CN103046516B CN201210588184.9A CN201210588184A CN103046516B CN 103046516 B CN103046516 B CN 103046516B CN 201210588184 A CN201210588184 A CN 201210588184A CN 103046516 B CN103046516 B CN 103046516B
Authority
CN
China
Prior art keywords
wall
concrete
filling
dam
clay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210588184.9A
Other languages
Chinese (zh)
Other versions
CN103046516A (en
Inventor
杨忠
吴建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 3 Engineering Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201210588184.9A priority Critical patent/CN103046516B/en
Publication of CN103046516A publication Critical patent/CN103046516A/en
Application granted granted Critical
Publication of CN103046516B publication Critical patent/CN103046516B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a method for filling the bottom of a gravelly soil core wall of a stone dam. The method includes steps of firstly, casting a concrete key wall on a first diaphragm wall, reserving a reserved passage for construction vehicles to enter on the concrete key wall; secondly, filling clay 2 meters thick in a gap area of the inner side and the outer side of the concrete key wall; thirdly, casting the concrete key wall to the top after the construction vehicles enter a filling roadway; and fourthly, forming a plurality of clay loading platforms on a downstream side of a concrete gallery by clay, throwing the clay into the filling roadway by a backacting shovel, paving, grinding and filling by layering until the clay in the filling roadway is all filled and then the construction vehicles can be driven out from the top. By the above steps, filling construction of the bottom of the gravelly soil core wall of the stone dam can be realized. By forming the filling roadway convenient for filling by the concrete key wall, flow of high-ductility clay is limited, and layering, grinding and paving of the construction vehicles in the filling roadway are facilitated. The method has the advantages of simplicity in construction, convenience and practicality, investment is saved and construction quality and speed are guaranteed.

Description

Dam filling construction bottom a kind of loose rock dam gravelly soil core-wall
Technical field
The present invention relates to the dam filling construction bottom a kind of Hydraulic and Hydro-Power Engineering construction water retaining structure construction field, particularly a kind of loose rock dam gravelly soil core-wall.
Background technology
The structural configuration on dash dam twice impervious wall basis is design first at home, fills in tunnel at all round closure, and the filling construction beyond example in the middle of upstream impervious wall and downstream gallery is used for reference.
Can be the construction method that Chinese patent 200910058708.1 discloses a kind of highly plastic clay core wall for the data used for reference, roller compaction construction method is adopted to roll highly plastic clay band and gravelly soil core-wall, especially a kind of thick and heavy concept rolled is proposed, Problems existing is, because the plasticity of clay is high, good fluidity, difficulty of construction is comparatively large, and construction period is longer.
Summary of the invention
Technical problem to be solved by this invention is to provide the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall, can reduce the filling construction difficulty bottom core-wall, and efficiency of construction is high, easy to operate.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall, comprise the first impervious wall and the second impervious wall that are arranged on checkdam, the second described impervious wall is positioned at downstream, concrete corridor built by second impervious wall, concrete corridor two ends are connected with slope on left bank core-wall district subsides slope concrete and right bank slope core-wall district subsides slope concrete respectively, comprise the following steps:
One, concreting key-wall on the first impervious wall, concrete key-wall two ends are connected with slope on left bank core-wall district subsides slope concrete and right bank slope core-wall district subsides slope concrete respectively, and concrete key-wall leaves the reserved passageway entered for Construction traffic;
Two, inside and outside concrete key-wall, the gap area of both sides fills the thick clay of 1-3 rice, and wall external symmetry is filled within the walls;
Three, Construction traffic enters into filling in tunnel between concrete key-wall and concrete corridor from reserved passageway, then the concrete key-wall in reserved passageway region is poured into top;
Four, form multiple clay material platform at the downstream clay of concrete corridor, with backhoe, clay filler is got rid of into filling in tunnel, layering decking and rolling fills, until after filling the clay filling in tunnel, equipment is outputed from top simultaneously;
The filling construction bottom loose rock dam gravelly soil core-wall is realized by above-mentioned steps.
Also being provided with horizontal reverse filtering layer in the downstream of concrete corridor, horizontal reverse filtering layer is gravelly soil reclamation district.
Described Construction traffic is excavator, bulldozer and rolling machine.
Described rolling machine is the convex mill of vibration.
Grouting adit is provided with in described concrete corridor.
Described concrete key-wall height is 9-11 rice.
Described concrete corridor height is 8-9 rice.
Described reserved passageway width is 10-14 rice.
Dam filling construction bottom a kind of loose rock dam gravelly soil core-wall provided by the invention, by the concrete key-wall arranged formed be convenient to fill fill tunnel, thus limit the flowing of highly plastic clay, just equipment in the inner, such as excavator, bulldozer and rolling machine construction, layered rolling paves.It is succinct, convenient, practical that dam filling construction of the present invention has construction, both saved investment, and in turn ensure that construction quality and progress.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is overall structure schematic top plan view of the present invention.
Fig. 2 is the longitudinal cross section in the present invention between concrete key-wall rain concrete corridor.
Fig. 3 is the longitudinal cross section filled between concrete key-wall rain concrete corridor in the present invention when tunnel is filled.
Fig. 4 is the transverse cross sectional view of concrete key-wall rain concrete corridor in the present invention.
In figure: slope on left bank core-wall district subsides slope concrete 1, highly plastic clay reclamation district 2, gravelly soil reclamation district 3, dump truck 4, clay material platform 5, excavator 6, concrete corridor 7, right bank slope core-wall district subsides slope concrete eight, concrete key-wall 9, bulldozer 10, grouting adit 11, rolling machine 12, reserved passageway 13, high retrospective clay 14, first impervious wall 15 after placement in layers, second impervious wall 16, fills tunnel 17, horizontal reverse filtering layer 18.
Detailed description of the invention
As in Fig. 1-4, dam filling construction bottom a kind of loose rock dam gravelly soil core-wall, comprise the first impervious wall 15 and the second impervious wall 16 being arranged on checkdam, the second described impervious wall 16 is positioned at downstream, concrete corridor 7 built by second impervious wall 16, concrete corridor 7 two ends are connected with slope on left bank core-wall district subsides slope concrete 1 and right bank slope core-wall district subsides slope concrete eight respectively, and be provided with grouting adit 11 in described concrete corridor 7, described concrete corridor 7 is highly 8-9 rice.Also being provided with horizontal reverse filtering layer 18 in the downstream of concrete corridor 7, horizontal reverse filtering layer 18 is gravelly soil reclamation district 3.Specifically comprise the following steps:
One, as in Fig. 1,3,4, concreting key-wall 9 on the first impervious wall 15, described concrete key-wall 9 is highly 9-11 rice, and the height in this example is 10 meters.Concrete key-wall 9 two ends are connected with slope on left bank core-wall district subsides slope concrete 1 and right bank slope core-wall district subsides slope concrete eight respectively, concrete key-wall 9 leaves the reserved passageway 13 entered for Construction traffic, described reserved passageway 13 width is 10-14 rice, is set to 12 meters in this example.
Two, as in Fig. 1,3, inside and outside concrete key-wall 9, the gap area of both sides fills the thick clay of 1-3 rice, and wall external symmetry is filled within the walls, and preferred thickness is 2 meters.
Three, excavator 6, bulldozer 10 and rolling machine 12 enter into filling in tunnel 17 between concrete key-wall 9 and concrete corridor 7 from reserved passageway 13, then the concrete key-wall 9 in reserved passageway 13 region is poured into top; Rolling machine 12 in this example is the convex mill of vibration.
Four, form multiple clay material platform 5 at the downstream clay of concrete corridor 7, with backhoe, clay filler is got rid of into filling in tunnel 17, layering decking and rolling fills, until after filling the clay filling in tunnel 17, equipment is outputed from top simultaneously;
The filling construction bottom loose rock dam gravelly soil core-wall is realized by above-mentioned steps.Adopt dam filling construction of the present invention to limit the flowing of highly plastic clay due to concrete key-wall, there is construction succinct, convenient, practical, both saved investment, and in turn ensure that construction quality and progress.

Claims (8)

1. the dam filling construction bottom a loose rock dam gravelly soil core-wall, comprise the first impervious wall (15) and the second impervious wall (16) that are arranged on checkdam, described the second impervious wall (16) is positioned at downstream, second impervious wall (16) has been built concrete corridor (7), concrete corridor (7) two ends are connected with subsides slope concrete, slope on left bank core-wall district (1) and subsides slope concrete, right bank slope core-wall district (8) respectively, it is characterized in that comprising the following steps:
One, at the upper concreting key-wall (9) of the first impervious wall (15), concrete key-wall (9) two ends are connected with subsides slope concrete, slope on left bank core-wall district (1) and subsides slope concrete, right bank slope core-wall district (8) respectively, and concrete key-wall (9) leaves the reserved passageway (13) entered for Construction traffic;
Two, fill the thick clay of 1-3 rice at the gap area of the inside and outside both sides of concrete key-wall (9), wall external symmetry is filled within the walls;
Three, Construction traffic enters into filling in tunnel (17) between concrete key-wall (9) and concrete corridor (7) from reserved passageway (13), then the concrete key-wall (9) in reserved passageway (13) region is poured into top;
Four, form multiple clay material platform (5) at the downstream clay of concrete corridor (7) simultaneously, with backhoe, clay filler is got rid of into filling in tunnel (17), layering decking and rolling fills, until after filling the clay filling in tunnel (17), Construction traffic is outputed from top;
The filling construction bottom loose rock dam gravelly soil core-wall is realized by above-mentioned steps.
2. the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall according to claim 1, is characterized in that: be also provided with horizontal reverse filtering layer (18) in the downstream of concrete corridor (7), and horizontal reverse filtering layer (18) is upper is gravelly soil reclamation district (3).
3. the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall according to claim 1, is characterized in that: described Construction traffic is excavator (6), bulldozer (10) and rolling machine (12).
4. the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall according to claim 3, is characterized in that: described rolling machine (12) is the convex mill of vibration.
5. the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall according to claim 1, is characterized in that: be provided with grouting adit (11) in described concrete corridor (7).
6. the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall according to claim 1, is characterized in that: described concrete key-wall (9) is highly 9-11 rice.
7. the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall according to claim 1, is characterized in that: described concrete corridor (7) is highly 8-9 rice.
8. the dam filling construction bottom a kind of loose rock dam gravelly soil core-wall according to claim 1, is characterized in that: described reserved passageway (13) width is 10-14 rice.
CN201210588184.9A 2012-12-29 2012-12-29 Method for filling bottom of gravelly soil core wall of stone dam Active CN103046516B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210588184.9A CN103046516B (en) 2012-12-29 2012-12-29 Method for filling bottom of gravelly soil core wall of stone dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210588184.9A CN103046516B (en) 2012-12-29 2012-12-29 Method for filling bottom of gravelly soil core wall of stone dam

Publications (2)

Publication Number Publication Date
CN103046516A CN103046516A (en) 2013-04-17
CN103046516B true CN103046516B (en) 2015-04-01

Family

ID=48059354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210588184.9A Active CN103046516B (en) 2012-12-29 2012-12-29 Method for filling bottom of gravelly soil core wall of stone dam

Country Status (1)

Country Link
CN (1) CN103046516B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213543B (en) * 2014-09-24 2016-05-18 中国水利水电第五工程局有限公司 A kind of for the clay filling construction method between two walls of earth and rockfill dam bottom
CN108166457A (en) * 2018-01-12 2018-06-15 中国电建集团华东勘测设计研究院有限公司 The anti-seepage linkage of the deep covering layer dam foundation and calculous soil core-wall

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476309A (en) * 2009-01-15 2009-07-08 中国葛洲坝集团股份有限公司 Dam body prepressing inverted filling construction method for ultra-high concrete panel rock-fill dam
CN101538839A (en) * 2009-03-26 2009-09-23 中国水利水电第七工程局有限公司 Method for constructing highly plastic clay core wall

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100284747A1 (en) * 2009-05-05 2010-11-11 Peterson Galen L Water-filled building block for temporary levee

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476309A (en) * 2009-01-15 2009-07-08 中国葛洲坝集团股份有限公司 Dam body prepressing inverted filling construction method for ultra-high concrete panel rock-fill dam
CN101538839A (en) * 2009-03-26 2009-09-23 中国水利水电第七工程局有限公司 Method for constructing highly plastic clay core wall

Also Published As

Publication number Publication date
CN103046516A (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN107419630B (en) Soft soil foundation high-filling embankment capable of effectively controlling post-construction settlement and construction method
CN104060631B (en) A kind of manhole mouth elevation Dynamic controlling structure
CN101718086A (en) Concrete-enrockment mixed dam and construction method thereof
CN109057861B (en) Method for calculating underground reservoir, reservoir water storage body and reservoir capacity of open coal mine
CN106560559B (en) A kind of leakage preventing structure and construction method for city river
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN203462484U (en) Existing retaining wall reinforcement structure
CN102660936A (en) Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film
CN106049379B (en) Interim electricity-generating method and enrockment self bursting dam during the construction hysteresis of spillway downstream
CN109487641A (en) A kind of high-speed railway monoblock type cable slot structure and surface layer of subgrade bed construction method
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN103046516B (en) Method for filling bottom of gravelly soil core wall of stone dam
CN102174803B (en) Assembled drainage canal of debris flows and construction method thereof
CN105804101A (en) Load-reducing retaining system capable of reducing stress of retaining structure, construction method and applications
CN202865803U (en) Check dam
CN111502748A (en) Construction method for backfilling foundation of railway crossing giant karst cave
CN206189430U (en) A escape canal for deep overburden ground
CN107326791A (en) The improved method and structure of a kind of overflow bridge
CN214005285U (en) High fill roadbed structure
CN210458918U (en) Space stacked bridge structure
CN212895900U (en) Gravity type U-shaped abutment rear drainage structure
CN212052626U (en) Concrete panel rock-fill dam with multiple anti-seepage structure
CN210368867U (en) Superimposed structure of homogeneity earth dam and rock-fill dam
CN204000894U (en) Artificial heap is built cascading waterfalls water scenery structure on massif
CN203270515U (en) Full tailing hydraulic reclamation split film yarn woven geofabriform piled dam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160516

Address after: 710000 Shaanxi province Xi'an Chanba Ecological District Su Shaanxi international financial center building A

Patentee after: CHINA GEZHOUBA GROUP NO.3 ENGINEERING CO., LTD.

Address before: 443002 Hubei province Yichang City Road No. 1

Patentee before: China Gezhouba Group Co., Ltd.