CN102979629A - 高热值燃气匹配额定低热值燃机的运行方法 - Google Patents
高热值燃气匹配额定低热值燃机的运行方法 Download PDFInfo
- Publication number
- CN102979629A CN102979629A CN2011102639016A CN201110263901A CN102979629A CN 102979629 A CN102979629 A CN 102979629A CN 2011102639016 A CN2011102639016 A CN 2011102639016A CN 201110263901 A CN201110263901 A CN 201110263901A CN 102979629 A CN102979629 A CN 102979629A
- Authority
- CN
- China
- Prior art keywords
- heating value
- gas
- calorific value
- value
- control valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Regulation And Control Of Combustion (AREA)
Abstract
高热值燃气匹配额定低热值燃机的运行方法,属于冶金高炉的运行工艺,主要用于设计额定热值是3090kJ/Nm3的低热值燃机匹配高热值燃气的的运行方法,它包括采用热值测量仪在线测量燃气的热值——对测量出的燃气热值进行比较,其特征是在PLC控制系统中增设高热值运行控制模式程序,高热值运行控制模式程序中设定额定热值是3090kJ/Nm3~3770kJ/Nm3,设定比较热值是3130kJ/Nm3~3650kJ/Nm3,燃气比较后,开启燃气流量控制阀同时开启燃气压力隔断阀,燃气压力控制阀开至最大流量开度的10%,燃气流量控制阀跟踪开启。本发明可以减少氮气的消耗,降低发电成本。
Description
技术领域:
本发明属于冶金高炉的运行工艺,主要用于设计热值能力是3090kJ/Nm3的低热值燃机匹配高热值燃气的的运行方法。
背景技术:
设计热值能力是3098 kJ/Nm3的低热值高炉,主燃料为煤气的M251S型CCPP发电机组,管网来的高炉煤气的热值是3098 kJ/Nm3。为了匹配运行,通常采用通入氮气来降低高热值煤气的热量,达到机组的设计热值要求。这种运行方法需要消耗大量的氮气,从而增加了发电成本。
通入氮气运行方法的流程是:采用热值测量仪在线测量燃气的热值——对测量出的燃气热值—进行比较,比较值为3090 kJ/Nm3——设定氮气的需求量——通入氮气。
发明内容:
为了减少氮气的消耗,降低发电成本,本发明提出高热值燃气匹配低热值燃机的运行方法。
本发明的流程包括采用热值测量仪在线测量燃气的热值——对测量出的燃气热值进行比较,其特征是在PLC控制系统中增设高热值运行控制模式程序,高热值运行控制模式程序中设定额定热值是3090 kJ/Nm3 ~3770kJ/Nm3,设定比较热值是3130 kJ/Nm3 ~3650kJ/Nm3,燃气比较后,开启燃气流量控制阀同时开启燃气压力隔断阀,燃气压力控制阀开至最大流量开度的10%,燃气流量控制阀跟踪开启。
本发明可以减少氮气的消耗,降低发电成本。
具体实施方式:
实施例:本实施例是在山西太钢不锈钢股份有限公司高炉煤气联合循环发电机组(CCPP)进行试验。
在PLC控制系统的热值调整控制程序增设高热值运行控制模式程序。
M251S型CCPP发电机组的PLC控制系统显示屏的控制按钮包括:“手动”“自动”“增加热值”“降低热值” “确认”,(1)、 按“手动”和“确认”按钮,高热值运行模式投入;(2)、按“增加热值”和“确认”按钮,提高机组调整热值的比较值;(3)、在线热值仪测量燃气热值;(4)、测量下的热值与第二步的热值比较值比较;(5)、比较结果小于40kj/m3,停止按“增加热值”;比较结果大于40kj/m3,开启燃气流量控制阀同时开启燃气压力隔断阀,燃气压力控制阀开至最大流量开度的10%,燃气流量控制阀跟踪开启,直到结果小于40kj/m3;6、按“自动”按钮,高热值运行模式退出。
所述的高热值运行控制模式程序是由( 日本三菱)生产商设计。
Claims (1)
1.高热值燃气匹配额定低热值燃机的运行方法,包括采用热值测量仪在线测量燃气的热值——对测量出的燃气热值进行比较,其特征是在PLC控制系统中增设高热值运行控制模式程序,高热值运行控制模式程序中设定额定热值是3090 kJ/Nm3 ~3770kJ/Nm3,设定比较热值是3130 kJ/Nm3 ~3650kJ/Nm3,燃气比较后,开启燃气流量控制阀同时开启燃气压力隔断阀,燃气压力控制阀开至最大流量开度的10%,燃气流量控制阀跟踪开启。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102639016A CN102979629A (zh) | 2011-09-07 | 2011-09-07 | 高热值燃气匹配额定低热值燃机的运行方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102639016A CN102979629A (zh) | 2011-09-07 | 2011-09-07 | 高热值燃气匹配额定低热值燃机的运行方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102979629A true CN102979629A (zh) | 2013-03-20 |
Family
ID=47853939
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102639016A Pending CN102979629A (zh) | 2011-09-07 | 2011-09-07 | 高热值燃气匹配额定低热值燃机的运行方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102979629A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779707A (zh) * | 2018-12-10 | 2019-05-21 | 北京首钢股份有限公司 | 一种燃气-蒸汽联合循环机组降热值的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060234171A1 (en) * | 2005-04-19 | 2006-10-19 | Mitsubishi Heavy Industries, Ltd. | Fuel gas calorie control method and device |
CN101169071A (zh) * | 2006-10-27 | 2008-04-30 | 邢一崧 | 高、(中)、热值煤气配低热值煤气燃气轮机联合循环发电新工艺 |
JP2008157226A (ja) * | 2006-12-19 | 2008-07-10 | General Electric Co <Ge> | ガスタービンで低btu燃料ガスを使用する方法及び系 |
CN101832183A (zh) * | 2009-03-10 | 2010-09-15 | 通用电气公司 | 低热值燃料气体混合控制 |
CN102080602A (zh) * | 2009-11-30 | 2011-06-01 | 通用电气公司 | 用于控制燃料混合的系统和方法 |
-
2011
- 2011-09-07 CN CN2011102639016A patent/CN102979629A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060234171A1 (en) * | 2005-04-19 | 2006-10-19 | Mitsubishi Heavy Industries, Ltd. | Fuel gas calorie control method and device |
CN101169071A (zh) * | 2006-10-27 | 2008-04-30 | 邢一崧 | 高、(中)、热值煤气配低热值煤气燃气轮机联合循环发电新工艺 |
JP2008157226A (ja) * | 2006-12-19 | 2008-07-10 | General Electric Co <Ge> | ガスタービンで低btu燃料ガスを使用する方法及び系 |
CN101832183A (zh) * | 2009-03-10 | 2010-09-15 | 通用电气公司 | 低热值燃料气体混合控制 |
CN102080602A (zh) * | 2009-11-30 | 2011-06-01 | 通用电气公司 | 用于控制燃料混合的系统和方法 |
Non-Patent Citations (1)
Title |
---|
杨福忠: "《CCPP机组高热值运行的研究与应用》", 《冶金动力》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779707A (zh) * | 2018-12-10 | 2019-05-21 | 北京首钢股份有限公司 | 一种燃气-蒸汽联合循环机组降热值的方法 |
CN109779707B (zh) * | 2018-12-10 | 2021-10-01 | 北京首钢股份有限公司 | 一种燃气-蒸汽联合循环机组降热值的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2228524B1 (en) | Low heating value fuel gas blending control | |
JP2007127125A (ja) | ガスタービンエンジンを運転するための装置 | |
WO2008048391A3 (en) | Igcc design and operation for maximum plant output and minimum heat rate | |
CN202733905U (zh) | 一种油、气两用燃烧器 | |
JP2014105601A (ja) | ガスタービン燃焼器及びその運転方法 | |
US20100326082A1 (en) | Methods and apparatus for combustor fuel circuit for ultra low calorific fuels | |
CN203285545U (zh) | 燃气轮机零值班燃料运行系统 | |
CN103148504A (zh) | 自适应经济燃烧控制系统 | |
CN104344414A (zh) | 废热回收装置以及废热回收方法 | |
CN102979629A (zh) | 高热值燃气匹配额定低热值燃机的运行方法 | |
CN201810401U (zh) | 煤炭地下气化联合循环发电系统中的煤气热值调配装置 | |
US9822704B2 (en) | Control method for gasification power generation system | |
CN203174123U (zh) | 高炉喷吹焦炉煤气系统 | |
CN106196113B (zh) | 一种利用蒸汽引射流技术产生吹灰汽源的系统 | |
CN202141070U (zh) | 油田注气锅炉燃烧控制装置 | |
CN103742270A (zh) | 燃机吹扫管线监控方法 | |
CN207600230U (zh) | 烧结点火炉燃料控制系统 | |
CN103388832B (zh) | 锅炉启动优化方法 | |
CN210951389U (zh) | 一种低热值燃气轮机的天然气掺烧装置 | |
CN110748921B (zh) | 一种低热值燃气轮机的天然气掺烧装置及方法 | |
CN211650294U (zh) | 用于联合循环电厂锅炉吹管系统 | |
CN220062525U (zh) | 水泥回转窑生物燃气装置 | |
CN201110573Y (zh) | 一种机械式同步控制燃气灶 | |
CN203420788U (zh) | 低热值工业煤气燃气轮机燃气供气系统 | |
CN108506958A (zh) | 一种天然气裂解制乙炔工艺中高级炔废气综合利用系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130320 |