CN103042078A - Curved metal plate forming process - Google Patents

Curved metal plate forming process Download PDF

Info

Publication number
CN103042078A
CN103042078A CN2012105859703A CN201210585970A CN103042078A CN 103042078 A CN103042078 A CN 103042078A CN 2012105859703 A CN2012105859703 A CN 2012105859703A CN 201210585970 A CN201210585970 A CN 201210585970A CN 103042078 A CN103042078 A CN 103042078A
Authority
CN
China
Prior art keywords
plate
working plate
tooling
frock
tooling plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105859703A
Other languages
Chinese (zh)
Other versions
CN103042078B (en
Inventor
蔡慈平
余企平
李琴
王芝华
张敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinochem Huayi equipment technology (Shanghai) Co.,Ltd.
Original Assignee
SHANGHAI CHEMICAL EQUIPMENT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CHEMICAL EQUIPMENT TECHNOLOGY Co Ltd filed Critical SHANGHAI CHEMICAL EQUIPMENT TECHNOLOGY Co Ltd
Priority to CN201210585970.3A priority Critical patent/CN103042078B/en
Publication of CN103042078A publication Critical patent/CN103042078A/en
Application granted granted Critical
Publication of CN103042078B publication Critical patent/CN103042078B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

The invention provides a curved metal plate forming process. The process includes the steps: preparing 6 carbon steel tooling plates matched with raw metal plates, regularly stacking 1-300 raw metal plates with the thickness of 1-300mm on a bottom tooling plate, and tightly clamping the stacked raw metal plates by a front tooling plate, a rear tooling plate, a left tooling plate and a right tooling plate; pressing the clamped raw metal plates by a hydraulic press, welding the bottom tooling plate with the front tooling plate, the rear tooling plate, the left tooling plate and the right tooling plate to from a tooling box, covering a top tooling plate, and pressing the top tooling plate and the raw metal plates once more prior to welding the top tooling plate with the front tooling plate, the rear tooling plate, the left tooling plate and the right tooling plate; after the tooling box is made, placing the tooling box and the raw metal plates on an intermediate-frequency machine, and heating while integrally bending the raw metal plates to curved plates; after bending, subjecting the tooling box and the curved metal plates to air cooling; performing stress-relief heat treatment; and after the tooling box and the curved metal plates are cooled completely, detaching the tooling plates, and taking out the formed curved metal plates. The process is easy for formation quality control, energy-saving and environment-friendly, more than 30% of raw materials are saved, and production efficiency is improved greatly by the aid of batch forming.

