CN103033389B - A kind of method of stand-by boiler interlock test of proterctive equipment - Google Patents

A kind of method of stand-by boiler interlock test of proterctive equipment Download PDF

Info

Publication number
CN103033389B
CN103033389B CN201210588134.0A CN201210588134A CN103033389B CN 103033389 B CN103033389 B CN 103033389B CN 201210588134 A CN201210588134 A CN 201210588134A CN 103033389 B CN103033389 B CN 103033389B
Authority
CN
China
Prior art keywords
equipment
boiler
interlock test
test
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210588134.0A
Other languages
Chinese (zh)
Other versions
CN103033389A (en
Inventor
秦伦斌
谭春江
蔡志强
杨晓虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNMING CELLULOSE FIBERS CO Ltd
Original Assignee
KUNMING CELLULOSE FIBERS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNMING CELLULOSE FIBERS CO Ltd filed Critical KUNMING CELLULOSE FIBERS CO Ltd
Priority to CN201210588134.0A priority Critical patent/CN103033389B/en
Publication of CN103033389A publication Critical patent/CN103033389A/en
Application granted granted Critical
Publication of CN103033389B publication Critical patent/CN103033389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

The present invention is a kind of stand-by boiler interlock test method of proterctive equipment.By adjusting the aperture of participation interlock test equipment in advance, order participates in the equipment not on-load of interlock test, avoids stand-by boiler to interlock and jumps when car is tested the damage of correlation test equipment and infringement.What the method for operating of proterctive equipment of the present invention was applicable to that " regulation " specify possess interlocking protective device and need carry out the power-equipment of regular interlock test (static or dynamically interlock test) and the protection of device and equipment thereof.Method of the present invention had both been conducive to stand-by boiler interlock test and had tested rapidly, was conducive to again the equipment that the protection of interlock test process participates in test.

Description

A kind of method of stand-by boiler interlock test of proterctive equipment
Technical field
The present invention relates to the stand-by boiler interlock test method of a kind of proterctive equipment (boiler accessory machinery).
Background technology
Relevant " regulation " regulation, safety attachment and the interlocking protective device of every platform boiler want periodic maintenance and test, to ensure that it is sensitive, reliable.In order to ensure the safe and reliable of stand-by boiler and close rule use, car test (also must do before unplanned urgent kindling) jumped by the interlocking that monthly regularly will do stand-by boiler, and because stand-by boiler back-up period is longer, the frequency therefore doing interlock test is also more.No matter be do Static and dynamic interlock test, interlock test condition: induced draft fan, pressure fan, fire grate, feeder should stop in automatic trip when arbitrary parameter arrives interlocking jumping car parameter.If but boiler induced-draft fan and pressure fan adopt frequency conversion fan (widely using), when stand-by boiler does regularly interlocking jumping car test, need to restart after interlock of fan stop jumping, and now blower fan stop jumping rear fan shaft coupling still at high-speed cruising, generally need to wait for that blower fan just can restart after stopping, otherwise can because of blower fan do not stop completely time, produce a back electromotive force, frequency converter overload is caused to trip, simultaneously because the tripping operation of fan frequency converter overload causes the serviceable life of the damage of blower fan being reduced to blower fan, Frequent Troubles, cause restarting increasing when car test jumped by interlocking and operate the frequency.
Summary of the invention
The object of this invention is to provide a kind of stand-by boiler interlock test method of proterctive equipment simple to operation (boiler accessory machinery); the method of operating of this proterctive equipment (boiler accessory machinery) is good by practical application verification the verifying results; both be conducive to stand-by boiler interlock test to test rapidly, be conducive to again the equipment that the protection of interlock test process participates in test.
When doing stand-by boiler interlock test, with circuit signal source feedback interlocking pre-set parameter, have nothing to do with fans load, only need to start blower fan and participate in testing.
When the present invention is achieved in that stand-by boiler regular interlock test, by adjusting the aperture that (can on the spot or program control adjustment) participates in interlock test equipment in advance, order participates in the equipment not on-load of interlock test, avoids stand-by boiler to interlock and jumps when car is tested the damage of correlation test equipment and infringement.
When doing stand-by boiler interlock test, induced draft fan aperture is adjusted to " 0 ", pressure fan, fire grate, feeder adjustment aperture is " 0 ", stack damper is opened 10% and is carried out regular interlock test, i.e. pressure fan, induced draft fan, fire grate, feeder not on-load, so just can avoid making stand-by boiler interlocking and jump when car is tested the damage of correlation test equipment or infringement.
The present invention is applicable to (relevant " regulation " specify) possesses interlocking protective device and need carry out power-equipment and the device of regular interlock test (static or dynamically interlock test).Method of operating of the present invention is good by practical application verification the verifying results, has both been conducive to stand-by boiler interlock test and has tested rapidly, is conducive to again the equipment that the protection of interlock test process participates in test.
Accompanying drawing explanation
Fig. 1 is the stand-by boiler interlock test method of operating schematic diagram of proterctive equipment of the present invention.
In figure, 1-boiler induced-draft fan, 2-boiler fan, 3-boiler grate motor, 4-coal feeder of boiler.
Embodiment
As shown in Figure 1, when stand-by boiler is regularly interlocked, by interlocking direction successively on the spot or program control adjustment participate in the aperture of interlock test equipment, specifically be adjusted to boiler induced-draft fan (1) aperture for " 0 ", boiler fan (2) aperture is " 0 ", and boiler grate motor (3) aperture is " 0 ", and coal feeder of boiler (4) aperture is " 0 ", the aperture adjustment completing participation interlock test equipment when stand-by boiler is regularly interlocked is arranged, and stack damper is opened 10% and carried out regular interlock test.Like this, to the damage of correlation test equipment and infringement when stand-by boiler interlocking jumping car can be avoided to test, the object of protection interlock test system and correlation test equipment is reached.

Claims (2)

1. the stand-by boiler interlock test method of a proterctive equipment; it is characterized in that by adjusting the aperture participating in interlock test equipment in advance; order participate in interlock test equipment not on-load carry out interlock test again; to the damage and the infringement that participate in interlock test equipment when avoiding stand-by boiler interlock test, the equipment of described participation interlock test is pressure fan, induced draft fan, fire grate, feeder.
2. the stand-by boiler interlock test method of proterctive equipment according to claim 1; it is characterized in that when doing stand-by boiler interlock test, induced draft fan aperture being adjusted to " 0 "; pressure fan, fire grate, feeder adjustment aperture is " 0 "; i.e. pressure fan, induced draft fan, fire grate, feeder not on-load, stack damper is opened 10% and is carried out regular interlock test.
CN201210588134.0A 2012-12-29 2012-12-29 A kind of method of stand-by boiler interlock test of proterctive equipment Active CN103033389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210588134.0A CN103033389B (en) 2012-12-29 2012-12-29 A kind of method of stand-by boiler interlock test of proterctive equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210588134.0A CN103033389B (en) 2012-12-29 2012-12-29 A kind of method of stand-by boiler interlock test of proterctive equipment

Publications (2)

Publication Number Publication Date
CN103033389A CN103033389A (en) 2013-04-10
CN103033389B true CN103033389B (en) 2015-12-23

Family

ID=48020514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210588134.0A Active CN103033389B (en) 2012-12-29 2012-12-29 A kind of method of stand-by boiler interlock test of proterctive equipment

Country Status (1)

Country Link
CN (1) CN103033389B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1919363A1 (en) * 1968-04-19 1969-10-30 Westinghouse Electric Corp Control system for steam turbines
CN101602492A (en) * 2009-06-19 2009-12-16 瓮福(集团)有限责任公司 Acid-making acid circulating pump of sulphuric acid device and main blower interlocking method
CN101929882A (en) * 2009-06-19 2010-12-29 中冶成工上海五冶建设有限公司 Debugging method of dry-quenching automatic meter system
CN202484964U (en) * 2011-11-01 2012-10-10 嘉兴市特种设备检测院 Automatic control equipment of biomass boiler
CN102820656A (en) * 2012-08-25 2012-12-12 华北电力大学(保定) Method for jointly scheduling power generation load by using wind power generation unit and thermal power generation unit

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009080426A (en) * 2007-09-27 2009-04-16 Canon Inc Image forming apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1919363A1 (en) * 1968-04-19 1969-10-30 Westinghouse Electric Corp Control system for steam turbines
CN101602492A (en) * 2009-06-19 2009-12-16 瓮福(集团)有限责任公司 Acid-making acid circulating pump of sulphuric acid device and main blower interlocking method
CN101929882A (en) * 2009-06-19 2010-12-29 中冶成工上海五冶建设有限公司 Debugging method of dry-quenching automatic meter system
CN202484964U (en) * 2011-11-01 2012-10-10 嘉兴市特种设备检测院 Automatic control equipment of biomass boiler
CN102820656A (en) * 2012-08-25 2012-12-12 华北电力大学(保定) Method for jointly scheduling power generation load by using wind power generation unit and thermal power generation unit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宁夏300MW火电机组仿真机增加锅炉静态总联锁试验模型;刘奋群等;《西北电力技术》;19970430(第2期);第25-28,44页 *
锅炉辅机大联锁存在的问题及电气回路改进方案;刘云萍等;《成才之路》;20071231(第34期);第115页 *

Also Published As

Publication number Publication date
CN103033389A (en) 2013-04-10

Similar Documents

Publication Publication Date Title
WO2010134987A8 (en) Systems and method for determining carbon credits utilizing two-way devices that report power usage data
KR20120055556A (en) A protection arrangement of an electric power system
US11186178B2 (en) Monitoring system, server, terminal device, monitoring method, and storage medium
CN103807982A (en) Air conditioner
CN104197367A (en) Primary air fan RB optimal control method based on mother tube pressure
CN107255268A (en) A kind of primary air fan RB control methods based on primary air fan system state monitoring
CN103033389B (en) A kind of method of stand-by boiler interlock test of proterctive equipment
CN111263892B (en) Method, device and equipment for detecting functions of adapter and storage medium
US20160201501A1 (en) Method for testing an overspeed protection apparatus of a single-shaft system
CN103090353A (en) Method and equipment for automatically controlling biomass boiler
CN202093147U (en) Fault detection device of alternating current motor
JP2008035619A (en) Determination method for individual operation of dispersed power system
CN113415576B (en) Method, device and system for judging jamming fault of coal feeder
CN103499958A (en) Method and device for controlling MFT (Main Fuel Trip)
EP2860837A1 (en) Virtual circuit breaker
CN202785145U (en) Elevator traction system protection device based on current detection
JP5496246B2 (en) Power storage control system and power storage control method
JP5311437B2 (en) Stabilized power supply
KR102247917B1 (en) Safety accident prevention photovoltaics generation system related to ess
CN107238102A (en) A kind of primary air fan RB control methods under full load mode
JP4845830B2 (en) Fuel switching command output method for thermal power generation facilities
JP6135591B2 (en) Charger
CN110416993A (en) A kind of anticreep fire prevention low-voltage distribution system
RU2397595C1 (en) Control method of unsuccessful automatic repeated fault close-in, and further failure of shutoff of sectionalising circuit breaker in power transmission line
CN202996621U (en) Switch for disconnecting power automatically when power-off condition occurs first and then power-on condition occurs later

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant