CN102982429A CN2012104336898A CN201210433689A CN102982429A CN 102982429 A CN102982429 A CN 102982429A CN 2012104336898 A CN2012104336898 A CN 2012104336898A CN 201210433689 A CN201210433689 A CN 201210433689A CN 102982429 A CN102982429 A CN 102982429A
Authority
CN
China
Prior art keywords
link
order volume
early
value
year
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104336898A
Other languages
Chinese (zh)
Inventor
徐慧杰
王云亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jingdong Century Trading Co Ltd
Original Assignee
Beijing Jingdong Century Trading Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jingdong Century Trading Co Ltd filed Critical Beijing Jingdong Century Trading Co Ltd
Priority to CN2012104336898A priority Critical patent/CN102982429A/en
Publication of CN102982429A publication Critical patent/CN102982429A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method and a device for outputting storage production warning information. The method and the device for outputting the storage production warning information is helpful for finding abnormal phenomena in storage production as soon as possible, and therefore losses brought to clients or electronic commercial enterprises can be avoided or reduced. The method includes that order quantities accumulated by assigned production links in the process of storage production are acquired sequentially for a plurality of times according to a plurality of preset time points; and the storage production warning information is output under the condition that increasing values of the order quantities meet warning conditions.

Description

A kind of method and apparatus of exporting storage production early warning information
Technical field
The present invention relates to a kind of method and apparatus of exporting storage production early warning information.
Background technology
In e-commerce field, the basic method of operation of commodity transaction is that the client places an order by the website, and order is issued to each storehouse of e-commerce venture and produces.In the storage production run of order, usually comprise successively following link:
Reception order → location storage space → sorter's picking → check platform verification → packing person's packing → mating section of sending to deliver.
Each above-mentioned link production might occur and unusually cause industrial accident, brings loss for client or e-commerce venture.
Summary of the invention
In view of this, the invention provides a kind of method and apparatus of exporting storage production early warning information, the abnormal occurrence in producing of helping to find as early as possible to store in a warehouse, thus avoid or reduce the loss that brings to client or e-commerce venture.
For achieving the above object, according to an aspect of the present invention, provide a kind of method of exporting storage production early warning information.
The method of output storage production early warning information of the present invention comprises: the order volume of successively repeatedly obtaining the given production link accumulation in the storage production run by default a plurality of time points; Meet output storage production early warning information in the situation of default early-warning conditions at the i.v. of described order volume.
Alternatively, described given production link be receive order link, location storage space link, sorter's picking link, check platform verification link, packing person packs link or the mating section of sending delivery link.
Alternatively, the i.v. of described order volume is the value that increases by on a year-on-year basis of order volume; And described early-warning conditions be order volume increase by value on a year-on-year basis greater than preset value.
Alternatively, described early-warning conditions is that the order volume that has continuously put the seclected time that reaches preset number causes exceeding the default value that increases by on a year-on-year basis.
Alternatively, the i.v. of described order volume is the sequential growth rate value of order volume; And described early-warning conditions is that the sequential growth rate value of order volume is less than preset value.
Alternatively, described early-warning conditions is that the order volume that has continuously put the seclected time that reaches preset number causes less than default sequential growth rate value.
According to a further aspect in the invention, provide a kind of device of exporting storage production early warning information.
The device of output storage production early warning information of the present invention comprises: the order volume acquisition module, for the order volume of successively repeatedly obtaining the given production link accumulation of storage production run by default a plurality of time points; Judge output module, be used for output storage production early warning information in the situation that i.v. in described order volume meets default early-warning conditions.
Alternatively, described given production link be receive order link, location storage space link, sorter's picking link, check platform verification link, packing person packs link or the mating section of sending delivery link.
Alternatively, the i.v. of described order volume is the value that increases by on a year-on-year basis of order volume; And described early-warning conditions be order volume increase by value on a year-on-year basis greater than preset value.
Alternatively, the i.v. of described order volume is the sequential growth rate value of order volume; And described early-warning conditions is that the sequential growth rate value of order volume is less than preset value.
According to technical scheme of the present invention, by obtaining the order volume in the storage production link, and meet output storage production early warning information in the situation of default early-warning conditions at the i.v. of this order volume, can in time find the unusual of order volume, it is unusual that thereby prompting warehousing management personnel further examine the production of storage production, avoid issuable industrial accident, reduce client or e-commerce venture and produce the loss that unusually brings because of storage.
Description of drawings
Accompanying drawing is used for understanding the present invention better, does not consist of improper restriction of the present invention.Wherein:
Fig. 1 is the basic step synoptic diagram according to the method for the output storage production early warning information of the embodiment of the invention;
Fig. 2 is the synoptic diagram of the order volume of the reception order link during the storage relevant with the embodiment of the invention produced;
Fig. 3 is the synoptic diagram of a kind of order volume of the sorter's picking link during the storage relevant with the embodiment of the invention produced;
Fig. 4 is the synoptic diagram of the another kind of order volume of the sorter's picking link during the storage relevant with the embodiment of the invention produced;
Fig. 5 is the synoptic diagram according to the basic structure of the device of the output storage production early warning information of the embodiment of the invention.
Embodiment
Below in conjunction with accompanying drawing example embodiment of the present invention is explained, to help understanding, they should be thought it only is exemplary comprising the various details of the embodiment of the invention.Therefore, those of ordinary skills will be appreciated that, can make various changes and modification to the embodiments described herein, and can not deviate from scope and spirit of the present invention.Equally, for clarity and conciseness, omitted the description to known function and structure in the following description.
Fig. 1 is the basic step synoptic diagram according to the method for the output storage production early warning information of the embodiment of the invention.As shown in Figure 1, the method for the output of embodiment of the invention storage production early warning information mainly comprises following step S11 and step S12.
Step S11: the order volume of successively repeatedly obtaining the given production link accumulation in the storage production run by default a plurality of time points.In this step, can obtain the sequence of an order volume, this sequence is the order volume of the link of an appointment in the production link.Can grasp order volume by 5 minutes frequencies once.Production link can be receive order link, location storage space link, sorter's picking link, check platform verification link, packing person packs link or the mating section of sending delivery link.
Step S12: meet output storage production early warning information in the situation of default early-warning conditions at the i.v. of the above order amount.Because in chronological sequence obtained the sequence of an order volume, can analyze the rising characteristic of this order volume.In the present embodiment, that mainly adopts order volume increases by value and sequential growth rate value on a year-on-year basis.In realization, can take other to weigh the index of order rising characteristic according to actual conditions.
From the actual features that storage is produced, because always there is the client placing an order, order volume should sustainable growth.For example adopt the sequential growth rate value to investigate, can be with the order volume of each little time point with respect to the order volume i.v. number percent of last little time point as the sequential growth rate value, corresponding early-warning conditions can be the sequential growth rate value less than preset value, for example the sequential growth rate value of the order volume of selected continuous several little time points is all then exported the production early warning information of storing in a warehouse less than preset value.That is to say under order volume all presented the situation of increment deficiency continuously in a plurality of hours and report to the police.
Also can adopt and increase by the situation that value is investigated storage production on a year-on-year basis.At first calculate the order volume same period here.The same period order volume be in the recent period for example one month each day from zero point to the mean value of the accumulation order volume of same time point.The accumulation order volume of current point in time and the same period order volume compare the i.v. number percent that obtains and be and increase by value on a year-on-year basis.Corresponding early-warning conditions can be to increase by value on a year-on-year basis greater than preset value, specifically can be that the order volume that has continuously put the seclected time that reaches preset number causes exceeding the default value that increases by on a year-on-year basis.
In order to understand better the present invention, below lift some numerical examples.
Fig. 2 is the synoptic diagram of the order volume of the reception order link during the storage relevant with the embodiment of the invention produced.As shown in Figure 2, the curve 21 in the chart 20 represents the order volume that held in reception order link the same day, the order volume that hold in reception order link some day before curve 22 expressions.
In normal situation of producing, along with the growth of client's amount of placing an order, the order that storehouse receives should continue increasing.If this order volume is continuous rise in time, the sequential growth rate value should be not less than 1%, and increasing by value on a year-on-year basis should be in 20%, and then this link of storehouse belongs to normal condition.If but n time point surpassed tolerance interval with the sequential growth rate value on year-on-year basis continuously, then thinks and need to send early warning by this link abnormal state.
As shown in Figure 2, at 12:00,13:00, continuous 4 time points of 14:00,15:00, the sequential growth rate amplitude of order volume is 0%, and the sequential growth rate value should be not less than 1% under normal circumstances, then think that storehouse abnormal conditions occurred in this link of reception order this moment, so the output early warning information.
The store management personnel namely can analyze this unusual reason that produces after receiving this early warning information, for example pass system's abnormal under the order of up-stream system, perhaps the reception form ordering system abnormal of storehouse etc.