Description

A kind of moulding process of metal arc
Technical field
The present invention relates to the circular arc molding technique of metallic plate, particularly a kind of moulding process of metal arc.
Background technology
In order to comply with the demand in market, now a lot of equipment all adopt special material to make.Arc in the equipment by after the steel plate cutting, carries out machined usually again, the processing technology more complicated, and this forming method, although simple, material is slatterned in a large number.
Summary of the invention
The objective of the invention is for arc in the prior art by after the steel plate cutting, carry out again the weak point of machined moulding, the designer has adopted a kind of moulding process of metal arc, this moulding process operation is simple, and Forming Quality is controlled easily, and energy consumption is low, save raw material, operating environment is good, is easy in batches moulding, greatly enhances productivity.Produced thus useful technique effect, and practical value is higher.
The present invention is achieved in that the moulding process of a kind of metal arc of the present invention, realizes through the following steps:
(1) with the raw metal plate of thickness 1~300 ㎜, cut growth 1000~2000 ㎜, wide 50~300 ㎜ strip raw metal plates;
(2) prepare 6 carbon steel working plates that are complementary with the raw metal plate by the length size of 1~300 block of raw metal plate: frock top board, frock base plate, front working plate, rear working plate, left working plate, right working plate, wherein frock top board, frock base plate, front working plate and rear working plate length are that 1500~2200mm is used as the medium frequency equipment clamping;
(3) 1~300 metal lot raw material plate is neatly superposeed, be placed on the frock base plate, with hydraulic press with its upper-lower compacting, avoid the space between plate and the plate, then use front working plate, rear working plate, left working plate and right working plate clamp the raw metal plate after the stack, after the compression with frock base plate and front working plate, rear working plate, left working plate, right working plate welding, front working plate, rear working plate and left working plate, right working plate is welded to each other and forms the frock case, cover the frock top board, last hydraulic press is again with after frock top board and the folded face compression of raw metal plate, with frock top board and front working plate, rear working plate, left working plate and the welding of right working plate;
(4) after the frock case is made, be put on the medium frequency equipment with the raw metal plate, promote the frock case and advance at the medium frequency equipment track, on one side heating, its Integral bending is made R300~3000 ㎜ arc plates on one side;
(5) bend after, frock case and metal arc are cooled off in air;
(6) behind the air cooling, with the heat treatment that eliminates stress of frock case and metal arc;
(7) after cooling off fully, remove working plate shape, take out in type metal arc;
Raw metal plate thickness of the present invention is 1~300 ㎜, stack height 1~300 ㎜.
Working plate of the present invention is to be made by carbon steel material, and thickness is 18~25 ㎜.
The present invention compared with prior art has following advantage:
1, for metal, the utilization rate of material is very important, and the present invention improves the utilization rate of material greatly.The present invention compares with other circular arc molding methods, can save 30% above metal material.
2, the stack of this circular arc molding process using steel plate bends, and is little with the forming errors of batch arc, is easy to guarantee Forming Quality.
3, the frock material is made of carbon steel or steel scrap, has reduced manufacturing cost.
4, energy consumption is low, operating environment is good, because in batches moulding is greatly enhanced productivity.
Description of drawings
Fig. 1 is fixedly schematic diagram of working plate
Fig. 2 is the left view of Fig. 1
Fig. 3 is metal arc sheet metal forming figure
Number in the figure represents:
1---the right working plate of raw metal plate 2---frock top board 3---
4---the left working plates of front working plate 5---frock base plate 6---
7---rear working plate 8---metal arc
The specific embodiment
Now by reference to the accompanying drawings 1, Fig. 2, Fig. 3 and embodiment, the present invention is specified.Embodiment is further specifying rather than limitation of the scope of the invention content of the present invention.
A kind of moulding process of metal arc comprises the steps:
(1) the raw metal plate [1] that is 3 ㎜ with 20 thickness, cut growth 1828 ㎜, 170 ㎜ strip precious metal raw material plates [1];
(2) prepare 6 carbon steel working plates that are complementary with raw metal plate [1] by the length size of 20 blocks of raw metal plates [1]: frock top board [2], frock base plate [5], front working plate [4], rear working plate [7], left working plate [6], right working plate [3], carbon steel working plate thickness is 20mm, and wherein frock top board [2], frock base plate [5], front working plate [4] and rear working plate [7] length are that 2100mm is used as the medium frequency equipment clamping;
(3) with the neat stack of 20 metal lot raw material plates [1], be placed on the frock base plate [5], with hydraulic press with its upper-lower compacting, avoid the space between plate and the plate, then use front working plate [4], rear working plate [7], left working plate [6] and right working plate [3] clamp the raw metal plate [1] of stack, after the compression with frock base plate [5] and front working plate [4], rear working plate [7], left working plate [6], right working plate [3] welding, front working plate [4], rear working plate [7] and left working plate [6], right working plate [3] is welded to each other and forms the frock case, cover frock top board [2], after last hydraulic press compresses the folded face of frock top board [2] and raw metal plate [1] again, with frock top board [2] and front working plate [4], rear working plate [7], left working plate [6], right working plate [3] welding;
(4) after the frock case is made, be put on the medium frequency equipment with raw metal plate [1], promote the frock case and advance at the medium frequency equipment track, on one side heating, its Integral bending is made R1226 ㎜ arc on one side;
(5) bend after, frock case and metal arc [8] are cooled off in air;
(6) behind the air cooling, with the heat treatment that eliminates stress of frock case and metal arc [8];
(7) after cooling off fully, remove working plate, take out in type metal arc [8].

Claims (3)

1. the moulding process of a metal arc, it is characterized in that: this technique comprises the steps:
(1) with thickness is the raw metal plate [1] of 1~300 ㎜, cut growth 1000~2000 ㎜, wide 50~300 ㎜ strip raw metal plates [1];
(2) prepare 6 carbon steel working plates that are complementary with raw metal plate [1] by the length size of 1~300 block of raw metal plate [1]: frock top board [2], frock base plate [5], front working plate [4], rear working plate [7], left working plate [6], right working plate [3]; Wherein frock top board [2], frock base plate [5], front working plate [4] and rear working plate [7] length are 1500~2200mm;
(3) with the neat stack of 1~300 metal lot raw material plate [1], be placed on the frock base plate [5], with hydraulic press with its upper-lower compacting, avoid the space between plate and the plate, then use front working plate [4], rear working plate [7], left working plate [6] and right working plate [3] clamp the raw metal plate [1] after the stack, after the compression with frock base plate [5] and front working plate [4], rear working plate [7], left working plate [6], right working plate [3] welding, front working plate [4], rear working plate [7] is welded to each other with left working plate [6] and right working plate [3] and forms the frock case, cover frock top board [2], after last hydraulic press compresses the folded face of frock top board [2] and raw metal plate [1] again, with frock top board [2] and front working plate [4], rear working plate [7], left working plate [6], right working plate [3] welding;
(4) after the frock case is made, be put on the medium frequency equipment with raw metal plate [1], promote the frock case and advance at the medium frequency equipment track, on one side heating, its Integral bending is made R300~3000mm arc on one side;
(5) bend after, frock case and metal arc [8] are cooled off in air;
(6) behind the air cooling, with the heat treatment that eliminates stress of frock case and metal arc [8];
(7) after cooling off fully, remove working plate, take out in type metal arc [8].
2. the moulding process of metal arc according to claim 1 is characterized in that; Raw metal plate [1] thickness described in the step (1) is 1~300 ㎜, stack height 1~300 ㎜.
3. the moulding process of metal arc according to claim 1 is characterized in that; Working plate material described in the step (2) is carbon steel, and thickness is 18~25 ㎜.
CN201210585970.3A 2012-12-28 2012-12-28 Curved metal plate forming process Active CN103042078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210585970.3A CN103042078B (en) 2012-12-28 2012-12-28 Curved metal plate forming process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210585970.3A CN103042078B (en) 2012-12-28 2012-12-28 Curved metal plate forming process

Publications (2)

Publication Number Publication Date
CN103042078A true CN103042078A (en) 2013-04-17
CN103042078B CN103042078B (en) 2014-11-26

Family

ID=48055072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210585970.3A Active CN103042078B (en) 2012-12-28 2012-12-28 Curved metal plate forming process

Country Status (1)

Country Link
CN (1) CN103042078B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1177564A (en) * 1966-06-30 1970-01-14 Commissariat Energie Atomique Improvements in Means for Bending Plates.
US4770017A (en) * 1986-04-02 1988-09-13 Agency Of Industrial Science And Technology Apparatus for forming plate with a double-curved surface
KR20050119752A (en) * 2004-06-17 2005-12-22 수성기체(주) Device and the method for roll bending the al alloy frame
KR20100004832A (en) * 2008-11-19 2010-01-13 이이기 Method of forming a curved shape
CN202021240U (en) * 2011-03-09 2011-11-02 苏州领航自动化科技有限公司 Metal plate bending machine
CN102699653A (en) * 2012-05-22 2012-10-03 大明重工有限公司 Tailor-welding and bending method for multi-thick metal plate material
CN102814368A (en) * 2012-08-23 2012-12-12 北京航空航天大学 Compound molding tool system for hot stretch bending and creep deformation of section bar and application method of compound molding tool system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1177564A (en) * 1966-06-30 1970-01-14 Commissariat Energie Atomique Improvements in Means for Bending Plates.
US4770017A (en) * 1986-04-02 1988-09-13 Agency Of Industrial Science And Technology Apparatus for forming plate with a double-curved surface
KR20050119752A (en) * 2004-06-17 2005-12-22 수성기체(주) Device and the method for roll bending the al alloy frame
KR20100004832A (en) * 2008-11-19 2010-01-13 이이기 Method of forming a curved shape
CN202021240U (en) * 2011-03-09 2011-11-02 苏州领航自动化科技有限公司 Metal plate bending machine
CN102699653A (en) * 2012-05-22 2012-10-03 大明重工有限公司 Tailor-welding and bending method for multi-thick metal plate material
CN102814368A (en) * 2012-08-23 2012-12-12 北京航空航天大学 Compound molding tool system for hot stretch bending and creep deformation of section bar and application method of compound molding tool system

Also Published As

Publication number Publication date
CN103042078B (en) 2014-11-26

Similar Documents

Publication Publication Date Title
CN201511073U (en) Silicon steel film clip stamping device
CN102151735A (en) Process method for realizing product edge circle rolling in moulds
CN105162293B (en) A kind of motor stator core processing method
CN201543723U (en) Multi-station assembling die
CN103861902A (en) U-shaped metal plate manufacturing method
CN203343284U (en) Production line for car central channel parts
CN103042078B (en) Curved metal plate forming process
CN202779449U (en) Drawing die
CN202517706U (en) Hot pressing mold for right-angled bus bar
CN103722589A (en) Shutter die
CN202862299U (en) Shutter die
CN202817095U (en) Mirrored slicing device
CN201618791U (en) Dedicated blank-holding and bending die
CN205236772U (en) Ironing board stamping die blanking and punching one -time forming machine constructs
CN204842630U (en) Piercing press is managed in side
CN204208969U (en) A kind of deburring blanking composite die
CN201639138U (en) Small space continuous terminal stamping mold
CN201855861U (en) Special hydraulic machine tool for rolling mill rack reinforcing rib
CN202910189U (en) Progressive mold for iron-shell drawing
CN101890448A (en) Moulding press for reinforcing pressureproof steel plate
CN202741592U (en) Turning-plate reforming mold for filter shell
CN207288590U (en) A kind of high stability high-speed stamping die
CN108987092A (en) The production method of bulk amorphous alloy lamination element
CN205341624U (en) Stamping die's positive top -cross sword structure
CN205309083U (en) Furniture baffle supporting seat mould

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201417, No. 1188, Cang Gong Road, Shanghai, Fengxian District

Patentee after: Sinochem Huayi equipment technology (Shanghai) Co.,Ltd.

Address before: 201417, No. 1188, Cang Gong Road, Shanghai, Fengxian District

Patentee before: SHANGHAI CHEMICAL EQUIPMENT TECHNOLOGY Co.,Ltd.