CN102995700A - Power generating and pumping system/device for water piping manifold erected on high-speed railway subgrade - Google Patents

Power generating and pumping system/device for water piping manifold erected on high-speed railway subgrade Download PDF

Info

Publication number
CN102995700A
CN102995700A CN2012105145671A CN201210514567A CN102995700A CN 102995700 A CN102995700 A CN 102995700A CN 2012105145671 A CN2012105145671 A CN 2012105145671A CN 201210514567 A CN201210514567 A CN 201210514567A CN 102995700 A CN102995700 A CN 102995700A
Authority
CN
China
Prior art keywords
water
high ferro
ferro roadbed
roadbed
aqueduct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105145671A
Other languages
Chinese (zh)
Inventor
李宏江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012105145671A priority Critical patent/CN102995700A/en
Publication of CN102995700A publication Critical patent/CN102995700A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/50Hydropower in dwellings

Landscapes

  • Sewage (AREA)

Abstract

The invention provides a power generating and pumping system/device for a water piping manifold erected on a high-speed railway subgrade, which is formed by assembling the high-speed railway subgrade, a super drain pipe, a valve, a hydrogenerator, an electric power water suction pump, a mountain and plateau water diversion point, a water storage reservoir and the like. The system/device provided by the invention is used for achieving the predetermined aims of water diversion and delivery, power generation, water pumping and water delivery by utilizing the natural geographical advantage of the high-speed railway subgrade on a mountain or plateau so as to be very suitable for popularization and application in areas with proper conditions at home and abroad.

Description

The aqueduct net generating power and pumping water system and device that the high ferro roadbed sets up
Technical field: a kind of ad hoc diversion, draw water, water supply line net system, especially relate to the aqueduct net generating power and pumping water system and device that the high ferro roadbed sets up.
Technical background: adopt pipeline pressure except city and rural area, small towns, part mountain area both at home and abroad at present and carry tap water and quote mountain spring water and do the drinking water, most farming, forestry, animal husbandry, sideline production and fishery waters all are that the method that adopts trench water channel, river course gravity flow to carry or draw water a upper high position and then adopt the open channel gravity flow to carry is carried the water source.Because these two kinds of water-carriage modes exist shortcomings, namely at a slow speed, seepage, polluted source, conveying capacity is few, fed distance is short etc., especially take mountain region, arable land, forest land, river course, premises, also destroy to some extent the ecological homeostasis and cause the geological hazards such as soil erosion, mud-rock flow.In order to address the above problem, it is main purpose of the present invention.
Technical scheme: in order to realize high ferro roadbed a thousand li diversion aqueduct net system engineering construction object.Embodiment of the present invention are: at first adopt the super drain water piping with drag reduction effect, in the bottom of high ferro roadbed or in the roadbed both sides, by lifting or take up fixed form, along high ferro roadbed straight line, horizontal line install connect to form diversion water delivery supervisor net after, connect respectively again high ferro roadbed branch line valve aqueduct and water pipeline everywhere and branching valve everywhere along the line and consist of scale formula water delivery network shape grid system.At last in the high mountain highway section of high ferro roadbed, or the selected water point in the highway section of highlands, and according to design and construction diversion connector, controlled valve is installed, build block water water storage Ba Ku after, the declaration of the remote diversion aqueduct of a kind of high ferro roadbed net system and device is set up and is finished.But scheme two, there is not the water of drainage such as location, high ferro roadbed aqueduct net their location, or the drainage water yield is on the low side, when not satisfying water demand, can adopt selection nearby peripheral rivers and lakes to build the water pumping power water-carriage mode be high ferro roadbed water transfer pipe network water services.But the water delivery method of drawing water needs the consumption of power energy, for solving this problem, poor pressure, the gravitional force of high water level that can adopt plateau and mountains drainage water to exist drives the hydraulic generator unit that is installed on the position, the lowland rear water that generates electricity first, and the electric across-the-line starting electricity water pump of being generated, high ferro roadbed aqueduct net is transported to the various places use on the extraction water source, lowland.
Operating principle: the principle of the invention mainly contains three: one, utilize the high ferro roadbed to be basic pipe laying, removed occupation of land and the construction investment of setting up the pipe-line roadbed from; Two, utilize the elevation advantage of plateau and mountains and high ferro roadbed, successfully realized the purpose of generating, gravity flow water delivery.Three, utilize the function of the intrinsic attenuating current of super drain water piping and the adhesion resistance between the aqueduct, and utilize the power supply of diversion and power successfully to drive again the predetermined purpose that electric pump draws water and exports.
Social benefit: the present invention utilizes natural geographical conditions, successfully realize the purpose of a thousand li diversion and power, water, as all being promoted use at home and abroad, will bring glad tidings to water-deficient area, users, particularly to the sustainable development of ecological environment, has immeasurable realistic meaning.

Claims (2)

1. the high ferro roadbed aqueduct net generating of setting up, the pumping system device, comprise plateau high mountain water point, the high ferro roadbed, super drain water piping and common pipe valve, the hydraulic generator unit, the electric power water pump station, the compositions such as lowland user's aqueduct net, concrete connectivity scenario is: at first adopt the super drain water piping with drag reduction effect, in the bottom of high ferro roadbed or in the roadbed both sides, by lifting or take up fixed form, along high ferro roadbed straight line, after the horizontal line installation connects to form diversion water delivery supervisor net, connect respectively again high ferro roadbed branch line valve aqueduct and water pipeline everywhere and branching valve formation scale formula water delivery network shape grid system everywhere along the line.At last in the high mountain highway section of high ferro roadbed, or the selected water point in the highway section of highlands, and according to design and construction diversion connector, controlled valve is installed, build block water water storage Ba Ku after, the declaration of the remote diversion aqueduct of a kind of high ferro roadbed net system and device is set up and is finished.
2. described device is characterized in that according to claim 1: but scheme two, there is not the water of drainage such as location, high ferro roadbed aqueduct net their location, or the drainage water yield is on the low side, when not satisfying water demand, can adopt selection nearby peripheral rivers and lakes to build the water pumping power water-carriage mode be high ferro roadbed water transfer pipe network water services.But the water delivery method of drawing water needs the consumption of power energy, for solving this problem, poor pressure, the gravitional force of high water level that can adopt plateau and mountains drainage water to exist drives the hydraulic generator unit that is installed on the position, the lowland rear water that generates electricity first, and the electric across-the-line starting electricity water pump of being generated, high ferro roadbed aqueduct net is transported to the various places use on the extraction water source, lowland.
CN2012105145671A 2012-12-05 2012-12-05 Power generating and pumping system/device for water piping manifold erected on high-speed railway subgrade Pending CN102995700A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105145671A CN102995700A (en) 2012-12-05 2012-12-05 Power generating and pumping system/device for water piping manifold erected on high-speed railway subgrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105145671A CN102995700A (en) 2012-12-05 2012-12-05 Power generating and pumping system/device for water piping manifold erected on high-speed railway subgrade

Publications (1)

Publication Number Publication Date
CN102995700A true CN102995700A (en) 2013-03-27

Family

ID=47924755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105145671A Pending CN102995700A (en) 2012-12-05 2012-12-05 Power generating and pumping system/device for water piping manifold erected on high-speed railway subgrade

Country Status (1)

Country Link
CN (1) CN102995700A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410189A (en) * 2013-08-30 2013-11-27 广西玉林宏江能源科技有限公司 Novel method and device for diverting water in siphoning mode through pipelines on Tibet plateau to feed people in China
WO2016025201A1 (en) * 2014-08-14 2016-02-18 Hontiveros Jackie B Systems and methods of elevated drainage for flood control and water conservation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3003772B2 (en) * 1995-12-22 2000-01-31 株式会社栗本鐵工所 Water pipe bridge with emergency water storage function
CN1380256A (en) * 2002-03-17 2002-11-20 李吴中威 Method for preventing area-source pollution in the projects for diverting water from the south to the north and its structure system
CN201901930U (en) * 2010-12-10 2011-07-20 中国海洋大学 Open channel type highway pavement rainwater removal control device
CN102330634A (en) * 2010-08-30 2012-01-25 李宏江 Novel device and novel method for introducing water to low parts through plateau alpine pipelines for electric generation and water consumption and reducing pipeline flowing water friction resistance

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3003772B2 (en) * 1995-12-22 2000-01-31 株式会社栗本鐵工所 Water pipe bridge with emergency water storage function
CN1380256A (en) * 2002-03-17 2002-11-20 李吴中威 Method for preventing area-source pollution in the projects for diverting water from the south to the north and its structure system
CN102330634A (en) * 2010-08-30 2012-01-25 李宏江 Novel device and novel method for introducing water to low parts through plateau alpine pipelines for electric generation and water consumption and reducing pipeline flowing water friction resistance
CN201901930U (en) * 2010-12-10 2011-07-20 中国海洋大学 Open channel type highway pavement rainwater removal control device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410189A (en) * 2013-08-30 2013-11-27 广西玉林宏江能源科技有限公司 Novel method and device for diverting water in siphoning mode through pipelines on Tibet plateau to feed people in China
WO2016025201A1 (en) * 2014-08-14 2016-02-18 Hontiveros Jackie B Systems and methods of elevated drainage for flood control and water conservation

Similar Documents

Publication Publication Date Title
CN104060645A (en) Karst sloping field efficient water collection irrigation method and irrigation system
CN203939076U (en) The efficient water collecting irrigation system of a kind of karst sloping field
CN104452650A (en) Lake water flow distribution irrigation system
CN106613749B (en) Farmland rainwater collection, storage, drainage and irrigation-saving system
CN102330634A (en) Novel device and novel method for introducing water to low parts through plateau alpine pipelines for electric generation and water consumption and reducing pipeline flowing water friction resistance
CN102995700A (en) Power generating and pumping system/device for water piping manifold erected on high-speed railway subgrade
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN103651045B (en) Communicating vessels efficient water-saving irrigation water resource system
CN205276229U (en) Irrigation and water conservancy circulation irrigation and drainage facilities
CN204662385U (en) A kind of power station Tao River ecological flow control structure
CN102146693A (en) Comprehensive utilization method for rainwater energy resource
CN205954435U (en) People moving walkways complex pipe network and drainage system U shape ditch
CN104088267B (en) A kind of method of regional partition type comprehensive regulation Desert Sand dust storm
CN103758176A (en) Roof rainwater collection system
CN207244784U (en) A kind of villages and small towns sewage network multiple spot collects pressurized feeding system
CN208686517U (en) Multistage hydroelectric generating system in a kind of diversion works
CN202451974U (en) Anti-floating structure of buried pipeline
CN204080925U (en) A kind of karst Pipeline Water water intake system
CN102518542B (en) Flowing water louvered power machine
CN201924397U (en) Underground water and rainwater mixing collector
CN204343255U (en) A kind of canal system hydraulic engineering is by the structure of high drop cheuch
CN204715208U (en) A kind of hydrocone type highway bridge runoff drainage system
CN203729262U (en) Concrete ecosystem ball for use in communicated irrigation
CN203087134U (en) Novel farmland irrigation
CN202304106U (en) Vertical single-S-shaped heat exchanger for ground source heat pump

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130327