Fig. 3 is the synoptic diagram of a kind of order volume of the sorter's picking link during the storage relevant with the embodiment of the invention produced.As shown in Figure 3, the order volume of this link of sorter's picking of the 31 expression storehouses of the curve in the chart 30.In the working time section, along with the sorter carries out picking to these orders, treat that the picking amount is reducing gradually, but storehouse is receiving order always, so order volume continued jitters in time, under normal circumstances, sequential growth rate value (being fluctuating range) should be not more than 20%, if but n time point sequential growth rate value surpassed tolerance interval continuously, then thinks and need to send early warning by this link abnormal state.
With reference to figure 3, at 13:00,14:00, continuous 3 time points of 15:00, the sequential growth rate of order volume has all significantly surpassed 20%, and the sequential growth rate value should be not more than 20% under normal circumstances, so think that storehouse abnormal conditions occurred in this link of sorter's picking this moment.Possible reason comprises that the sorter slows down or system exception causes that picking can't be carried out etc.
Fig. 4 is the synoptic diagram of the another kind of order volume of the sorter's picking link during the storage relevant with the embodiment of the invention produced.As shown in Figure 4, the order volume of the current sorter's picking link of curve 41 expressions in the chart 40, curve 42 represents the order volume of sorter's picking link of the historical same period.
Under the normal condition of production, along with the sorter carries out picking to these orders, treat that the picking amount is reducing gradually, but storehouse is receiving order always, therefore order volume continued jitters in time, should be not more than 50% but increase by value (namely with the same period in past fluctuating range) on a year-on-year basis, then this link of storehouse belongs to normal condition.If surpassed tolerance interval but continuous n time point increases by value on a year-on-year basis, then thought and to send early warning by this link abnormal state.
With reference to figure 4, at 9:00,10:00,11:00,12:00,13:00,14:00, continuous 7 time points of 15:00, increasing by on a year-on-year basis all of single amount significantly surpassed 50%, increases by under normal circumstances value on a year-on-year basis and should be not more than 50%.Think then that storehouse abnormal conditions occurred in this link of sorter's picking this moment.Possible reason comprises that the sorter slows down, system exception cause picking can't carry out, not in inside the plan large sales promotion etc.
Below the device of the output of embodiment of the invention storage production early warning information is explained.Fig. 5 is the synoptic diagram according to the basic structure of the device of the output storage production early warning information of the embodiment of the invention.As shown in Figure 5, the device 50 of output storage production early warning information mainly comprises order volume acquisition module 51 and judges output module 52.Order volume acquisition module 51 is used for successively repeatedly obtaining by default a plurality of time points the order volume of the given production link accumulation of storage production run; Judge that output module 52 is used for output storage production early warning information in the situation that i.v. in this order volume meets default early-warning conditions.
Can find out from above description, the i.v. of order volume is to present certain rule under storage production normal condition, therefore can find that by the i.v. of order volume relatively possible order volume i.v. is unusual, but that the warehousing management personnel are difficult to usually discover is this unusual.And according to the technical scheme of the embodiment of the invention, by obtaining the order volume in the storage production link, and meet output storage production early warning information in the situation of default early-warning conditions at the i.v. of this order volume, can in time find the unusual of order volume, it is unusual that thereby prompting warehousing management personnel further examine the production of storage production, avoid issuable industrial accident, reduce client or e-commerce venture and produce the loss that unusually brings because of storage.
Ultimate principle of the present invention has below been described in conjunction with specific embodiments, but, it is to be noted, for those of ordinary skill in the art, can understand whole or any steps or the parts of method and apparatus of the present invention, can be in the network of any calculation element (comprising processor, storage medium etc.) or calculation element, realized that with hardware, firmware, software or their combination this is that those of ordinary skills use their basic programming skill just can realize in the situation of having read explanation of the present invention.
Therefore, purpose of the present invention can also be by realizing in any program of calculation element operation or batch processing.Described calculation element can be known fexible unit.Therefore, purpose of the present invention also can be only by providing the program product that comprises the program code of realizing described method or device to realize.That is to say that such program product also consists of the present invention, and the storage medium that stores such program product also consists of the present invention.Obviously, described storage medium can be any storage medium of developing in any known storage medium or future.
It is pointed out that also that in apparatus and method of the present invention obviously, each parts or each step can decompose and/or reconfigure.These decomposition and/or reconfigure and to be considered as equivalents of the present invention.And, carry out the step of above-mentioned series of processes and can order naturally following the instructions carry out in chronological order, but do not need necessarily to carry out according to time sequencing.Some step can walk abreast or carry out independently of one another.
Above-mentioned embodiment does not consist of limiting the scope of the invention.Those skilled in the art should be understood that, depend on designing requirement and other factors, and various modifications, combination, sub-portfolio and alternative can occur.Any modification of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included within the protection domain of the present invention.

Claims (10)

1. a method of exporting storage production early warning information is characterized in that, comprising:
Successively repeatedly obtain the order volume of the given production link accumulation in the storage production run by default a plurality of time points;
Meet output storage production early warning information in the situation of default early-warning conditions at the i.v. of described order volume.
2. method according to claim 1 is characterized in that, described given production link be receive order link, location storage space link, sorter's picking link, check platform verification link, packing person packs link or the mating section of sending delivery link.
3. method according to claim 1 and 2 is characterized in that,
The i.v. of described order volume is the value that increases by on a year-on-year basis of order volume;
And described early-warning conditions be order volume increase by value on a year-on-year basis greater than preset value.
4. method according to claim 3 is characterized in that, described early-warning conditions is that the order volume that has continuously put the seclected time that reaches preset number causes exceeding the default value that increases by on a year-on-year basis.
5. method according to claim 1 and 2 is characterized in that,
The i.v. of described order volume is the sequential growth rate value of order volume;
And described early-warning conditions is that the sequential growth rate value of order volume is less than preset value.
6. method according to claim 5 is characterized in that, described early-warning conditions is that the order volume that has continuously put the seclected time that reaches preset number causes less than default sequential growth rate value.
7. a device of exporting storage production early warning information is characterized in that, comprising:
The order volume acquisition module is used for the order volume of accumulating by the given production link that default a plurality of time points priorities are repeatedly obtained the storage production run;
Judge output module, be used for output storage production early warning information in the situation that i.v. in described order volume meets default early-warning conditions.
8. device according to claim 7 is characterized in that, described given production link be receive order link, location storage space link, sorter's picking link, check platform verification link, packing person packs link or the mating section of sending delivery link.
9. according to claim 7 or 8 described devices, it is characterized in that,
The i.v. of described order volume is the value that increases by on a year-on-year basis of order volume;
And described early-warning conditions be order volume increase by value on a year-on-year basis greater than preset value.
10. according to claim 7 or 8 described devices, it is characterized in that,
The i.v. of described order volume is the sequential growth rate value of order volume;
And described early-warning conditions is that the sequential growth rate value of order volume is less than preset value.
CN2012104336898A 2012-11-02 2012-11-02 Method and device for outputting storage production warning information Pending CN102982429A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104336898A CN102982429A (en) 2012-11-02 2012-11-02 Method and device for outputting storage production warning information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104336898A CN102982429A (en) 2012-11-02 2012-11-02 Method and device for outputting storage production warning information

Publications (1)

Publication Number Publication Date
CN102982429A true CN102982429A (en) 2013-03-20

Family

ID=47856394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104336898A Pending CN102982429A (en) 2012-11-02 2012-11-02 Method and device for outputting storage production warning information

Country Status (1)

Country Link
CN (1) CN102982429A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104408605A (en) * 2014-12-15 2015-03-11 北京京东尚科信息技术有限公司 Order splitting method and system
CN105719109A (en) * 2015-05-22 2016-06-29 北京小度信息科技有限公司 Order monitoring method and device
CN106204086A (en) * 2015-05-06 2016-12-07 阿里巴巴集团控股有限公司 The method for early warning of Sales Volume of Commodity and device
CN109919526A (en) * 2017-12-12 2019-06-21 北京京东尚科信息技术有限公司 Stock management method, apparatus, medium and the electronic equipment of unmanned warehouse
CN109919529A (en) * 2017-12-12 2019-06-21 北京京东尚科信息技术有限公司 Outbound management method, device, medium and the electronic equipment of unmanned warehouse
CN117436709A (en) * 2023-12-20 2024-01-23 四川宽窄智慧物流有限责任公司 Cross-region order data overall warning method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101206729A (en) * 2006-12-22 2008-06-25 深圳富泰宏精密工业有限公司 Inventory management system
CN101350113A (en) * 2008-09-04 2009-01-21 上海交通大学 Huddle early-warning system based on passenger flow estimation and self-adapting simulation
CN101655935A (en) * 2009-06-09 2010-02-24 北京千禧维讯技术服务有限公司 Telecommunication equipment network interaction processing method
CN101692300A (en) * 2009-10-14 2010-04-07 金蝶软件(中国)有限公司 Warning method, warning device and warning system for visual safety stock
CN102722758A (en) * 2012-06-12 2012-10-10 中国电力科学研究院 System for on-line processing queue and evaluation information of power supply business hall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101206729A (en) * 2006-12-22 2008-06-25 深圳富泰宏精密工业有限公司 Inventory management system
CN101350113A (en) * 2008-09-04 2009-01-21 上海交通大学 Huddle early-warning system based on passenger flow estimation and self-adapting simulation
CN101655935A (en) * 2009-06-09 2010-02-24 北京千禧维讯技术服务有限公司 Telecommunication equipment network interaction processing method
CN101692300A (en) * 2009-10-14 2010-04-07 金蝶软件(中国)有限公司 Warning method, warning device and warning system for visual safety stock
CN102722758A (en) * 2012-06-12 2012-10-10 中国电力科学研究院 System for on-line processing queue and evaluation information of power supply business hall

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104408605A (en) * 2014-12-15 2015-03-11 北京京东尚科信息技术有限公司 Order splitting method and system
CN106204086A (en) * 2015-05-06 2016-12-07 阿里巴巴集团控股有限公司 The method for early warning of Sales Volume of Commodity and device
CN105719109A (en) * 2015-05-22 2016-06-29 北京小度信息科技有限公司 Order monitoring method and device
CN109919526A (en) * 2017-12-12 2019-06-21 北京京东尚科信息技术有限公司 Stock management method, apparatus, medium and the electronic equipment of unmanned warehouse
CN109919529A (en) * 2017-12-12 2019-06-21 北京京东尚科信息技术有限公司 Outbound management method, device, medium and the electronic equipment of unmanned warehouse
CN109919529B (en) * 2017-12-12 2022-03-04 北京京东乾石科技有限公司 Ex-warehouse management method, device, medium and electronic equipment for unmanned warehouse
CN109919526B (en) * 2017-12-12 2022-04-12 北京京东乾石科技有限公司 Warehousing management method, warehousing management device, warehousing management medium and electronic equipment for unmanned warehouse
CN117436709A (en) * 2023-12-20 2024-01-23 四川宽窄智慧物流有限责任公司 Cross-region order data overall warning method
CN117436709B (en) * 2023-12-20 2024-03-19 四川宽窄智慧物流有限责任公司 Cross-region order data overall warning method

Similar Documents

Publication Publication Date Title
CN102982429A (en) Method and device for outputting storage production warning information
CN105095056B (en) A kind of method of data warehouse data monitoring
CN108512689B (en) Micro-service monitoring method and server
CN106383766B (en) System monitoring method and apparatus
US20110161030A1 (en) Method And Device For Monitoring Measurement Data In Semiconductor Process
EP2720100A1 (en) Systems and methods for comprehensive alarm management
JP6315815B2 (en) Communication load and communication charge reduction system in sensor data collection
CN105912703A (en) Data storage method and data query method and device
CN105160513A (en) Equipment spare part safety stock calculating method and system
CN106940677A (en) One kind application daily record data alarm method and device
CN110826831A (en) Method and device for restocking a picking zone of a warehouse
CN204313949U (en) Equipment checked by the parcel that a kind of having electronic claims
CN109167699A (en) The method and apparatus for handling the state of the node of block chain
CN103685347B (en) Method and device for allocating network resources
CN106251207A (en) Order monitoring method and device
CN114266294A (en) Training method of classification model, and fault analysis method and device of target link
CN110019367A (en) A kind of method and apparatus of statistical data feature
CN107819745B (en) Method and device for defending against abnormal traffic
CN112219212A (en) Automated detection of anomalous industrial processing operations
CN112307098A (en) Cost consultation management method, system, electronic equipment and computer readable storage medium
CN109543083A (en) The detection method of abnormal data in a kind of polynary real-time data of power grid
CN116894539A (en) Clothing production monitoring method, system and medium
CN104501848B (en) Data accessing method and system of substation equipment
CN106130929A (en) The service message automatic processing method of the Internet based on graph-theoretical algorithm insurance field and system
CN111754295A (en) Electronic communication product sale management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130320