CN103032629B - 一种自密实加固与防渗先导管顶管装置及其使用方法 - Google Patents

一种自密实加固与防渗先导管顶管装置及其使用方法 Download PDF

Info

Publication number
CN103032629B
CN103032629B CN201210585427.3A CN201210585427A CN103032629B CN 103032629 B CN103032629 B CN 103032629B CN 201210585427 A CN201210585427 A CN 201210585427A CN 103032629 B CN103032629 B CN 103032629B
Authority
CN
China
Prior art keywords
conduit
compacted
pilot pipe
plate
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210585427.3A
Other languages
English (en)
Other versions
CN103032629A (zh
Inventor
黎永索
阳军生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Hunan City University
Original Assignee
Central South University
Hunan City University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, Hunan City University filed Critical Central South University
Priority to CN201210585427.3A priority Critical patent/CN103032629B/zh
Publication of CN103032629A publication Critical patent/CN103032629A/zh
Application granted granted Critical
Publication of CN103032629B publication Critical patent/CN103032629B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种自密实加固与防渗先导管顶管装置及其使用方法,本发明沿先导管前端内侧全环向或局部布置有挤密板,挤密板可以绕转动轴转动,改变挤密板与先导管之间的夹角,挤密板与先导管之间存在楔形空隙,内设可沿先导管纵向移动的楔形杆,楔形杆上焊接的螺杆穿过固定板内的设置内丝的螺孔,拧动螺杆上的螺母,可以使楔形杆沿先导管内纵向移动,挤密板与先导管之间的夹角范围为1°~15°。这种自密实加固与防渗先导管顶管装置及其使用方法的优点是在渗水地层或软土地层中进行大口径的顶管过程中不降水,通过挤密板挤密先导管内的土体以实现加固与防渗的目的,施工安全性好,地表沉降容易控制。

Description

一种自密实加固与防渗先导管顶管装置及其使用方法
技术领域
本发明涉及地下工程施工领域,特别涉及一种自密实加固与防渗先导管顶管装置及其使用方法。
背景技术
在市政及地下工程建设领域,顶管法施工应用范围越来越广泛。在渗水地层和软土地层中进行大口径顶管施工时,采用人工或半机械法顶管作业时,在顶管前端很容易出现渗水和土方垮塌,给顶管施工带来风险,而通常采取注浆的方法对顶管前端土方预加固时,不仅增加了工程直接成本和延长了施工周期,而且前期预加固注浆的浆液容易将顶管裹住,造成后续顶管顶力急剧增加和顶管变形严重。大口径顶管过程中降水后再顶管施工,容易引起地层沉降,造成地下管线破坏和周边建筑的不均匀沉降和破坏。
发明内容
本发明的目的是在顶管过程中,为了实现大口径顶管作业时不降水,缩短顶管作业的工期,确保大口径顶管作业的安全,提供一种自密实加固与防渗先导管顶管装置及其使用方法,解决顶管施工过程中不降水及先导管管头前端或管内的土体自密实加固与和防渗的问题。
为实现上述目的,本发明采用如下技术方案:
一种自密实加固与防渗先导管顶管装置,沿先导管前端内侧全环向或局部布置有挤密板,挤密板前端有转动轴孔,转动轴穿过转动轴孔与先导管刃口处的转动轴支座连接;挤密板可以绕转动轴转动,改变挤密板与先导管之间的夹角,挤密板后端设置有限位螺栓,限位螺栓位置所对应的先导管上有固定板,固定板焊接在先导管内壁,固定板上有限位槽,限位螺栓可沿限位槽内移动;挤密板与先导管之间存在楔形空隙,内设可沿先导管纵向移动的楔形杆,楔形杆上焊接的螺杆穿过固定板内的设置内丝的螺孔,拧动螺杆上的螺母,可以使楔形杆沿先导管内纵向移动。
挤密板可以沿先导管前端内侧全环向布置或局部布置。
先导管前端外侧可以设有加强环。
本发明的工作过程如下:
在大口径顶管的先导管内设置可以组合安装和转动的挤密板,拧动调节楔形杆上的螺帽,使楔形杆沿先导管纵向移动,以调节挤密板与先导管之间的夹角,将先导管顶入地层一定长度,先导管内的前段土体在挤密板作用下被挤密,地层的渗透性降低,实现了在管内土方开挖过程中自密实加固与防渗目的,使大口径顶管作业不降水,并确保后段土体在开挖过程中的安全和前段土体的稳定性,同时降低进入挤密板的后段土体的开挖难度。先导管内的后段土体脱离了挤密板后,对后段土体开挖,在开挖后段土体过程中,可同时进行顶管,实现顶管的连续性作业。
挤密板与先导管之间的夹角该夹角范围为1°~15°,根据地层条件和施工经验,调整该夹角数值在1°~15°之间变动;拧动调节楔形杆上的螺帽,使楔形杆沿先导管纵向移动,使楔形杆前端分别与挤密板、先导管接触,拧紧螺杆,固定挤密板,然后开始顶管。
挤密板与先导管之间的夹角需根据先导管的直径、渗水地层或软土地层的特性确定,顶管过程中可以调节挤密板与先导管之间的夹角,以适应不同的地层条件,实现自密实加固与防渗的目的。当地层比较密实或地层渗透性较小时,夹角取1°,当地层比较松散或地层渗透性较大时,夹角取15°。
本发明在大口径顶管的先导管内安装了可拆卸并可以调节夹角的管内土体挤密板,在渗水地层或软土地层中进行大口径的顶管过程中,利用管内挤密板对先导管内的土体进行挤密与加固,降低管内土体渗透性,实现顶管作业过程中不降水、土体自密实加固和防渗的目的。
(1)    大口径顶管过程中不降水,降低了施工成本,保护了环境。
(2)      通过该挤密板对先导管内土体挤密和加固,可以阻止水从顶管前端向管内渗透,确保了土方开挖过程中先导管内土体的稳定,为土方的安全开挖创造了条件。
(3)      通过该挤密板对先导管内土体挤密和加固,可实现顶管作业的连续施工,缩短施工周期,提高了工效,节约了成本。
(4)      通过该挤密板对先导管内土体挤密和加固,施工安全性好,地表沉降容易控制,具有很好的环境效益和社会效益。
附图说明:
图1是本发明的纵向剖面图;
图2是本发明挤密板的示意图;
图3是本发明楔形杆的示意图;
图4是本发明固定板的示意图;
图5是本发明挤密板全环向布置示意图;
图6是本发明挤密板局部布置的示意图。
具体实施方式
实施例1  参见图1~图6,本发明自密实防渗先导管顶管装置,沿先导管1前端内侧全环向或局部布置有挤密板5,挤密板5前端有转动轴孔6,转动轴7穿过转动轴孔6与先导管刃口3处的转动轴支座4连接;挤密板5可以绕转动轴7转动,改变挤密板5与先导管1之间的夹角,挤密板5后端设置有限位螺栓8,限位螺栓8位置所对应的先导管1上有固定板12,固定板12焊接在先导管1内壁,固定板12上有限位槽13,限位螺栓8可沿限位槽13内移动;挤密板5与先导管1之间存在楔形空隙9,内设可沿先导管纵向移动的楔形杆10,楔形杆10上焊接的螺杆11穿过固定板12内的设置内丝的螺孔14,拧动螺杆11上的螺母,可以使楔形杆10沿先导管1内纵向移动。
挤密板5沿先导管1前端内侧全环向布置或局部布置。
先导管1前端外侧设有加强环2。
在大口径顶管的先导管1内设置可以组合安装和转动的挤密板5,拧动调节楔形杆5上的螺帽,使楔形杆5沿先导管1纵向移动,调节挤密板5与先导管1之间的夹角,该夹角范围为1°~15°,当地层比较密实或地层渗透性较小时,夹角取1°,当地层比较松散或地层渗透性较大时,夹角取15°,根据地层条件和施工经验,调整该夹角数值在1°~15°之间变动;拧动调节楔形杆11上的螺帽,使楔形杆11沿先导管1纵向移动,使楔形杆11前端分别与挤密板5、先导管1接触,将先导管顶入地层一定长度,先导管1内的前段土体在挤密板5作用下被挤密,地层的渗透性降低,实现了在管内土方开挖过程中自密实加固与防渗目的,使大口径顶管作业不降水,并确保后段土体在开挖过程中的安全和前段土体的稳定性,同时降低进入挤密板5的后段土体的开挖难度。先导管1内的后段土体脱离了挤密板5后,对后段土体开挖,在开挖后段土体过程中,可同时进行顶管,实现顶管的连续性作业。

Claims (3)

1.一种自密实加固与防渗先导管顶管装置,其特征在于:沿先导管(1)前端内侧全环向或局部布置有挤密板(5),挤密板(5)前端有转动轴孔(6),转动轴(7)穿过转动轴孔(6)与先导管刃口(3)处的转动轴支座(4)连接;挤密板(5)可以绕转动轴(7)转动,改变挤密板(5)与先导管(1)之间的夹角,挤密板(5)后端设置有限位螺栓(8),限位螺栓(8)位置所对应的先导管(1)上有固定板(12),固定板(12)焊接在先导管(1)内壁,固定板(12)上有限位槽(13),限位螺栓(8)可沿限位槽(13)内移动;挤密板(5)与先导管(1)之间存在楔形空隙(9),内设可沿先导管纵向移动的楔形杆(10),楔形杆(10)上焊接的螺杆(11)穿过固定板(12)内的设置内丝的螺孔(14),拧动螺杆(11)上的螺母,可以使楔形杆(10)沿先导管(1)内纵向移动。
2.根据权利要求1所述的一种自密实加固与防渗先导管顶管装置,其特征在于:先导管(1)前端外侧设有加强环(2)。
3. 一种根据权利要求1所述的自密实加固与防渗先导管顶管装置的使用方法,其特征在于:拧动调节楔形杆上的螺帽,使楔形杆沿先导管纵向移动,楔形杆前端分别与挤密板、先导管接触,挤密板与先导管之间的夹角该夹角范围为1°~15°。
CN201210585427.3A 2012-12-30 2012-12-30 一种自密实加固与防渗先导管顶管装置及其使用方法 Expired - Fee Related CN103032629B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210585427.3A CN103032629B (zh) 2012-12-30 2012-12-30 一种自密实加固与防渗先导管顶管装置及其使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210585427.3A CN103032629B (zh) 2012-12-30 2012-12-30 一种自密实加固与防渗先导管顶管装置及其使用方法

Publications (2)

Publication Number Publication Date
CN103032629A CN103032629A (zh) 2013-04-10
CN103032629B true CN103032629B (zh) 2014-09-10

Family

ID=48019847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210585427.3A Expired - Fee Related CN103032629B (zh) 2012-12-30 2012-12-30 一种自密实加固与防渗先导管顶管装置及其使用方法

Country Status (1)

Country Link
CN (1) CN103032629B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106369224B (zh) * 2016-12-07 2018-12-11 湖南城市学院 顶管机工具管及应用
CN110500122B (zh) * 2019-08-22 2024-04-12 郑州市市政工程总公司 顶管施工洞口防水加固结构及顶管施工洞口防水加固方法
CN110608044B (zh) * 2019-10-11 2024-06-04 安徽唐兴装备科技股份有限公司 一种矩形顶管机的纠偏引导机构
CN111335912B (zh) * 2019-12-17 2022-03-11 中建水务环保有限公司 湿陷性黄土地区软土地基大管径机械顶管施工工艺
CN113173611A (zh) * 2021-06-04 2021-07-27 上海蓝幸环保科技有限公司 一种便于安装的污水处理装置

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4329077A (en) * 1980-10-14 1982-05-11 Allied Steel & Tractor Products, Inc. Underground pipe pusher
EP0089798A2 (en) * 1982-03-22 1983-09-28 Bralorne Resources Limited Improved casing hanger
WO1993016311A1 (en) * 1992-02-10 1993-08-19 Belman Production A/S Pipe joint member for assembling district heating pipes
US5431459A (en) * 1991-02-08 1995-07-11 Npc, Inc. Band with slotted wedge cams
CN2795603Y (zh) * 2005-04-25 2006-07-12 武汉理工大学 具有玻璃钢连接套环功能的玻璃钢夹砂顶管
CN101619793A (zh) * 2009-07-22 2010-01-06 劳锦华 活动扣压式薄壁金属管管接件
CN101834423A (zh) * 2010-04-28 2010-09-15 唐兆连 一种大口径防渗电缆顶管
CN102518873A (zh) * 2011-12-29 2012-06-27 中铁上海工程局市政工程有限公司 一种采用顶拉结合在软土中铺设大直径管道的方法
CN203010002U (zh) * 2012-12-30 2013-06-19 中南大学 一种自密实加固与防渗先导管顶管装置

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4329077A (en) * 1980-10-14 1982-05-11 Allied Steel & Tractor Products, Inc. Underground pipe pusher
EP0089798A2 (en) * 1982-03-22 1983-09-28 Bralorne Resources Limited Improved casing hanger
US5431459A (en) * 1991-02-08 1995-07-11 Npc, Inc. Band with slotted wedge cams
WO1993016311A1 (en) * 1992-02-10 1993-08-19 Belman Production A/S Pipe joint member for assembling district heating pipes
CN2795603Y (zh) * 2005-04-25 2006-07-12 武汉理工大学 具有玻璃钢连接套环功能的玻璃钢夹砂顶管
CN101619793A (zh) * 2009-07-22 2010-01-06 劳锦华 活动扣压式薄壁金属管管接件
CN101834423A (zh) * 2010-04-28 2010-09-15 唐兆连 一种大口径防渗电缆顶管
CN102518873A (zh) * 2011-12-29 2012-06-27 中铁上海工程局市政工程有限公司 一种采用顶拉结合在软土中铺设大直径管道的方法
CN203010002U (zh) * 2012-12-30 2013-06-19 中南大学 一种自密实加固与防渗先导管顶管装置

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
"顶管施工隧道扰动区土体变形计算";施成华, 黄林冲;《中南大学学报》;20050426;第36卷(第2期);第323页至第324页 *
施成华, 黄林冲."顶管施工隧道扰动区土体变形计算".《中南大学学报》.2005,第36卷(第2期),
程翠林."隧洞内PCCP管安装与混凝土结构施工技术".《水利水电工程》.2009,第31卷(第11期),
程翠林."隧洞内PCCP管安装与混凝土结构施工技术".《水利水电工程》.2009,第31卷(第11期), *

Also Published As

Publication number Publication date
CN103032629A (zh) 2013-04-10

Similar Documents

Publication Publication Date Title
CN103032629B (zh) 一种自密实加固与防渗先导管顶管装置及其使用方法
CN106402490B (zh) 基于钢套头工具管的粉砂土地层顶管顶进施工方法
CN102777189B (zh) 一种超长管幕无中继间顶进施工装置及方法
CN102277898B (zh) 排水管顶进施工方法
CN104295814B (zh) 一种内壁带螺旋复合加强环的地下钢混结构管道及其制作方法
CN101737005B (zh) 一种用于套取锚索的钻具及跟管套取锚索的施工方法
CN204253056U (zh) 一种盾构机进出洞洞口加固结构
CN105201518A (zh) 一种大直径泥水平衡盾构洞内接收解体方法
CN202970719U (zh) 一种超长管幕无中继间顶进施工装置
CN105114698A (zh) 过江相向顶管对接施工工艺及特制机头
CN106369224B (zh) 顶管机工具管及应用
CN104481549A (zh) 一种用于阻断涌水涌沙的膨润土注入方法及系统
CN203010002U (zh) 一种自密实加固与防渗先导管顶管装置
CN203855990U (zh) 一种大降深管井封堵结构
CN104652383B (zh) 尾矿库坝体自流排水装置
CN101575855A (zh) 非取土引孔预应力管桩或预制方桩沉桩工艺
CN104074195A (zh) 一种通过水平注浆控制基坑外地面沉降的方法
CN103527205A (zh) 盾构水下斜交进洞施工方法
CN204187155U (zh) 一种内壁带螺旋复合加强环的地下钢混结构管道
CN102758443B (zh) 一种适用于新老管改接的新型围护结构和施工方法
CN204343286U (zh) 一种钢管桩支架
CN203175568U (zh) 电缆隧道用顶管掘进机内部进排泥控制机构
CN204199288U (zh) 一种管桩纠偏校正装置
CN203099080U (zh) 埋地煤气管道的保护装置
CN114754194A (zh) 一种调蓄池顶管安装装置及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HUNAN CITY UNIVERSITY

Effective date: 20140711

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Yongsuo

Inventor after: Yang Junsheng

Inventor before: Li Yongsuo

Inventor before: Xiao Chao

Inventor before: Yang Junsheng

Inventor before: Zhang Keneng

Inventor before: Peng Limin

Inventor before: Zeng Wanghui

Inventor before: Huang Changbo

Inventor before: Zhang Xuemin

Inventor before: Ma Yanna

Inventor before: Chen Xin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI YONGSUO YANG JUNSHENG ZHANG KENENG PENG LIMIN CENG WANGHUI HUANG CHANGBO ZHANG XUEMIN MA YANNA CHEN XIN XIAO CHAO TO: LI YONGSUO YANG JUNSHENG

TA01 Transfer of patent application right

Effective date of registration: 20140711

Address after: Yuelu District City, Hunan province 410083 Changsha left ridge Lushan Road No. 932

Applicant after: Central South University

Applicant after: Hunan City University

Address before: Yuelu District City, Hunan province 410083 Changsha left ridge Lushan Road No. 932

Applicant before: Central South University

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140910

Termination date: 20151230

EXPY Termination of patent right or utility model