CN103036251B - 一种提高电网风电接纳能力的源网协调调度方法 - Google Patents
一种提高电网风电接纳能力的源网协调调度方法 Download PDFInfo
- Publication number
- CN103036251B CN103036251B CN201210518798.XA CN201210518798A CN103036251B CN 103036251 B CN103036251 B CN 103036251B CN 201210518798 A CN201210518798 A CN 201210518798A CN 103036251 B CN103036251 B CN 103036251B
- Authority
- CN
- China
- Prior art keywords
- wind
- scheduling
- electricity generation
- powered electricity
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 148
- 238000000034 method Methods 0.000 title claims abstract description 28
- 230000006855 networking Effects 0.000 claims abstract description 23
- 230000005540 biological transmission Effects 0.000 claims description 26
- 238000011156 evaluation Methods 0.000 claims description 8
- 238000005096 rolling process Methods 0.000 claims description 7
- 241001269238 Data Species 0.000 claims description 6
- 238000011835 investigation Methods 0.000 claims description 6
- 238000004458 analytical method Methods 0.000 claims description 5
- 238000004364 calculation method Methods 0.000 claims description 4
- 238000012545 processing Methods 0.000 claims description 4
- 239000012141 concentrate Substances 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 238000007619 statistical method Methods 0.000 claims description 3
- 230000007613 environmental effect Effects 0.000 abstract description 4
- 239000002699 waste material Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 230000002354 daily effect Effects 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 230000005619 thermoelectricity Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210518798.XA CN103036251B (zh) | 2012-12-06 | 2012-12-06 | 一种提高电网风电接纳能力的源网协调调度方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210518798.XA CN103036251B (zh) | 2012-12-06 | 2012-12-06 | 一种提高电网风电接纳能力的源网协调调度方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103036251A CN103036251A (zh) | 2013-04-10 |
CN103036251B true CN103036251B (zh) | 2014-08-27 |
Family
ID=48022868
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210518798.XA Active CN103036251B (zh) | 2012-12-06 | 2012-12-06 | 一种提高电网风电接纳能力的源网协调调度方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103036251B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103326387B (zh) * | 2013-06-09 | 2015-04-01 | 东北电力大学 | 一种利用储能减小风电调度风险的源网协调调度方法 |
CN104124713B (zh) * | 2014-08-06 | 2016-08-24 | 国网吉林省电力有限公司 | 一种风电机组优化运行控制方法 |
CN104573878A (zh) * | 2015-01-30 | 2015-04-29 | 国家电网公司 | 一种新能源调度计划的协调方法 |
CN104701889B (zh) * | 2015-03-16 | 2017-03-29 | 东北电力大学 | 风电场群风能时空分布差异性定量评价方法 |
CN106058918B (zh) * | 2016-06-04 | 2018-04-10 | 东北电力大学 | 基于光伏接纳可行域的储能控制策略及经济性评价方法 |
CN106208154B (zh) * | 2016-08-30 | 2018-12-18 | 国网江苏省电力公司南京供电公司 | 一种源网互动的智能配电网日前调度方法 |
CN106936128B (zh) * | 2017-03-07 | 2019-06-04 | 广西电网有限责任公司电力科学研究院 | 一种电网短期接纳可再生能源能力的评估方法 |
CN108695845A (zh) * | 2018-05-28 | 2018-10-23 | 华润电力风能(汕头潮南)有限公司 | 一种风电机组可利用率的计算方法及系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DK200700626A (da) * | 2007-04-27 | 2008-05-10 | Lm Glasfiber As | Effektkurve af vindenergianlæg til energinet |
-
2012
- 2012-12-06 CN CN201210518798.XA patent/CN103036251B/zh active Active
Non-Patent Citations (4)
Title |
---|
Junhui Li等.Research On Energy Storage System Capacity Allocation To Improve Wind Power Integration Capability.《Innovative Smart Grid Technologies - Asia (ISGT Asia), 2012 IEEE 》.2012, |
Junhui Li等.Research On Energy Storage System Capacity Allocation To Improve Wind Power Integration Capability.《Innovative Smart Grid Technologies- Asia (ISGT Asia), 2012 IEEE 》.2012, * |
确定风电场群功率汇聚外送输电容量的静态综合优化方法;穆钢等;《中国电机工程学报》;20110105;第31卷(第1期);第15页-第19页 * |
穆钢等.确定风电场群功率汇聚外送输电容量的静态综合优化方法.《中国电机工程学报》.2011,第31卷(第1期),第15页-第19页. |
Also Published As
Publication number | Publication date |
---|---|
CN103036251A (zh) | 2013-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103036251B (zh) | 一种提高电网风电接纳能力的源网协调调度方法 | |
Wu et al. | Stochastic multi-timescale power system operations with variable wind generation | |
CN104779611B (zh) | 基于集中式和分布式双层优化策略的微电网经济调度方法 | |
Tewari et al. | A statistical model for wind power forecast error and its application to the estimation of penalties in liberalized markets | |
CN107239863B (zh) | 一种电网安全约束的鲁棒机组组合方法 | |
Zhang et al. | Improved Wind Speed Prediction Using Empirical Mode Decomposition. | |
CN109523128A (zh) | 一种促进消纳的可再生能源容量配置方法 | |
CN103617453B (zh) | 考虑风电和谐消纳的电力系统中长期交易运营计划获取方法 | |
CN201928022U (zh) | 风电功率预测系统 | |
CN105490309A (zh) | 一种基于电网调峰能力的风电消纳评估方法 | |
CN105654224A (zh) | 一种计及风电不确定性的省级电网月度购电风险管理方法 | |
Beltramo et al. | Using electric vehicles as flexible resource in power systems: A case study in the Netherlands | |
Lannoye et al. | Assessing Power System Flexibility for Variable Renewable Integration: A Flexibility Metric | |
CN102904248A (zh) | 基于风电出力不确定性集合的电力系统调度方法 | |
CN105305485A (zh) | 一种消纳大规模间歇性能源的安全约束经济调度方法 | |
CN103633641B (zh) | 一种考虑风电接纳的中长期交易运营计划获取方法 | |
CN105226707A (zh) | 一种基于Shapley值风电并网系统输电固定成本的分摊方法 | |
CN103530508B (zh) | 一种建立风速功率转换概率模型的方法 | |
CN106447118A (zh) | 一种电源优化规划方法及系统 | |
CN103199616A (zh) | 大区电网风电群运行数据监测分析系统 | |
CN103326387B (zh) | 一种利用储能减小风电调度风险的源网协调调度方法 | |
CN104331748A (zh) | 一种预测规划目标年风电场群持续功率曲线的方法 | |
Nalbandyan et al. | The Concept Of Internet Of Energy In Russia: Drivers And Perspectives | |
Rawn et al. | Kinetic energy from distributed wind farms: Technical potential and implications | |
Ma | Decentralized valley-fill charging control of large-population plug-in electric vehicles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID JILIN ELECTRIC POWER CO., LTD. NORTHEAS Effective date: 20140731 Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: NORTHEAST ELECTRIC POWER UNIVERSITY Effective date: 20140731 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Cai Hongyi Inventor after: Mu Gang Inventor after: Zheng Taiyi Inventor after: Cui Yang Inventor after: Sun Yong Inventor after: Yan Gangui Inventor after: Zhang Jiguo Inventor after: Liu Jia Inventor before: Mu Gang Inventor before: Cui Yang Inventor before: Yan Gangui Inventor before: Liu Jia |
|
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 132012 JILIN, JILIN PROVINCE TO: 100031 XICHENG, BEIJING Free format text: CORRECT: INVENTOR; FROM: MU GANG CUI YANG YAN GANGUI LIU JIA TO: CAI HONGYI MU GANG ZHENG TAIYI CUIYANG SUN YONG YAN GANGUI ZHANG JIGUO LIU JIA |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140731 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: Guo Wang Jilin Electric Power Co., Ltd. Applicant after: Northeast Dianli University Address before: Jilin City, Jilin province Changchun ship 132012 Camp Road No. 169 Applicant before: Northeast Dianli University |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |