CN102982221A - 一种河流断面动态模拟方法及系统 - Google Patents
一种河流断面动态模拟方法及系统 Download PDFInfo
- Publication number
- CN102982221A CN102982221A CN2012105753677A CN201210575367A CN102982221A CN 102982221 A CN102982221 A CN 102982221A CN 2012105753677 A CN2012105753677 A CN 2012105753677A CN 201210575367 A CN201210575367 A CN 201210575367A CN 102982221 A CN102982221 A CN 102982221A
- Authority
- CN
- China
- Prior art keywords
- section
- river
- water level
- cross
- areaseries
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210575367.7A CN102982221B (zh) | 2012-12-26 | 2012-12-26 | 一种河流断面动态模拟方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210575367.7A CN102982221B (zh) | 2012-12-26 | 2012-12-26 | 一种河流断面动态模拟方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102982221A true CN102982221A (zh) | 2013-03-20 |
CN102982221B CN102982221B (zh) | 2015-04-01 |
Family
ID=47856236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210575367.7A Active CN102982221B (zh) | 2012-12-26 | 2012-12-26 | 一种河流断面动态模拟方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102982221B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104182634A (zh) * | 2014-08-21 | 2014-12-03 | 华中科技大学 | 一种梯级水电站联合运行水位控制断面优选方法 |
CN108614305A (zh) * | 2016-12-09 | 2018-10-02 | 中国石油化工股份有限公司 | 一种膝折构造模拟方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030125914A1 (en) * | 2001-12-28 | 2003-07-03 | Tan Du | System simulation using dynamic step size and iterative model |
CN102460428A (zh) * | 2009-06-05 | 2012-05-16 | 惠普开发有限公司 | 用于表示与web服务的用户交互的系统和方法 |
CN102708226A (zh) * | 2012-04-18 | 2012-10-03 | 中国水电顾问集团成都勘测设计研究院 | 基于工艺流的水利水电工程仿真建模方法 |
-
2012
- 2012-12-26 CN CN201210575367.7A patent/CN102982221B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030125914A1 (en) * | 2001-12-28 | 2003-07-03 | Tan Du | System simulation using dynamic step size and iterative model |
CN102460428A (zh) * | 2009-06-05 | 2012-05-16 | 惠普开发有限公司 | 用于表示与web服务的用户交互的系统和方法 |
CN102708226A (zh) * | 2012-04-18 | 2012-10-03 | 中国水电顾问集团成都勘测设计研究院 | 基于工艺流的水利水电工程仿真建模方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104182634A (zh) * | 2014-08-21 | 2014-12-03 | 华中科技大学 | 一种梯级水电站联合运行水位控制断面优选方法 |
CN104182634B (zh) * | 2014-08-21 | 2015-07-22 | 华中科技大学 | 一种梯级水电站联合运行水位控制断面优选方法 |
CN108614305A (zh) * | 2016-12-09 | 2018-10-02 | 中国石油化工股份有限公司 | 一种膝折构造模拟方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102982221B (zh) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103559375B (zh) | 调度工程水质改善的数值模拟及可视化仿真系统 | |
CN107368655A (zh) | 抽水蓄能电站动态监测监控与仿真培训系统及其实现方法 | |
CN103559739A (zh) | 基于osg的数字湖泊三维可视化仿真方法及仿真平台 | |
CN102572076B (zh) | 一种充电状态显示的方法及装置 | |
CN103440357A (zh) | 虚拟现实漫游场景生成方法及系统 | |
Lechner et al. | Procedural modeling of urban land use | |
CN104008218A (zh) | 电力工程三维一体化设计平台 | |
CN108427781A (zh) | 基于bim的装配式工艺设计数据处理方法及装置 | |
CN103699960A (zh) | 一种中压配电网运行态势可视化方法 | |
CN102508994A (zh) | 一种面向虚拟实验教学的动态构件的可视化方法 | |
CN102877443A (zh) | 一种基于虚拟现实和物联网技术的水闸交互控制系统 | |
CN102982221B (zh) | 一种河流断面动态模拟方法及系统 | |
CN103310067B (zh) | 实现设备实时模拟仿真监控的方法 | |
CN102662674A (zh) | 工程三维仿真系统通用开发平台构建方法 | |
Mirea | Industrial landscape-a landscape in transition in the municipality area of Bucharest | |
CN110675509A (zh) | 一种基于三维建模的可编辑综合仿真方法及其系统 | |
Xiao | The construction path of university smart library based on digital twin | |
Gao et al. | The Research and Development of Integrated Operation-Maintenance Simulation Training System [J] | |
CN105335553A (zh) | 轻量级三维仿真教学平台构建方法 | |
CN102903148A (zh) | 一种栅格数据渲染方法和装置 | |
CN105259783A (zh) | 一种水电工程施工过程可视化预演系统 | |
Halatsch et al. | ETH Value Lab-A Framework For Managing Large-Scale Urban Projects | |
Schnabel | Architectural parametric designing | |
Sengupta et al. | Systemic Diagramming: an approach to decoding urban ecologies | |
Fakiri | The interpretation of landscape: Strategies towards smarter cities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Method and system for simulating river cross section dynamically Effective date of registration: 20170508 Granted publication date: 20150401 Pledgee: Huaxia Bank Limited by Share Ltd Zhongguancun Beijing branch Pledgor: Beijing Automatic Science and Technology Co., Ltd. Registration number: 2017990000383 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20180323 Granted publication date: 20150401 Pledgee: Huaxia Bank Limited by Share Ltd Zhongguancun Beijing branch Pledgor: Beijing Automatic Science and Technology Co., Ltd. Registration number: 2017990000383 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A dynamic simulation method and system of river section Effective date of registration: 20220427 Granted publication date: 20150401 Pledgee: Zheshang Bank Co.,Ltd. Beijing Branch Pledgor: BEIJING AUTOMIC SCIENCE&TECHNOLOGY Co.,Ltd. Registration number: Y2022990000243 |