CN102989781A - Automatic control technology for head positioning of laying head of high-speed wire mill - Google Patents

Automatic control technology for head positioning of laying head of high-speed wire mill Download PDF

Info

Publication number
CN102989781A
CN102989781A CN2012101919461A CN201210191946A CN102989781A CN 102989781 A CN102989781 A CN 102989781A CN 2012101919461 A CN2012101919461 A CN 2012101919461A CN 201210191946 A CN201210191946 A CN 201210191946A CN 102989781 A CN102989781 A CN 102989781A
Authority
CN
China
Prior art keywords
laying head
head
speed
automatic control
laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101919461A
Other languages
Chinese (zh)
Inventor
邢峥嵘
张精
王力平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Iron and Steel Group Co Ltd
Inner Mongolia Baotou Steel Union Co Ltd
Original Assignee
Baotou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Iron and Steel Group Co Ltd filed Critical Baotou Iron and Steel Group Co Ltd
Priority to CN2012101919461A priority Critical patent/CN102989781A/en
Publication of CN102989781A publication Critical patent/CN102989781A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Winding, Rewinding, Material Storage Devices (AREA)

Abstract

The invention discloses an automatic control technology for head positioning of a laying head of a high-speed wire mill, which belongs to the technical field of automatic control. In the automatic control technology, a PLC (Programmable Logical Controller), an HMI (Human Machine Interface) operation panel, a T400 template, a high-speed counting module (HSC), a thermal metal detector, a proximity switch and a process monitoring system are adopted. A mature electronic automatic control technology is introduced for automatically controlling head positioning of the laying head of the high-speed wire mill; programs are generated automatically by using the S7-CFC language of SIEMENS, i.e., a continuous function chart; and a powerful prefabricated program library and a standard block of the software, PLC elements ( such as input/output, a timer, a counter, a symbol table and the like) and the characteristics of graphical programming languages are utilized. According to the automatic control technology, delayed shearing and coarse positioning of a flying shear in front of a finishing mill are combined with accelerated positioning of the laying head, so that the defects of high inertia, poor rapidness and large positioning deviations existing in a home-made laying head are overcome, and a process control and system engineering technology for automatic head positioning of the laying head of the high-speed wire mill is developed.

Description

The automatic control technology of high-speed rod-rolling mill Laying head head location
One, affiliated technical field:
Belong to the automatic control technology field, relate to the automated control technology of high-speed rod-rolling mill Laying head head location.
Two, background technology:
One of major product of our factory is high-speed rod, according to the actual production statistics with to the production operation personal investigation, in production process in the past, Laying head 3 to the 5 spiral materials that whenever spue, plant with regard to the head that 1 spiral material is arranged between the roll gap of stelmor roller-way, when serious disorderly volume, can produce accumulation at roller-way, make next root wire rod (2 tons/root steel) can't enter Laying head, for this reason, it is cataclasm to carry out immediately the flying shear shearing, and per tour stelmor roller-way and first group of air-cooled roller-way place behind Laying head, arrange the special messenger to cut useless and arrangement to the wire rod head, every volume is cut useless 1 to 4 circle.So, not only strengthen direct labor's labour intensity, reduced labor productivity, and had a strong impact on the qualification rate of product, increased percent defective.
Spinneret in the high-speed rod-rolling mill Laying head is comprised of a kind of spiral-shaped structure and solenoid.During Laying head work, solenoid is made High Rotation Speed, and when rolled piece out entered Laying head from finishing mill, the spinneret of Laying head was made High Rotation Speed, and rolled piece becomes circular wire rod and falls on the stelmor roller-way through behind the Laying head.
Because the stelmor roller-way of high-speed rod is to be installed side by side by many circular rollers to form, certain interval is arranged between the roller, when finished product wire rod process Laying head, the wire rod head is often planted between the roll gap of stelmor roller-way, cause the 1st section roller-way card line, make driving motor overload tripping operation, cause simultaneously finished wire rod on the stelmor roller-way, disorderly to roll up, cause producing a large amount of waste products of cutting.
Three. summary of the invention:
The automated control technology that the objective of the invention is open high-speed rod-rolling mill Laying head head location to reduce percent defective, increases product percent of pass, reduces labor strength, raises labour productivity.
The technical scheme that the present invention will solve above technical problem is: utilize ripe electronic auto-control technology, Laying head head location to high-speed rod-rolling mill is controlled automatically, the S7-CFC(Continuous Function Chart of Introduced from Siemens) language is continuous function figure, come automatically generating program with this, utilize this software powerful ready-made program storehouse and calibrated bolck, with and the PLC element that has (for example: I/O, timer, counter, symbol table etc.) and the characteristic of graphical programming language, automatically process control and the system engineering technology of location of exploitation high-speed rod-rolling mill Laying head head.
Technical scheme of the present invention is achieved in that the external product of this system hardware for introducing, and is comprised of a PLC, HMI guidance panel, T400 template, high speed counting module HSC, hot metal detector and an approach switch and process monitoring system.Only need to access hot metal detector from the scene, the approach switch signal, the high speed counting module HSC that Laying head code-disc signal flying shear control system before T400 template and the finishing mill increases newly, make the flying shear time-delay shear the next coarse adjustment to the angle of weaving silk of control, produce the additional speed preset signal of Laying head by programme-control, on the present speed that is added to is given, speed-raising by a period of time, the wire rod head position that Laying head is spued reaches the set angle position, play the effect of fine setting, the such automatic control mode of the two combination, make the head location of Laying head more accurately reliable, namely finish the head location function.
Core technology all adopts software, realizes from three parts:
When hot metal detector before the Laying head detects the head arrival of steel, must finish three calculating: at first, read the current residing position of Laying head by code-disc; Secondly, when the hot metal detector H1 before first workpiece front end arrival flying shear, PLC sampling was weaved silk the angle value of the mouth of pipe at that time whether in ± 60 degree scopes, and calculate the delay time value that flying shear is proofreaied and correct according to the rotary speed of this angle value and new angle process set value and the mouth of pipe of weaving silk, this value and the addition of flying shear shear time have just been obtained the starting time of flying shear.The 3rd, when the workpiece front end after flying shear before the finishing mill is sheared arrives hot metal detector H4, program calculates the angle value of the mouth of pipe in ± 60 degree scopes of weaving silk when weaving silk automatically according to rolling line egress line speed, by comparing with the technique initialization positional value, calculate the speed amount that Laying head need to change, then come regulating electric machine rotating speed by the speed preset value that changes the Laying head transmission device, further revise the angular error that still exists after the front flying shear time-delay of finishing mill is sheared.Automatic calculating and control Laying head speed make it reach position deviation and get final product.As shown in Figure 4.
Laying head automatic operation program is seen block diagram (shown in Figure 3).
Be transformed into Laying head location automatically after the control, workpiece front end is pressed given position (angle) from Laying head pipe situation out:
Finished product rate has improved 0.20%, and comprehensive qualified rate has improved 0.20%, comprehensive in useless rate descended 0.12%.
The realization of Laying head head Automatic Positioning Control technology produces a desired effect, and effect is remarkable in the application of Φ 10mm and above high line products.
The coil of wire that Laying head spues is fitly fallen on the stelmor roller-way, and production is carried out smoothly, can increase about 481.5 ten thousand yuan of economic benefit every year.
Four. description of drawings:
Fig. 1 is the rotational trajectory figure of the Laying head mouth of pipe.
Fig. 2 is HMI guidance panel realistic picture.
Fig. 3 is Laying head automatic operation flow chart.
Fig. 4 is the process control process schematic diagram.
H-hot metal detector, 2-flying shear, 3-finishing mill, 4-water tank, 5-Laying head, 6-motor, 7-incremental code-disc, 8-approach switch, 9-T400 module, 10-frequency conversion speed-adjusting system, HSC-high speed counting module, PLC-single board computer among the figure.
Five. the specific embodiment:
Below in conjunction with embodiment and accompanying drawing the present invention is described in further detail.
Embodiment 1
1. the hardware configuration of Laying head 5 head positioning control technology:
The computer control system of high-speed rod-rolling mill adopts the PLC single board computer of AM General GE company automatically to control, driving control system adopts the 6SE70 frequency conversion speed-adjusting system 10 of Siemens Company, when design improvement Laying head 5 heads are located automatically, be installed in addition with the T400 module 9 of a Siemens Company, increased " Laying head head location " control adjusting operation picture (shown in Figure 2) at control interface.
1.1. motion control unit:
Laying head 5 is ac motor 6 transmissions by a 315KW, rotating speed 970r/min, the transmission cabinet adopts the 6SE70 AC variable-frequency speed regulation system 10 of Siemens Company, mill speed can be given by the transmission cabinet, also can be undertaken by fieldbus Master field Bus by host computer, requirement according to Laying head 5 head positioning controls, 5% impact is given, and the acceleration time of motor is less than 300ms.
1.2. incremental code-disc 7:
Incremental code-disc 7 is installed in afterbody and the rotation of motor 6 rotor synchronous of Laying head 5 drive motors 6.When 7 rotation of incremental code-disc, export square-wave pulses by three passages: the A of incremental code-disc 7, B two passages are exported 1024 square-wave pulses when motor 6 rotates a circle, mutual deviation is 90 ° on phase place; C-channel revolves at motor 6 only exports a square-wave pulse when turning around, be called all pulses.The angle number corresponding according to each pulse calculates the anglec of rotation of Laying head 5 spinnerets and workpiece front end in the residing position of locating area.
1.3. hot metal detector H:
Hot metal detector H is mainly for detection of the position of high temperature rolled piece.When the high temperature rolled piece is detected by hot metal detector H, the output high level signal, during without rolled piece, the output low level signal.
1.4. high speed counting module HSC:
Former electric-control system at finishing mill 3 front flying shears 2 increases a high speed counting mould HSC, is used for receiving Laying head motor code-disc 7 signals and Laying head zero-bit approach switch 8 signals, makes shearing system know at any time the anglec of rotation of the mouth of pipe of weaving silk.
2. the control mode of Laying head head location after improving:
Laying head 5 head positioning controls mainly are that workpiece front end can go out spinneret at given position when guaranteeing that rolled piece passes through Laying head 5.High-speed wire production line as shown in Figure 4, when the hot metal detector H1 before first workpiece front end arrival flying shear 2, weaved silk the at that time angle value of the mouth of pipe of PLC sampling, and calculate the delay time value that flying shear 2 is proofreaied and correct according to the rotary speed of this angle value and new angle process set value and the mouth of pipe of weaving silk, this value and flying shear 2 shear time additions have just been obtained the starting time of flying shear 2.When the head of rolled piece arrives hot metal detector H4 after shearing, program calculates the angle value of the mouth of pipe of weaving silk when weaving silk automatically according to rolling line egress line speed, by comparing with the technique initialization positional value, calculating Laying head 5 needs the speed amount of change, then come regulating electric machine rotating speed by the speed preset value that changes Laying head 5 transmission devices, further revise the angular error that still exists after flying shear 2 time-delays are sheared.In whole control procedure, flying shear 2 time-delay shearing controls are the coarse adjustment to the angle of weaving silk, and change the angle that Laying head 5 rotating speeds are further adjusted the mouth of pipe of weaving silk, and play the effect of fine setting, and it is more accurate reliable that the mode of the two combination makes the head location of Laying head 5 like this.Specification requirement to Laying head 5 head locations is: workpiece front end outgoing position (angle)=given position (angle) ± 60 °.
2.1. change the 5 chain-drive section positioning control of weaving silk that the rotating speed of Laying head 5 is proofreaied and correct:
The weave silk rotational trajectory of the mouth of pipe and the computational methods of angle:
When Laying head 5 is made High Rotation Speed, the rotational trajectory of Laying head 5 mouths of pipe as shown in Figure 1, as shown in Figure 1, the rotational trajectory of spinneret is clockwise, i.e. positive direction, its actual anglec of rotation α is: α=β PTOT-2k π face (k=1,2 ..., n)
β is angle (referring to 360 °/1024 here) corresponding to each pulse in the formula;
PTOT is tally count pulse sum.
Computer draws the α angle when calculating excursion is 0 °~360 °.
The head positioning control principle that changes the correction of Laying head 5 rotating speeds is the purpose of weaving silk the mouth of pipe and reaching control Laying head 5 head locations by increasing the starting time of Laying head 5, workpiece front end being delayed to reach.
The concrete grammar of control is: when workpiece front end went out to weave silk the mouth of pipe, computer was sampled to the outgoing position angle value of reality, by comparing with the given position value, calculated the position set point that makes new advances.When single line material head arrives hot metal detector H4 behind the finishing mill 3 instantly, computer is sampled to the angle value of the mouth of pipe of weaving silk this moment, be used for Laying head 5 rotating speeds are finely tuned, by receiving Laying head motor code-disc 7 signals and Laying head 5 zero-bit approach switchs 8 signals, make transmission system know at any time the anglec of rotation of the mouth of pipe of weaving silk; Then the rotary speed according to this angle value and new set positions point value and the mouth of pipe of weaving silk calculates the time value that Laying head 5 is proofreaied and correct, and this value and 5 given additions start-up time of setting Laying head has just been obtained the starting time of Laying head 5.
3. the software of Laying head 5 head locations configuration:
3.1. according to above principle and Mathematical Modeling, designed program with the CFC programming language of Siemens PLC C.
3.2. in Industry Control policer operation picture, designed the HMI guidance panel, as shown in Figure 2.

Claims (4)

1. the automatic control technology of a high-speed rod-rolling mill Laying head head location, by a PLC, a HMI guidance panel, the T400 template, high-speed counter module HSC, hot metal detector and approach switch and process monitoring system form, it is characterized in that utilizing the S7-CFC language of Siemens is continuous function figure, come automatically generating program, utilize this software powerful ready-made program storehouse and calibrated bolck, with and the PLC element that has such as I/O, timer, counter, the characteristic of symbol table and graphical programming language, exploitation high-speed rod-rolling mill Laying head head is process control and the system engineering technology of location automatically.
2. the automatic control technology of high-speed rod-rolling mill Laying head head location according to claim 1, it is characterized in that: the former electric-control system of flying shear is increased a high speed counting mould HSC, be used for receiving Laying head motor code-disc signal and Laying head zero-bit approach switch signal, make shearing system know at any time the anglec of rotation of the mouth of pipe of weaving silk, when rolled piece arrives hot metal detector H1, according to flying shear speed, calculate the time that needs time-delay to shear, thereby finish the coarse adjustment part of head location.
3. the automatic control technology of high-speed rod-rolling mill Laying head head location according to claim 1, it is characterized in that: Laying head Electrified Transmission original system is Siemens 6SE70 frequency converter, now increase by one of T400 technology controlling and process plate, be used for the Laying head rotating speed is finely tuned, by receiving Laying head motor code-disc signal and Laying head zero-bit approach switch signal, make transmission system know at any time the anglec of rotation of spinning plate; When hot metal detector H4 has detected the steel signal behind the finishing mill, Laying head rotational speed setup signal is superposeed, thereby finish the fine setting of location, Laying head control angle position, the fine setting program is worked out with the CFC programming language.
4. according to claim 1 or the automatic control technology of 4 described high-speed rod-rolling mill Laying head head locations, it is characterized in that: judge that according to the Laying head position that calculates they are whether in ± 60 degree scopes, if in this scope, then need not to adjust, if do not exist, calculating location deviation then, the position of calculating is subtracted each other with negative 60 degree positions, calculate position deviation, thereby calculate hot steel from the hot metal detector position to the time required the Laying head, automatically calculate and control Laying head speed and make it reach position deviation.
CN2012101919461A 2012-06-12 2012-06-12 Automatic control technology for head positioning of laying head of high-speed wire mill Pending CN102989781A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101919461A CN102989781A (en) 2012-06-12 2012-06-12 Automatic control technology for head positioning of laying head of high-speed wire mill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101919461A CN102989781A (en) 2012-06-12 2012-06-12 Automatic control technology for head positioning of laying head of high-speed wire mill

Publications (1)

Publication Number Publication Date
CN102989781A true CN102989781A (en) 2013-03-27

Family

ID=47919185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101919461A Pending CN102989781A (en) 2012-06-12 2012-06-12 Automatic control technology for head positioning of laying head of high-speed wire mill

Country Status (1)

Country Link
CN (1) CN102989781A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109613481A (en) * 2019-01-10 2019-04-12 重庆大学 A kind of Wave beam forming identification of sound source method adapting to wind tunnel test environment
CN111922101A (en) * 2020-08-20 2020-11-13 中天钢铁集团有限公司 High-speed wire packet type arranging equipment and control method thereof
CN112068491A (en) * 2020-09-02 2020-12-11 四川省达州钢铁集团有限责任公司 Method for improving response speed of flying shear
CN113714302A (en) * 2021-08-06 2021-11-30 阳春新钢铁有限责任公司 Hook type recoil control method for changing tail ring of dual-high-speed wire rolling

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101332475A (en) * 2008-07-23 2008-12-31 福建三钢闽光股份有限公司 Automatic control method of head orientation of laying head
CN102441569A (en) * 2011-12-09 2012-05-09 中冶南方(武汉)自动化有限公司 New method for controlling flying shears for bars and wires based on T400

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101332475A (en) * 2008-07-23 2008-12-31 福建三钢闽光股份有限公司 Automatic control method of head orientation of laying head
CN102441569A (en) * 2011-12-09 2012-05-09 中冶南方(武汉)自动化有限公司 New method for controlling flying shears for bars and wires based on T400

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
左希庆: "高线吐丝机头部定位控制系统的改进", 《制造业自动化》 *
张精: "高速线材吐丝机头部定位控制系统改造", 《包钢科技》 *
黄义慧: "高速线材轧机吐丝机的定位控制系统", 《冶金自动化》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109613481A (en) * 2019-01-10 2019-04-12 重庆大学 A kind of Wave beam forming identification of sound source method adapting to wind tunnel test environment
CN111922101A (en) * 2020-08-20 2020-11-13 中天钢铁集团有限公司 High-speed wire packet type arranging equipment and control method thereof
CN111922101B (en) * 2020-08-20 2024-05-28 中天钢铁集团有限公司 High-speed coil type normalization equipment and control method thereof
CN112068491A (en) * 2020-09-02 2020-12-11 四川省达州钢铁集团有限责任公司 Method for improving response speed of flying shear
CN112068491B (en) * 2020-09-02 2021-09-21 四川省达州钢铁集团有限责任公司 Method for improving response speed of flying shear
CN113714302A (en) * 2021-08-06 2021-11-30 阳春新钢铁有限责任公司 Hook type recoil control method for changing tail ring of dual-high-speed wire rolling

Similar Documents

Publication Publication Date Title
CN102989781A (en) Automatic control technology for head positioning of laying head of high-speed wire mill
CN201760574U (en) Continuous casting fixed-length detection cutter
CN106903172B (en) It is a kind of to realize steel plate in the control method of rolling different zones position tracking switching
CN106311749B (en) High-speed rod rolling line fault handling method
CN106001127B (en) A kind of online minus deviation control guidance method in steel process
CN104360626B (en) Steel rider road automated intelligent control method is fed in steel rolling
CN105182942B (en) A kind of principal and subordinate's position synchronization control system and method based on servo
CN108315841A (en) A kind of RING SPINNING Numerical control system and its control method
CN101332475A (en) Automatic control method of head orientation of laying head
CN103135496A (en) Altitude alternating current flying shear control device based on motion control and control system
CN109940218A (en) A kind of servo flying shear control method under the platform based on Novel control
CN203679404U (en) Starting and stopping type flying shear device
CN203351291U (en) Automatic control system of cable separate machine
CN107282647A (en) A kind of bar continuous rolling eliminates the overproof control device and method of tail dimension
CN103537492A (en) Synchronous control method for multi-section cooling bed
CN1858667A (en) Compensating method for multiple shaft synchronou position error of magnetic stick flat screen printer
CN201603758U (en) Head-positioning automatic control device of wire feeding machine
CN103521830B (en) The control method of a kind of mode fling shear and control device
CN107716566B (en) 2 sections of walking beam cooler methods of operation of cage guide steel and synchronous operation control method
CN111464087B (en) Control method and positioning mechanism of zero-free switch stepping motor
CN204999418U (en) That adopts that torque motors receives line mode moves a set device certainly
CN100458618C (en) Precontrol algorithm for film tracting machine rolling perimeter
CN102081409B (en) Speed control system and method of titanium welded pipe production line
CN105834223B (en) A kind of Cross Location Method of hot continuous rolling PC milling trains
CN103499946A (en) Rolled piece position tracking device and tracking method for sectional material hot rolling finishing mill

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130327