CN102977869A - 一种煤矿井下高压水力压裂封孔材料及封孔工艺 - Google Patents
一种煤矿井下高压水力压裂封孔材料及封孔工艺 Download PDFInfo
- Publication number
- CN102977869A CN102977869A CN2012105786435A CN201210578643A CN102977869A CN 102977869 A CN102977869 A CN 102977869A CN 2012105786435 A CN2012105786435 A CN 2012105786435A CN 201210578643 A CN201210578643 A CN 201210578643A CN 102977869 A CN102977869 A CN 102977869A
- Authority
- CN
- China
- Prior art keywords
- hole
- sealing
- pipe
- pressure break
- slurry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
一种煤矿井下高压水力压裂封孔材料及封孔工艺,其中封孔材料由水泥100份,Ms型早强减水剂2~4份,聚丙烯纤维0.08~0.5份,水60份组成。封孔工艺包括:在煤岩体上钻一钻孔,施工至煤层顶板,再扩孔至煤层底板,压裂管送入孔底,注浆管送入到煤层底板处,返浆管设在孔口封堵段前端。孔口段采用AB胶加棉纱封堵。由注浆管向孔内注入该封孔材料,待返浆管返浆后,关闭返浆管截止阀,继续注浆,当压裂孔有水流出时,放空注浆管内浆液,待浆体凝固之后,二次注浆,最后后固结。本发明的优点在于:封孔材料具有收缩小、抗压强度和抗冲击韧性高的优点。在高压水力压裂冲击载荷作用下,具有良好的密封性能和抗高压性能,同时该材料成本低廉,施工方便;封孔工艺简单,封孔深度满足要求,成功率高。
Description
技术领域
本发明涉及一种煤矿井下高压水力压裂封孔材料及封孔工艺。
背景技术
瓦斯灾害是制约煤矿安全、高效生产的第一要素,钻孔预抽是瓦斯治理和防突的有效措施。我国煤矿煤层大多数是松软低透气性煤层,在实施钻孔抽采过程中,由于煤层透气性低,瓦斯抽采难度大。如何增加原始煤体的透气性系数,确保能快速较好的实现抽采达标,防治煤与瓦斯突出事故发生,适应矿井安全高效的需要,为科学合理采取针对性的瓦斯综合治理技术显得尤其重要。
水力压裂是地面煤层气开发的常规工艺,移植到井下具有异曲同工之妙。在煤矿井下进行高压水力压裂,是煤层增透的特殊途径,是提高预抽瓦斯浓度、缩短抽放时间的有力保障。
煤矿井下高压水力压裂,一个重要的技术难题就是钻孔的高压密封问题,封孔质量的好坏,直接关系到压裂的成功与否。为了提高钻孔封孔的成功率,必须解决三个问题:一是钻孔裂隙圈内的裂隙封堵问题,二是钻孔孔壁与封孔材料的间隙封堵问题,三是如何解决封孔材料凝固后自身产生的微裂隙问题。目前,煤矿井下高压水力压裂常采用胶囊封孔和普通水泥浆进行钻孔密封,胶囊抗压强度有限,难以满足抗高压的要求;普通水泥浆体系普遍存在:进行高压水压裂时,水泥石抗冲击韧性低;与钻孔孔壁的胶接质量差;凝固后存在微裂隙以及抗压强度低等缺点,密封难度大,生产实践中难以满足高压水力压裂密封抗冲击、抗高压的要求,封孔成功率低。
中国专利号CN102287163A,公告日期2011年12月21日,发明创造名称“煤矿井下超高压压裂孔的钻孔封孔方法及封孔装置”。该封孔方法注浆管伸入封堵孔内4m以上,返浆管底端距封堵孔孔底距离为30m以下。应用该结构进行注浆,注浆方式是替浆注浆,封孔浆体不能太稠,否则替浆失败,注浆困难。由于稠度小的浆体收缩大,凝固后,由于浆体的收缩,封孔深度不够,钻孔的密封性有一定局限。
发明内容
本发明的目的在于克服背景技术中存在的问题,提供一种煤矿井下高压水力压裂封孔材料及封孔工艺,该封孔材料具有很高的抗压强度、抗冲击韧性,收缩率低,同时成本低廉等特点,使用该材料进行封孔时,能有效封堵钻孔裂隙圈内的裂隙以及钻孔孔壁与封孔材料的间隙,凝固后能有效抑制自身产生的微裂隙。本发明还涉及一种封孔工艺,应用该封孔材料进行封孔的工艺,解决了替浆注浆,浆液稀,收缩大,封孔深度不够等问题。
为实现上述目的,本发明采用如下技术方案:
一种煤矿井下高压水力压裂封孔材料,该封孔材料由下列组分组成,各组分按重量配比如下:水泥100份、水60份、Ms型早强减水剂2~4份、聚丙烯纤维0.08~0.5份(体积掺量0.1~0.6%)。
本发明所述的水泥、早强减水剂、聚丙烯纤维都是市场上可以购买到的公知材料。另外,早强减水剂1元/kg,聚丙烯纤维20元/kg,早强减水剂和聚丙烯纤维加量少,对封孔材料的成本影响很小。
所述材料的优选组分为:水泥100份、水60份、Ms型早强减水剂3份、聚丙烯纤维0.5份。所述材料在制成浆体时,Ms早强减水剂是直接加入拌合水中,聚丙烯纤维要先与水泥干拌,混合均匀后,再加入水中,使其均匀的分布在浆体中。
所述早强减水剂为Ms型早强减水剂;所述的聚丙烯纤维为高强聚丙烯束状单丝纤维,密度为0.91g/cm3。
一种煤矿井下高压水力压裂封孔工艺,包括以下顺序进行的步骤:
a在煤岩体上钻一孔径为75mm的压裂孔,施工至煤层顶板,用Φ94mm直径的钻头扩孔至煤层底板。
b将压裂管送至钻孔孔底煤层顶板处,压裂管前段为筛管,筛管采用纱布包裹50~100cm,防止封孔浆体回流堵塞压裂管;在筛管下端包裹并捆绑棉纱,形成一个棉纱塞,用于塞住煤层底板煤岩体交界处的孔段,起到封堵封孔浆体及过滤水的作用。将注浆管送至靠近煤层底板处,返浆管终端设在孔口封堵段前段5~10cm位置处。
c在钻孔孔口采用AB胶加棉纱封堵,固结后,在孔口打入木塞。
d 由注浆管向钻孔内注入封孔材料,当浆体从返浆管外部管口流出时,关闭返浆管外部阀门,继续注浆,直至压裂管外部管口有水流出时,停止注浆;同时,放空注浆管内浆液。
e 待浆体凝固8小时后,进行二次注浆,当压裂管外部管口有水流出时,停止注浆,并关闭注浆管上截止阀,固结24小时。
采用前述方案的本发明,由于筛管采用纱布包裹50-100cm,在筛管下端包裹并捆绑棉纱,形成一个棉纱塞。在进行注浆封孔时,稠浆不会进入筛孔段,保证压裂孔不会被堵塞,利于压裂的顺利进行。
优选的技术方案,孔口段用AB胶加棉纱封堵是用AB料浸透过的棉纱进行封堵。采用注浆管送入煤层底板,由于浆体的收缩性,封孔深度不够,一次注浆后,可进行二次注浆甚至多次注浆保障封孔的深度。返浆管终端设在孔口封堵段前端,其目的是保障浆体是否流入到孔口封堵段前端,然后逐渐上升至孔深部。
本发明具有如下有益效果:本发明的封孔材料从机理上分析外加剂和外掺料对水泥浆的影响为基础。添加早强减水剂,使浆体的强度3d提高40—50%,同时减小了浆体的收缩;添加聚丙烯纤维,不但能很好地改善水泥石的韧性和抗冲击性能,还可以提高水泥浆的流变性,降低失水量并延长稠化时间,纤维对水泥石性能具有增强效果,同时在外载荷作用下,纤维与水泥石共同承受外载荷,尤其是水泥石开始起裂时,能有效控制水泥石裂纹的延展和扩展,并能控制水泥石多点开裂,保证水泥石的完整性。本发明的封孔工艺以封孔材料为基础,施工简单,封孔深度满足施工要求,密封性好。
附图说明
图1是本发明的封孔工艺的结构示意图。
具体实施方式
实施例1:封孔材料的成分为:水泥100份、水60份、早强减水剂2~4份,聚丙烯纤维0.08~0.5份(体积掺量0.1~0.6%)。
表1 封孔材料配比实验数据
实施例2:封孔材料的成分为:水泥100份、水60份、早强减水剂3份、聚丙烯纤维0.08~0.5份(体积掺量0.1~0.6%)。
由表2中的第18组数据可以看出,早强减水剂掺量为3%,聚丙烯纤维体积掺量为0.6%时,强度最大,收缩率最小。
表2 封孔材料最佳配比实验数据
上述方案中聚丙烯纤维属惰性材料,与Ms早强减水剂配伍,具有很好的相容性,不影响浆体的其他性能,Ms早强减水剂直接加入拌合水中,聚丙烯纤维先与水泥干拌,混合均匀后,再加入水中,使其均匀的分布在浆体中,不会堵塞管线等设备;聚丙烯纤维长度3 ~15mm,通过选择不同长度的纤维可以提高了界面的胶结质量,纤维在浆体中起到桥接作用,可以部分或者全部渗入到钻孔周边裂隙,压裂时,阻止微裂纹的产生和扩张,同时阻止开裂,从而达到钻孔的高压密封性能。
以上的早强减水剂可采用现在市面上的Ms型早强减水剂,如重庆健杰科技有限公司、四川国兴建材有限公司、重庆路恩建材厂等公司都有生产销售。
实施例:封孔工艺,如图1所示,包括以下顺序进行的步骤:
a 在煤岩体上钻一孔径为75mm的钻孔,施工至煤层顶板,用Φ94mm直径的钻头扩孔至煤层底板。
b将压裂管1送至钻孔孔底煤层顶板处,压裂管1前段为筛管6,筛管6采用纱布包裹50~100cm长度,防止封孔浆体回流堵塞压裂管;在筛管6下端包裹并捆绑棉纱,形成一个棉纱塞11,用于塞住煤层底板煤岩体交界处的孔段,起到封堵封孔浆体10及过滤水的作用,将筛管6和压裂管1连接,放入钻孔直至送至钻孔孔底。将注浆管2送至靠近煤层底板处,返浆管3终端设在孔口封堵段前段5~10cm位置处。
c 钻孔孔口段采用AB胶加棉纱4封堵,固结后,在孔口打入木塞5。
d 由注浆管2向钻孔内注入封孔浆体10,当浆体从返浆管3外部管口流出时,关闭返浆管外部截止阀8,继续注浆,直至压裂管1外部管口有水流出时,停止注浆;同时,放空注浆管2内浆液。
e 待浆体10凝固8小时之后,进行二次注浆,当压裂管1外部管口有水流出时,停止注浆,并关闭注浆管2上截止阀9,注浆完成后,固结24小时。
采用前述方案的本发明,筛管采用纱布包裹50~100cm,防止封孔浆体回流堵塞压裂管,在筛管下端包裹并捆绑棉纱,形成一个棉纱塞,用于塞住煤层底板煤岩体交界处的孔段,起到封堵封孔浆体及过滤水的作用。注浆封孔时,稠浆不会进入筛孔段,保证压裂孔不会被堵塞,利于压裂的顺利进行。
优选的技术方案,孔口段用AB胶加棉纱封堵是用AB料浸透过的棉纱进行封堵,所述固结时间是10min。采用注浆管深入到煤层底板,由于浆体的收缩性,封孔深度不够,一次注浆后,可进行二次注浆甚至多次注浆保障封孔的深度;返浆管设在孔口封堵段前端,其目的是保障浆体流入到孔口封堵段前端然后逐渐上升至孔深部。
Claims (10)
1.一种煤矿井下高压水力压裂封孔材料,其特征在于:所述材料由下列重量配比的组分组成:水泥100份、水60份、早强减水剂2~4份、聚丙烯纤维0.08~0.5份。
2.根据权利要求1所述的煤矿井下高压水力压裂封孔材料,其特征在于,所述材料由下列重量配比的组分组成:水泥100份、水60份、早强减水剂3份、聚丙烯纤维0.5份。
3.根据权利要求1或2所述的煤矿井下高压水力压裂封孔材料,其特征在于,所述材料在制成浆体时,早强减水剂是直接加入水中,聚丙烯纤维要先与水泥干拌,混合均匀后,再加入水中,使其均匀的分布在浆体中。
4.根据权利要求1或2 所述的煤矿井下高压水力压裂封孔材料,其特征在于,所述早强减水剂为Ms型早强减水剂;所述的聚丙烯纤维为高强聚丙烯束状单丝纤维,密度为0.91g/cm3。
5.一种利用权利要求1或2 所述封孔材料进行煤矿井下高压水力压裂封孔的工艺,其特征在于,包括以下步骤:
a 在煤岩体上钻一钻孔,施工至煤层顶板,再扩孔至煤层底板;
b 将压裂管(1)送至钻孔孔底煤层顶板处,压裂管(1)前段为筛管(6),筛管采用纱布包裹50~100cm长度,防止封孔浆体(10)回流堵塞压裂管;在筛管(6)下端包裹并捆绑棉纱,形成一个棉纱塞(11),用于塞住煤层底板煤岩体交界处的孔段,起到封堵封孔浆体(10)及过滤水的作用;将注浆管(2)送至靠近煤层底板处;压裂管(1)、注浆管(2)和返浆管(3)一端都露出钻孔孔口;压裂管(1)露出钻孔孔口的端部设有截止阀(7),注浆管(2)露出钻孔孔口的端部设有截止阀(9),返浆管(3)露出钻孔孔口的端部设有截止阀(8);
c 在钻孔孔口采用AB胶加棉纱(4)封堵,固结后,在孔口打入木塞(5);
d 由注浆管(2)向钻孔内注入所述封孔材料的浆体(10),当封孔浆体(10)从返浆管(3)外部管口流出时,关闭返浆管外部截止阀(8),继续注浆,直至压裂管(1)外部管口有水流出时,停止注浆,同时,放空注浆管内浆液;
e 待浆体(10)凝固之后,进行二次注浆,当压裂管(1)外部管口有水流出时,停止注浆,并关闭注浆管(2)上截止阀(9),注浆完成后,固结。
6.根据权利要求5所述的煤矿井下高压水力压裂封孔工艺,其特征在于:所述施工至煤层顶板的钻孔孔径为75mm,扩孔至煤层底板的钻头的直径为Φ94mm。
7.根据权利要求5所述的煤矿井下高压水力压裂封孔工艺,其特征在于:所述返浆管(3)终端设在钻孔孔口封堵段前段5~10cm位置处。
8.根据权利要求5所述的煤矿井下高压水力压裂封孔工艺,其特征在于:所述封孔浆体(10)要凝固8小时之后再进行二次注浆,注浆完成后,再固结24小时。
9.根据权利要求5所述的煤矿井下高压水力压裂封孔方法,其特征在于:所述的AB胶加棉纱封堵是用AB料浸透过的棉纱进行封堵,其中A料与B料的质量比为1:1。
10.根据权利要求5所述的煤矿井下高压水力压裂封孔方法,其特征在于:最后的封孔材料凝固之后位于煤层底板煤岩交接处,即封孔深度为煤层底板煤岩交接处。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210578643.5A CN102977869B (zh) | 2012-12-27 | 2012-12-27 | 一种煤矿井下高压水力压裂封孔材料及封孔工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210578643.5A CN102977869B (zh) | 2012-12-27 | 2012-12-27 | 一种煤矿井下高压水力压裂封孔材料及封孔工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102977869A true CN102977869A (zh) | 2013-03-20 |
CN102977869B CN102977869B (zh) | 2014-11-12 |
Family
ID=47852218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210578643.5A Active CN102977869B (zh) | 2012-12-27 | 2012-12-27 | 一种煤矿井下高压水力压裂封孔材料及封孔工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102977869B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103360006A (zh) * | 2013-07-15 | 2013-10-23 | 淮北矿业(集团)工程建设有限责任公司 | 无机纤维增强膨胀抗压钻孔封闭材料 |
CN104775787A (zh) * | 2015-02-27 | 2015-07-15 | 河南工程学院 | 一种破碎围岩水力压裂穿层钻孔上仰孔封孔方法 |
CN105041263A (zh) * | 2015-07-29 | 2015-11-11 | 兖州煤业股份有限公司 | 一种封孔器 |
CN105156067A (zh) * | 2015-10-09 | 2015-12-16 | 中煤科工集团重庆研究院有限公司 | 煤矿井下水力压裂钻孔封孔装置及方法 |
CN106833568A (zh) * | 2017-01-19 | 2017-06-13 | 安徽理工大学 | 一种早强型矿用封孔材料 |
CN106869894A (zh) * | 2017-03-21 | 2017-06-20 | 阳泉煤业(集团)有限责任公司 | 松软煤层顶板顺层岩石长钻孔多泵协调压裂增透方法 |
CN109854220A (zh) * | 2019-01-14 | 2019-06-07 | 中南大学 | 一种适用于低渗储层水力压裂模拟试验的注液管密封方法 |
CN109917101A (zh) * | 2019-04-12 | 2019-06-21 | 中国矿业大学(北京) | 基于上向穿层钻孔同时测定多煤层瓦斯含量的方法 |
CN111859712A (zh) * | 2020-08-03 | 2020-10-30 | 重庆大学 | 一种煤矿冲击地压地面超前预控方法 |
CN112855072A (zh) * | 2021-02-04 | 2021-05-28 | 河南理工大学 | 利用浆液及微生物矿化多级封堵围岩裂隙水的装置及方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101269935A (zh) * | 2008-04-29 | 2008-09-24 | 水利部交通部电力工业部南京水利科学研究院 | 输水管接头密封灌注砂浆及其制造方法 |
CN102287163A (zh) * | 2011-09-08 | 2011-12-21 | 重庆市能源投资集团科技有限责任公司 | 煤矿井下超高压压裂孔的钻孔封孔方法及封孔装置 |
-
2012
- 2012-12-27 CN CN201210578643.5A patent/CN102977869B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101269935A (zh) * | 2008-04-29 | 2008-09-24 | 水利部交通部电力工业部南京水利科学研究院 | 输水管接头密封灌注砂浆及其制造方法 |
CN102287163A (zh) * | 2011-09-08 | 2011-12-21 | 重庆市能源投资集团科技有限责任公司 | 煤矿井下超高压压裂孔的钻孔封孔方法及封孔装置 |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103360006B (zh) * | 2013-07-15 | 2016-02-24 | 淮北矿业(集团)工程建设有限责任公司 | 无机纤维增强膨胀抗压钻孔封闭材料 |
CN103360006A (zh) * | 2013-07-15 | 2013-10-23 | 淮北矿业(集团)工程建设有限责任公司 | 无机纤维增强膨胀抗压钻孔封闭材料 |
CN104775787A (zh) * | 2015-02-27 | 2015-07-15 | 河南工程学院 | 一种破碎围岩水力压裂穿层钻孔上仰孔封孔方法 |
CN104775787B (zh) * | 2015-02-27 | 2018-12-21 | 河南工程学院 | 一种破碎围岩水力压裂穿层钻孔上仰孔封孔方法 |
CN105041263A (zh) * | 2015-07-29 | 2015-11-11 | 兖州煤业股份有限公司 | 一种封孔器 |
CN105156067B (zh) * | 2015-10-09 | 2019-03-22 | 中煤科工集团重庆研究院有限公司 | 煤矿井下水力压裂钻孔封孔装置及方法 |
CN105156067A (zh) * | 2015-10-09 | 2015-12-16 | 中煤科工集团重庆研究院有限公司 | 煤矿井下水力压裂钻孔封孔装置及方法 |
CN106833568A (zh) * | 2017-01-19 | 2017-06-13 | 安徽理工大学 | 一种早强型矿用封孔材料 |
CN106869894A (zh) * | 2017-03-21 | 2017-06-20 | 阳泉煤业(集团)有限责任公司 | 松软煤层顶板顺层岩石长钻孔多泵协调压裂增透方法 |
CN109854220A (zh) * | 2019-01-14 | 2019-06-07 | 中南大学 | 一种适用于低渗储层水力压裂模拟试验的注液管密封方法 |
CN109917101A (zh) * | 2019-04-12 | 2019-06-21 | 中国矿业大学(北京) | 基于上向穿层钻孔同时测定多煤层瓦斯含量的方法 |
CN111859712A (zh) * | 2020-08-03 | 2020-10-30 | 重庆大学 | 一种煤矿冲击地压地面超前预控方法 |
CN111859712B (zh) * | 2020-08-03 | 2023-11-21 | 重庆大学 | 一种煤矿冲击地压地面超前预控方法 |
CN112855072A (zh) * | 2021-02-04 | 2021-05-28 | 河南理工大学 | 利用浆液及微生物矿化多级封堵围岩裂隙水的装置及方法 |
CN112855072B (zh) * | 2021-02-04 | 2022-10-28 | 河南理工大学 | 利用浆液及微生物矿化多级封堵围岩裂隙水的装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102977869B (zh) | 2014-11-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102977869B (zh) | 一种煤矿井下高压水力压裂封孔材料及封孔工艺 | |
CN104534167B (zh) | 触变泥浆的减阻方法 | |
CN207131371U (zh) | 煤矿瓦斯抽采孔带压可控囊袋式封孔装置 | |
CN103061785B (zh) | 巷道破碎涌水围岩钻孔套管隔压渗透封固注浆装置所采用的注浆工艺 | |
CN109339736A (zh) | 一种瓦斯抽采钻孔固液两相封孔装置及工艺 | |
CN110080712A (zh) | 一种本煤层近水平瓦斯抽采钻孔磁性密封装置及方法 | |
CN104314508A (zh) | 一种用于煤层瓦斯抽排钻孔的封孔方法 | |
CN102587859A (zh) | 返流注浆封堵矿井突水技术 | |
CN105888673B (zh) | 松软富水围岩内深孔塑管高压注浆防爆装置的操作方法 | |
CN206722798U (zh) | 一种组合式煤层注水压裂及瓦斯抽采一体封孔装置 | |
CN105174886B (zh) | 一种适用于超长距离泵送的灰岩含水层注浆改造材料 | |
CN108222882A (zh) | 巨厚冲积层单井多层段注浆新型套管与施工方法 | |
CN103362117A (zh) | 注浆段全段注浆的方法 | |
CN106050185B (zh) | 一种煤矿开采底板遇断层产生突水通道的防治方法 | |
CN102535472B (zh) | 一种孔管封填、高压冲挤灌浆的方法 | |
CN108086945A (zh) | 一种穿层钻孔分离式全程瓦斯抽采封孔装置及其封孔方法 | |
CN207145003U (zh) | 用于采空区注浆充填的一次性永久止浆塞 | |
CN103089276A (zh) | 深浅孔与高低压耦合注浆工艺 | |
CN202023532U (zh) | 一种煤矿注浆加固用封孔器 | |
CN101225740A (zh) | 冻结管与围岩间环状充填的方法 | |
CN108868825A (zh) | 高压大涌水量钻孔快速封堵方法 | |
CN105804691B (zh) | 一种矿用瓦斯瓦斯抽采钻孔无管封孔方法 | |
CN103470212A (zh) | 一种主动式钻孔封孔装置及方法 | |
CN203035203U (zh) | 巷道破碎涌水围岩钻孔套管隔压渗透封固注浆装置 | |
CN107489399A (zh) | 一种适用于煤矿床的封闭不良钻孔井下反向注浆封堵工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |