invention relates to the drainage pipe field, particularly relate to a kind of inspection, catch-basin and production method thereof for connecting heavy caliber (diameter is 1200-2800mm) drainage pipe.
Background technology:
Existing drainage pipe inspection, catch-basin comprise the well body, there is horizontal interface well body both sides, the well body leads directly to ground, there is well lid well body top, shortcoming is that bore is identical up and down for the well body, because inspection, catch-basin stretch into underground darker, inspection, the catch-basin that particularly is located at the drainage pipe downstream need stretch into underground 10 meters even darker, because the downstream discharge of sewage is large, the drainage pipe bore is also large, so the well body bore of inspection, catch-basin is also wanted corresponding increasing, the cost of this inspection, catch-basin is high, and waste is large.
In addition, that the production method of existing drainage pipe inspection, catch-basin has an injection moulding and build or be built into cement block with cement, that well body bore is little with the drainage pipe inspection of injection moulding process production, the shortcoming of catch-basin wherein, generally all below 100mm, can't be connected with the heavy caliber drain pipe road, as want injection moulding large-diameter well body, the cost of its injection-moulding device is very expensive, so can't realize; Build or can be connected with the heavy caliber drain pipe road with inspection, catch-basin that cement block is built into cement, but it needs at the scene construction, excavates earth volume large, recruitment is many, long construction period, and cost is high, but also the climate condition restriction can't be constructed at north of china in winter.
Summary of the invention:
It is low that technical problem to be solved by this invention provides a kind of cost, saves raw-material drainage pipe inspection, catch-basin.
Another technical problem to be solved by this invention provides a kind ofly produces in factory, can be connected with the heavy caliber drain pipe road, and cost of production is low, not the drainage pipe inspection of climate condition restriction, the production method of catch-basin.
First purpose of the present invention is achieved in that it comprises the well body, the shaft bottom is arranged at well body bottom, there is horizontal interface the both sides of well body, tube material is arranged on the horizontal interface, for being connected with drainage pipe, it is characterized in that: the well body of horizontal interface top is provided with cement load-bearing cover plate, on the cement load-bearing cover plate pit shaft is housed, mineshaft diameter is less than the diameter of well body (can be by being as the criterion with the inspection personnel), have the opening that can supply the inspection personnel to pass through on the cement load-bearing cover plate of pit shaft below, there is well lid the pit shaft top.
Another object of the present invention is achieved in that utilizes reclaimed materials to pass through secondary operations extrusion board band, again it is wound in steel-plastics composite pipe shape well body, make and the end of PVC lamination or extrusion board, the shaft bottom is bonded at the bottom of well body with special glue, dig out horizontal interface in well body both sides, the tubing head is bonded on the horizontal interface of well body both sides with special glue; Make again cement load-bearing cover plate, establish the opening that passes through for the inspection personnel at cement load-bearing cover plate, the pit shaft that supplies the inspection personnel to pass through that adapts with the opening diameter on pipe of cement or steel-plastics composite pipe making and the cement load-bearing cover plate is again made the well lid that covers above pit shaft again.
The preparation method of described special glue is: get polyvinyl chloride resin 100kg, CPE5kg, stabilizing agent 4kg, monoglyceride 1.4kg, ACR3kg, light body calcium activated 62.5kg, the cured 70g of Masterbatch 1kg, PE, stearic acid 50g; Above-mentioned raw material are mixed, be heated to about 130 ℃, make grog for subsequent use, during use above-mentioned grog is mixed with the U-PVC adhesive, stirring into pasty state can use.
Advantage of the present invention is that the amplitude that the inspection in drainage pipe downstream, catch-basin cost reduce is larger because mineshaft diameter less than the diameter of well body, makes the cost of inspection, catch-basin obtain decrease; Can in factory, produce owing to it in addition, climate condition restriction not, again because this well body is that steel-plastics composite pipe is entwined, can be the well body that the drainage pipe of 110mm-2800mm is connected with diameter so can make as required, because shaft bottom and tubing head are bonding with special glue, bonding firm, and easy for installation again, construction is easy, and cost of production is low.
Description of drawings:
Accompanying drawing is structural representation of the present invention.
The specific embodiment:
With reference to accompanying drawing, it comprises well body 1, and shaft bottom 2 is arranged at well body bottom, and there is horizontal interface the both sides of well body, and tube material 3 is arranged on the horizontal interface, for being connected with drainage pipe; The well body of horizontal interface top is provided with cement load-bearing cover plate 4, on the cement load-bearing cover plate folding 5 is housed, mineshaft diameter is less than the diameter (mineshaft diameter is 600mm-800mm) of well body, have the opening 6 (opening diameter is 600mm-800mm) that can supply the inspection personnel to pass through on the cement load-bearing cover plate of pit shaft below, there is well lid 7 the pit shaft top.
The production method of described drainage pipe inspection, catch-basin is: utilize reclaimed materials to pass through secondary operations extrusion board band, again it is wound in steel-plastics composite pipe shape well body, do the shaft bottom with PVC lamination or extrusion board, the shaft bottom is bonded at the bottom of well body with special glue, dig out horizontal interface in well body both sides, the tubing head is bonded on the horizontal interface of well body both sides with special glue; Make again cement load-bearing cover plate, establish the opening that passes through for the inspection personnel at cement load-bearing cover plate, the pit shaft that supplies the inspection personnel to pass through that adapts with the opening diameter on pipe of cement or steel-plastics composite pipe making and the cement load-bearing cover plate is again made the well lid that covers above pit shaft again.
The preparation method of described special glue is: get polyvinyl chloride resin 100kg, CPE5kg, stabilizing agent 4kg, monoglyceride 1.4kg, ACR3kg, light body calcium activated 62.5kg, the cured 70g of Masterbatch 1kg, PE, stearic acid 50g; Above-mentioned raw material are mixed, be heated to about 130 ℃, make grog for subsequent use, during use above-mentioned grog is mixed with the U-PVC adhesive, stirring into pasty state can use.

Claims (3)

1. a drainage pipe inspection, catch-basin comprise well body (1), and shaft bottom (2) is arranged at well body bottom, and there is horizontal interface the both sides of well body, and tube material (3) is arranged on the horizontal interface; It is characterized in that: the well body of horizontal interface top is provided with cement load-bearing cover plate (4), pit shaft (5) is housed on the cement load-bearing cover plate, mineshaft diameter has opening (6) less than the diameter of well body on the cement load-bearing cover plate of pit shaft below, and there is well lid (7) the pit shaft top.
2. the production method of a drainage pipe inspection, catch-basin, it is characterized in that: utilize reclaimed materials to pass through secondary operations extrusion board band, again it is wound in steel-plastics composite pipe shape well body, do the shaft bottom with PVC lamination or extrusion board, the shaft bottom is bonded at the bottom of well body with special glue, dig out horizontal interface in well body both sides, the tubing head is bonded on the horizontal interface of well body both sides with special glue; Make again cement load-bearing cover plate, establish the opening that passes through for the inspection personnel at cement load-bearing cover plate, the well lid that covers above pit shaft is made in the folding that supplies the inspection personnel to pass through that adapts with the opening diameter on pipe of cement or steel-plastics composite pipe making and the cement load-bearing cover plate more again.
3. according to the production method of a kind of drainage pipe inspection claimed in claim 2, catch-basin, it is characterized in that: the preparation method of described special glue is: get polyvinyl chloride resin 100kg, CPE5kg, stabilizing agent 4kg, monoglyceride 1.4kg, ACR3kg, light body calcium activated 62.5kg, the cured 70g of Masterbatch 1kg, PE, stearic acid 50g; Above-mentioned raw material are mixed, be heated to about 130 ℃, make grog for subsequent use, during use above-mentioned grog is mixed with the U-PVC adhesive, stir into pasty state and get final product.
CN2011103089352A 2011-10-13 2011-10-13 Checking and catch basin for drainage pipeline and production method thereof Pending CN103046639A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103089352A CN103046639A (en) 2011-10-13 2011-10-13 Checking and catch basin for drainage pipeline and production method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103089352A CN103046639A (en) 2011-10-13 2011-10-13 Checking and catch basin for drainage pipeline and production method thereof

Publications (1)

Publication Number Publication Date
CN103046639A true CN103046639A (en) 2013-04-17

Family

ID=48059469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103089352A Pending CN103046639A (en) 2011-10-13 2011-10-13 Checking and catch basin for drainage pipeline and production method thereof

Country Status (1)

Country Link
CN (1) CN103046639A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524213A (en) * 2016-06-21 2017-12-29 五冶集团上海有限公司 A kind of job site water discharge method using sump

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1553006A (en) * 2003-06-06 2004-12-08 周佰兴 Unitary piping inspection well
CN1727582A (en) * 2005-07-28 2006-02-01 四川天鑫塑胶管业有限公司 Wrapping formed inspection well prepared from plastic in environmental protection, and method of preparation
CN201221130Y (en) * 2008-06-02 2009-04-15 华升建设集团有限公司 Rain water and sewage water manhole structure
CN201241337Y (en) * 2008-08-07 2009-05-20 句容市科达技术开发有限公司 Elliptical inspection manhole cover

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1553006A (en) * 2003-06-06 2004-12-08 周佰兴 Unitary piping inspection well
CN1727582A (en) * 2005-07-28 2006-02-01 四川天鑫塑胶管业有限公司 Wrapping formed inspection well prepared from plastic in environmental protection, and method of preparation
CN201221130Y (en) * 2008-06-02 2009-04-15 华升建设集团有限公司 Rain water and sewage water manhole structure
CN201241337Y (en) * 2008-08-07 2009-05-20 句容市科达技术开发有限公司 Elliptical inspection manhole cover

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524213A (en) * 2016-06-21 2017-12-29 五冶集团上海有限公司 A kind of job site water discharge method using sump

Similar Documents

Publication Publication Date Title
CN201857660U (en) Reinforced plastic inspection well
CN103470212A (en) Device and method for active hole drilling and sealing
CN203286163U (en) Combined concrete pipe with lining pipe
CN202544903U (en) Hole packer
CN103046639A (en) Checking and catch basin for drainage pipeline and production method thereof
CN202081432U (en) Plastic drainage inspection well device of large-scale combined type
CN204001143U (en) A kind of novel environment friendly water channel
CN201621382U (en) Prestressed concrete and glass fiber reinforced plastic composite jack pipe
CN201502826U (en) Spigot-and-socket type fusing plastic pipeline
CN204311454U (en) A kind of pile end concrete placing device for foundation construction
CN205653873U (en) Plastic check well convenient to installation
CN205677032U (en) A kind of plastic inspection well for ease of maintenaince
CN202466792U (en) Inspection well with connection short pipe
CN202181723U (en) Concrete embedded mould for vertical pipe of water supplying-draining pipeline
CN104775501B (en) A kind of construction method of anti-settling plastic drainage inspection well
CN201180869Y (en) Polythene steel strip reinforced hollow winding structure wall pipes
CN203145028U (en) Corrugated pipe water-collecting well
CN202745188U (en) High-strength inspection well
CN102322141A (en) Concrete embedded die for water supply and drainage pipe riser and mounting position forming and mounting method
CN206337587U (en) Prefabricated assembled rectangle inspection well well room
CN205653872U (en) High strength plastic check well
CN205745694U (en) A kind of double-wall corrugated pipe
CN203320679U (en) General glass fiber reinforced plastic inspection well
CN202298871U (en) Straight wall plastic inspection well
CN204058205U (en) upper and lower combined plastic septic tank assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130417