CN102989773B - Construction method for improving centring accuracy of racks of steel tube perforating machines - Google Patents

Construction method for improving centring accuracy of racks of steel tube perforating machines Download PDF

Info

Publication number
CN102989773B
CN102989773B CN201210548912.3A CN201210548912A CN102989773B CN 102989773 B CN102989773 B CN 102989773B CN 201210548912 A CN201210548912 A CN 201210548912A CN 102989773 B CN102989773 B CN 102989773B
Authority
CN
China
Prior art keywords
base
frame
punch
hydraulic jack
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210548912.3A
Other languages
Chinese (zh)
Other versions
CN102989773A (en
Inventor
徐宝英
宋磊
韩丽华
景福才
谭亨达
彭喜平
张立杰
范清厚
王丽茹
徐艳荣
白素平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201210548912.3A priority Critical patent/CN102989773B/en
Publication of CN102989773A publication Critical patent/CN102989773A/en
Application granted granted Critical
Publication of CN102989773B publication Critical patent/CN102989773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a construction method for improving the centring accuracy of racks of steel tube perforating machines, which is characterized in that left and right racks are assembled inside a base, and internal components are arranged; and a one-to-four synchronous hydraulic jack is controlled by using a hydraulic control device to realize the synchronous propulsion of the base and the racks, and a grating displacement sensor is adopted for positioning. The construction method disclosed by the invention has the advantages of accurate rack centring, low construction cost, and simple and safe operation.

Description

A kind of construction method improving steel tube punching machine frame accuracy of alignment
Technical field
The present invention relates to a kind of construction method improving steel tube punching machine frame accuracy of alignment, belong to metallurgical machinery equipment installation field.
Technical background
Steel tube punching machine is the key equipment of seamless steel tube production chain, and punch installation engineering quality directly affects the product quality of seamless steel pipe.In punch equipment is in the past installed, adopt integral hoisting method, that is: it is right first to be organized on assembly platform by punch memorial archway, then by group to good punch integral hoisting to installation site, finally adjust installation.This method need be installed with large automobile crane or crawler crane, there is the reasons such as construction site is narrow, factory building roof, job site is closed, inadequate, the large-scale crane radius of gyration of overhead traveling crane maximum lift heavy amount is limited, causes equipment hoisting and adjustment difficulty.Limit by large-scale crane radius of gyration, need the factory roof that close remove, equipment hoisting potential safety hazard is comparatively large, and final frame accuracy of alignment is low, the crane used time is many, waste time and energy.
Summary of the invention
The object of this invention is to provide that a kind of frame centering is accurate, operating expenses is low, the construction method of safe raising steel tube punching machine frame accuracy of alignment simple to operate.
The object of the invention is by realize with under type:
First left and right for punch base is lifted on the basis that equipment is installed, left and right base is relative, between reserve frame is connected T-shaped key size (centre-to-centre spacing+key high size) assembling space with internal part, then respectively arranged on left and right sides frame is assembled into the inner side of base, arranged on left and right sides frame is pre-assembled with lower pressuring upper device, upper screwdown gear, changing rig and crosshead bolt respectively, measure adjustment equipment absolute altitude, levelness, the depth of parallelism and perpendicularity; Be placed between basis, both sides that the left and right base of punch and equipment installs by symmetrical respectively for four hydraulic jack again, horizontally disposed two hydraulic jack in every side, four hydraulic jack are by the action of a hydraulic control device control synchronization; Theodolite is adopted to determine the Precise Installation Position of left and right base, light barrier transmitter is set, two grating sensing lines are transmitted into respectively the Precise Installation Position of the left and right base that theodolite is determined, be separately fixed on arranged on left and right sides base inside edge by two cover grating displacement sensors, the holding wire of grating displacement sensor is connected with the breaker of hydraulic control device; Power to hydraulic control device, four hydraulic jack start to do extend action simultaneously, promotion base and the frame be connected with base move to punch equipment center simultaneously, when grating sensor with base motions to grating sensing line position time, the breaker open circuit immediately that sensor connects, power-off, causes hydraulic control device locking, hydraulic jack stop motion, completes the left and right frame of punch and synchronously passes centering installation.
Advantage of the present invention is:
(1) one drags four synchronous hydra-ulic jacks propulsive forces to utilize hydraulic means to control, and realizes synchronously advancing;
(2) grating displacement sensor is by the refraction principle of light, and connecting breaker makes power supply automatically close, thus fast braking hydraulic means, can accurately stop in the horizontal direction;
(3) frame centering is accurate, improves installation accuracy, reduces operating expenses, simple to operate safe and practical.
Accompanying drawing explanation
Fig. 1 is the structural representation of punch;
Fig. 2 is that the A-A of Fig. 1 is to sectional view;
Fig. 3 is hydraulic control device control principle drawing.
Detailed description of the invention
With reference to accompanying drawing, in φ 159 mandrel mill-rolled steel pipe production line project that Baogang is seamless, punch is installed as example, and present invention is described:
Punch be arranged in factory building BC across 12 ~ 13 lines between, on 13 meters of reinforced concrete platforms.Punch body equipment manufactures and designs for western mark group of Germany (SMS group).Punch main body frame heavily about 180t, the heavy 260000kg of main frame, appearance and size is 4710mm × 3624mm × 7244mm.Punch equipment is loose mail arrival, carries out Assembling.
1, preparation before construction method: first install left and right two bases 5,4 of punch, reserve frame and be connected T-shaped key size (centre-to-centre spacing+key high size) with internal part.Then respectively arranged on left and right sides frame 3,2 is assembled into the inner side of base, arranged on left and right sides frame is pre-assembled with bolt with lower pressuring upper device 1, upper screwdown gear 6, changing rig 7 and crosshead 8 respectively, reserve left and right frame equally and coordinate with internal unit the size that T-shaped key is high, measure adjustment equipment absolute altitude, levelness, the depth of parallelism and perpendicularity.
2, centering location and installation construction method:
(1) be placed between basis, both sides 9,10 that the left and right base 5,4 of punch and equipment installs by symmetrical respectively for four hydraulic jack 11, horizontally disposed two hydraulic jack in every side, four hydraulic jack are by the action of a hydraulic control device control synchronization;
(2) theodolite is adopted to determine the Precise Installation Position of left and right base 5,4, light barrier transmitter 12 is set, two grating sensing lines 13,14 are transmitted into respectively the Precise Installation Position of the left and right base that theodolite is determined, be separately fixed on arranged on left and right sides base 5,4 inside edge by two cover grating displacement sensors 15,16, the holding wire of grating displacement sensor 15,16 is connected with the breaker 18 of hydraulic control device 19;
(3) power supply 17 powers to hydraulic control device 19, four hydraulic jack 11 start to do extend action simultaneously, promotion base and the frame be connected with base move to punch equipment center simultaneously, when grating sensor with base motions to grating sensing line position time, the breaker open circuit immediately that sensor connects, power-off, causes hydraulic control device locking, hydraulic jack stop motion, completes the left and right frame of punch and synchronously passes centering installation.
Facts have proved and utilize the method, novel, quick, reliable, the accuracy of alignment of steel tube punching machine frame can greatly be improved, shorten the construction period, increase work efficiency, achieve good effect.

Claims (1)

1. one kind is improved the construction method of steel tube punching machine frame accuracy of alignment, it is characterized in that: first left and right for punch base is lifted on the basis that equipment is installed, left and right base is relative, between reserve frame is connected T-shaped key size assembling space with internal part, then respectively arranged on left and right sides frame is assembled into the inner side of base, arranged on left and right sides frame is pre-assembled with lower pressuring upper device, upper screwdown gear, changing rig and crosshead bolt respectively, measure adjustment equipment absolute altitude, levelness, the depth of parallelism and perpendicularity; Be placed between basis, both sides that the left and right base of punch and equipment installs by symmetrical respectively for four hydraulic jack again, horizontally disposed two hydraulic jack in every side, four hydraulic jack are by the action of a hydraulic control device control synchronization; Theodolite is adopted to determine the Precise Installation Position of left and right base, light barrier transmitter is set, two grating sensing lines are transmitted into respectively the Precise Installation Position of the left and right base that theodolite is determined, be separately fixed on arranged on left and right sides base inside edge by two cover grating displacement sensors, the holding wire of grating displacement sensor is connected with the breaker of hydraulic control device; Power to hydraulic control device, four hydraulic jack start to do extend action simultaneously, promotion base and the frame be connected with base move to punch equipment center simultaneously, when grating sensor with base motions to grating sensing line position time, sensor connect breaker open circuit immediately, power-off, cause hydraulic control device locking, hydraulic jack stop motion, complete the left and right frame of punch and synchronously pass centering installation, described T-shaped key is of a size of centre-to-centre spacing+key high size.
CN201210548912.3A 2012-12-18 2012-12-18 Construction method for improving centring accuracy of racks of steel tube perforating machines Active CN102989773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210548912.3A CN102989773B (en) 2012-12-18 2012-12-18 Construction method for improving centring accuracy of racks of steel tube perforating machines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210548912.3A CN102989773B (en) 2012-12-18 2012-12-18 Construction method for improving centring accuracy of racks of steel tube perforating machines

Publications (2)

Publication Number Publication Date
CN102989773A CN102989773A (en) 2013-03-27
CN102989773B true CN102989773B (en) 2015-03-25

Family

ID=47919177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210548912.3A Active CN102989773B (en) 2012-12-18 2012-12-18 Construction method for improving centring accuracy of racks of steel tube perforating machines

Country Status (1)

Country Link
CN (1) CN102989773B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104624654A (en) * 2014-12-31 2015-05-20 中国二冶集团有限公司 Construction method for installation of puncher frame structure
CN112170631A (en) * 2020-09-24 2021-01-05 杭州亦和水电安装工程有限公司 Seamless steel pipe perforating equipment with location structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0601680B1 (en) * 1992-12-11 1996-04-10 MANNESMANN Aktiengesellschaft Method of guiding a rough-pierced tube blank
JP2005211973A (en) * 2004-01-30 2005-08-11 Sanyo Special Steel Co Ltd Method for manufacturing hot rolled seamless steel pipe having minimized inside surface flaws
CN201737601U (en) * 2010-06-09 2011-02-09 中国一冶集团有限公司 Double hydraulic type rolling-mill housing hoisting device
CN102145353A (en) * 2010-01-19 2011-08-10 五冶集团上海有限公司 O-forming machine mounting method
CN102764793A (en) * 2012-07-20 2012-11-07 天津二十冶建设有限公司 Method for installing and adjusting cantilever type uncoiler

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0601680B1 (en) * 1992-12-11 1996-04-10 MANNESMANN Aktiengesellschaft Method of guiding a rough-pierced tube blank
JP2005211973A (en) * 2004-01-30 2005-08-11 Sanyo Special Steel Co Ltd Method for manufacturing hot rolled seamless steel pipe having minimized inside surface flaws
CN102145353A (en) * 2010-01-19 2011-08-10 五冶集团上海有限公司 O-forming machine mounting method
CN201737601U (en) * 2010-06-09 2011-02-09 中国一冶集团有限公司 Double hydraulic type rolling-mill housing hoisting device
CN102764793A (en) * 2012-07-20 2012-11-07 天津二十冶建设有限公司 Method for installing and adjusting cantilever type uncoiler

Also Published As

Publication number Publication date
CN102989773A (en) 2013-03-27

Similar Documents

Publication Publication Date Title
CN103669885B (en) Super-span steel truss sections hoisting
CN104895035A (en) High-efficiency mounting method of large ship reception chamber of vertical ship lift and auxiliary tool device for mounting and location
CN205557339U (en) From climbing formula pier stud template elevating gear
CN104389268A (en) Steel tower column with positioning structure and hoisting construction method thereof
CN106193117A (en) A kind of assembling and construction method of the prefabricated pipe gallery in underground
CN102989773B (en) Construction method for improving centring accuracy of racks of steel tube perforating machines
CN105804115B (en) Assembled ground-connecting-wall or prefabricated pile and assembled underground station integrative construction device and construction method
CN203130086U (en) Excavating structure without pilot tunnel of double-linked-arch tunnel
CN202325546U (en) Side slip type needle beam bottom die trolley
CN103527218A (en) Multifunctional combined type concrete lining trolley
CN105714851B (en) Assembled ground-connecting-wall or prefabricated pile are with cast-in-place underground station integrative construction device and using its construction method
CN106241234B (en) A kind of self-propelled transport assembly car for prefabricated pipe gallery
CN208684247U (en) A kind of prefabricated subsection hanging apparatus
CN102505863B (en) Wireless laser synchronous control device for multi-rail slide construction
CN204024079U (en) Prefabricated assembled Metro Station Structure quick tensioning equipment
CN203783146U (en) Engineering any curve slipping translation synchronous measurement and control system based on RTK
CN203975963U (en) Composite type automatic setting machine
CN204298736U (en) A kind of steel tower column with location structure
CN202756000U (en) Airborne temporary support frame
CN105382056A (en) Press device for correcting welding deformation of longitudinal joint of large-diameter steel pipe
CN102943672A (en) Automatic repaired hard-rock heading machine coal mining machine electric control device
CN105735349A (en) Cast-in-situ bored pile and cast-in-situ subway station integrated construction method
CN205183395U (en) Correct large -diameter steel pipe longitudinal joint welding deformation's press device
CN202866647U (en) Perpendicular positioning drilling machine for road maintenance
CN204984433U (en) Equipment car is assembled to prefabricated assembled subway station component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant